Low-clearance overwater vibration pile driving and pulling machine

By designing a low-clear air vibration pile puller for bridge construction, the combined structure of floating box, cantilever frame and pile clamping device is used to achieve efficient removal of underwater steel pipe piles, which solves the existing technology The problem of difficulty in removing steel pipe piles has improved safety and resource utilization.

CN222065461UActive Publication Date: 2024-11-26XUZHOU ROAD CONSTR MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420698213.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-08
Publication Date
2024-11-26
Estimated Expiration
2034-04-08

AI Technical Summary

Technical Problem

In bridge construction, the clearance from the water surface to the bottom of the bridge is very low, which makes it difficult to remove steel pipe piles safely and efficiently. The existing methods have the risk of personnel diving into the bottom of the water to cut, the navigation hazards caused by the residue of steel pipe piles and the waste of resources.

Method used

Design a low-clearance water vibration pile puller, including floating box, cantilever frame, pile clamper, hammer head and hoisting cylinder. Through the excitation force of the hammer head and the clamping and loosening mechanism of the pile clamping oil cylinder, it can realize Efficient extraction of steel pipe piles.

Benefits of technology

The safe and efficient extraction of steel pipe piles is achieved, avoiding the risk of personnel diving into the water and cutting, reducing resource waste, and improving the removal efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065461U_ABST
    Figure CN222065461U_ABST
Patent Text Reader

Abstract

The utility model discloses a low-clearance overwater vibration pile driving and pulling machine which comprises a floating box, a cantilever rack arranged at the front end of the floating box and a pile clamping device connected through a hoisting floating pulley block assembly on the cantilever rack, a hammer head arranged on the pile clamping device, a jacking oil cylinder arranged in the middle of the floating box, an output end of the jacking oil cylinder connected with the hoisting floating pulley block assembly, and an output end of the jacking oil cylinder connected with the hoisting floating pulley block assembly. A starting cabinet for controlling starting and stopping of the jacking oil cylinder, the hammer head and the pile clamping device is arranged on the rear portion of the floating box, paddle hanging machines are symmetrically arranged on the tail portion of the floating box, and a crane is arranged on the floating box and located on the rear side of the cantilever rack. When the low-clearance overwater vibration pile driving and pulling machine is used for pulling out a steel pipe, the problem that the steel pipe pile below an overwater low bridge is difficult to pull out is solved, the steel pipe can be efficiently pulled out, people do not need to dive into water to cut the steel pipe, the safety is improved, the pulled-out steel pipe can be continuously used, the cost is saved, and resource waste is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering machinery, in particular to a low-headroom water vibration pile driver. Background Art

[0002] Currently in bridge construction, after the piers are completed, steel pipe piles are driven between the piers to temporarily support the steel beams of the bridge deck above them. After the bridge is closed and the bridge deck is completed, the steel pipe piles serving as support under the bridge need to be removed.

[0003] Since the clearance from the water surface to the bottom of the bridge is very low, the underwater cutting method is commonly used in engineering. Specifically, divers dive into the water and cut the steel pipe at the root of the steel pipe pile. This method has three disadvantages:

[0004] 1. Since personnel dive into the water to cut, it is dangerous for divers.

[0005] 2. After cutting, part of the steel pipe piles remain at the bottom of the water, which poses a permanent hazard to the navigation and subsequent dredging of the river.

[0006] 3. Since the steel pipe piles remain at the bottom of the water, there is a certain waste of resources.

[0007] Therefore, it is necessary to design a low-headroom water vibration pile driver that can be used to remove steel pipe piles under low bridges on water, which is safe, reliable and efficient. Summary of the invention

[0008] The utility model aims to provide a low-headroom water vibration pile driver and extractor to solve the problem that steel pipe piles under low bridges on water are difficult to extract.

[0009] In order to achieve the above-mentioned purpose, the specific technical scheme of a low-headroom underwater vibration pile driver of the utility model is as follows:

[0010] A low-headroom water vibratory pile driver comprises a pontoon, a cantilever frame and a pile clamp connected via a lifting floating pulley assembly on the cantilever frame are provided at the front end of the pontoon, a hammer is provided on the pile clamp, a jacking cylinder is provided at the middle of the pontoon, an output end of the jacking cylinder is connected to the lifting floating pulley assembly, a starting cabinet for controlling the start and stop of the jacking cylinder, the hammer and the pile clamp is provided at the rear of the pontoon, a propeller is symmetrically provided at the tail of the pontoon, and a crane is provided on the rear side of the cantilever frame on the pontoon.

[0011] Furthermore, the pontoon is formed by splicing at least two small pontoons, and each small pontoon is provided with three partitions.

[0012] Furthermore, the cantilever frame is detachably mounted on the front end of the pontoon.

[0013] Furthermore, the pile clamp is single-sidedly opened, and a fixed block is provided in the middle of the opening, and movable blocks are provided on both sides. The fixed block is semicircular and is fixed to the pile clamp by screws, and the movable blocks on both sides are connected to pile clamping cylinders.

[0014] Furthermore, the opening of the pile clamp is in the shape of a trumpet with a large outside and a small inside.

[0015] Furthermore, a plurality of shock-absorbing spring devices are arranged on both sides of the pile clamp.

[0016] Furthermore, there are two hammer heads, which are symmetrically arranged on the pile clamp and connected via a hammer head synchronous connecting shaft.

[0017] Beneficial effects of the utility model:

[0018] The low-headroom water vibration pile driver is used to pull out steel pipe piles, which solves the problem that steel pipe piles under low bridges on water are difficult to pull out. The steel pipe piles can be pulled out efficiently without the need for personnel to dive into the water to cut the steel pipe piles, thereby improving safety. The pulled-out steel pipe piles can be reused, saving costs and not causing waste of resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0020] Figure 2 It is a schematic diagram of the pile clamp and hammer head of the utility model;

[0021] Figure 3 This is a schematic diagram of the internal structure of the pile clamp of the utility model when viewed from above;

[0022] Figure 4 This is a schematic diagram of the internal structure of the hammer head of the utility model;

[0023] In the figure: 1. pontoon, 11. small pontoon, 2. cantilever frame, 3. lifting floating pulley assembly, 4. pile clamp, 41. fixed block, 42. movable block, 43. pile clamp cylinder, 5. hammer, 51. hammer synchronous connecting shaft, 52. V-belt pulley, 53. hammer transmission shaft, 54. eccentric block, 6. lifting cylinder, 7. starting cabinet, 8. propeller hanging machine, 9. crane, 10. shock-absorbing spring device. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] like Figures 1 to 4 As shown, a low-headroom water vibratory pile driver is designed, comprising a pontoon 1, a cantilever frame 2 is provided at the front end of the pontoon 1, and a pile clamp 4 connected through a lifting floating pulley block assembly 3 on the cantilever frame 2, a hammer 5 is provided on the pile clamp 4, a jacking cylinder 6 is provided in the middle of the pontoon 1, an output end of the jacking cylinder 6 is connected to the lifting floating pulley block assembly 3, a starting cabinet 7 for controlling the jacking cylinder 6, the hammer 5 and the start and stop of the pile clamp is provided at the rear of the pontoon 1, a propeller 8 is symmetrically provided at the tail of the pontoon 1, and a crane 9 is provided on the rear side of the cantilever frame 2 on the pontoon 1.

[0026] Among them, the pontoon 1 is composed of at least two small pontoons 11, and each small pontoon 11 is provided with three partitions. When the pontoon 1 is unbalanced, water can be added to the corresponding diaphragm to adjust the balance of the pontoon 1; the cantilever frame 2 is detachably installed at the front end of the pontoon 1, which is convenient for disassembly and installation; the pile clamp 4 is a single-sided opening, and a fixed card block 41 is provided in the middle of the opening, and movable card blocks 42 are provided on both sides. The fixed card block 41 is semicircular and is fixed to the pile clamp 4 by screws. The movable card blocks 42 on both sides are connected to the pile clamp oil cylinder 43, the two pile clamping cylinders 43 are extended and retracted at the same time to achieve the effect of clamping and loosening the steel pipe pile; the opening of the pile clamp 4 is in the shape of a trumpet with a large outside and a small inside, which is convenient for the introduction of the steel pipe pile; a number of shock-absorbing spring devices 10 are arranged on both sides of the pile clamp 4 to play a role in shock absorption and noise reduction; there are two hammer heads 5, which are symmetrically arranged on the pile clamp 4, and the two hammer heads 5 are connected by a hammer head synchronous connecting shaft 51 to achieve a synchronous effect. The hammer head 5 is rotated by the hammer head motor therein, and the hammer is driven by the triangular belt pulley 52 The head transmission shaft 53 rotates, and then drives several groups of eccentric blocks 54 to rotate, generating centrifugal force, which is superimposed up and down and offset left and right. As a result, the up and down vibrations generate exciting force. After being connected with the pile clamp 4, the pile clamp 4 clamps the steel pipe pile and then starts the hammer 5, which can pull the steel pipe pile out of the soil; the bottom of the jacking cylinder 6 is connected to the bottom of the cantilever frame 2 with bolts to form a rigid connection, and the output end of the jacking cylinder 6 is connected to the lifting floating pulley assembly 3, which is used to lift the pile clamp 4 and the hammer 5; the starting cabinet 7 is used to control The jacking cylinder 6, hammer head 5 and pile clamp 4 are started and stopped. Specifically, it is composed of two parts: a pump station system and an electrical frequency conversion starting system. The electrical frequency conversion starting system starts and stops the hammer head motor to achieve the start and stop control of the hammer head 5. The pump station system consists of two parts. One part is used to control the extension and retraction of the jacking cylinder 6 to achieve the lifting and lowering of the pile clamp 4, and the other part controls the extension and retraction of the pile clamp cylinder 43 to achieve the purpose of clamping the loosened steel pipe piles; the crane 9 is used to lift and lower the steel pipe piles pulled out by the pile clamp 4; the propeller machine 8 is used to move the pontoon 1 forward, backward, left and right.

[0027] Working principle or use process, first, open the starting cabinet 7 and turn the knob of the pile clamp 4 to the loose position, then the left and right pile clamp cylinders 43 retract at the same time, and after the movable clamping block 42 opens to the maximum position, the knob is turned to the stop position; at this time, the knob for controlling the lifting cylinder 6 in the starting cabinet 7 can be turned on, and the pile clamp 4 and the hammer head 5 can be lifted to a suitable position by lifting the floating pulley assembly 3, and the slurry hanging machine 8 at the tail of the pontoon 1 is started to move the pontoon 1 forward, backward, left and right. Move the pile clamp 4 so that the opening is aligned with the steel pipe pile, and the steel pipe pile is introduced into the pile clamp 4. Then, the knob for controlling the pile clamp 4 is turned to the clamping position. At this time, the pile clamping cylinder 43 of the pile clamp 4 drives the movable clamping block 42 to extend and hold the steel pipe pile tightly. Then, the working button of the hammer head 5 in the starting cabinet 7 is turned on. Under the action of the hammer head motor, the hammer head 5 and the pile clamp 4 vibrate up and down. After the hammer head 5 is fully started, the knob for controlling the jacking cylinder 6 in the starting cabinet 7 is turned on to supply oil to the jacking cylinder 6. The pile clamp 4 and the hammer 5 are slowly lifted by lifting the floating pulley assembly 3. At this time, the friction between the steel pipe pile and the soil layer is reduced under the action of the exciting force of the hammer 5, and the steel pipe pile is lifted along with the pile clamp 4 and slowly pulled out of the water bottom. After the stroke of the jacking cylinder 6 is completed, the knob of the pile clamp 4 is controlled to be turned to the release position. At this time, the active block 42 is slowly opened, and then the knob of the jacking cylinder 6 is rotated to retract the jacking cylinder 6. At this time, the hammer 5 and the pile clamp 4 are in Under the action of gravity, it slowly slides down along the wall of the steel pipe pile. When it reaches a certain height, the knob of the pile clamp 4 is controlled to hit the clamping position, and oil is supplied to the pile clamp cylinder 43 to hold the steel pipe pile tightly. The above operation is repeated to pull out the steel pipe pile. When there is no space at the top of the pulled-out steel pipe pile, the steel pipe pile can be cut off, and the cut steel pipe pile can be lifted off the pile position by the crane 9 and installed on another cargo box, and then the steel pipe pile is continued to be pulled out until the steel pipe pile is completely pulled out of the water. This work is considered completed.

[0028] It is understood that the present invention is described by some embodiments, and those skilled in the art are aware that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the scope of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application belong to the scope protected by the present invention.

Claims

1. A low-headroom water vibratory pile driver, comprising a pontoon (1), characterized in that: The front end of the pontoon (1) is provided with a cantilever frame (2) and a pile clamp (4) connected to a lifting floating pulley assembly (3) on the cantilever frame (2); the pile clamp (4) is provided with a hammer head (5); a jacking cylinder (6) is provided in the middle of the pontoon (1); the output end of the jacking cylinder (6) is connected to the lifting floating pulley assembly (3); a starting cabinet (7) for controlling the start and stop of the jacking cylinder (6), the hammer head (5) and the pile clamp (4) is provided at the rear of the pontoon (1); a propeller (8) is symmetrically provided at the tail of the pontoon (1); and a crane (9) is provided on the rear side of the cantilever frame (2) on the pontoon (1).

2. A low-headroom underwater vibratory pile driver according to claim 1, characterized in that: The buoyancy box (1) is formed by splicing at least two small buoyancy boxes (11), and each small buoyancy box (11) is provided with three partitions inside.

3. The low-headroom underwater vibratory pile driver according to claim 1, characterized in that: The cantilever frame (2) is detachably mounted on the front end of the buoyancy box (1).

4. The low-headroom underwater vibratory pile driver according to claim 1, characterized in that: The pile clamp (4) is open on one side, and a fixed clamping block (41) is arranged in the middle of the opening, and movable clamping blocks (42) are arranged on both sides. The fixed clamping block (41) is semicircular and is fixed to the pile clamp (4) by screws, and the movable clamping blocks (42) on both sides are connected to pile clamping cylinders (43).

5. The low-headroom underwater vibratory pile driver according to claim 4, characterized in that: The opening of the pile clamp (4) is in the shape of a trumpet, which is large on the outside and small on the inside.

6. The low-headroom underwater vibratory pile driver according to claim 1, characterized in that: A plurality of shock-absorbing spring devices (10) are arranged on both sides of the pile clamp (4).

7. The low-headroom underwater vibratory pile driver according to claim 1, characterized in that: The hammer heads (5) are provided with two hammer heads (5), which are symmetrically arranged on the pile clamp (4), and the two hammer heads (5) are connected via a hammer head synchronous connection shaft (51).