Highway subgrade anti-settlement structure

By designing an anti-segmentation structure including compaction layer, rubber layer, support spring and reinforcement plate on the roadbed, the sinking and landslide problems caused by long-term load on the road gene are solved, and the stability and safety of the road surface are improved.

CN222065055UActive Publication Date: 2024-11-26ZHEJIANG COMM CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323542813.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-11-26
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

The roadbed is subjected to high loads for a long time and causes overall sinking, resulting in unevenness, frequent landslides or collapses, and the lack of shock-absorbing structures lead to sunken road surfaces.

Method used

A highway roadbed anti-segmentation structure was designed, including foundation frame, compaction layer, plain soil layer, anti-segmentation mechanism, concrete layer and asphalt layer. The upper and lower support columns and drainage are set with rubber layer, support springs and reinforcement plates. The tube forms a stable structure to reduce vibration and prevent sinking.

Benefits of technology

It effectively prevents the subgrade and landslide, improves the stability of the road surface, slows down vibration, avoids the depression of the road surface, and solves the use problem caused by the lack of shock-absorbing structure of the road gene.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065055U_ABST
    Figure CN222065055U_ABST
Patent Text Reader

Abstract

The utility model relates to a highway subgrade anti-settlement structure which comprises a foundation frame, a tamping layer is arranged at the bottom of the foundation frame, a first plain soil layer is arranged at the top of the tamping layer, an anti-settlement mechanism is arranged at the top of the first plain soil layer, a second plain soil layer is arranged at the top of the anti-settlement mechanism, and a first plain soil layer is arranged at the top of the second plain soil layer. A concrete layer is arranged on the top of the second plain soil layer, and an asphalt layer is arranged on the top of the concrete layer. According to the anti-settlement structure for the highway subgrade, the tamping layer is arranged to reinforce the bottom of the whole foundation frame, and the upper supporting columns and the lower supporting columns are arranged in the first plain soil layer and the second plain soil layer correspondingly, so that the first plain soil layer and the second plain soil layer are prevented from deforming and sinking after being subjected to gravity; the first plain soil layer and the second plain soil layer are stabilized, and the upper anti-settling base body and the lower anti-settling base body can be quickly restored to the original positions by arranging the rubber layer and utilizing the characteristic that rubber has elasticity due to reversible deformation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of roadbeds, in particular to a highway roadbed anti-settling structure. Background Art

[0002] Roadbed refers to a strip structure built as the foundation of the road surface according to the route location and certain technical requirements. It is the foundation of railways and highways. The roadbed is a linear structure built with soil or stone. It is a roadbed built under good geological, hydrological and climatic conditions. Based on the materials, the roadbed can be divided into three types: earth roadbed, stone roadbed and earth-stone roadbed.

[0003] Roadbed is the basic project of road construction. Roadbed settlement is a common phenomenon that endangers driving safety during the use of highways. Because the highway bears high loads for a long time, the roadbed sinks as a whole, forming unevenness. Some highway roadbeds often slide and collapse. Since the roadbed has no shock-absorbing structure, it will sink when the road surface is under great pressure. Therefore, a highway roadbed anti-settlement structure is proposed to solve the above problem. Utility Model Content

[0004] In view of the shortcomings of the prior art, the utility model provides a highway roadbed anti-subsidence structure with the advantages of anti-subsidence, etc., which solves the problem that the roadbed sinks as a whole and becomes uneven due to the high load the highway bears for a long time. Some highway roadbeds often experience landslides and collapses. Since the roadbed has no shock-absorbing structure, it will sink when the road surface is under great pressure.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a highway roadbed anti-settlement structure, comprising a foundation frame, a compacted layer is arranged at the bottom of the foundation frame, a first plain soil layer is arranged on the top of the compacted layer, an anti-settlement mechanism is arranged on the top of the first plain soil layer, a second plain soil layer is arranged on the top of the anti-settlement mechanism, a concrete layer is arranged on the top of the second plain soil layer, and an asphalt layer is arranged on the top of the concrete layer;

[0006] The anti-settling mechanism includes an upper anti-settling base, a rubber layer, a cavity, a supporting compression spring, an upper supporting column, a lower anti-settling base and a lower supporting column. The upper anti-settling base is arranged at the bottom of the second soil layer, the bottom of the upper anti-settling base is arranged at the rubber layer, a cavity is opened inside the rubber layer, a supporting compression spring is arranged inside the cavity, an upper supporting column is arranged inside the first soil layer, the bottom of the rubber layer is arranged at the lower anti-settling base, and the lower supporting column is arranged inside the second soil layer.

[0007] Furthermore, reinforcement plates are installed on both sides of the foundation frame, and the two reinforcement plates are respectively located at the top ends of the compacted layer.

[0008] Furthermore, water inlets are provided at both ends of the top of the asphalt layer, the bottoms of the two water inlets are connected to drainage pipes, and the bottoms of the drainage pipes pass through the reinforcement plate and extend to the outside of the foundation frame.

[0009] Furthermore, the cavity is adapted to the supporting compression spring, and the cavities are equidistantly distributed inside the rubber layer, the top of the supporting compression spring is fixedly connected to the bottom of the upper anti-settling substrate, and the bottom is fixedly connected to the inner bottom wall of the cavity.

[0010] Furthermore, the upper support column is located between the concrete layer and the upper anti-settlement matrix, and the lower support column is located between the compacted layer and the lower anti-settlement matrix.

[0011] Furthermore, the surface of the asphalt layer is coated with a waterproof coating, and the reinforcement plate is tightly fitted to both sides of the foundation frame.

[0012] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0013] 1. By setting a compaction layer, the bottom of the foundation frame as a whole is reinforced. By setting an upper support column and a lower support column respectively inside the first soil layer and the second soil layer, the first soil layer and the second soil layer are prevented from being deformed and sunken after being subjected to gravity, and the first soil layer and the second soil layer are stabilized. By setting a rubber layer, the upper anti-settling matrix and the lower anti-settling matrix can be quickly restored to their original positions by utilizing the elastic characteristics of the reversible deformation of rubber, and thus can be prevented from sinking after being subjected to gravity. By setting a support compression spring, the elasticity of the spring can be further used to make the upper anti-settling matrix quickly restore to its original position, and the upper anti-settling matrix can be prevented from being pressed down by gravity on the asphalt layer. At the same time, a certain vibration can be reduced to prevent the vibration generated during the driving of the car from causing the foundation frame to sink. By setting an anti-settling mechanism, the problem of the overall sinking of the roadbed caused by the long-term high load on the highway is solved, forming unevenness. Landslides and collapses of some highway roadbeds often occur. Since the roadbed has no shock-absorbing structure, the road surface will sink and sink when it is subjected to heavy pressure.

[0014] 2. The anti-settlement structure of the highway roadbed is convenient for the accumulated water on the asphalt layer to enter the drainage pipe through the water inlet by setting the water inlet and the water in the drainage pipe is discharged to the outside, thus avoiding the inconvenience caused by water accumulation on the road surface. By setting reinforcement plates on the left and right sides of the foundation frame, landslides and other phenomena on the road surface are prevented, thereby improving the stability of the road surface. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional diagram of the structure of the utility model;

[0016] Figure 2This is a schematic diagram of the internal structure of the utility model;

[0017] Figure 3 The utility model structure Figure 2 Enlarged view of point A in the middle.

[0018] In the figure: 1 foundation frame, 2 compaction layer, 3 first soil layer, 4 anti-settlement mechanism, 401 upper anti-settlement base, 402 rubber layer, 403 cavity, 404 support compression spring, 405 upper support column, 406 lower anti-settlement base, 407 lower support column, 5 second soil layer, 6 concrete layer, 7 asphalt layer, 8 water inlet, 9 drainage pipe, 10 reinforcement plate. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] See also Figure 1-3 In this embodiment, a highway roadbed anti-settlement structure comprises a foundation frame 1, a compacted layer 2 is arranged at the bottom of the foundation frame 1, a first plain soil layer 3 is arranged on the top of the compacted layer 2, an anti-settlement mechanism 4 is arranged on the top of the first plain soil layer 3, a second plain soil layer 5 is arranged on the top of the anti-settlement mechanism 4, a concrete layer 6 is arranged on the top of the second plain soil layer 5, and an asphalt layer 7 is arranged on the top of the concrete layer 6;

[0021] The anti-settling mechanism 4 includes an upper anti-settling substrate 401, a rubber layer 402, a cavity 403, a support compression spring 404, an upper support column 405, a lower anti-settling substrate 406 and a lower support column 407. The bottom of the second soil layer 5 is provided with an upper anti-settling substrate 401, the bottom of the upper anti-settling substrate 401 is provided with a rubber layer 402, the inside of the rubber layer 402 is provided with a cavity 403, the inside of the cavity 403 is provided with a support compression spring 404, the inside of the first soil layer 3 is provided with an upper support column 405, the rubber layer 402 is provided with a support compression spring 404, the inside of the first soil layer 3 ... A lower anti-settling matrix 406 is provided at the bottom, and a lower support column 407 is provided inside the second soil layer 5. By arranging an upper anti-settling matrix 401 and a lower anti-settling matrix 406 at the top and bottom of the rubber layer 402, the upper anti-settling matrix 401 and the lower anti-settling matrix 406 can be quickly restored to their original positions by utilizing the reversible deformation and elasticity of rubber to avoid sinking due to gravity. The top of the support compression spring 404 is fixedly connected to the bottom of the upper anti-settling matrix 401, and the bottom is fixedly connected to the inner bottom wall of the cavity 403. A support compression spring 404 is provided, and the elasticity of the spring can further enable the upper anti-settling base 401 to quickly return to its original position, thereby preventing the upper anti-settling base 401 from being pressed down by gravity on the asphalt layer 7, and at the same time, it can reduce a certain vibration, thereby preventing the vibration generated during the driving of the car from causing the foundation frame 1 to sink. By respectively providing an upper support column 405 and a lower support column 407 inside the first soil layer 3 and the second soil layer 5, the first soil layer 3 and the second soil layer 5 are prevented from being deformed and sunken after being affected by gravity, thereby preventing the first soil layer 3 and the second soil layer 5 from being deformed and sunken after being affected by gravity. The bare soil layer 3 and the second bare soil layer 5 play a stabilizing role. Reinforcement plates 10 are installed on both sides of the foundation frame 1. By setting the reinforcement plates 10, landslides and other phenomena on the road surface are prevented, and the stability of the road surface is improved. The surface of the reinforcement plates 10 is coated with waterproof coating to prevent accumulated water from entering the interior of the foundation frame 1 from the surface of the reinforcement plates 10. Water inlets 8 are opened at both ends of the top of the asphalt layer 7. The bottoms of the two water inlets 8 are connected to drain pipes 9. By setting the water inlets 8 and the drain pipes 9, it is convenient to discharge the accumulated water on the road surface.

[0022] In summary, the highway roadbed anti-settlement structure, by setting a compaction layer 2, reinforces the bottom of the foundation frame 1 as a whole, and by setting an upper support column 405 and a lower support column 407 inside the first soil layer 3 and the second soil layer 5 respectively, it prevents the first soil layer 3 and the second soil layer 5 from deforming and sinking after being affected by gravity, and plays a stabilizing role for the first soil layer 3 and the second soil layer 5. By setting a rubber layer 402, the reversible deformation and elasticity of rubber are utilized to enable the upper anti-settlement matrix 401 and the lower anti-settlement matrix 406 to quickly return to their original positions to avoid sinking after being affected by gravity. A support compression spring 404 is provided, and the elasticity of the spring can further enable the upper anti-settling base 401 to quickly return to its original position, so as to prevent the upper anti-settling base 401 from being pressed down by gravity on the asphalt layer 7, and at the same time, it can reduce a certain vibration, so as to prevent the vibration generated during the driving of the car from causing the foundation frame 1 to sink. By providing the anti-settling mechanism 4, the problem of the overall sinking of the roadbed and the formation of unevenness due to the long-term high load of the highway is solved. The landslide and collapse of some highway roadbeds often occur. Since the roadbed has no shock-absorbing structure, the road surface will sink when it is under great pressure.

[0023] Furthermore, by providing a water inlet 8 and a drain pipe 9, it is convenient for the accumulated water on the asphalt layer 7 to enter the drain pipe 9 through the water inlet 8, and the water in the drain pipe 9 is discharged to the outside, thereby avoiding the inconvenience caused by water accumulation on the road surface. By providing reinforcement plates 10 on the left and right sides of the foundation frame 1, landslides and the like of the road surface are prevented, thereby improving the stability of the road surface.

[0024] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0025] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A highway subsidence prevention structure, comprising a foundation frame (1), characterized in that: A compacted layer (2) is provided at the bottom of the foundation frame (1), a first soil layer (3) is provided on the top of the compacted layer (2), an anti-settling mechanism (4) is provided on the top of the first soil layer (3), a second soil layer (5) is provided on the top of the anti-settling mechanism (4), a concrete layer (6) is provided on the top of the second soil layer (5), and an asphalt layer (7) is provided on the top of the concrete layer (6); The anti-settling mechanism (4) comprises an upper anti-settling base (401), a rubber layer (402), a cavity (403), a support compression spring (404), an upper support column (405), a lower anti-settling base (406) and a lower support column (407); the upper anti-settling base (401) is arranged at the bottom of the second soil layer (5); the rubber layer (402) is arranged at the bottom of the upper anti-settling base (401); a cavity (403) is provided inside the rubber layer (402); a support compression spring (404) is arranged inside the cavity (403); the upper support column (405) is arranged inside the first soil layer (3); the lower anti-settling base (406) is arranged at the bottom of the rubber layer (402); and the lower support column (407) is arranged inside the second soil layer (5).

2. A highway subsidence prevention structure according to claim 1, characterized in that: Reinforcement plates (10) are installed on both left and right sides of the foundation frame (1), and the two reinforcement plates (10) are respectively located at the top ends of the compacted layer (2).

3. The highway subsidence prevention structure according to claim 1 is characterized by: Water inlets (8) are provided at both ends of the top of the asphalt layer (7), the bottoms of the two water inlets (8) are connected to drainage pipes (9), and the bottoms of the drainage pipes (9) penetrate the reinforcement plate and extend to the outside of the foundation frame (1).

4. The highway subsidence prevention structure according to claim 1, characterized in that: The cavity (403) is compatible with the supporting compression spring (404), and the cavities (403) are distributed at equal distances inside the rubber layer (402); the top of the supporting compression spring (404) is fixedly connected to the bottom of the upper anti-settling base (401), and the bottom is fixedly connected to the inner bottom wall of the cavity (403).

5. The highway subsidence prevention structure according to claim 1, characterized in that: The upper support column (405) is located between the concrete layer (6) and the upper anti-settlement base (401), and the lower support column (407) is located between the compacted layer (2) and the lower anti-settlement base (406).

6. The highway subsidence prevention structure according to claim 2, characterized in that: The surface of the asphalt layer (7) is coated with a waterproof coating, and the reinforcement plate (10) is tightly fitted to both sides of the foundation frame (1).