Contact channel structure for vertically stacked metro section

By designing a C-shaped connecting channel structure in the upper and lower subway areas, connecting the upper and lower tunnels and setting up pump stations and fire doors, the problems of high construction difficulty and large land use area are solved, the emergency evacuation channels and sewage drainage functions are realized, and construction investment is reduced and environmental impact.

CN222045773UActive Publication Date: 2024-11-22中交一航局城市交通工程有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420039511.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-08
Publication Date
2024-11-22
Estimated Expiration
2034-01-08

AI Technical Summary

Technical Problem

When building subway lines in cities with complex transportation networks, especially the contact channels between upper and lower overlapping shields, it is difficult to construct, have tight construction periods, high risks, and have large land area, which is difficult to effectively solve.

Method used

Design a connecting channel structure including upper tunnel, lower tunnel and C-shaped setting, connect the upper tunnel and lower tunnel through vertical shaft, set up pump station, fire door and ventilation shaft to realize the interconnection and evacuation channels of upper and lower tunnels, and reduce the Transportation and environmental impact.

Benefits of technology

There is no need for traffic guidance, which saves a lot of land use and construction investment, realizes the emergency evacuation passage and sewage drainage functions of upper and lower tunnels, and provides good exhaust through ventilation shafts, reducing the impact of construction on the environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045773U_ABST
    Figure CN222045773U_ABST
Patent Text Reader

Abstract

The utility model discloses a connecting channel structure for an up-and-down stacked metro section, which comprises an upper-layer tunnel and a lower-layer tunnel, the upper-layer tunnel and the lower-layer tunnel are communicated through a connecting channel, the connecting channel is arranged in a C shape, the connecting channel comprises a vertical shaft, and an opening of a steel pipe sheet of the upper-layer tunnel is communicated with an upper-layer channel. Openings of the steel pipe pieces of the lower-layer tunnel are communicated with a lower-layer channel, the upper-layer channel and the lower-layer channel are communicated through a vertical shaft, and a pump station is arranged at the bottom of the vertical shaft; traffic guide and change are not needed in construction, a large amount of land is used, and generally, an isolation belt below a viaduct or a non-motorized vehicle lane is used as a refrigerating machine room position; a large amount of construction investment is saved in the earlier stage, the C-shaped connection channel achieves mutual connection of the upper-layer tunnel and the lower-layer tunnel, and the C-shaped connection channel can serve as an evacuation channel of the upper-layer tunnel and the lower-layer tunnel and also serve as a sewage drainage pumping station in case of emergency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of subway construction, in particular to a communication channel structure for upper and lower stacked subway sections. Background Art

[0002] When building a subway in a city with a complex transportation network, the route is often restricted by existing bridges, shops, pipelines and other environmental constraints, resulting in stacked shield sections. The connecting channel is one of the important ancillary projects in rail transit construction, with the characteristics of high construction difficulty, tight construction period and high risk. Ground freezing and excavation construction are all carried out in the section tunnel, which requires traffic diversion and occupies a large area.

[0003] To this end, a communication channel structure for upper and lower stacked subway sections is proposed. Utility Model Content

[0004] The purpose of the utility model is to provide a communication channel structure for stacked subway sections, so as to solve or at least alleviate one or more of the above-mentioned problems and other problems existing in the prior art.

[0005] In order to achieve the above-mentioned purpose, the main technical solutions adopted by the utility model include:

[0006] A communication channel structure for upper and lower stacked subway sections, including.

[0007] Upper tunnel;

[0008] Lower tunnel;

[0009] The upper tunnel and the lower tunnel are connected via a communication channel, and the communication channel is arranged in a C shape.

[0010] In a communication channel structure for upper and lower stacked subway sections according to the utility model, the communication channel includes a vertical shaft, and the opening of the steel pipe sheet of the upper tunnel is connected to the upper channel;

[0011] The steel pipe segment opening of the lower tunnel is connected with a lower passage;

[0012] The upper channel and the lower channel are connected through the vertical shaft, and a pump station is arranged at the bottom of the vertical shaft.

[0013] In a communication channel structure for stacked subway sections according to the utility model, the opening of the steel pipe segment of the upper tunnel and the upper channel, as well as the opening of the steel pipe segment of the lower tunnel and the lower channel are connected by deformation joints.

[0014] In a communication channel structure for stacked subway sections according to the utility model, the upper channel located on one side of the deformation joint and the lower channel located on one side of the deformation joint are both installed with fire doors with a two-way evacuation function.

[0015] In a communication passage structure for stacked subway sections according to the utility model, an internal staircase is fixedly installed inside the shaft, the upper end of the internal staircase is connected to the upper passage, and the bottom of the internal staircase is connected to the lower passage.

[0016] In a communication passage structure for stacked subway sections according to the utility model, a ventilation shaft is provided at the top of the vertical shaft.

[0017] The utility model has at least the following beneficial effects:

[0018] The utility model does not require traffic diversion and large-scale land use during construction. Usually, only the isolation belt under the viaduct or the non-motorized vehicle lane is needed as the location of the refrigeration room; a large amount of construction investment is saved in the early stage;

[0019] The C-type communication channel realizes the interconnection between the upper tunnel and the lower tunnel. In case of emergency, it can be used as an evacuation channel for the upper tunnel and the lower tunnel and also serves as a sewage drainage pumping station. Like the conventional communication channel, deformation joints and fire partitions for the up and down lines are set; good exhaust is carried out through the ventilation shaft on the upper ground. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0021] Figure 1 This is a plan view of the communication channel and ventilation shaft in the utility model;

[0022] Figure 2 This is a temporary support diagram of the steel pipe segments in the stacked section communication channel of the utility model;

[0023] Figure 3 It is a structural schematic diagram of the upper channel and the lower channel after the construction of the stacked section communication channel of the utility model is completed and the primary support and secondary lining are completed;

[0024] Figure 4 It is a cross-sectional view of the upper channel and the lower channel of the utility model;

[0025] Figure 5 It is a structural schematic diagram of pouring the secondary lining and the internal staircase in the utility model;

[0026] Figure 6 It is a schematic diagram of temporary support for the vertical shaft in the utility model.

[0027] Description of Figure Numbers:

[0028] 1. Ventilation shaft; 2. Upper tunnel; 3. Lower tunnel; 4. Temporary tunnel supports; 5. Internal steel supports; 6. Fire doors; 7. Upper passage; 8. Lower passage; 9. Vertical shaft; 10. Pump station; 11. Internal stairs. DETAILED DESCRIPTION

[0029] The following will describe the implementation methods of the present application in detail with the help of accompanying drawings and examples, so that the implementation process of how the present application uses technical means to solve technical problems and achieve technical effects can be fully understood and implemented accordingly.

[0030] Please refer to Figures 1 to 6 As shown, this embodiment provides a communication channel structure for stacked subway sections, which consists of an upper tunnel 2, a lower tunnel 3 and a C-shaped communication channel. The upper tunnel 2 and the lower tunnel 3 are connected through the communication channel.

[0031] In this embodiment, the communication channel includes a vertical shaft 9, and the opening of the steel pipe segment of the upper tunnel 2 is connected to the upper channel 7;

[0032] The steel pipe segment opening of the lower tunnel 3 is connected to the lower passage 8;

[0033] The upper channel 7 and the lower channel 8 are connected via a vertical shaft 9 , and a pump station 10 is provided at the bottom of the vertical shaft 9 , through which the accumulated water in the vertical shaft 9 can be discharged.

[0034] In order to ensure the connection strength, the steel pipe segment opening of the upper tunnel 2 and the upper channel 7, and the steel pipe segment opening of the lower tunnel 3 and the lower channel 8 are connected by deformation joints.

[0035] In this embodiment, an internal staircase 11 is fixedly installed inside the shaft 9 , the upper end of the internal staircase 11 is connected to the upper passage 7 , and the bottom of the internal staircase 11 is connected to the lower passage 8 .

[0036] Specifically, in order to improve the fire safety of the communication channel, the upper channel 7 is located on one side of its deformation joint and the lower channel 8 is located on one side of its deformation joint. Both are equipped with fire doors 6 with a two-way evacuation function. Through this arrangement, when a dangerous situation occurs in the upper tunnel 2 or the lower tunnel 3, people can enter the safe tunnel through the communication channel and then close the fire door 6.

[0037] In order to ensure good ventilation in the vertical shaft 9 , a ventilation shaft 1 is provided at the top of the vertical shaft 9 .

[0038] In order to facilitate understanding of the above technical solution of the present invention, the working principle or operation method of the present invention in the actual process is described in detail below.

[0039] The construction steps are:

[0040] like Figure 1 As shown, first construct part 1 of the ventilation shaft;

[0041] like Figure 2 As shown, temporary tunnel supports 4 are installed near the upper tunnel 2 and the lower tunnel 3;

[0042] like Figure 3-Figure 4 As shown, the steel pipe segments in the lower tunnel 3 are opened to connect the lower channel 8, and after the initial support and part of the secondary lining of the lower channel 8 are completed, the lower tunnel 3 is connected to the pump station 10 through the reserved steel bar joints and waterproof joints.

[0043] like Figure 3-Figure 4 As shown, the opening of the steel pipe segment in the upper tunnel 2 is connected to the upper channel 7. The upper channel 7 is connected to the pre-buried well pipe during the initial support process. After the upper channel 7 support and part of the secondary lining are completed, the upper channel 7 and the vertical shaft 9 are connected to form a secondary lining as a whole;

[0044] like Figure 5 As shown, the pump station 10 is blocked with a cover plate and temporarily supported with a steel support;

[0045] like Figure 5-Figure 6 As shown, after all the secondary linings are completed, the internal steel support 5 for the installation of the internal staircase 11 is installed in the shaft 9, and the internal staircase 11 connecting the upper passage 7 and the lower passage 8 is applied. After the internal staircase 11 is completed, the internal steel support 5 is removed.

[0046] In view of the complex environment, proximity to viaducts and buildings and other surrounding characteristics, the application of this structure effectively reduces the impact on traffic, shops and residents, and avoids the relocation of a large number of trees and pipelines; the "C"-shaped structure is a reasonable and feasible communication channel structure. Compared with other structural forms, it saves a lot of initial investment and has good economic and social benefits.

[0047] The above description shows and describes several preferred embodiments of the utility model, but as mentioned above, it should be understood that the utility model is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the utility model concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art do not deviate from the spirit and scope of the utility model, and should be within the scope of protection of the claims attached to the utility model.

Claims

1. A communication channel structure for stacked subway sections, characterized in that: include: Upper tunnel (2); Lower tunnel (3); The upper tunnel (2) and the lower tunnel (3) are connected via a communication channel, and the communication channel is arranged in a C shape; The communication channel comprises a vertical shaft (9), and the steel pipe segment opening of the upper tunnel (2) is connected to the upper channel (7); The steel pipe segment opening of the lower tunnel (3) is connected to a lower channel (8); The upper channel (7) and the lower channel (8) are connected via the vertical shaft (9), and a pump station (10) is provided at the bottom of the vertical shaft (9); The opening of the steel pipe segment of the upper tunnel (2) and the upper channel (7), and the opening of the steel pipe segment of the lower tunnel (3) and the lower channel (8) are connected via deformation joints; The upper passage (7) is located on one side of the deformation joint, and the lower passage (8) is located on one side of the deformation joint, both of which are equipped with fire doors (6) with a two-way evacuation function; An internal staircase (11) is fixedly installed inside the vertical shaft (9), the upper end of the internal staircase (11) is connected to the upper passage (7), and the bottom of the internal staircase (11) is connected to the lower passage (8); A ventilation shaft (1) is arranged at the top of the vertical shaft (9).