Anti-blocking air stirring system

By setting up filters and cleaning components in the air stirring system, the problems of aeration pipe blockage and inconvenience in maintenance are solved, the system usage time and maintenance efficiency are improved, and the maintenance cost is reduced.

CN222064246UActive Publication Date: 2024-11-26CHONGQING NAIDE MACHINERY EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323661199.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-11-26
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

In traditional air stirring systems, the aeration pipe is easily attached to silt sediment and debris when soaking in the liquid for a long time, resulting in the aeration pipe orifice being blocked and inconvenient for maintenance, which affects the aeration effect and maintenance costs.

Method used

An anti-blocking air stirring system was designed. By setting a filter on the front end of the gas explosion tube, it reduces the attachment of silt and sand and debris, and sets the gas explosion tube as a detachable connection method to facilitate cleaning; at the same time, cleaning components are set up Used to clean up sediment inside the storage tank to prevent sediment from adhering to the bottom.

Benefits of technology

It effectively reduces the number of cleaning times of gas explosion pipes, reduces maintenance costs, increases the system usage time, and simplifies the maintenance process, avoiding the cumbersome operation of clearing the filler layer first.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222064246U_ABST
    Figure CN222064246U_ABST
Patent Text Reader

Abstract

The utility model provides an anti-clogging air stirring system which comprises a storage pool, the bottom of the storage pool is in a V shape, discharging openings are formed in the two ends of the storage pool, cover plates are arranged at the two discharging openings, each cover plate is provided with a locking mechanism used for locking the cover plate, and an iron-carbon filler layer is further arranged in the storage pool. The air stirring part comprises a main air pipe arranged outside the storage pool and a plurality of groups of gas explosion pipes detachably connected with the main air pipe, one end of each gas explosion pipe is located in the storage pool and detachably connected with the storage pool, and each gas explosion pipe is located on the lower side of the iron-carbon filler layer; the end, away from the main gas pipe, of each gas explosion pipe is sleeved with a filter screen used for preventing the end of the gas explosion pipe from being blocked by sediment in water. The cleaning assembly is arranged in the storage pool, located on the lower sides of the multiple sets of gas explosion pipes and used for cleaning sediments in the storage pool; the filter screen is arranged at the front end of the gas explosion pipe, silt, sundries and the like attached to the gas explosion pipe are reduced, the service life is prolonged, and the cleaning frequency of the gas explosion pipe is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of environmental protection water treatment, in particular to an anti-clogging air stirring system. Background Art

[0002] In the field of water treatment, air agitation tanks are inevitably used in the sewage treatment process. Air agitation tanks mainly use aeration equipment to introduce air into sewage or sludge to increase the activity of some microorganisms, or to add some acidic or alkaline drugs for neutralization, which requires the injection of oxygen.

[0003] However, as the aeration pipe is immersed in the liquid for a long time during operation, the silt, sediment and debris in the liquid are easily attached to the aeration pipe openings, causing blockage of the aeration pipe openings, thereby deteriorating the aeration effect or even losing the aeration effect. At the same time, since the air stirring pipeline system is arranged at the bottom of the pool, an iron-carbon filler layer is provided in the middle of the advanced oxidation process section pool. If the bottom pipeline is blocked, the filler layer needs to be emptied first, which makes operation and maintenance inconvenient, time-consuming and labor-intensive. Utility Model Content

[0004] In view of the deficiencies existing in the prior art, the utility model provides an anti-clogging air stirring system, which solves the problem in the prior art that traditional aeration pipes are immersed in liquid for a long time, and are easily attached to the aeration pipe orifices by mud, sediment and debris in the liquid, causing blockage of the aeration pipe orifices and inconvenience in maintenance.

[0005] According to an embodiment of the utility model, an anti-clogging air stirring system includes a storage tank, the bottom of which is V-shaped, with discharge ports at both ends, cover plates are provided at the two discharge ports, each cover plate is provided with a locking mechanism for locking the cover plate, and an iron-carbon filler layer is also provided inside the storage tank; an air stirring member includes a main air pipe arranged outside the storage tank and a plurality of groups of gas explosion tubes detachably connected to the main air pipe, one end of each gas explosion tube is located inside the storage tank, and is detachably connected to the storage tank, and each gas explosion tube is located on the lower side of the iron-carbon filler layer, wherein the end of each gas explosion tube away from the main air pipe is provided with a filter net for preventing the end of the gas explosion tube from being blocked by sediment in the water; a cleaning component is arranged inside the storage tank, located on the lower side of the plurality of groups of gas explosion tubes, and is used to clean the sediment inside the storage tank.

[0006] Compared with the prior art, the utility model has the following beneficial effects: by arranging a filter net at the front end of the gas explosion pipe, the mud and sundries attached to the gas explosion pipe are reduced, the service life is increased, and the number of times the gas explosion pipe is cleaned is reduced. At the same time, the gas explosion pipe is arranged in a connection mode that can be detached from the storage tank and the main air pipe, so that the gas explosion pipe can be removed for cleaning without the need to waste time and effort to empty the packing layer first, and then take out the gas explosion pipe, thereby reducing the maintenance cost. When cleaning is required, the sewage is directly emptied first, and the connection with the main air pipe and the storage tank is removed in turn, and the gas explosion pipe can be directly pulled out for cleaning; and the cleaning component is used to clean the sediment inside the storage tank to prevent it from being precipitated and attached to the bottom of the storage tank.

[0007] Preferably, the storage tank is provided with a mounting seat, and the main air pipe is arranged on the mounting seat, wherein the main air pipe and one end of each gas explosion pipe close to the main air pipe are provided with flanges, and the corresponding flanges are bolted.

[0008] Preferably, threaded buckles corresponding to the number of gas explosion tubes are arranged outside the storage pool, and a threaded cover is threadedly connected to each threaded buckle, wherein corresponding gas explosion tubes are passed through corresponding threaded buckles and threaded covers.

[0009] Preferably, an annular groove is provided at one end of each gas explosion pipe away from the main gas pipe, a through groove is provided on the filter screen, and an annular retaining spring is provided at one end of the filter screen, and the annular retaining spring is clamped in the annular groove.

[0010] Preferably, each locking mechanism comprises a latching tooth arranged on the cover plate and a buckle arranged on the bottom of the storage tank, wherein the buckle is engaged with the latching tooth.

[0011] Preferably, the cleaning assembly includes a screw rod rotatably arranged in the storage pool, and a scraper threadedly connected to the screw rod, the scraper is located inside the storage pool and abuts against the bottom of the storage pool, a gear is arranged at one end of the screw rod, the gear is located outside the storage pool, and a hand wheel is rotatably arranged in the storage pool, and the hand wheel is meshed with the gear.

[0012] Preferably, a sealing gasket is provided at each discharge port, and a sealing ring is provided at each flange connection. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a three-dimensional structural schematic diagram of an embodiment of the utility model.

[0014] Figure 2 The figure is a schematic diagram of the explosion structure of an embodiment of the utility model.

[0015] Figure 3 It is a schematic diagram of the structure of the air stirring member in the embodiment of the utility model.

[0016] Figure 4 for Figure 3Magnified view of area A.

[0017] Figure 5 This is a schematic diagram of the structure of the locking mechanism and the cleaning component in the embodiment of the utility model.

[0018] In the above drawings: 1, storage tank; 100, iron-carbon filler layer; 101, mounting seat; 102, discharge port; 103, threaded buckle; 104, threaded cover; 2, main air pipe; 3, cover plate; 301, latch teeth; 302, buckle; 4, filter screen; 401, through groove; 5, screw rod; 501, scraper; 502, gear; 503, hand wheel; 6, gas explosion pipe; 601, flange; 602, ring groove. DETAILED DESCRIPTION

[0019] The technical solution of the present utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0020] like Figures 1 to 5 As shown, an embodiment of the utility model proposes an anti-clogging air stirring system, which includes a storage tank 1, the bottom of which is V-shaped, and has discharge ports 102 at both ends, and cover plates 3 are provided at the two discharge ports 102, and each cover plate 3 is provided with a locking mechanism for locking the cover plate 3, and an iron-carbon filler layer 100 is also provided inside the storage tank 1; an air stirring member, including a main air pipe 2 arranged outside the storage tank 1 and a plurality of groups of gas explosion pipes 6 detachably connected to the main air pipe 2, one end of each gas explosion pipe 6 is located inside the storage tank 1, and is detachably connected to the storage tank 1, and each gas explosion pipe 6 is located on the lower side of the iron-carbon filler layer 100, wherein each gas explosion pipe 6 is provided with a filter net 4 at one end away from the main air pipe 2 to prevent the end of the gas explosion pipe 6 from being blocked by sediment in the water; a cleaning component is arranged inside the storage tank 1, located on the lower side of the plurality of groups of gas explosion pipes 6, and is used to clean the sediment inside the storage tank 1.

[0021] The detailed working process of this embodiment is as follows: the bottom of the storage tank 1 is set to a V shape to facilitate cleaning and reduce dead corners and incomplete cleaning during cleaning. The cover plate 3 at the discharge port 102 is normally closed and sealed by a locking mechanism to ensure the sealing of the bottom of the storage tank 1, and the iron-carbon filler layer 100 is a commonly used sewage treatment filler. The main air pipe 2 is connected to an air pump or a fan, and the filter screen 4 is set on the jet end of the gas explosion pipe 6 to protect the jet port of the gas explosion pipe 6 to prevent mud and sand sediments from falling directly on the jet port and causing blockage.

[0022] By arranging a filter net 4 at the front end of the gas explosion pipe, the mud and sundries attached to the gas explosion pipe 6 are reduced, the service life is increased, and the number of times the gas explosion pipe 6 is cleaned is reduced. At the same time, the gas explosion pipe 6 is arranged to be detachable from the storage tank 1 and the main air pipe 2, so that the gas explosion pipe 6 can be removed separately for cleaning, without the need to waste time and effort to first empty the packing layer 100 and then take out the gas explosion pipe 6 for cleaning, thereby reducing maintenance costs. When cleaning is required, the sewage is directly emptied first, and the connection with the main air pipe 2 and the connection with the storage tank 1 are removed in turn, and the gas explosion pipe 6 is directly pulled out for cleaning; and the cleaning component is used to clean the sediment inside the storage tank 1 to prevent it from settling and adhering to the bottom of the storage tank 1.

[0023] like Figure 2 and Figure 3 As shown, the storage tank 1 is provided with a mounting seat 101, and the main air pipe 2 is arranged on the mounting seat 101, wherein the main air pipe 2 and one end of each gas explosion pipe 6 close to the main air pipe 2 are provided with a flange 601, and the corresponding flange 601 is bolted.

[0024] The detailed working process of this embodiment is as follows: the main air pipe 2 is connected to the gas explosion pipe 6 through the flange 601. When connecting, the flange 601 on the main air pipe 2 is directly docked with the flange 601 of the gas explosion pipe 6, and then the bolts are tightened, which can effectively avoid leakage at the two joints. When the main air pipe 2 and the gas explosion pipe 6 need to be disassembled, the bolts can be directly removed.

[0025] like Figure 2 As shown, the storage pool 1 is provided with threaded buckles 103 corresponding to the number of gas explosion tubes 6 on the outside, and each threaded buckle 103 is threadedly connected with a threaded cover 104 , wherein the corresponding gas explosion tube 6 passes through the corresponding threaded buckle 103 and the threaded cover 104 .

[0026] The detailed working process of this embodiment is as follows: under the setting of the threaded buckle 103 and the threaded cover 104, the gas explosion pipe 6 passing through the storage tank 1 can be fixed and sealed to prevent the sewage in the storage tank 1 from leaking from the joint. The threaded buckle 103 is divided into two halves, and the gas explosion pipe 6 passes through the middle of the threaded buckle 103. Then, the threaded cover 104 is tightened so that the two halves of the threaded buckle 103 are close to each other and abut against the gas explosion pipe 6, so that the gas explosion pipe 6 is fixed on the storage tank 1 and its joint is sealed.

[0027] like Figure 3 and Figure 4 As shown, an annular groove 602 is provided at one end of each gas explosion tube 6 away from the main gas pipe 2 , a through groove 401 is provided on the filter screen 4 , and an annular retaining spring is provided at one end of the filter screen 4 , and the annular retaining spring is retained in the annular groove 602 .

[0028] The detailed working process of this embodiment is as follows: the function of the filter screen 4 is to reduce the mud, sand and debris attached to the gas explosion tube 6, increase the service life, and reduce the number of cleaning times of the gas explosion tube 6. The filter screen 4 is cylindrically sleeved on one end of the gas explosion tube 6, and an annular retaining spring is provided at one end of the filter screen 4. The notch of the annular retaining spring is aligned with the through groove 401 of the filter screen 4. The filter screen 4 is firmly clamped on one end of the gas explosion tube 6 by the annular retaining spring to prevent it from falling off. When installing the filter screen 4, the through groove 401 on the filter screen 4 needs to be rotated to the bottom of the gas explosion tube 6 to prevent larger debris from passing through the through groove 401 and falling into the filter screen 4, and attaching to the air jet port to cause blockage.

[0029] like Figure 1 and Figure 5 As shown, each locking mechanism includes a latching tooth 301 disposed on the cover plate 3 and a buckle 302 disposed at the bottom of the storage tank 1 , wherein the buckle 302 is latched on the latching tooth 301 .

[0030] The detailed working process of this embodiment is as follows: under the arrangement of the buckle 302 and the latching teeth 301 , it can ensure that the cover plate 3 and the discharge port 102 of the storage tank 1 are firmly fitted together to avoid water leakage.

[0031] like Figure 2 As shown, the cleaning assembly includes a screw rod 5 rotatably arranged in the storage pool 1, and a scraper 501 threadedly connected to the screw rod 5, the scraper 501 is located inside the storage pool 1 and abuts against the bottom of the storage pool 1, a gear 502 is arranged at one end of the screw rod 5, the gear 502 is located outside the storage pool 1, and a hand wheel 503 is rotatably arranged on the storage pool 1, and the hand wheel 503 is meshed with the gear 502.

[0032] The detailed working process of this embodiment is as follows: the scraper 501 can reciprocate inside the storage tank 1 through the drive of the screw rod 5, so as to clean the bottom side of the storage tank 1, and clean the sediment on the bottom side of the storage tank 1 out of the storage tank 1 to prevent it from being precipitated and attached to the storage tank 1, affecting the sewage treatment. In this embodiment, the hand wheel 503 is manually rotated when the screw rod 5 is driven to rotate, and the screw rod 5 can also be driven in the same direction by electric drive to rotate. The hand wheel 503 then drives the screw rod 5 to rotate, and the scraper 501 can be controlled to move in the storage tank 1. When cleaning, first open the cover plate 3 to drain the sewage in the storage tank 1, and then drive the screw rod 5 to rotate, and then the scraper 501 moves in the storage tank 1 to scrape off the sediment attached to the storage tank 1 and discharge it from the discharge port 102.

[0033] like Figure 2 As shown, a sealing gasket is provided at each discharge port 102, and a sealing ring is provided at each flange 601 connection.

[0034] The detailed working process of this embodiment is as follows: the sealing gasket at the discharge port 102 and the sealing ring at the connection of the flange 601 are both for improving the sealing of the corresponding connection to avoid leakage at the connection.

[0035] The implementation principle of the embodiment of the present application is: the main air pipe 2 is inflated by an air pump or a fan, and the water body is stirred in the sewage sent into the storage tank 1 through the gas explosion pipe 6 to prevent the suspended matter in the water body from sinking, accelerate the transfer of oxygen in the air to the water body, and complete the purpose of oxygenation and stirring. The filter net 4 is responsible for reducing the mud and debris attached to the gas explosion pipe 6, thereby increasing the service life and reducing the number of times the gas explosion pipe 6 is cleaned.

[0036] When the gas explosion pipe 6 needs to be removed for cleaning, first open the cover plate 3 to drain the sewage in the storage tank 1, then remove the bolts on the flange 601, loosen the threaded cover, and pull the gas explosion pipe 6 out from the threaded buckle.

[0037] When cleaning the sediment in the storage tank 1, first open the cover 3 to drain the sewage in the storage tank 1, then drive the screw 5 to rotate, and then the scraper 501 moves in the storage tank 1 to scrape off the sediment attached to the storage tank 1 and discharge it from the discharge port 102.

[0038] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. An anti-clogging air stirring system, characterized in that: include: The storage tank (1) has a V-shaped bottom and is provided with discharge ports (102) at both ends. Cover plates (3) are provided at the two discharge ports (102). Each of the cover plates (3) is provided with a locking mechanism for locking the cover plate (3). An iron-carbon filler layer (100) is also provided inside the storage tank (1); An air stirring member, comprising a main air pipe (2) arranged outside the storage pool (1) and a plurality of groups of air explosion pipes (6) detachably connected to the main air pipe (2), one end of each of the air explosion pipes (6) being located inside the storage pool (1) and being detachably connected to the storage pool (1), and each of the air explosion pipes (6) being located below the iron-carbon filler layer (100), wherein one end of each of the air explosion pipes (6) away from the main air pipe (2) is sleeved with a filter screen (4) for preventing the end of the air explosion pipe (6) from being blocked by sediment in the water; A cleaning component is arranged inside the storage pool (1) and is located below the multiple groups of gas explosion tubes (6) and is used to clean sediment inside the storage pool (1).

2. The anti-clogging air stirring system according to claim 1, characterized in that: The storage tank (1) is provided with a mounting seat (101), and the main air pipe (2) is arranged on the mounting seat (101), wherein the main air pipe (2) and one end of each gas explosion pipe (6) close to the main air pipe (2) are provided with a flange (601), and the corresponding flange (601) is bolted.

3. The anti-clogging air stirring system according to claim 2, characterized in that: The storage pool (1) is provided with threaded buckles (103) corresponding to the number of the gas explosion tubes (6) on the outside, and each of the threaded buckles (103) is threadedly connected with a threaded cover (104), wherein the corresponding gas explosion tube (6) passes through the corresponding threaded buckle (103) and the threaded cover (104).

4. The anti-clogging air stirring system according to claim 3, characterized in that: An annular groove (602) is provided at one end of each gas explosion tube (6) away from the main gas pipe (2), a through groove (401) is provided on the filter screen (4), and an annular retaining spring is provided at one end of the filter screen (4), and the annular retaining spring is retained in the annular groove (602).

5. The anti-clogging air stirring system according to claim 1, characterized in that: Each of the locking mechanisms comprises a latching tooth (301) arranged on the cover plate (3) and a buckle (302) arranged at the bottom of the storage tank (1), wherein the buckle (302) is latched on the latching tooth (301).

6. The anti-clogging air stirring system according to claim 1, characterized in that: The cleaning assembly comprises a screw rod (5) rotatably arranged in the storage tank (1), and a scraper (501) threadedly connected to the screw rod (5), the scraper (501) being located inside the storage tank (1) and abutting against the bottom of the storage tank (1), a gear (502) being arranged at one end of the screw rod (5), the gear (502) being located outside the storage tank (1), and a hand wheel (503) being rotatably arranged in the storage tank (1), the hand wheel (503) being meshed with the gear (502).

7. The anti-clogging air stirring system according to claim 2, characterized in that: A sealing gasket is provided at each of the discharge ports (102), and a sealing ring is provided at each of the flange (601) connections.