Hoisting device for large-diameter reinforcement cage concrete jacking pipe

By designing a hoisting device with horizontal booms, traction mechanisms, and clamping mechanisms, the problem of swaying and tilting of large-diameter reinforced concrete jacking pipes during demolding and hoisting was solved, ensuring safety and efficiency.

CN222063838UActive Publication Date: 2024-11-26SHANDONG ELECTRIC POWER PIPELINE ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420176593.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-11-26
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

In existing technologies, large-diameter reinforced concrete jacking pipes are prone to swaying and tilting during demolding and hoisting, posing safety hazards and making hoisting inconvenient.

Method used

A hoisting device including a horizontal boom, a traction mechanism, and a clamping mechanism was designed. The device utilizes symmetrically arranged wire ropes and clamping plates, which are connected to the jacking pipe hoisting hole via pins. The clamping plates are tightly attached to the outer wall of the jacking pipe to ensure that the jacking pipe remains vertical during hoisting.

Benefits of technology

It effectively prevents the jacking pipe from swaying and tilting, ensures production safety, improves hoisting efficiency, and enables rapid hoisting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222063838U_ABST
    Figure CN222063838U_ABST
Patent Text Reader

Abstract

The utility model provides a hoisting device for a large-diameter reinforcement cage concrete jacking pipe, and relates to the technical field of hoisting. The hoisting device comprises a transverse hoisting rod, a traction mechanism and a clamping mechanism; wherein the traction mechanism comprises two groups of steel wire ropes symmetrically arranged at two ends of the transverse suspender, and one end of each steel wire rope is connected with the transverse suspender; the other end, opposite to the transverse suspender, of the steel wire rope is provided with a pin shaft which is in pin joint with a hoisting hole in the large-diameter reinforcement cage concrete jacking pipe during hoisting; and the clamping mechanism comprises two clamping plate frames which are respectively arranged on the two groups of steel wire ropes in a cross connection manner. According to the hoisting device for the large-diameter reinforcement cage concrete jacking pipe, it can be guaranteed that the jacking pipe is in a vertical state all the time in the jacking pipe demolding and hoisting process, and then production safety is guaranteed. Meanwhile, the hoisting device for the large-diameter reinforcement cage concrete jacking pipe can achieve rapid hoisting of the jacking pipe, and the production efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of lifting and hoisting, in particular to a lifting device for a large-diameter reinforced cage concrete jacking pipe. Background Art

[0002] Large-diameter reinforced concrete jacking pipe is a trenchless construction pipeline technology used in municipal construction. During the production process of jacking pipe, after pouring concrete, the jacking pipe needs to be demoulded, hoisted and stored. Therefore, the jacking pipe needs to be turned over before loading and transportation. To facilitate the turning of the jacking pipe, the pre-buried positions of the two hoisting holes of the jacking pipe are located at the lower center of the jacking pipe.

[0003] However, the commonly used jacking pipe lifting device is to directly lift the pipe by inserting two steel wire ropes and a pin shaft into the lifting hole. However, during the demoulding process of the jacking pipe, due to the heavy weight on the upper part, when the jacking pipe is lifted away from the inner mold of the mold, it is easy to cause the jacking pipe to shake, tilt, and roll over, creating a safety hazard and causing losses of personnel, equipment, and tooling molds. In order to solve the problems of jacking pipe shaking, tilting, and rollover during demoulding, it is urgently necessary to manufacture an anti-dumping device suitable for large-diameter reinforced concrete jacking pipes through technological innovation.

[0004] In view of this, the present utility model is proposed. Utility Model Content

[0005] The utility model aims to provide a lifting device for a large-diameter reinforced cage concrete jacking pipe, which can quickly realize the lifting and positioning of the jacking pipe during the demoulding and lifting process of the jacking pipe production, prevent the jacking pipe from tilting, and ensure the safety of production personnel. At the same time, the device is simple to assemble and easy to operate.

[0006] In order to achieve the above purpose, the utility model proposes the following technical solutions:

[0007] The utility model provides a large-diameter steel cage concrete jacking pipe hoisting device, which comprises: a transverse hanging rod, a traction mechanism and a clamping mechanism;

[0008] The traction mechanism includes two sets of steel wire ropes, which are symmetrically arranged at both ends of the transverse suspension rod, and one end of the steel wire rope is connected to the transverse suspension rod;

[0009] The other end of the steel wire rope relative to the transverse suspension rod is provided with a pin shaft, which is used to be pinned to the lifting hole on the large-diameter steel cage concrete top pipe during lifting;

[0010] The clamping mechanism comprises two symmetrically arranged clamping plate frames, which are cross-connected and arranged on two groups of steel wire ropes respectively, and are used for clamping large-diameter steel cage concrete jacking pipes to prevent shaking and tilting during hoisting.

[0011] Furthermore, the clamping plate frame is an anti-dumping arc frame, the arc surface of which faces the direction of the large-diameter steel cage concrete jacking pipe and fits the large-diameter steel cage concrete jacking pipe.

[0012] Furthermore, each anti-dumping arc frame is connected to a group of steel wire ropes through fixing bolts to ensure that the anti-dumping arc frame and the steel wire ropes are in a cross state during hoisting.

[0013] Furthermore, the anti-dumping arc frame is provided with three groups of fixing bolts, and the three groups of fixing bolts are linearly arranged in the vertical direction;

[0014] The steel wire rope is connected with three groups of fixing bolts in sequence.

[0015] Furthermore, a rubber pad is provided between the anti-dumping arc frame and the large-diameter steel cage concrete jacking pipe.

[0016] Furthermore, one end of the steel wire rope is connected to the transverse suspension rod in a fixed manner;

[0017] Alternatively, one end of the steel wire rope is connected to the transverse suspension rod by a sliding connection.

[0018] Furthermore, the steel wire rope is connected to the transverse suspension rod via a U-shaped clamp.

[0019] Furthermore, the transverse suspension rod is connected to the lifting equipment through a sling.

[0020] Furthermore, the diameter specification of the large-diameter reinforced cage concrete jacking pipe is DN1350~4000*2000~3000mm.

[0021] Furthermore, the diameter specification of the large-diameter reinforced cage concrete jacking pipe is DN3800*3000mm.

[0022] Compared with the prior art, the beneficial effects of the utility model are:

[0023] The utility model provides a lifting device for a large-diameter reinforced cage concrete jacking pipe, which comprises a transverse suspension rod, a traction mechanism and a clamping mechanism; wherein: the traction mechanism comprises two groups of steel wire ropes symmetrically arranged at both ends of the transverse suspension rod, one end of the steel wire rope is connected to the transverse suspension rod; the other end of the steel wire rope relative to the transverse suspension rod is provided with a pin shaft for pinning with a lifting hole on the large-diameter reinforced cage concrete jacking pipe during lifting; the clamping mechanism comprises two clamping plate frames respectively cross-connected and arranged on the two groups of steel wire ropes.

[0024] When the lifting device for the large-diameter reinforced cage concrete jacking pipe of the present application is used for jacking pipe lifting, the pin shaft is first inserted into the lifting hole of the large-diameter reinforced cage concrete jacking pipe; then two sets of steel wire ropes are put on the pin shaft, and two clamping plate frames connected to the steel wire ropes in a cross shape are pressed against the outer wall of the jacking pipe. The clamping effect and anti-slip effect of the clamping plate frames on the jacking pipe ensure that the large-diameter reinforced cage concrete jacking pipe is in a vertical lifting state when the transverse lifting rod is lifted.

[0025] Therefore, the lifting device for large-diameter reinforced cage concrete jacking pipe of the present application can effectively alleviate the problem of the existing lifting device causing the jacking pipe to shake and tilt easily when it is lifted away from the inner mold of the mold due to the heavy upper weight during the demoulding process of the large-diameter reinforced cage concrete jacking pipe, through the arrangement of the above-mentioned transverse hanger, traction mechanism and clamping mechanism. The lifting device for large-diameter reinforced cage concrete jacking pipe proposed in the present application can ensure that the jacking pipe is always in a vertical state during the demoulding and lifting process of the jacking pipe, thereby ensuring production safety. At the same time, the lifting device for large-diameter reinforced cage concrete jacking pipe of the present application can also realize the rapid lifting of the jacking pipe, thereby improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 A schematic diagram of the hoisting of a large-diameter reinforced cage concrete jacking pipe hoisting device provided in Example 1 of the utility model;

[0028] Figure 2 A schematic diagram of the clamping state of the anti-dumping arc frame of the large-diameter reinforced cage concrete jacking pipe hoisting device provided in Example 1 of the utility model;

[0029] Figure 3 This is a schematic side view of the lifting of the large-diameter steel cage concrete jacking pipe lifting device provided in Example 1 of the utility model.

[0030] Icons: 1- horizontal hanger; 2- U-shaped clamp; 3- wire rope; 4- clamping plate frame; 5- pin shaft; 6- large diameter steel cage concrete jacking pipe. DETAILED DESCRIPTION

[0031] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. In order to help understand the utility model more clearly, the utility model is now described in detail through specific embodiments.

[0032] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0033] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0034] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.

[0035] According to one aspect of the utility model, a lifting device for a large-diameter reinforced cage concrete jacking pipe 6 is provided, the lifting device comprising: a transverse hanging rod 1, a traction mechanism and a clamping mechanism;

[0036] The traction mechanism includes two sets of steel wire ropes 3, which are symmetrically arranged at both ends of the transverse suspension rod 1, and one end of the steel wire rope 3 is connected to the transverse suspension rod 1;

[0037] The other end of the steel wire rope 3 relative to the transverse suspension rod 1 is provided with a pin shaft 5 for pinning with a hoisting hole on a large-diameter reinforced concrete jacking pipe 6 during hoisting;

[0038] The clamping mechanism comprises two symmetrically arranged clamping plate frames 4, which are cross-connected and arranged on two groups of steel wire ropes 3 respectively, and are used for clamping the large-diameter steel cage concrete jacking pipe 6 during hoisting to prevent shaking and tilting.

[0039] The utility model provides a lifting device for a large-diameter reinforced cage concrete jacking pipe 6, which includes a transverse hanger 1, a traction mechanism and a clamping mechanism; wherein: the traction mechanism includes two groups of steel wire ropes 3 symmetrically arranged at both ends of the transverse hanger 1, and one end of the steel wire rope 3 is connected to the transverse hanger 1; the other end of the steel wire rope 3 relative to the transverse hanger 1 is provided with a pin shaft 5 for pinning with a lifting hole on the large-diameter reinforced cage concrete jacking pipe 6 during lifting; the clamping mechanism includes two clamping plate frames 4 respectively cross-connected on the two groups of steel wire ropes 3.

[0040] When the lifting device of the large-diameter reinforced cage concrete jacking pipe 6 of the present application is used for jacking pipe lifting, the pin shaft 5 is first inserted into the lifting hole of the large-diameter reinforced cage concrete jacking pipe 6; then two groups of steel wire ropes 3 are inserted into the pin shaft 5, and two clamping plate frames 4 connected to the steel wire ropes 3 in a cross shape are placed close to the outer wall of the jacking pipe. The clamping effect and anti-slip effect of the clamping plate frames 4 on the jacking pipe ensure that the large-diameter reinforced cage concrete jacking pipe 6 is in a vertically lifted state when the transverse lifting rod 1 is lifted.

[0041] Therefore, the lifting device of the large-diameter steel cage concrete jacking pipe 6 of the present application can effectively alleviate the problem of the existing lifting device causing the jacking pipe to shake and tilt easily when the jacking pipe is lifted away from the inner mold of the mold due to the heavy upper weight during the demoulding process of the large-diameter steel cage concrete jacking pipe 6 through the arrangement of the above-mentioned transverse hanger 1, traction mechanism and clamping mechanism. The lifting device of the large-diameter steel cage concrete jacking pipe 6 proposed in the present application can ensure that the jacking pipe is always in a vertical state during the demoulding and lifting process of the jacking pipe, thereby ensuring production safety. At the same time, the lifting device of the large-diameter steel cage concrete jacking pipe 6 of the present application can also realize the rapid lifting of the jacking pipe, thereby improving production efficiency.

[0042] In a preferred embodiment of the present invention, the clamping plate frame 4 is an anti-dumping arc frame, the arc surface of which faces the direction of the large-diameter steel cage concrete jacking pipe 6 and fits the large-diameter steel cage concrete jacking pipe 6.

[0043] As a preferred embodiment, the above-mentioned clamping plate frame 4 is an anti-dumping arc frame, and an arc frame is arranged on the clamping plate frame 4 to clamp the large-diameter steel cage concrete jacking pipe 6 more stably and tightly, wherein the arc surface of the anti-dumping arc frame faces the direction of the large-diameter steel cage concrete jacking pipe 6, and fits with the large-diameter steel cage concrete jacking pipe 6.

[0044] In a preferred embodiment of the present invention, each anti-dumping arc frame is connected to a group of steel wire ropes 3 by fixing bolts to ensure that the anti-dumping arc frame and the steel wire ropes 3 are in a cross state during hoisting.

[0045] As a preferred embodiment, the anti-dumping arc frame and the steel wire rope 3 are in a cross state during hoisting. The above-mentioned anti-dumping arc frame and the steel wire rope 3 are connected in a cross state, which can effectively avoid the shaking of the large-diameter steel cage concrete top pipe 6 during hoisting, thereby making the hoisting operation safer. At the same time, the anti-dumping arc frame and the steel wire rope 3 are connected by fixing bolts, which can facilitate the disassembly and arrangement of the hoisting device of the present application after hoisting.

[0046] In the above preferred embodiment, three groups of fixing bolts are provided on the anti-dumping arc frame, and the three groups of fixing bolts are linearly arranged in the vertical direction; the steel wire rope 3 is connected to the three groups of fixing bolts in sequence.

[0047] As a preferred embodiment, the lifting device of the large-diameter reinforced cage concrete jacking pipe 6 of the present application can be connected to the wire rope 3 by setting three groups of fixing bolts on the anti-dumping arc frame; wherein the three groups of fixing bolts are linearly arranged along the vertical direction, thereby ensuring that the anti-dumping arc frame and the wire rope 3 are in a cross state during lifting.

[0048] In a preferred embodiment of the present utility model, a rubber pad is provided between the anti-dumping arc frame and the large-diameter reinforced cage concrete top pipe 6.

[0049] As a preferred embodiment, a rubber pad is further provided between the anti-dumping arc frame and the large-diameter steel cage concrete jacking pipe 6 to increase the friction between the anti-dumping arc frame and the large-diameter steel cage concrete jacking pipe 6 during hoisting, so as to make the clamping tighter.

[0050] In a preferred embodiment of the present invention, one end of the steel wire rope 3 is connected to the transverse suspension rod 1 by a fixed connection; or one end of the steel wire rope 3 is connected to the transverse suspension rod 1 by a sliding connection.

[0051] As a preferred embodiment, the connection mode between the steel wire rope 3 and the transverse hanger 1 can be set as a sliding connection according to the diameter specification of the large-diameter reinforced cage concrete jacking pipe 6.

[0052] In a preferred embodiment of the present invention, the steel wire rope 3 is connected to the transverse suspension rod 1 via a U-shaped clamp 2 .

[0053] As a preferred embodiment, the steel wire rope 3 and the transverse suspension rod 1 can be connected and fixed by using a U-shaped clamp 2.

[0054] In a preferred embodiment of the present invention, the transverse suspension rod 1 is connected to the lifting equipment via a suspension cable.

[0055] In a preferred embodiment of the present utility model, the diameter specification of the large-diameter reinforced cage concrete jacking pipe 6 is DN1350~4000*2000~3000mm.

[0056] In the above preferred embodiment, the diameter specification of the large-diameter reinforced cage concrete jacking pipe 6 is DN3800*3000mm.

[0057] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0058] Example 1

[0059] Figure 1 A schematic diagram of the hoisting device for the large-diameter reinforced concrete jacking pipe 6 provided in this embodiment;

[0060] Figure 2 A schematic diagram of the clamping state of the anti-dumping arc frame of the large-diameter reinforced cage concrete jacking pipe 6 lifting device provided in this embodiment;

[0061] Figure 3 A schematic side view of the lifting device for the large-diameter reinforced concrete jacking pipe 6 provided in this embodiment;

[0062] See also Figure 1 to Figure 3 , a lifting device for a large-diameter reinforced concrete jacking pipe 6, the lifting device comprising: a transverse suspension rod 1, a traction mechanism and a clamping mechanism;

[0063] The traction mechanism includes two sets of steel wire ropes 3, which are symmetrically arranged at both ends of the transverse suspension rod 1, and one end of the steel wire rope 3 is connected to the transverse suspension rod 1;

[0064] The other end of the steel wire rope 3 relative to the transverse suspension rod 1 is provided with a pin shaft 5 for pinning with a hoisting hole on a large-diameter reinforced concrete jacking pipe 6 during hoisting;

[0065] The clamping mechanism comprises two symmetrically arranged clamping plate frames 4, which are cross-connected and arranged on two groups of steel wire ropes 3 respectively, and are used for clamping the large-diameter steel cage concrete jacking pipe 6 during hoisting to prevent shaking and tilting.

[0066] The lifting device for the large-diameter reinforced cage concrete jacking pipe 6 provided in this embodiment includes a transverse hanger 1, a traction mechanism and a clamping mechanism; wherein: the traction mechanism includes two groups of steel wire ropes 3 symmetrically arranged at both ends of the transverse hanger 1, and one end of the steel wire rope 3 is connected to the transverse hanger 1; the other end of the steel wire rope 3 relative to the transverse hanger 1 is provided with a pin shaft 5 for pin connection with the lifting hole on the large-diameter reinforced cage concrete jacking pipe 6 during lifting; the clamping mechanism includes two clamping plate frames 4 respectively cross-connected on the two groups of steel wire ropes 3.

[0067] The working process of the large-diameter steel cage concrete top pipe 6 hoisting device of this embodiment is as follows:

[0068] First, insert the pin 5 into the lifting hole of the large-diameter steel cage concrete jacking pipe 6; then, insert two groups of steel wire ropes 3 onto the pin 5, and place the two clamping plate frames 4 connected in a cross shape with the steel wire ropes 3 close to the outer wall of the jacking pipe, and through the clamping effect and anti-slip effect of the clamping plate frames 4 on the jacking pipe, ensure that the large-diameter steel cage concrete jacking pipe 6 is in a vertical lifting state when the transverse hanger 1 is lifted. It can be seen that the large-diameter steel cage concrete jacking pipe 6 lifting device of this embodiment can effectively alleviate the problem of the existing lifting device in the demoulding process of the large-diameter steel cage concrete jacking pipe 6, due to the large upper weight, when the jacking pipe is lifted and leaves the inner mold of the mold, it is easy to cause the jacking pipe to shake and tilt. During the demoulding and lifting process of the jacking pipe, the jacking pipe of the lifting operation is always in a vertical state, thereby ensuring production safety. At the same time, the lifting device of the large-diameter steel cage concrete jacking pipe 6 of the present application can also realize the rapid lifting of the jacking pipe, thereby improving production efficiency.

[0069] See also Figure 2 In this embodiment, the above-mentioned clamping plate frame 4 is an anti-dumping arc frame, which can clamp the large-diameter steel cage concrete jacking pipe 6 more stably and tightly, wherein the arc surface of the anti-dumping arc frame faces the direction of the large-diameter steel cage concrete jacking pipe 6 and fits with the large-diameter steel cage concrete jacking pipe 6.

[0070] See also Figure 1 , Figure 3 In this embodiment, each anti-dumping arc frame is connected to a group of steel wire ropes 3 by fixing bolts to ensure that the anti-dumping arc frame and the steel wire ropes 3 are in a cross state during hoisting. The above-mentioned anti-dumping arc frame and the steel wire ropes 3 are connected in a cross state, which can effectively avoid the shaking of the large-diameter steel cage concrete top pipe 6 during hoisting, thereby making the hoisting operation safer. At the same time, the anti-dumping arc frame is connected to the steel wire ropes 3 by fixing bolts, which can facilitate the disassembly and arrangement of the hoisting device of the present application after hoisting.

[0071] Preferably, the lifting device of the large-diameter reinforced cage concrete jacking pipe 6 of the present application can be connected to the wire rope 3 by setting three groups of fixing bolts on the anti-dumping arc frame; wherein the three groups of fixing bolts are linearly arranged along the vertical direction, thereby ensuring that the anti-dumping arc frame and the wire rope 3 are in a cross state during lifting.

[0072] Preferably, a rubber pad is provided between the anti-dumping arc frame and the large-diameter steel cage concrete jacking pipe 6 to increase the friction between the anti-dumping arc frame and the large-diameter steel cage concrete jacking pipe 6 during hoisting, so as to make the clamping more secure.

[0073] Preferably, one end of the steel wire rope 3 is connected to the transverse hanger 1 in a fixed connection; or, according to the diameter specification of the large-diameter reinforced cage concrete jacking pipe 6, the connection between one end of the steel wire rope 3 and the transverse hanger 1 is set to a sliding connection.

[0074] See also Figure 1 The steel wire rope 3 and the transverse suspension rod 1 can be connected and fixed by using a U-shaped clamping ring 2.

[0075] Preferably, the transverse boom 1 is connected to the lifting equipment via a sling.

[0076] Preferably, the large-diameter reinforced cage concrete jacking pipe 6 lifting device of this embodiment is actually produced based on the specifications of DN3800*3000mm. As for other specifications of this type of jacking pipe, the corresponding dimensions of the device can be adjusted and produced by referring to the design drawings in the utility model.

[0077] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solution deviate from the scope of the technical solution of the embodiments of the utility model.

Claims

1. A lifting device for a large-diameter reinforced concrete jacking pipe, characterized in that: The hoisting device comprises: a transverse hoisting rod, a traction mechanism and a clamping mechanism; The traction mechanism includes two sets of steel wire ropes, which are symmetrically arranged at both ends of the transverse suspension rod, and one end of the steel wire rope is connected to the transverse suspension rod; The other end of the steel wire rope relative to the transverse suspension rod is provided with a pin shaft, which is used to be pinned to the lifting hole on the large-diameter steel cage concrete top pipe during lifting; The clamping mechanism comprises two symmetrically arranged clamping plate frames, which are cross-connected and arranged on two groups of steel wire ropes respectively, and are used for clamping large-diameter steel cage concrete jacking pipes to prevent shaking and tilting during hoisting.

2. The large-diameter reinforced concrete jacking pipe hoisting device according to claim 1 is characterized in that: The clamping plate frame is an anti-dumping arc frame, the arc surface of which faces the direction of the large-diameter steel cage concrete jacking pipe and fits the large-diameter steel cage concrete jacking pipe.

3. The hoisting device for large-diameter reinforced concrete jacking pipe according to claim 2 is characterized in that: Each anti-tipping arc frame is connected to a group of steel wire ropes through fixing bolts to ensure that the anti-tipping arc frame and the steel wire ropes are in a cross state during hoisting.

4. The large-diameter reinforced concrete jacking pipe hoisting device according to claim 3 is characterized in that: The anti-dumping arc frame is provided with three sets of fixing bolts, and the three sets of fixing bolts are linearly arranged in the vertical direction; The steel wire rope is connected with three groups of fixing bolts in sequence.

5. The hoisting device for large-diameter reinforced concrete jacking pipe according to claim 2 is characterized in that: A rubber pad is arranged between the anti-dumping arc frame and the large-diameter steel cage concrete top pipe.

6. The large-diameter reinforced concrete jacking pipe hoisting device according to claim 1 is characterized in that: One end of the steel wire rope is connected to the transverse suspension rod in a fixed manner; Alternatively, one end of the steel wire rope is connected to the transverse suspension rod by a sliding connection.

7. The large-diameter reinforced concrete jacking pipe hoisting device according to claim 1 is characterized in that: The steel wire rope is connected to the transverse suspension rod through a U-shaped clamping ring.

8. The large-diameter reinforced concrete jacking pipe hoisting device according to claim 1 is characterized in that: The transverse suspension rod is connected to the lifting equipment through a suspension cable.

9. The large-diameter reinforced concrete jacking pipe hoisting device according to claim 1 is characterized in that: The diameter specification of the large-diameter reinforced cage concrete jacking pipe is DN1350~4000*2000~3000mm.

10. The hoisting device for large-diameter reinforced concrete jacking pipe according to claim 9, characterized in that: The diameter specification of the large-diameter reinforced cage concrete jacking pipe is DN3800*3000mm.