Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

195results about How to "Reduce construction investment" patented technology

Micro-grid new energy hybrid energy storage system

The invention provides a micro-grid new energy hybrid energy storage system which comprises a new energy power generation subsystem, an energy storage carrier subsystem, a converter subsystem, a high / low-voltage power distribution subsystem and a background monitor subsystem. According to the invention, battery equalization is performed through a BMS (battery management system), a cask effect caused by non-uniformity of voltage, capacity and other parameters is avoided, and the phenomena that the capacity of the whole group is reduced and the service life of the battery is shortened due to vicious circle of performance of the battery pack are avoided. Meanwhile, a refrigeration mode of air-conditioning equipment is scientifically controlled through a heat management system, so that the battery keeps a proper, uniform and stable environment temperature in the operating process. Therefore, the service life of the storage battery is prolonged, and the operating cost is effectively reduced. A container modular energy storage scheme is adopted, the system can be designed into a miniature temporary power generation system, and the construction investment is low. The system is convenient to use and can be transported into bad condition environments such as fields for performing power generation and supply under emergency circumstances. The system can be constructed into a large energy storage power station in a centralized mode, and the capacity is conveniently expanded.
Owner:ZHEJIANG NARADA POWER SOURCE CO LTD +1

Oversize and overload nonlocal law enforcement system

The invention provides an oversize and overload nonlocal law enforcement system comprising a weighing subsystem which is used for realizing acquisition of vehicle weight data; a contour scanning subsystem which is used for realizing acquisition of vehicle contour data; a license plate recognition subsystem which is used for realizing acquisition of vehicle license plate information; an information release subsystem which is used for realizing information publishing and alarm prompting of oversize and overload vehicles; and a data processing subsystem which is used for judging the model number, the size and the weight of the current vehicle according to the vehicle contour data acquired by the contour scanning subsystem and the vehicle license plate information acquired by the license plate recognition subsystem so as to know whether the size of the vehicle is oversize and whether the weight is overload and transmit the local data to a background management part and also publish and alarm the oversize and overload vehicle license plates on the information release subsystem. The oversize and overload nonlocal law enforcement system is high in intelligent degree so that equipment and manpower input cost can be reduced, data acquisition and analysis can be performed anytime and anywhere and the working efficiency can be enhanced.
Owner:SHANGHAI LIANGXIANG INTELLIGENCE ENG +2

Steel structure three-dimensional scanning observe and control method

The invention relates to a computer aided construction method for a steel structure, in particular to a three-dimensional scanning, measuring and controlling method for pre-assembled or mounted steel structures. The method comprises the following steps: using a total station to carry out precise three-dimensional positioning, scanning and measuring for a component, designing N points on the component, inputting the measured points to AUTOCAD to build a model, making an actual three-dimensional component model, using a built theoretical model in a computer, compounding the two models to obtain actual processing deviation of the component, then drawing up a finishing proposal according to deviation characteristic, and after the finishing, measuring again, building the model, compounding the models and finishing till to accord with requirements. Compared with the prior method of entity detection and preassemble, the method has the advantages that the method reduces large quantity of construction sites, manpower and mechanical investment, only needs few men to finish measuring and controlling processes of the construction, improves labor productivity greatly, ensures construction quality, reduces construction cost greatly, and achieves low cost, high efficiency and high benefit.
Owner:CHINA 22MCC GROUP CORP

Household average distribution transform capacity configuration method based on user behaviors

The invention discloses a household average distribution transform capacity configuration method based on user behaviors, comprising the steps of: S1, calculating resident loads to obtain a calculated load Pjs; S2, calculating a distribution transformer load rate beta, and based on the calculated load Pjs obtained in step S1, calculating a distribution transformer capacity S and a distribution economic operation range; S3, determining a user number n; S4, calculating a household average distribution transform capacity Sav based on S1,S2 and S3; and S5, performing economic analysis on the distribution transformer capacity. The method can guarantee power grid safe operation, reduce power grid loss, improve power supply reliability and electric energy quality, effectively reduce distribution transform requirements and construction investment, improve the use ratio of electric power company manpower and material resources, achieve the purposes of saving electricity and reducing power grid operation costs, and allow a power distribution network to satisfy maximum electricity demands of social economy development and living standard improvement.
Owner:STATE GRID CORP OF CHINA +1

CRD construction method tunnel waterproof construction method

InactiveCN103643973ASolve the problem of large settlement deformationShorten the construction periodUnderground chambersTunnel liningSupporting systemDeformation monitoring
A CRD construction method tunnel waterproof construction method includes the following steps that after a primary support system is stabilized, deformation monitoring points are arranged on an arch crown and side walls; CRD I-steel is demounted every other within the range of a lining bottom plate and a lining top plate; the residual non-demounted I-steel is ground, and the periphery of the I-steel is floated with cement mortar and hardened; the non-demounted I-steel and the hardened base surface are coated with rubber bitumen and paved with waterproof plates, the surfaces of the waterproof plates on the periphery of the I-steel are coated with a layer of rubber bitumen, and eventually a water stop flange is welded to each I-steel, and grouting systems are arranged on the two sides of the I-steel; bottom plate lining construction and top plate lining construction are conducted, after the top plate lining construction is conducted, all residual temporary supports are demounted; temporary inverted arch concrete and the I-steel within the range of the bottom plate side walls are broken and demounted; bottom plate side wall ECB waterproof plate pavement and lining construction are conducted. The phenomenon of settlement deformation of primary supports in the lining process can be effectively controlled, the construction period is shortened, and construction investment is reduced.
Owner:CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP

Networked parking space control system and method

ActiveCN106205206AAvoid random stopsGuidance is accurate and effectiveTicket-issuing apparatusIndication of parksing free spacesParking areaRemote control
The invention discloses a networked parking space control system and method. The system comprises a center system, a Zigbee coordinator, a plurality of parking space locks and hand-held terminals. The center system is connected with the Zigbee coordinator through the internet; the Zigbee coordinator is connected with the parking space locks; the parking space locks are connected through Zigbee network communication. A networked parking space control APP is installed in each hand-held terminal, and the hand-held terminals are in communication connection with the center system and the parking space locks. The center system is used for acquiring real-time states of the parking space locks, judging whether the parking space locks are in an unlocked state or a locked state or an offline state and determining the current space of each parking space according to the real-time states of the parking space locks, and therefore state information of the parking spaces in a whole parking area is acquired. The hand-held terminals achieve parking space management, inquiring, booking, parking space lock remote control opening and closing and self-service paying operation through the installed internet parking space control APPs. According to the networked parking space control system and method, parking space state collection and automatic parking space control are achieved.
Owner:青岛慧都智能科技有限公司

Construction method for grouting curtain combined with steel reinforced concrete guard ring

The present invention relates to a construction method by which grout curtains are combined with reinforced concrete cages. The construction of a grout curtain is carried out by an engineering driller and a grouter as the construction of drilled piles is carried out, a foundation ditch is dug layer by layer while the reinforced concrete cages are constructed, the soil body on the periphery of a cofferdam is concreted, stepped excavation and stepped shoring are carried out till the bottom of the foundation ditch, and after the construction of the drilled piles is finished, the construction of a bearing platform is carried out. The curtain formed by grouting is waterproof, the reinforced concrete cages are constructed while the bearing platform foundation ditch is dug, so the soil pressure, water pressure and unbalanced construction load generated by the excavation of the foundation ditch are resisted. The construction of the grout curtain can be carried out as the construction of drilled piles is carried out, the foundation ditch is dug layer by layer while the reinforced concrete cages are constructed, consequently, the construction period is effectively shortened and the construction equipment which is put into use is reduced. The construction by reinforced concrete caissons, steel cofferdams and steel plate piles is difficult, the present invention can easily resolve the problem, and meanwhile, according to the geological conditions, the construction of the bearing platform can apply non-bottom sealing construction, thus saving the cost.
Owner:THE 2ND ENG CO LTD MBEC

Bulk material discharging, storage and transportation equipment and transportation method

The invention discloses bulk material discharging, storage and transportation equipment which comprises a transportation hopper installed on the upper portion of a frame. The lower end of the transportation hopper is provided with a discharge outlet, and the discharge outlet is provided with a bin door capable of being opened and closed. The equipment further comprises a bin door opening-closing and detection system, a vehicle positioning indication human-machine interaction system, a transportation hopper material level detection and indication system, an upper spraying device and a lower spraying device which are connected with a control system, wherein the upper spraying device is installed on the upper portion of the transportation hopper, and the lower spraying device is installed onthe lower portion of the transportation hopper. Transportation vehicle automatic monitoring and reminding are achieved, a boat discharging door machine can work without interruption, the storage capacity of the transportation hopper can be displayed in real time, the bin door is automatically opened and closed for discharging, the lower portion of the transportation hopper is provided with a material weighing system, an empty vehicle weight house, a heavy vehicle weight house and a discharging, storage and transportation device are integrated into a whole, loading and weighing are completed ina one-stop mode, the automobile weight house building cost is reduced, processes are reduced, and production efficiency is improved. The invention further provides a transportation method for transporting bulk materials through the bulk material discharging, storage and transportation equipment.
Owner:RIZHAO PORT +1

Video image dynamic water level information extraction method based on geographical space-time scenes

The present invention provides a video image dynamic water level information extraction method based on geographical space-time scenes. The method concretely comprises the following steps of (1) establishing a coordinate system; (2) measuring parameters; (3) establishing a conversion equation; (4) extracting the land-water intersection lines; (5) calculating a water level line elevation value; (6) outputting the water level dynamic information and carrying out the over-limit early warning alarm. According to the present invention, by carrying out the coordinate conversion of a two-dimensional image coordinate system and a three dimensional geographic coordinate system on the video images of the watercourses and the urban flood prevention flooding regions, a water level information extraction process based on the video images of the conventional watercourses and urban flood prevention flooding regions is realized, the insufficiency that the water level stations can not be set in the urban flood prevention flooding regions is made up to a certain extent, at the same time, the construction investment of the water level stations can be reduced to a certain extent. In addition, time interval scales are arranged on an imaging time shaft of a monitoring camera, and the dynamic water level change information of the appointed monitoring video stations is outputted, thereby monitoring the water level information of the video monitoring areas dynamically.
Owner:HOHAI UNIV

Process for pumping and exploiting coal bed gas by together using ground well drilling and underground hole drilling

The invention relates to a coal bed gas exploiting technique, in particular to a process for pumping and exploiting coal bed gas by together using ground well drilling and underground hole drilling, solving the problem of low efficiency of the traditional method for pumping and exploiting the coal bed gas. The process comprises the following steps of: (1) carrying out well drilling on the ground; (2) carrying out long hole drilling in underground coal beds; (3) making drilled holes and ground drilled wells crosslink and communicate in the appointed points by utilizing an orientation technique of a long hole drilling machine; (4) effectively closing the underground long drilled holes; (5) fracturing the ground drilled wells and the underground long drilled holes by utilizing fracturing equipment on the ground; (6) after fracturing, closing the ground drilled wells; and (7) opening the closed ends of the underground long drilled holes and then installing relevant pumping and discharging pipelines connected with underground pumping and discharging systems. The process improves the pumping and exploiting speed and efficiency of the coal bed gas, shortens the construction period of coal bed gas pumping and exploiting engineering and saves the construction investment of the coal bed gas pumping and exploiting engineering.
Owner:山西蓝焰煤层气集团有限责任公司

Segmental assembling box girder construction technology

The invention discloses a segmental assembling box girder construction technology. A constructed box girder is composed of multiple porous girders. Each porous girder is formed by assembling multiple box girder segments from back to front. When the constructed box girder is constructed, the process includes the following steps that firstly, the box girder segments are prefabricated, wherein all the box girder segments used for forming the constructed box girder are prefabricated in a prefabrication site in a concentrated manner; secondly, the box girder segments are transported, wherein all the box girder segments are transported to the erection position of the constructed box girder through a girder transport vehicle; thirdly, the box girder is erected, wherein the constructed box girder is erected and constructed through a descending bridge girder erection machine, and the descending bridge girder erection machine comprises a bottom horizontal supporting system, a main girder system, a longitudinal moving system, a cantilever crane, an assembling frame and an assembling vehicle; and fourthly, a system is converted, wherein the system is converted after the erection construction process is finished. By the adoption of the segmental assembling box girder construction technology, the technological step is simple, design is reasonable, construction is easy and convenient, a construction process is easy to control, a use effect is good, the segmental assembling box girder assembling process can be simply, conveniently and rapidly finished, and the construction quality is easy to guarantee.
Owner:CHINA RAILWAY FIRST GRP CO LTD

Internet of things technology-based multi-meter metering data acquisition method and system

The invention belongs to the technical field of power, water, gas and thermal integrated energy metering, and discloses an internet of things technology-based multi-meter metering data acquisition method and system. A data collection transceiving terminal is data collection equipment between a metering meter and a system master station and is used for performing data acquisition of the metering meter in a downward way, completing energy data standard conversion in an intermediate way and achieving data transceiving to different energy platforms in an upward way. On one hand, data acquisition operation is completed, and processing and storage are performed; and on the other hand, various types of time control commands are issued. Integrated and remote reading system of public utility energymetering data such as water, power and gas can be achieved by a low-voltage power user concentrated meter reading system platform, a convenient and beneficial excellent service system can be built, household meter reading is not needed, the resident disturbance is reduced, bills are uniformly sent, three bills are paid in one time, the convenience is improved, the energy consumption analysis function is deeply developed, the energy loss of the user is reduced, and the energy is saved.
Owner:贵安新区配售电有限公司

Smart park platform planning and designing system

The invention discloses a smart park platform planning and designing system, and relates to the technical field of park construction. The system comprises a supporting basic unit, an operation management unit, a garden enterprise service unit, a community service unit, an IBMS platform and an information unit. The supporting basic unit comprises a system supporting module, an operation platform portal and a mobile application platform. The operation management unit comprises a cooperation management module, an investment attraction management module, a property management module, an incubationmanagement module, a fixed asset management module, a garden payment management module, an industry analysis module, a decision management module, an entrance guard management module, a parking management module and a patrol management module. Intelligent park application services are provided for park management, park enterprises, enterprise employees and the like on the platform, the platform deploys and operates all levels of application services in a unified mode, data unification, interface unification and process unification are achieved, repeated construction is avoided, resources aresaved, energy consumption is reduced, and investment construction and operation maintenance cost is reduced.
Owner:广东飞企互联科技股份有限公司

Supporting and retaining device for open excavation construction of comprehensive pipe gallery and construction method thereof

The invention belongs to the technical field of underground project construction, particularly relates to a supporting and retaining device for open excavation construction of a comprehensive pipe gallery and a construction method thereof, and discloses the movable supporting and retaining device for open excavation construction of the comprehensive pipe gallery and the construction method thereof. The supporting and retaining device for open excavation construction of the comprehensive pipe gallery has the advantages of economization and high efficiency of the open excavation method and does not have to utilize building envelopes such as pile rows and steel sheet piles. The movable supporting and retaining device for construction mainly comprises a front supporting and retaining part, a middle supporting and retaining part and a tail supporting and retaining part, the front supporting and retaining part is composed of expansion blocks on the two sides of the front supporting and retaining part, the middle supporting and retaining part mainly comprises a top plate, side plates and a bottom plate and is connected to the tail supporting and retaining part through hinging oil cylinders, and propelling devices are arranged between the tail supporting and retaining part and the middle supporting and retaining part. According to the supporting and retaining device, the main problems that the construction occupation range is wide and the environmental influence is serious in the construction process of the underground comprehensive pipe gallery and pipelines through the open excavation method are effectively solved. The construction method has the advantages that the mechanization degree is high and the construction speed is high.
Owner:CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD

Method for fabricating house through members assembled by interlocking combined building blocks

ActiveCN107060071AReduce the risk of manpower working at heightsEasy to implement finelyWallsEngineeringHigh rise
The invention relates to a method for fabricating a house through members assembled by interlocking combined building blocks. The combined building blocks with different thicknesses, different interlocking types and functional block shapes are assembled to be the independent members such as inner-outer-wall equal thickness and unequal thickness hollow or solid square, L-shaped, T-shaped and cross structural column window beams, door beams, cantilevering beams, ring beams, wallboards and floors, and the independent members are fabricated to be the house meeting the current standard quality requirements. The products are not only suitable for small scattered living house man-made buildings, but also suitable for whole mechanical low-rise, multi-rise and high-rise full-fabricated buildings, the effect of improving seismic performance of the house is achieved, the aerial working safety risk under layer-by-layer erecting is avoided, lots of formworks are saved, the building construction speed is increased, and compared with all other domestic and oversea current building structure systems, the products have the more significant cost performance advantage.
Owner:段志祥

Construction method for tunneling excavation through matching of down-the-hole drill and breaking hammer

The invention discloses a construction method for tunneling excavation through matching of a down-the-hole drill and a breaking hammer. The construction method comprises the following steps that firstly, peripheral outline holes, slotting holes and breaking holes are formed in a tunnel face through a total station, and marks are made; secondly, the track-type hydraulic down-the-hole drill is utilized for drilling, according to the drilling sequence, the peripheral outline holes are drilled firstly, the slotting holes are formed in middle areas of a lower-middle section of the tunnel face, andthe breaking holes are formed in the rest part of the tunnel face; and thirdly, the breaking hammer is utilized to break the tunnel face from bottom to top in the vertical direction, the area with thedense hole pitch in the lower portion is broken firstly, a free face is dug out, then upward excavation is conducted layer by layer, and breaking is conducted according to the sequence of bottom, top, left, right and periphery. Interference to peripheral buildings is reduced, construction noise is controlled, tunneling of a tunnel body is accelerated, the design goal is achieved, and significantsocial benefits and economic benefits are achieved.
Owner:CHINA COMM 2ND NAVIGATIONAL BUREAU 2ND ENG +1

Steel-concrete combination deck plate and construction method thereof

The invention relates to a steel-concrete combination deck plate and a construction method thereof, wherein the steel-concrete combination deck plate comprises: bottom steel plates arranged on steel girders, wherein the bottom steel plates in the bearing regions of the steel girders are bent in shape, and the bottom steel plates are 8-10 mm in thickness; a plurality of shear plates vertically connected to the bottom steel plates; a concrete tier including reinforcement fabric penetrating through the shear plates, wherein the concrete tier is cast to the bottom steel plates, and the combination deck plate is 10-15 cm in thickness. The steel-concrete combination deck plate uses the bottom steel plates as stress-bearing parts as well as a formwork for a cast-in-place desk concrete tier, and steps of mounting and releasing concrete formwork are omitted; the shear plates serve as stiffeners for the bottom steel plates, good combination of the bottom steel plates with the concrete tier can be guaranteed, and cracking of the concrete tier is prevented; the deck thickness is controlled to 10-15 cm and is reduced, the weight is 25% and above lower than that of a composite beam deck system, dead load is reduced, crossing ability, structural strength and durability of the main structure are improved, construction input is reduced, and the efficiency of a construction method is high.
Owner:SICHUAN DEPT OF TRANSPORTATION HIGHWAY PLANNING PROSPECTING & DESIGN RES INST

Highway toll collection method and system for ETC multi-sensor information fusion track restoration

The invention belongs to the technical field of intelligent transportation, and provides a highway toll collection method and system for ETC multi-sensor information fusion track restoration. The highway toll collection method for ETC multi-sensor information fusion trajectory restoration comprises the steps: acquiring vehicle-mounted positioning breakpoint information, restoring a vehicle drivingpath, and calculating the estimated cost of high-speed driving of a vehicle, wherein the vehicle-mounted positioning breakpoint information is a discontinuously acquired positioning signal, and the positioning signal is acquired every time when the intensity of the communication base station signal reaches the highest and begins to weaken; comparing the estimated fee with the ETC fee deduction amount of the expressway exit; when the difference between the estimated fee and the ETC fee deduction amount of the expressway exit exceeds a preset amount threshold value, continuing to compare the restored vehicle driving path with the ETC portal frame segmented fee deduction driving path, and determining whether to release traffic and judging whether there is a fee evasion problem or not according to the consistency of the paths.
Owner:山东天星北斗信息科技有限公司

A charging station orderly charging management system and method

InactiveCN108973752ARealize peak elimination and valley fillingReduce the impact of load shocksCircuit monitoring/indicationCharging stationsPower capabilityPower margin
The invention discloses a charging station orderly charging management system, which comprises a system platform server which is used for sending the power capacity of the charging station to a corresponding charging station control management device. The charging pile monitoring device is used for collecting the operation parameters of the charging pile and sending the operation parameters to thestation control and management device of the charging station; The charging station control management device is used for judging whether the charging station has power margin according to the powercapacity and the operation parameters of each charging pile in the charging station after receiving the charging request sent by the charging pile monitoring device, and if so, immediately respondingto the charging request; If not, the charging power of the charging pile is delayed in response to a charging request or adjusted. The orderly charging management system of the charging station can control the charging power of the charging station within the permissible range, put an end to the phenomenon of overload, avoid the impact on the distribution network, and ensure the normal power consumption of residents and enterprises. The invention also discloses a charging station orderly charging management method, which also has the technical effect.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER CO LTD HANGZHOU POWER SUPPLY CO +1

Sea floor architecture positioning apparatus and method

The invention discloses a positioning device for a submarine building, consisting of an anchor bar and an anchor umbrella, wherein, the anchor umbrella is positioned at the bottom of the anchor bar; the open anchor umbrella takes the shape of an inversed umbrella. During the process of submarine sinking, the anchor umbrella is folded tightly, and a framework of the anchor umbrella of the positioning device is separated from a jack and stretched out in the shape of the umbrella until the predetermined position is reached. The power of the positioning device for injecting into the seabed is vibration of a high-frequency micro-amplitude vibration source which is arranged on the top of the anchor bar, and the vibration frequency is more than 50 hertzs. Under the action of high-frequency micro-amplitude vibration, a hardened silt structure is damaged, generates liquefaction and forms slurry with fluidness, thereby the device can run through smoothly; and silt with fluidness is easy to pass through an open screen of the anchor umbrella so as to make the anchor umbrella automatically open. After the anchor umbrella is opened, a large-area structural plane is formed; and the deadweight of soil bodies on the upper part of the structural plane provides strong anti-floating force, and soil bodies on the lower part of the structural plane limit the sinking action of the positioning device. The positioning device for the submarine building has simple construction technique, easy operation, short construction period and low manufacturing cost.
Owner:TONGJI UNIV

Sweet potato vermicelli

InactiveCN102742808AReduce construction investmentSolve the shortcomings of non-continuous productionFood preparationPotato starchAdditive ingredient
The invention discloses sweet potato vermicelli, comprising the following ingredients: sweet potato powder, corn starch, cassava starch, and potato starch, or sweet potato powder, corn starch, and cassava starch, or sweet potato powder and potato starch as raw materials, edible salt with the weight being 0.5-1.5% of the weight of the raw materials, and edible plant oil with the weight being 0.5-1.5% of the weight of the raw materials. The sweet potato vermicelli is prepared by the following steps: fully mixing the ingredients with water having the weight being 30-40% of the weight of the raw materials, conducting high pressure friction extrusion by using a double screw vermicelli maker, curing the vermicelli by using the heat generated by high pressure friction extrusion, preserving the moisture of the extruded cured vermicelli under a normal temperature at a humidity of 60-90% and naturally aging for 7-9 h, then cutting, loosening the cut vermicelli, then drying the loose cut vermicelli, and packaging to obtain a finished product.
Owner:汪志新

Indoor positioning method and system based on signal multipath propagation measurement

ActiveCN110351655AHigh accuracy of pseudo-range measurementExcellent theoretical distance measurement accuracyParticular environment based servicesPosition fixationCost burdenOperational costs
The invention discloses an indoor positioning method and system based on signal multipath propagation measurement, and the method comprises the following steps: S1, determining an available signal source and the coordinates of the available signal source from a plurality of indoor signal sources; S2, obtaining the distance from the mobile terminal to the available information source; S3, acquiringa current coordinate of the mobile terminal based on the distance; S4, enabling the mobile terminal to execute positioning display on an electronic map based on the coordinates; and S5, executing training of a channel environment fingerprint analysis engine based on the available information source and the coordinates of the mobile terminal. The technical scheme has the beneficial effects that the precision of measuring the pseudo distance between the mobile terminal and the available information source is high; positioning is realized by adopting public visible base stations and public visible radio signals, such as LBS, WiFi, WiMAX, FM, ZigBee and other fixed base station signals, access authorization of a base station owner is not needed, infrastructure construction investment and energy consumption are not increased, and operation cost burden is not increased.
Owner:BORUITAIKE SCI & TECH NINGBO CO LTD

Melting furnace for founding high-volatility-component glass

The invention discloses a melting furnace for founding high-volatility-component glass. The melting furnace comprises an electric melting tank, a flame clarifying tank and a working part, wherein the electric melting tank, the flame clarifying tank and the working part are distributed in sequence from left to right; the bottom of the electric melting furnace is provided with heating electrodes; at least one group of oppositely arrayed combustion spray guns are arranged on two side surfaces, where a first partitioning suspended wall and a second partitioning suspended wall are not located, above the liquid level of the flame clarifying tank; the combustion guns generate flame gas flows through combustion to sweep a glass liquid level; the first partitioning suspended wall separates the electric melting tank from the flame clarifying tank; the second partitioning suspended wall separates the flame clarifying tank from the working part; the first partitioning suspended wall at least stretches to a position which is not less than 50mm below the liquid surface; a partitioning structure is arranged at a joint between the second partitioning suspended wall and the working part; the partitioning structure stretches into the glass liquid level for not les than 250mm; the working part is provided with a material discharging port; the melting furnace also comprises a material distributing device loaded with a compound material; the material distributing device vertically adds the compound material to be above the liquid level of the electric melting furnace; a cold roof covered material pile is formed.
Owner:江苏华东耀皮玻璃有限公司

Intelligent loading hopper and method for transferring materials

PendingCN111891775AThe loading process is smoothReduce use costLoading/unloadingStructural engineeringMachine
The invention discloses an intelligent loading hopper which comprises a charging hopper arranged on the upper part of a frame and a discharging hopper arranged on the outer side of the frame. A conveying belt is arranged at the lower part of a discharging port at the lower end of the charging hopper, a connecting arm connected with a dock gantry crane is arranged on the frame, a traveling wheel capable of moving on a gantry crane rail is arranged at the lower end of the frame, and the traveling wheel shares the rail with the gantry crane and does not occupy an operation field and a storage field; a belt scale is arranged on a conveying machine frame of the conveying belt, so that the weight of loaded materials is accurately measured, a transfer vehicle can be directly loaded, the accuratemeasurement is realized without weighing the transfer vehicle, automatic and quantitative loading of cargos is realized, the loading speed is high, the period is short, and the phenomena of underload,overload and the like can be effectively avoided. An empty vehicle weight house, a heavy vehicle weight house and an unloading storage and transportation device are combined into one, one-stop completion of loading and weighing is realized, the weight house investment is reduced, and production efficiency is improved. The invention also provides a method for transferring materials by utilizing the intelligent loading hopper.
Owner:SHANDONG GURUN ENG TECH

Bridge deck pavement method for orthotropic steel bridge

The invention discloses a bridge deck pavement method for an orthotropic steel bridge. The pavement method comprises the following steps: (1) performing sand-blasting and de-rusting treatment on a steel bridge panel, and coating a mica-containing epoxy anti-corrosion layer; (2) coating a solvent-free epoxy resin water-proof layer; (3) spreading a hot melt particle bonding layer which is partially sunken into the solvent-free epoxy resin water-proof layer, wherein the hot melt particles are high-polymer particles of which the softening point is greater than 150 DEG C; (4) paving a fine-particle asphalt mixture to form a high-elasticity modified asphalt pavement lower layer; (5) spreading a modified emulsified asphalt bonding layer; (6) paving a fine-particle or medium-particle asphalt mixture to form a high-elasticity modified asphalt pavement upper layer. By adopting the pavement method, the construction difficulty is lowered greatly, later maintenance is easy, the universality is high, a pavement lower structure is durable and long in service life, only the surface needs to be maintained in daily use, overall repeated maintenance is avoided, and the investment in a full life cycle is lowered.
Owner:SHANGHAI MUNICIPAL ENG DESIGN INST GRP

Real-time big data processing platform for digital construction

The invention discloses a real-time big data processing platform for digital construction. The platform comprises a working end data collection device, a data transmission system, a data analysis system, a data processing system, a client and a job management system, wherein the working end data collection device collects working data of an engineering machinery, sends the working data to the dataanalysis system through the data transmission system; the data analysis system analyzes the working data and sends the analyzed working data to the data processing system; the data processing systemprocesses the received data according to processing requirements of the job management system on the data and sends a processing result to the client for performing display; and meanwhile, the data processing system regularly processes data stored in the job management system. According to the platform provided by the invention, the influence of an excessively large data quantity on the performance of the platform can be reduced; massive production data information in engineering construction can be obtained in real time, analyzed, processed and displayed; and real-time information of engineering construction is visualized, so that the construction efficiency, the engineering quality and the informatization level are improved.
Owner:北京壹陆科技发展有限公司

Rapid construction method for strong-stormy-wave deep sea underwater connection system

InactiveCN104196000AConstruction safetySolve the problems of deep water construction operationsArtificial islandsBridge erection/assemblyUnderwaterEngineering
The invention provides a rapid construction method for a strong-stormy-wave deep sea underwater connection system. The method comprises the following steps that (1) construction preparation is carried out; (2) platform steel pipe piles are constructed; (3) underwater sleeve connection systems are manufactured in factories; (4) the underwater sleeve connection systems are transported to a steel pipe pile construction platform at a pier position through a ship; (5) a floating crane enters a site and is anchored and positioned; (6) lifting points of one sleeve connection system are connected, and a lifting appliance is installed; (7) the sleeve connection system is lifted by the floating crane, and the corresponding platform steel pipe piles are sleeved with the sleeve connection system; (8) the sleeve connection system is released downwards to a design position, and a top crossbeam is installed and fixedly connected with the lifting appliance; (9) mortar is poured in interlayer walls of the sleeve connection system and the steel pipe piles; (10) after the strength of the mortar reaches design strength, the lifting appliance is dismounted; (11) construction of mortar in other sleeve interlayer walls is carried out; (12) cyclic construction of the other sleeve connection systems is carried out, and construction of the connection systems of all the platform piles is finished. The method has the advantages that problems of deepwater construction operations carried out by frogmen are solved, the construction period is shortened, and construction investment is reduced.
Owner:CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP

Takifugu obscurus parent and scatophagus argus pond greenhouse overwintering mixed culture method

A takifugu obscurus parent and scatophagus argus pond greenhouse overwintering mixed culture method is characterized in that a land with a flat floor is selected, the depth of a pond is more than 2m, a steel wire rope flexible plastic film greenhouse is built above the pond, takifugu obscurus parents are transferred into the pond greenhouse for overwintering when the water temperature of an external pond is reduced to 13 DEG C in November, scatophagus argus overwintering stocking time is similar to takifugu obscurus overwintering stocking time, a takifugu obscurus feedstuff feeding method is as same as an external pond conventional culture method, feeding of commercial feedstuff is omitted if aquatic macrophytes are placed in the scatophagus argus pond, water change is avoided when the water temperature of the pond in the greenhouse is lower than 12 DEG C, water is changed once every three weeks when the water temperature of the pond in the greenhouse is higher than 12 DEG C to 15 DEG C, the water temperature of the external pond is kept higher than 15 DEG C in April every year, takifugu obscurus and scatophagus argus are dragged out of the greenhouse through a net and cultured in the external pond, the scatophagus argus is firstly picked out and placed into another net cage when the net is dragged, the takifugu obscurus parents are directly transported, and the scatophagus argus is dragged out of the greenhouse or cultured in the pond after the takifugu obscurus is dragged out of the pond through the net.
Owner:SHANGHAI FISHERIES RES INST

Arch-after-girder construction method of large-span steel box tacked arch bridge

The invention relates to an arch-after-girder construction method of a large-span steel box tacked arch bridge. The construction method comprises the following steps of: respectively building two temporary reinforced concrete bar-shaped bases on the ground at the bottom parts of steel girders on two sides of a to-be-built steel-structure bridge; mounting a plurality of temporary supporting piers on the reinforced concrete bar-shaped bases; respectively mounting steel girder assembling platforms on two external sides of the two bar-shaped bases; and paving portal crane rails on two sides of the steel girder assembling platforms and mounting two portal cranes. In the construction method, arch ribs, lifting rods and bridge surfaces engineering are carried out after system girders, end transverse girders and vertical transverse girders are mounted to form a whole stressed system by combining with temporary main supporting piers. The construction method has the advantages of low construction investment, specific structure stress, and simple and convenient construction process, and can realize parallel construction; all the steel components are hoisted by adopting the running-type portal canes, thereby reducing a great amount of mounting and dismantling work of the scaffoldings in the high altitude, and reducing the mounting period of the box girders; and the steel components can beassembled under the bridge during the transporting time of thebox girders, which increases the safety coefficients, and improves the structural quality.
Owner:CCCC TUNNEL ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products