Ultra-large type tower crane jacking sleeve frame

By cooperating with the climbing claws and hanging plates in the lifting assembly, the main hydraulic cylinder and auxiliary hydraulic cylinder are lifted synchronously, which solves the safety hazards and difficulties in manual pushing during the lifting process of ultra-large tower cranes, and achieves steady lifting and efficient installation.

CN222063950UActive Publication Date: 2024-11-26浙江省建设工程机械集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420880119.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-26
Publication Date
2024-11-26
Estimated Expiration
2034-04-26

AI Technical Summary

Technical Problem

The existing tower crane lifting frame cannot meet the lifting requirements of ultra-large tower cranes, posing safety hazards and making it difficult to manually push the hanging plate, which affects installation efficiency and increases labor costs.

Method used

The tower crane is steadily lifted by using climbing claws and hanging plates in the lifting assembly, and by synchronous lifting of the main hydraulic cylinder and auxiliary hydraulic cylinder, so that the rotating body is separated from the tower body. MGB friction blocks are used instead of rollers to prevent wear. The design includes a multi-layer frame platform and a horizontal and diagonal web structure with pin connections.

Benefits of technology

This technology enables the steady lifting of ultra-large tower cranes, reduces labor costs, improves installation efficiency and safety, and extends the service life of the tower cranes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222063950U_ABST
    Figure CN222063950U_ABST
Patent Text Reader

Abstract

The utility model discloses a jacking sleeve frame of an ultra-large tower crane. The jacking sleeve frame comprises a jacking sleeve frame structure and jacking assemblies symmetrically arranged on the two sides of the jacking sleeve frame structure. The jacking assembly comprises a main oil cylinder, an auxiliary oil cylinder connected to the main oil cylinder and climbing claws located on the two sides of the top of the main oil cylinder, one end of the auxiliary oil cylinder is connected with a hanging plate, each climbing claw is of an L-shaped structure, one end of each climbing claw is hinged to a cross beam of the jacking sleeve frame structure, a rocker is arranged below each climbing claw, and a rotating piece is hinged to the position, close to the end, of each rocker. The climbing claw in the jacking assembly is matched with the hanging plate, the upper portion of the tower crane is stably lifted, the rotary body is separated from the tower body, and therefore the standard knot is introduced, and jacking knot adding work of the tower crane is completed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tower cranes, in particular to a jacking sleeve frame of a super-large tower crane. Background Art

[0002] A tower crane is a rotating crane with a lifting arm and a counter-arm assembled on the upper part of the tower. With the vigorous development of the country, it is necessary to develop and build various infrastructures. There is an increasing demand for super-large tower cranes for power facilities, super-high buildings, power plants, and transportation facilities. The requirements for various parameters are getting higher and higher. In order to meet the lifting needs of super-large lifting weights, the weight of a single piece of the whole machine continues to increase, which also puts higher requirements on the tower crane's jacking frame device.

[0003] 1. The original tower crane jacking frame cannot meet the jacking work of super-large tower cranes, and it adopts unilateral oil cylinder jacking. During the jacking installation process, the upper part of the tower crane is prone to tilt to one side, which poses a great safety hazard;

[0004] 2. The existing hanging plates need to be pushed by manpower, but in order to meet the lifting needs of large tower cranes, the weight of the hanging plates and lifting beams is often unable to be pushed by manpower, which affects the installation efficiency of super-large tower cranes and increases labor costs. Utility Model Content

[0005] In order to solve the above technical problems, the utility model provides a super-large tower crane jacking frame. The climbing claws and hanging plates in the jacking assembly cooperate with each other to steadily lift the upper part of the tower crane, separate the rotating body from the tower body, thereby introducing standard sections to complete the jacking and sectioning work of the tower crane.

[0006] The utility model adopts the following technical solutions:

[0007] A super-large tower crane jacking frame comprises a jacking frame structure and jacking components symmetrically arranged on both sides of the jacking frame structure; the jacking component comprises a main oil cylinder, an auxiliary oil cylinder connected to the main oil cylinder and climbing claws located on both sides of the top of the main oil cylinder, one end of the auxiliary oil cylinder is connected to a hanging plate, the climbing claw is an L-shaped structure, one end of the climbing claw is hinged to the crossbeam of the jacking frame structure, a rocker is provided below the climbing claw, a rotating part is hinged near the end of the rocker, and one end of the rotating part is hinged to the climbing claw.

[0008] Preferably, the auxiliary oil cylinder is connected to the main oil cylinder via a clamp.

[0009] Preferably, the jacking frame structure includes multiple layers of frame platforms, and ladders are provided between adjacent frame platforms.

[0010] Preferably, the inner side of the lifting sleeve structure has an MGB friction block.

[0011] Preferably, the transverse and diagonal web bars of the jacking frame structure are connected to the frame structure body by pins.

[0012] Compared with the prior art, the utility model has the following advantages: the utility model provides a super-large tower crane jacking frame, including a jacking frame structure and jacking components symmetrically arranged on both sides of the jacking frame structure; the jacking component includes a main oil cylinder, an auxiliary oil cylinder connected to the main oil cylinder, and climbing claws located on both sides of the top of the main oil cylinder, one end of the auxiliary oil cylinder is connected to a hanging plate, and the climbing claws and the hanging plate in the jacking assembly cooperate with each other to steadily lift the upper part of the tower crane, separate the rotating body from the tower body, thereby introducing a standard section, and completing the jacking and sectioning work of the tower crane. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of the jacking frame.

[0014] Figure 2 It is a side view of the lifting frame.

[0015] Figure 3 It is a structural schematic diagram of the jacking component.

[0016] Figure 4 This is a schematic diagram of the joystick in the pulled-up state.

[0017] Figure 5 Schematic diagram of the joystick in the flipped-down state.

[0018] Figure 6 It is a schematic diagram of the structure of the clamp.

[0019] In the figure, there are a lifting frame structure 1, a frame platform 11, a lifting assembly 2, a main oil cylinder 21, an auxiliary oil cylinder 22, a climbing claw 23, a hanging plate 24, a rocker 25, a rotating part 26, a clamp 27, and an MGB friction block 3. DETAILED DESCRIPTION

[0020] In order to facilitate the understanding of the technical solution of the utility model, a detailed description is given below in conjunction with the accompanying drawings and specific embodiments.

[0021] Example 1

[0022] like Figure 1-6 As shown, a super-large tower crane jacking frame includes a jacking frame structure 1 and jacking components 2 symmetrically arranged on both sides of the jacking frame structure 1;

[0023] The jacking assembly 2 includes a main oil cylinder 21, an auxiliary oil cylinder 22 connected to the main oil cylinder 21, and climbing claws 23 located on both sides of the top of the main oil cylinder 21, one end of the auxiliary oil cylinder 22 is connected to a hanging plate 24, and the climbing claw 23 is an L-shaped structure, one end of the climbing claw 23 is hinged to the crossbeam of the jacking frame structure 1, and a rocker 25 is provided below the climbing claw 23, one end of the rocker 25 is hinged to the crossbeam of the jacking frame structure 1, and a rotating member 26 is hinged near the end of the rocker 25, one end of the rotating member 26 is hinged to the climbing claw 23, and a lever structure is formed between the rocker 25, the rotating member 26 and the climbing claw 23, which reduces the installation difficulty of the installer; wherein the rotating member 26 is a triangular structure, two corners of which are respectively hinged to the rocker 25 and the climbing claw 23, and a mounting hole is provided on the upper corner, and a detachable mounting stop pin is installed in the mounting hole;

[0024] One end of the auxiliary oil cylinder 22 is connected to the hoop 27, which consists of two half frames, which are connected to the main oil cylinder 21 by bolts, and the other end of the auxiliary oil cylinder 22 is connected to the jacking frame structure 1; when in use, the auxiliary oil cylinder 22 is extended to hang the hanging plate 24 on the lower step of the standard section (in this embodiment, the standard section is provided with a plurality of steps), the installation pin is installed, and the rocker 25 is flipped downward, the climbing claw 23 is disengaged from the upper step of the standard section of the tower body, and a stop pin is installed in the installation hole of the rotating part 26 to prevent the rocker 25 from being pulled up, and the tower is lifted synchronously by the two main oil cylinders 21 to drive The upper rotating body of the machine is separated from the tower body. When the maximum stroke of the main oil cylinder 21 is reached, the rocker 25 is pulled up, and the extension and contraction amount of the main oil cylinder 21 is adjusted to hang the climbing claw 23 on the step of the standard section of the tower body to ensure that the frame structure and the upper part of the tower crane rotating body are stable in mid-air. Then the safety pin is taken out, and the hanging plate 24 is disengaged from the lower step of the standard section of the tower body by contracting the auxiliary oil cylinder 22. Then the main oil cylinder 21 is contracted and the hanging plate 24 is retracted; then the auxiliary oil cylinder 22 is extended to hang the hanging plate 24 on the step of the upper level. By repeating the above steps, the standard section is introduced after the introduction height of the standard section is reached, and the jacking and section adding work is completed. The main oil cylinders 21 on both sides are controlled by a pump station for synchronous lifting. The pump station can effectively adjust the operating speed of the oil cylinders on both sides through the control valve and the balance valve to make them basically synchronized and have a cut-off function, thereby ensuring the steady lifting of the super-large tower crane and the safety of the lifting and sectioning of the large tower crane. The hanging plate 24 is operated by the extension and contraction of the auxiliary oil cylinder 22, which reduces the cost of the installation personnel and ensures that the hanging plate 24 is smoothly hung on the tower steps during the lifting process, making it convenient for the safety pin to connect and fix the hanging plate 24 to the steps to prevent the hidden danger of tower collapse due to the hanging plate 24 not being hung on the steps.

[0025] The jacking frame structure 1 includes a multi-layer frame platform 11, and there is a ladder between adjacent frame platforms 11. In this embodiment, the jacking frame structure 1 includes a 4-layer frame platform 11, which is arranged outside the frame body to facilitate the tower crane jacking and sectioning work. The 4-layer frame platform 11 and the frame body are installed in a bayonet manner, which is convenient and quick to install. Since the overall volume of this component is large, it is detachable and convenient to transport.

[0026] The inner side of the jacking frame structure 1 is provided with an MGB friction block 3. The MGB friction block is used instead of the traditional iron roller to prevent the roller from wearing the main chord of the tower body during the jacking process of the tower crane, thereby improving the safety and service life of the tower crane. At the same time, the point contact of the roller is changed to the surface contact of the friction block, ensuring that the jacking frame structure 1 is subjected to more balanced force during the jacking process and the frame climbs more smoothly.

[0027] The transverse and oblique web bars of the jacking frame structure 1 are connected to the frame structure body by pins, so the installation and disassembly of the transverse and oblique web bars are more convenient, and the pins are locked by cotter pins, so the operation is reliable.

[0028] The above are only preferred embodiments of the present invention. The protection scope of the present invention shall be based on the scope defined by the claims. Several improvements and modifications made by those skilled in the art without departing from the spirit and scope of the present invention shall also be regarded as the protection scope of the present invention.

Claims

1. A super large tower crane lifting frame, characterized in that: The invention comprises a lifting frame structure (1) and a lifting assembly (2) symmetrically arranged on both sides of the lifting frame structure (1); the lifting assembly (2) comprises a main oil cylinder (21), an auxiliary oil cylinder (22) connected to the main oil cylinder (21), and climbing claws (23) located on both sides of the top of the main oil cylinder (21); one end of the auxiliary oil cylinder (22) is connected to a hanging plate (24); the climbing claw (23) is an L-shaped structure; one end of the climbing claw (23) is hinged to a crossbeam of the lifting frame structure (1); a rocker (25) is provided below the climbing claw (23); a rotating member (26) is hinged to the rocker (25) near the end; one end of the rotating member (26) is hinged to the climbing claw (23).

2. The super-large tower crane lifting frame according to claim 1, characterized in that: The auxiliary oil cylinder (22) is connected to the main oil cylinder (21) via a clamp (27).

3. The super-large tower crane lifting frame according to claim 1, characterized in that: The jacking frame structure (1) comprises a plurality of layers of frame platforms (11), and ladders are provided between adjacent frame platforms (11).

4. The super-large tower crane lifting frame according to claim 1, characterized in that: The inner side surface of the lifting sleeve structure (1) is provided with an MGB friction block (3).

5. The super-large tower crane lifting frame according to claim 1, characterized in that: The transverse and diagonal web bars of the jacking frame structure (1) are connected to the frame structure body by means of pins.