High pile cap shipping wharf structure
By setting up a plurality of first cast-in-fill piles in the existing bed-type cylinder outbound terminal structure, the problems of high cost and slow transformation of the bearings of medium and high piles in the existing technology are solved, and high efficiency is achieved , stable delivery capacity and construction convenience of major components.
Patent Information
- Application Number
- CN202420748683.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-11
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-11
AI Technical Summary
When the existing bed-type cylinder delivery terminal structure meets the requirements for the delivery of major components, it is necessary to demolish and rebuild or build a new high-pile bearing on a large scale, resulting in high investment costs, slow transformation speed and long construction cycle.
A high pile bearing platform outbound terminal structure was designed, and using the retaining effect of the original bed-type cylindrical structure, multiple first cast-in piles penetrate the cylindrical structure and reach the bedrock, combining the backfill structure and the upper bearing platform. , realize load transfer and soil retaining functions, reduce the amount of demolition and excavation, and meet the overload transportation needs.
It has achieved the effects of strong overload capacity, fast transformation speed, convenient construction and investment saving, ensuring the stability of the dock structure and construction efficiency.
Smart Images

Figure CN222065323U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of docks, and in particular relates to a high-pile cap shipping dock structure. Background Art
[0002] The existing bed-type cylindrical shipping terminal structure design, if the original structure after review cannot meet the requirements for the shipment of major components, it is necessary to carry out large-scale demolition and reconstruction of the original structure or to build a new high-pile foundation shipping terminal at the adjacent project location. However, the above two treatment methods have high investment costs, slow transformation speed and long construction period. Utility Model Content
[0003] The utility model aims to provide a high pile cap shipping wharf structure, which can not only meet the requirements of strong overload capacity and fast transformation speed, but also has the advantages of convenient construction and investment saving.
[0004] The utility model is realized by the following technical solutions:
[0005] A high-pile cap shipping wharf structure comprises a cylindrical structure, an upper cap and a backfill structure, wherein the cylindrical structure is arranged at the front of the wharf, the upper cap is arranged at the top of the cylindrical structure, a plurality of first cast-in-place piles and a plurality of second cast-in-place piles are arranged at the bottom of the upper cap, the plurality of first cast-in-place piles are arranged in the cylindrical structure and penetrate the cylindrical structure, and the backfill structure is arranged at a side of the cylindrical structure away from the water area and is respectively connected to the cylindrical structure and the upper cap.
[0006] Furthermore, the cylindrical structure includes a plurality of cylinders arranged in parallel, the cylinders are filled with backfill sand layers, a protrusion is provided at one end of the bottom of the upper base close to the water area, the protrusions are respectively connected to the plurality of cylinders and the plurality of first cast-in-place piles, the plurality of first cast-in-place piles are respectively arranged in the plurality of cylinders and penetrate the backfill sand layer, and a unloading plate connected to the protrusion is provided on the top of the cylinder.
[0007] Furthermore, the backfill structure includes a backfill block stone layer arranged behind the cylindrical structure and a transition block stone layer arranged above the backfill block stone layer, the backfill block stone layer is connected to the cylindrical structure, and the transition block stone layer is connected to the upper bearing platform.
[0008] Furthermore, a mixed filter layer and a double-layer geotextile are provided between the backfill block stone layer and the transition block stone layer.
[0009] Furthermore, a special-shaped notch is arranged on one end of the top of the upper pedestal close to the water area, and a lap rail is arranged on the bottom of the special-shaped notch.
[0010] Compared with the prior art, the beneficial effects of the utility model are as follows: making full use of the retaining effect of the original bed-type cylindrical structure, achieving the retaining function without dismantling the original cylindrical structure, maintaining the soil pressure caused by the height difference of the wharf, and greatly reducing the amount of demolition and excavation; at the same time, utilizing the bottomless characteristics of the bed-type cylindrical structure, the bored piles can penetrate the cylindrical structure directly to the bedrock bearing layer, so that the stress of the base tends to be balanced, and the load is transferred to the pile foundation structure, ensuring the stability of the cylindrical structure during overload transportation, and bearing the main load transmitted by the transportation components through the bored piles and the upper pedestal, so as to meet the transportation of major components. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a structural schematic diagram of the high pile cap shipping wharf structure of the utility model;
[0012] Figure 2 It is a schematic diagram of the arrangement of cast-in-place piles in the high pile cap shipping wharf structure of the utility model.
[0013] In the figure, 1-upper foundation, 2-first cast-in-place pile, 3-second cast-in-place pile, 4-cylinder, 5-backfill sand layer, 6-backfill block stone layer, 7-transition block stone layer, 8-mixed filter layer, 9-double-layer geotextile, 10-blown sand, 11-special-shaped notch, 12-overlapping rail, 13-protrusion, 14-unloading plate, 15-riprap base bed. DETAILED DESCRIPTION
[0014] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.
[0015] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0016] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. At the same time, in the description of the present utility model, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0017] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0018] In the description of the present utility model, it should be noted that the terms "upper", "lower", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the utility model product is usually placed when in use. They are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present utility model.
[0019] See also Figure 1 and Figure 2 , Figure 1 This is a structural schematic diagram of the high pile cap shipping terminal structure of the utility model. Figure 2 The schematic diagram of the arrangement of cast-in-place piles in the high-pile cap shipping wharf structure of the utility model is shown in FIG. A high-pile cap shipping wharf structure includes a cylindrical structure, an upper cap 1 and a backfill structure, wherein the cylindrical structure is arranged at the front of the wharf, the upper cap 1 is arranged at the top of the cylindrical structure, a plurality of first cast-in-place piles 2 and a plurality of second cast-in-place piles 3 are arranged at the bottom of the upper cap 1, the plurality of first cast-in-place piles 2 are arranged in the cylindrical structure and penetrate the cylindrical structure, and the backfill structure is arranged at the side of the cylindrical structure away from the water, and is respectively connected to the cylindrical structure and the upper cap 1.
[0020] The high-pile foundation shipping dock structure of the utility model utilizes the retaining effect of the original bed-type cylindrical structure itself, and realizes the retaining function without dismantling the original cylindrical structure, maintains the soil pressure caused by the height difference of the dock, and greatly reduces the demolition excavation volume; at the same time, utilizing the bottomless characteristic of the bed-type cylindrical structure, the bored piles can penetrate the cylindrical structure directly to the bedrock bearing layer, so that the stress of the base tends to be balanced, and the load is transferred to the pile foundation structure, ensuring the stability of the cylindrical structure during overload shipping, thereby realizing the transformation of the bed-type cylindrical structure into a high-pile foundation shipping dock; and the bored piles and the upper foundation 1 bear the main load transmitted by the shipping components, so as to meet the shipping of major components.
[0021] In one embodiment, the cylindrical structure includes a plurality of cylinders 4 arranged in parallel, and the cylinders 4 are filled with backfill sand layers 5. A protrusion 13 is provided at one end of the bottom of the upper platform 1 near the water area, and the protrusion 13 is respectively connected to the plurality of cylinders 4 and the plurality of first cast-in-place piles 2. The plurality of first cast-in-place piles 2 are respectively arranged in the plurality of cylinders 4 and penetrate the backfill sand layer 5. A load-relief plate 14 connected to the protrusion 13 is provided on the top of the cylinder 4. The foundation of the cylindrical structure is a riprap bed 15, and the cylinder 4 is filled with backfill sand to form a backfill sand layer 5. During construction, a portion of the original load-relief plate 14 on the top of the cylinder 4 is chiseled off, and then the upper platform 1 is constructed, so that the protrusion 13 on the bottom of the upper platform 1 is arranged on the plurality of cylinders 4 and connected to the load-relief plate 14 on the cylinder 4, and the opening at the top of the cylinder 4 is closed, so that the backfill sand in the cylinder 4 does not leak out. The first cast-in-place piles 2 connected to the protrusions 13 pass through the first backfill sand layer 5 and the riprap bed 15 to reach the rock foundation bearing layer, transferring the upper load to the pile foundation structure. In one embodiment, multiple first cast-in-place piles 2 are divided into multiple groups in pairs, and multiple groups of first cast-in-place piles 2 correspond to multiple cylinders 4. Each group of first cast-in-place piles 2 is respectively arranged in the corresponding cylinders 4, and the two first cast-in-place piles 2 in the same group are arranged at intervals. In one embodiment, along the coastline direction, the first cast-in-place piles 2 or the second cast-in-place piles 3 on the same straight line are divided into the same row of cast-in-place piles, wherein the row of cast-in-place piles closest to the water area has the longest length, and the row of cast-in-place piles farthest from the water area has the shortest length. The cast-in-place piles use different pile lengths to enter the rock foundation bearing layer, reducing the amount of materials used.
[0022] In one embodiment, the backfill structure includes a backfill block layer 6 arranged behind the cylindrical structure and a transition block layer 7 arranged above the backfill block layer 6, the backfill block layer 6 is connected to the cylindrical structure, and the transition block layer 7 is connected to the upper support platform 1. Backfill blocks are thrown behind the cylindrical structure to form the backfill block layer 6, and then blocks are thrown to form the transition block layer 7. In order to prevent the loss of the blown sand 10 behind the wharf, and to provide support, the amount of concrete construction of the upper support platform 1 is reduced. In one embodiment, a mixed filter layer 8 and a double-layer geotextile 9 are provided between the backfill block layer 6 and the transition block layer 7. This setting can prevent leakage of the rear fill.
[0023] In one embodiment, a special-shaped notch 11 is provided on the end of the top of the upper pedestal 1 close to the water area, and a lap rail 12 is provided on the bottom of the special-shaped notch 11. The special-shaped notch 11 is provided on the upper pedestal 1 to meet the process requirements of the flat connection between the hull and the dock during the overlap and reduce the stress concentration on the wall thickness of the cylindrical structure, thereby ensuring the safety and stability of the dock.
[0024] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Therefore, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A high pile cap shipping terminal structure, characterized in that: It includes a cylindrical structure, an upper pedestal and a backfill structure. The cylindrical structure is arranged at the front of the wharf, the upper pedestal is arranged at the top of the cylindrical structure, a plurality of first cast-in-place piles and a plurality of second cast-in-place piles are arranged at the bottom of the upper pedestal, the plurality of first cast-in-place piles are arranged in the cylindrical structure and pass through the cylindrical structure, and the backfill structure is arranged on the side of the cylindrical structure away from the water area, and is respectively connected to the cylindrical structure and the upper pedestal.
2. The high pile cap shipping terminal structure according to claim 1 is characterized in that: The cylindrical structure includes a plurality of cylinders arranged in parallel, the cylinders are filled with backfill sand layers, a protrusion is provided at one end of the bottom of the upper pedestal close to the water area, the protrusions are respectively connected to the plurality of cylinders and a plurality of first cast-in-place piles, the plurality of first cast-in-place piles are respectively arranged in the plurality of cylinders and penetrate the backfill sand layer, and a unloading plate connected to the protrusion is provided on the top of the cylinder.
3. The high pile cap shipping terminal structure according to claim 1, characterized in that: The backfill structure comprises a backfill block stone layer arranged behind the cylindrical structure and a transition block stone layer arranged above the backfill block stone layer, the backfill block stone layer is connected to the cylindrical structure, and the transition block stone layer is connected to the upper bearing platform.
4. The high pile cap shipping terminal structure according to claim 3 is characterized in that: A mixed filter layer and a double-layer geotextile are arranged between the backfill block stone layer and the transition block stone layer.
5. The high pile cap shipping terminal structure according to claim 1, characterized in that: A special-shaped notch is arranged on one end of the top of the upper support platform close to the water area, and a lap rail is arranged on the bottom of the special-shaped notch.