Connecting structure of tunnel primary support feet-lock anchor pipe and I-shaped steel

By adding locking steel plates and ribbed steel plates at the connection between the locking anchor pipe and the I-steel, the problem of insufficient strength of the locking anchor pipe and the I-steel connection structure in the prior art is solved, and the anchoring force and stability are significantly improved. It effectively suppresses the deformation of soft rock tunnels and reduces construction risks.

CN222066813UActive Publication Date: 2024-11-26中国水利水电第七工程局有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420453135.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-10
Publication Date
2024-11-26
Estimated Expiration
2034-03-10

AI Technical Summary

Technical Problem

In soft rock tunnels, the connecting structure of the existing locking anchor pipe and I-steel is not effective in suppressing the deformation of surrounding rocks, and the strength of the connection points is insufficient, resulting in weak anchoring force and poor shear resistance, making it difficult to effectively stabilize Tunnel structure.

Method used

By tying the locking steel plate at the front end of the lock foot anchor pipe and welding it with I-shaped steel, the ribbed steel plate is added to enhance the strength of the connection point, ensuring the anchor strength and stability of the anchor pipe and surrounding rock.

Benefits of technology

Improve the connection strength and stability between the locking anchor pipe and I-steel, enhance the anchoring force, effectively suppress the deformation of soft rock tunnels, reduce safety risks and arch replacement risks during construction, and improve tunnel support quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066813U_ABST
    Figure CN222066813U_ABST
Patent Text Reader

Abstract

The utility model discloses a connecting structure of a tunnel primary support feet-lock anchor pipe and I-shaped steel, belongs to the technical field of civil engineering construction, and particularly relates to a primary support in an underground engineering structure, in particular to a primary support connecting structure in a soft rock large-deformation tunnel. Which comprises I-shaped steel and a feet-lock anchor pipe, and is characterized in that a locking steel plate is sleeved at the front end of the feet-lock anchor pipe in a penetrating manner, the locking steel plate is fixed with the I-shaped steel, and a ribbed steel plate is fixed between the outer wall of the feet-lock anchor pipe and the locking steel plate. The locking steel plate and the anchor pipe are reinforced up and down and left and right by the ribbed steel plates, so that the strength of a connecting node can be effectively improved, the stability of the locking anchor pipe and the I-shaped steel is improved, and the strength of the locking anchor pipe and the shear resistance and tension resistance of the anchor pipe are improved, so that the anchoring strength of the locking anchor pipe is higher, and the service life of the locking anchor pipe is prolonged. The stability of the I-shaped steel is improved, deformation of the soft rock tunnel is restrained, and therefore the tunnel supporting quality in the construction process is improved, and the tunnel construction safety risk and the arch changing risk are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention discloses a connection structure between a tunnel initial support locking foot anchor pipe and an I-beam, belonging to the technical field of civil engineering construction, in particular to initial support in underground engineering structures, and particularly to an initial support connection structure in a soft rock large deformation tunnel. Background Art

[0002] With the rapid increase in the number and scale of civil engineering projects in my country, more tunnels need to pass through soft rock deformation tunnel sections. The basic characteristics of soft rock are low strength, weak bearing capacity, easy weathering, easy water seepage, softening and disintegration when exposed to water, and expansion. After tunnel excavation and initial support, with the emergence of the air surface, the stress is released, and the surrounding rock in the tunnel will shift and creep, causing large-scale top arch settlement and side wall convergence deformation in the tunnel. The deformation ranges from tens of centimeters to tens of centimeters or even several meters. If the tunnel deformation encroaches on the lining structure line, a lot of manpower and material resources will be spent on arch removal and replacement construction in the later stage, causing serious delays in the construction period. At the same time, with the expansion of the section, the surrounding rock will be disturbed twice, and arch replacement and landslides are prone to occur, posing a major safety hazard.

[0003] In the field of surrounding rock deformation suppression technology, the conventional support method in engineering is to use two φ25mm locking anchor rods to lock the I-beams for reinforcement. This locking method is not effective in enhancing the normal pressure and friction resistance between the surrounding rock and the side wall of the anchor rod, and resisting the vertical stress on the end of the anchor rod caused by the sinking of the tunnel primary support structure. The end will bend and deform due to the long-term vertical stress. At the same time, the anchoring force between the φ25mm locking anchor rod and the surrounding rock is weak and the shear resistance is poor. Therefore, the conventional use of two φ25mm locking anchor rods to lock the I-beam feet is not ideal in suppressing deformation.

[0004] In order to better suppress the deformation of the surrounding rock, the existing solutions generally adopt the method of setting two locking foot anchor pipes (seamless steel pipes) with larger diameter (generally greater than 76mm in diameter) and thicker wall (generally greater than 6mm in wall thickness) at the bottom of each excavation step steel support of the tunnel to lock the steel support. Compared with the locking foot anchor rod, the locking foot anchor pipe has higher bending and shear strength, and at the same time, its contact area with the surrounding rock is larger, which makes its anchoring force higher. The locking foot method of I-beam using locking foot anchor pipe is better than locking foot anchor rod, but the connection between it and the I-beam is a weak point. If the strength of the connection point between the locking foot anchor pipe and the I-beam is insufficient, it will still lead to poor locking effect. Summary of the invention

[0005] The problem to be solved by the present invention is to provide a connection structure that can effectively improve the strength of the connection node between the locking foot anchor pipe and the I-beam in view of the above shortcomings, so as to improve the connection effect between the locking foot anchor pipe and the I-beam. The technical solution is as follows:

[0006] A connection structure between a tunnel primary support locking foot anchor pipe and an I-beam comprises an I-beam and a locking foot anchor pipe, wherein a key technology is to insert a locking steel plate through the front end of the locking foot anchor pipe, the locking steel plate is fixed to the I-beam, and a ribbed steel plate is fixed between the outer wall of the locking foot anchor pipe and the locking steel plate.

[0007] The number of ribbed steel plates fixed to each locking foot anchor pipe is 3 to 5.

[0008] The ribbed steel plate is a triangular steel plate with a thickness of 8 to 12 mm, a bottom length of 50 to 60 mm, a side length of 50 to 60 mm, and an oblique length of 70 to 80 mm.

[0009] The locking steel plate has a thickness of ≧16 mm, a length of 400 to 500 mm, and a width of 200 to 300 mm.

[0010] Compared with the prior art, the utility model has the following beneficial effects:

[0011] 1. By locking the steel plate and the I-beam to connect, the connection between the steel plate and the I-beam is more firmly stressed, the angle control is more accurate during the installation of the anchor pipe, and the anchoring strength between the anchor pipe and the surrounding rock is more effectively improved.

[0012] 2. The use of ribbed steel plates to reinforce the locking steel plates and anchor pipes up, down, left and right can effectively improve the strength of the connection nodes, improve the stability of the locking foot anchor pipe and the I-beam, and improve the strength of the locking foot anchor pipe itself and the shear and tensile resistance of the anchor pipe, making the locking foot anchoring strength stronger, improving the stability of the I-beam, and curbing the deformation of the soft rock tunnel, thereby improving the quality of tunnel support during construction and reducing the safety risks of tunnel construction and the risk of arch replacement. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is the front view of the utility model;

[0014] Figure 2 It is a side view of the utility model;

[0015] Figure 3 It is a top view of the utility model. DETAILED DESCRIPTION

[0016] See also Figure 1 to Figure 3 A connection structure between a tunnel primary support locking foot anchor pipe and an I-beam, comprising an I-beam 1 and a locking foot anchor pipe 3. The key technology is that a locking steel plate 2 is sleeved on the front end of the locking foot anchor pipe 3, the locking steel plate 2 is welded and fixed to the I-beam 1 through a welding point 4, a locking steel plate 2 is installed on each I-beam, and a ribbed steel plate 5 is welded and fixed between the outer wall of the locking foot anchor pipe 3 and the locking steel plate 2.

[0017] The number of ribbed steel plates 5 fixed to each locking foot anchor pipe 3 is 3 to 5.

[0018] The ribbed steel plate 5 is a triangular steel plate with a thickness of 8 to 12 mm, a bottom length of 50 to 60 mm, a side length of 50 to 60 mm, and an oblique length of 70 to 80 mm.

[0019] The locking steel plate 2 has a thickness of ≧16 mm, a length of 400-500 mm, and a width of 200-300 mm.

[0020] The locking foot anchor pipe 3 is made of seamless steel pipe, and two locking foot anchor pipes 3 are arranged on each I-beam.

[0021] When using Figure 2 As shown, ribbed steel plates 5 are welded to the locking steel plates 2 and the locking foot anchor pipes 3 on the left, right, top and bottom of the locking foot anchor pipes 3 respectively to ensure that the ribbed steel plates 5 are firmly welded to the locking foot anchor pipes 3 and the locking steel plates 2, and the I-beam 1 is anchored in the surrounding rock through the locking foot anchor pipes 3 to improve the anchoring strength of the locking foot.

Claims

1. A connection structure between a tunnel primary support locking foot anchor pipe and an I-beam, comprising an I-beam (1) and a locking foot anchor pipe (3), wherein The front end of the locking foot anchor pipe (3) is sleeved with a locking steel plate (2), the locking steel plate (2) is fixed to the I-beam (1), and a ribbed steel plate (5) is fixed between the outer wall of the locking foot anchor pipe (3) and the locking steel plate (2).

2. The connection structure of the tunnel primary support anchor pipe and I-beam according to claim 1 is characterized in that The number of ribbed steel plates (5) fixed to each locking foot anchor pipe (3) is 3 to 5.

3. The connection structure of the tunnel primary support anchor pipe and I-beam according to claim 1 is characterized in that The ribbed steel plate (5) is a triangular steel plate with a thickness of 8 to 12 mm, a bottom length of 50 to 60 mm, a side length of 50 to 60 mm, and an oblique length of 70 to 80 mm.

4. The connection structure of the tunnel primary support anchor pipe and I-beam according to claim 1 is characterized in that The locking steel plate (2) has a thickness of ≧16 mm, a length of 400 to 500 mm, and a width of 200 to 300 mm.

5. The connection structure of the tunnel primary support anchor pipe and I-beam according to claim 1 is characterized in that The locking foot anchor pipe (3) is made of a seamless steel pipe, and two locking foot anchor pipes (3) are arranged on each I-beam (1).