Wine factory heat comprehensive utilization system

Through the cascade cooling heat recovery system and the boiler flue gas heat recovery system, the problem of heat waste in the winery is solved, the effective utilization of wine steam and boiler flue gas heat is achieved, the comprehensive utilization efficiency of heat is improved, and energy consumption is saved.

CN222069341UActive Publication Date: 2024-11-26GUIZHOU ZHONGNENG INVESTMENT TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323659926.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-11-26
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

The heat of the wine steam generated by the distiller during the distillation cannot be effectively utilized, resulting in a large amount of heat wasted.

Method used

The step-by-stage cooling heat recovery system and the boiler flue gas heat recovery system are adopted to achieve multiple cooling of condenser cooling water and heat recovery of boiler flue gas through multi-stage heat exchangers and heat pump units, thereby improving heat utilization efficiency.

Benefits of technology

It effectively reduces the condenser cooling water temperature, meets the winemaking temperature requirements, and recycles and utilizes the waste heat of the boiler flue gas, improves the comprehensive utilization efficiency of heat, and saves fuel consumption and refrigeration costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222069341U_ABST
    Figure CN222069341U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of waste heat recovery and utilization, and particularly discloses a winery heat comprehensive utilization system which comprises a stepped cooling heat recovery system, the stepped cooling heat recovery system comprises a condenser, a first cooling tower and a first water collector, and a water cavity and a heat exchange pipe located in the water cavity are arranged in a condenser shell; a low-temperature cooling water supply pipe is arranged at the bottom of the water cavity, the high-temperature cooling water return pipe and the medium-temperature cooling water return pipe are connected with a high-temperature heat exchanger and a first medium-temperature heat exchanger respectively, and cooling water outlet pipes of the high-temperature heat exchanger and the first medium-temperature heat exchanger are both connected with a first water collector. The first water collector is connected with the cooling tower, and the water outlet end of the cooling tower is connected with the low-temperature heat exchanger which is connected with the low-temperature cooling water supply pipe. The utility model aims to solve the problem that the wine steam heat of the existing winery cannot be effectively utilized and is greatly wasted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of waste heat recovery and utilization, in particular to a comprehensive heat utilization system for a winery. Background Art

[0002] Distillation is a traditional method for brewing highly alcoholic beverages. Although this method has a history of hundreds of years, it is still loved by many wine manufacturers and wine lovers. The basic principle is to use the physical properties of steam to separate liquid into two parts: alcohol and water. When the liquid is heated, the alcohol first boils and turns into steam, then cools through the condenser and turns back into liquid; this process increases the concentration of alcohol until the desired level is reached.

[0003] During the winemaking condensation process in the winery, a large amount of cooling water is needed to cool the wine vapor. In order to ensure the outlet water temperature of the wine, the temperature of the cooling water sent to the cooling device is relatively low, usually required to be lower than 30°C, so that the temperature of the warm water after the heat exchange is also relatively low, mainly about 50°C warm water; and the cooling water after the temperature is cooled again usually only through the cooling tower, which makes the workload of the cooling tower high. At the same time, cooling through the cooling tower causes the heat of the 50°C cooling water to be directly wasted, and the heat cannot be effectively utilized. Utility Model Content

[0004] In view of the deficiencies in the prior art, the technical problem solved by the utility model is to provide a comprehensive heat utilization system for a winery, so as to solve the problem that the heat of wine steam in the existing winery cannot be effectively utilized and is wasted in large quantities.

[0005] In order to solve the above problems, the technical solution adopted by the utility model is: a comprehensive utilization system of heat in a winery, including a cascade cooling heat recovery system; the cascade cooling heat recovery system includes a condenser, a first cooling tower, and a first water collector, a water cavity and a heat exchange tube located in the water cavity are arranged in the condenser shell, a high-temperature cooling return water pipe is arranged on the upper part of the water cavity, a medium-temperature cooling return water pipe is arranged in the middle part of the water tank, and a low-temperature cooling water supply pipe is arranged at the bottom of the water cavity, the high-temperature cooling return water pipe and the medium-temperature cooling return water pipe are respectively connected to the high-temperature heat exchanger and the first medium-temperature heat exchanger, the cooling water outlet pipes of the high-temperature heat exchanger and the first medium-temperature heat exchanger are both connected to the first water collector, the first water collector is connected to the cooling tower, the water outlet end of the cooling tower is connected to the low-temperature heat exchanger, and the low-temperature heat exchanger is connected to the low-temperature cooling water supply pipe;

[0006] The low-temperature heat exchanger includes a low-temperature preheating heat exchanger and a soft water preheating heat exchanger connected in parallel. The heat absorption sides of the low-temperature preheating heat exchanger and the medium-temperature heat exchanger are connected in series through pipelines and are connected to a production hot water tank. The water inlet end of the heat absorption side of the low-temperature preheating heat exchanger is connected to the production tap water pipeline. The production tap water is heated up by the low-temperature preheater and the medium-temperature heat exchanger in turn and enters the production hot water tank. The production hot water tank is connected to the heat absorption side inlet of the medium-temperature heat exchanger through a medium-temperature heat recovery return pipe; the heat absorption sides of the soft water preheating heat exchanger and the high-temperature heat exchanger are connected in series with a soft water insulation water tank through pipelines. The water inlet end of the hot side of the soft water preheating heat exchanger is connected to a normal-temperature soft water replenishment pipe. The normal-temperature soft water is heated up by the soft water preheating heat exchanger and the high-temperature heat exchanger in turn and is stored in the soft water insulation water tank.

[0007] The beneficial effects of this scheme are as follows: the cooling water of the condenser is cooled once by the high-temperature heat exchanger and the medium-temperature heat exchanger, and the first cooling tower cooperates with the low-temperature heat exchanger to cool the cooling water twice and three times respectively, so that the low-temperature cooling water after heat exchange can be cooled to below 30°C in a high-temperature environment to meet the return water temperature requirement of the condenser cooling water, thereby ensuring that the outlet temperature of the wine meets the standard and the quality of the wine; through the high-temperature heat exchanger, the medium-temperature heat exchanger, the low-temperature preheating heat exchanger and the soft water preheating heat exchanger, the tap water and softened water heated by the low-temperature preheating heat exchanger and the soft water preheating heat exchanger can be sent to the medium-temperature heat exchanger and the high-temperature heat exchanger for secondary heating, thereby increasing the temperature of the tap water and softened water, which is convenient for subsequent production heat use.

[0008] Furthermore, it also includes a boiler flue gas heat recovery system, which includes a fresh air preheating chamber and a flue gas heat exchanger and an air preheating heat exchanger which are arranged at the exhaust pipe of the boiler in sequence. The inlet of the water medium pipeline of the flue gas heat exchanger is connected to the soft water insulation water tank through a pipeline, and the outlet of the water medium pipeline of the flue gas heat exchanger is connected to the second water collector, and the second water collector is respectively connected to the high-temperature insulation water tank and the heat-using heat exchanger unit. The water outlet end of the heat-dissipating side of the heat-using heat exchanger unit is connected to the soft water insulation water tank through a pipeline. The heat-using heat exchanger unit includes a production heat exchanger unit, and the heat absorption side pipeline of the production heat exchanger unit is connected in series with the production hot water tank through a pipeline; the water medium pipeline of the air preheating heat exchanger is connected to the air heating heat exchanger, and the air heating heat exchanger is installed in the fresh air preheating chamber, and the fresh air preheating chamber is connected to an air supply pipe, one end of which is connected to the air collecting chamber of the boiler, and the air supply pipe is located at one end of the fresh air preheating chamber and is provided with a blower.

[0009] The softened water heated by the cascade cooling heat recovery system is transported to the flue gas heat exchanger, thereby exchanging heat with the high-temperature flue gas to heat it up, thereby realizing the recovery of the waste heat of the boiler flue gas. After heating, it enters the second water collector to supply each heat-using unit or enters the high-temperature water storage tank for storage; the flue gas discharged by the boiler enters the air preheating heat exchanger after heat exchange through the flue gas heat exchanger, and at the same time, the low-temperature return water after heat exchange with the fresh air in the air heating heat exchanger is pumped to the air preheating heat exchanger, and the low-temperature return water exchanges heat with the flue gas in the air preheating heat exchanger, and is discharged from the exhaust pipe after the flue gas temperature drops; after the low-temperature return water is heated, it enters the air heating heat exchanger again to exchange heat with the fresh air, and the heated fresh air is pressurized by the blower and sent to the air collecting chamber through the air supply pipe, providing the blower with preheated fresh air heated by heat recovery, thereby improving the production efficiency of the boiler.

[0010] Furthermore, the low-temperature cooling water supply pipe is also connected to a refrigeration auxiliary heat exchanger, the refrigeration auxiliary heat exchanger is connected in series with the low-temperature heat exchanger, and the heat absorption side pipeline of the refrigeration auxiliary heat exchanger is connected to an auxiliary refrigeration and heating system, the auxiliary refrigeration and heating system includes a heat pump unit, an energy storage tank and a second cooling tower, the chilled water prepared by the heat pump unit is stored in the energy storage tank, the energy storage tank is connected to the heat absorption side inlet of the refrigeration auxiliary heat exchanger through a chilled water supply pipe, and the heat absorption side outlet of the refrigeration auxiliary heat exchanger is connected to the evaporator side of the heat pump unit through a pipeline; the water outlet of the condenser of the heat pump unit is connected to the second cooling tower through a heat pump water supply branch, and the second cooling tower is connected to the water inlet of the condenser of the heat pump unit through a heat pump return branch.

[0011] When the cooling water after cooling down through the low-temperature cooling tower and the low-temperature heat exchanger still cannot reach the condenser inlet water temperature requirement, the refrigeration auxiliary heat exchanger is started by sending the chilled water in the energy storage tank to the heat absorption side of the refrigeration auxiliary heat exchanger, and the cooling water is further cooled to the set temperature and then sent back to the condenser. When the temperature of the chilled water in the energy storage tank reaches the set lower limit, the heat pump unit is started to prepare chilled water for the energy storage tank. When preparing chilled water, if the high-temperature insulation water tank needs to be heated or insulated, the circulation pipeline on the heat pump condenser side passes through the heat pump water supply pipe and the heat pump return pipe, so that the condenser of the heat pump unit and the high-temperature insulation water tank water circulate, and the heat pump unit prepares chilled water for the energy storage tank while providing high-temperature hot water for the high-temperature insulation water tank. When the high-temperature insulation water tank does not need heat, the heat pump unit's condenser and the second cooling tower water circulation cooling are carried out through the heat pump water supply branch pipe and the heat pump return branch pipe.

[0012] Furthermore, the medium-temperature cooling return pipe is also provided with a second medium-temperature heat exchanger connected in parallel with the first medium-temperature heat exchanger. The energy storage tank is connected to the heat absorption side pipeline inlet of the second medium-temperature heat exchanger through the heat pump evaporation water supply pipe, and the heat absorption side pipeline outlet of the second medium-temperature heat exchanger is connected to the water inlet of the evaporator of the heat pump unit through the heat pump evaporation return pipe, and the water outlet of the evaporator is connected to the energy storage tank; the water outlet of the condenser of the heat pump unit is connected to the second water collector through the heat pump water supply pipe, and the water outlet of the heat exchanger unit on the heat dissipation side is also connected to the water inlet of the condenser of the heat pump unit through the heat pump return pipe.

[0013] The cold water after the evaporator of the heat pump unit absorbs heat and cools down is stored in the energy storage tank. The water in the energy storage tank is sent to the second medium-temperature heat exchanger for heat exchange and temperature increase, and the medium-temperature heat of the medium-temperature cooling water in the second medium-temperature heat exchanger is obtained, and then sent back to the evaporator. Through the heat energy conversion of the heat pump unit, the medium-temperature heat energy is converted into high-temperature heat energy and released to the condenser of the heat pump unit, and then the heat is transported to the high-temperature insulation water tank through the heat pump water supply pipe and the heat pump return water pipe to store heat energy or supply heat energy. Therefore, the heat pump unit has the characteristics of high efficiency and energy saving. In addition, the temperature of the cold water after heat exchange and temperature increase with the medium-temperature cooling water is higher than the cold water in the natural environment and the temperature is stable, so the comprehensive energy efficiency of the heat pump unit can reach 1:8, and the heating cost is extremely low.

[0014] Furthermore, the low-temperature cooling water supply pipe is also provided with a first temperature sensor, the chilled water supply pipe is provided with a chilled water circulation pump, the first temperature sensor is electrically connected to a first controller, the output ends of the first controller are respectively electrically connected to the chilled water circulation pump, and the first controller is used to control the frequency of the chilled water circulation pump according to the signal input by the first temperature sensor.

[0015] When the first temperature sensor detects that the temperature of the low-temperature cooling water supply pipe is higher than the set value, it means that the cooling water still does not reach the temperature after the first cooling tower is cooled at full load and the low-temperature heat exchanger is cooled. The first controller controls the chilled water circulation pump to open. At the same time, the first controller controls the operating frequency of the chilled water circulation pump in real time according to the temperature signal detected by the first temperature sensor, and sends the chilled water in the energy storage tank to the heat absorption side of the refrigeration auxiliary heat exchanger, thereby starting the refrigeration auxiliary heat exchanger, and further cools the cooling water to the set temperature before sending it back to the condenser.

[0016] Furthermore, a second temperature sensor and a high-temperature cooling electric valve are provided on the side of the high-temperature cooling return pipe close to the condenser. The second temperature sensor is electrically connected to a temperature control meter, which is electrically connected to a relay. The relay is electrically connected to the high-temperature cooling electric valve. The temperature control meter is used to control the opening and closing of the relay according to the signal of the second temperature sensor and then control the opening and closing of the high-temperature cooling electric valve. When the second temperature sensor detects that the condenser outlet water temperature is lower than the set temperature, the temperature control meter controls the relay to close and then controls the high-temperature cooling electric valve to close, so as to prevent cooling water that does not meet the temperature requirements from entering the high-temperature heat exchanger and affecting the heat recovery grade of softened water.

[0017] Furthermore, the second water collector is connected to the water inlet of the boiler through a boiler water supply pipe, and a deaerator is provided on the boiler water supply pipe. The softened water heated by the flue gas heat exchanger is then pumped to the deaerator through the water collector and the boiler water supply pipe, the water inlet temperature of the deaerator is increased and deoxygenated by the deaerator, and then the deoxygenated softened water is transported to the boiler. Since the water inlet temperature of the boiler is increased in multiple stages, the heat required to form steam is reduced, the steam production efficiency of the boiler is improved, and fuel consumption is saved.

[0018] Furthermore, the flue gas heat exchanger includes a primary heat exchanger and a secondary heat exchanger sequentially arranged along the flue gas discharge direction, the soft water insulation water tank is connected to the water inlet of the secondary heat exchanger through a pipeline, the water outlet of the secondary heat exchanger is connected to the water inlet of the primary heat exchanger, and the water outlet of the primary heat exchanger is connected to the second water collector. The heat of the boiler flue gas is fully absorbed by the two-stage heat exchanger, and the temperature of the softened water is gradually increased by the two-stage heat exchanger.

[0019] Furthermore, a third temperature sensor is provided at the outlet of the first cooling tower, the third temperature sensor is electrically connected to a second controller, the output end of the second controller is electrically connected to the cooling fan and the spray pump of the cooling tower, respectively, and the second controller is used to control the cooling fan and the spray pump frequency according to the third temperature sensor signal. The third temperature sensor at the outlet of the cooling tower detects whether the outlet water temperature of the cooling tower reaches the set temperature, and the controller controls the frequency of the cooling fan and the spray pump of the cooling tower in real time according to the received temperature signal, so as to reduce the temperature of the cooling water to the set temperature. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the overall system.

[0021] Figure 2 Schematic diagram of the cascade cooling heat recovery system.

[0022] Figure 3 Schematic diagram of boiler flue gas heat recovery system.

[0023] Figure 4 Schematic diagram of auxiliary cooling and heating system. DETAILED DESCRIPTION

[0024] The following is further described in detail through specific implementation methods:

[0025] The reference numerals in the drawings of the specification include: the step cooling heat recovery system includes: a condenser 1, a cooling tower 11, a third temperature sensor 110, a high temperature heat exchanger 12, a second temperature sensor 121, a first medium temperature heat exchanger 13, a second medium temperature heat exchanger 14, a low temperature preheating heat exchanger 15, a soft water preheating heat exchanger 16, a refrigeration auxiliary heat exchanger 17, a first temperature sensor 171, a chilled water electric valve 172, a first water collector 18, a production hot water tank 19, a soft water insulation water tank 2, a water replenishment three-way valve 21, a water supply three-way valve 22, a soft water heating pipe 23, a soft water supply pipe 24, Soft water make-up pipe 25; the boiler flue gas heat recovery system includes: exhaust pipe 3, economizer 31, primary heat exchanger 32, secondary heat exchanger 33, air preheating heat exchanger 34, deaerator 35, air heating heat exchanger 4, air supply pipe 41, air collecting chamber 42, high temperature insulation water tank 5, second water collector 51; the auxiliary cooling and heating system includes: heat pump unit 6, heat pump water supply main pipe 61, heat pump return water main pipe 62, heat pump water supply branch pipe 63, heat pump return water branch pipe 64, heat pump evaporation water supply pipe 65, chilled water circulation pump 651, heat pump evaporation return water pipe 66, energy storage tank 7, second cooling tower 8.

[0026] Example 1 This is as attached Figure 1 , Figure 2 As shown:

[0027] A comprehensive heat utilization system for a winery includes a cascade cooling heat recovery system, the cascade cooling heat recovery system includes a condenser 1, a cooling tower 11, and a first water collector 18. A water cavity and a heat exchange pipe located in the water cavity are arranged in a shell of the condenser 1. A high-temperature cooling return water pipe is arranged at the upper part of the water cavity, a medium-temperature cooling return water pipe is arranged at the middle part of the water tank, and a low-temperature cooling water supply pipe is arranged at the bottom of the water cavity. The high-temperature cooling return water pipe and the medium-temperature cooling return water pipe are respectively connected to a high-temperature heat exchanger 12 and a first medium-temperature heat exchanger 13. The cooling water outlet pipes of the high-temperature heat exchanger 12 and the first medium-temperature heat exchanger 13 are both connected to the first water collector 18. The first water collector 18 is connected to the cooling tower 11. The water outlet end of the cooling tower 11 is connected to the low-temperature heat exchanger, and the low-temperature heat exchanger is connected to the low-temperature cooling water supply pipe.

[0028] The low-temperature heat exchanger includes a low-temperature preheating heat exchanger 15 and a soft water preheating heat exchanger 16 connected in parallel. The heat absorption sides of the low-temperature preheating heat exchanger 15 and the medium-temperature heat exchanger are connected in series through pipelines to a production hot water tank 19. The water inlet end of the heat absorption side of the low-temperature preheating heat exchanger 15 is connected to the production tap water pipeline. The production tap water is heated up by the low-temperature preheater and the medium-temperature heat exchanger in turn and enters the hot water exchange circuit of the production hot water tank 19. The water outlet end of the hot water exchange circuit is connected to the heat absorption side inlet of the medium-temperature heat exchanger through a medium-temperature heat recovery return pipe; the heat absorption sides of the soft water preheating heat exchanger 16 and the high-temperature heat exchanger 12 are connected in series with a soft water insulation water tank 2, and the water inlet end of the hot side of the soft water preheating heat exchanger 16 is connected to a normal temperature soft water replenishment pipe 25. The normal temperature soft water is heated up by the soft water preheating heat exchanger 16 and the high-temperature heat exchanger 12 in turn and is stored in the soft water insulation water tank 2.

[0029] A second temperature sensor 121 and a high-temperature cooling electric valve are provided on the side of the high-temperature cooling return pipe close to the condenser 1. The second temperature sensor 121 is electrically connected to a temperature control meter, the temperature control meter is electrically connected to a relay, the relay is electrically connected to the high-temperature cooling electric valve, and the temperature control meter is used to control the opening and closing of the relay according to the signal of the second temperature sensor 121 and thus control the opening and closing of the high-temperature cooling electric valve.

[0030] A third temperature sensor 110 is provided at the water outlet of the first cooling tower 11, and the third temperature sensor 110 is electrically connected to a second controller. The output end of the second controller is electrically connected to the cooling fan and spray pump of the cooling tower 11 respectively, and the second controller is used to control the cooling fan and spray pump frequency according to the signal of the third temperature sensor 110.

[0031] When the working environment temperature of the equipment is high and the outlet water temperature of the cooling tower 11 cannot reach the production cooling temperature required by the condenser 1, that is, it cannot reach 28°C, the low-temperature cooling water enters the condenser 1 from the low-temperature cooling water supply pipe, and flows from bottom to top in the condenser 1. The medium-temperature cooling water in the middle of the water cavity after heat exchange passes through the medium-temperature cooling return pipe and the medium-temperature heat exchanger and enters the first water collector 18. The high-temperature cooling water at the top of the water cavity passes through the high-temperature cooling return pipe and the high-temperature heat exchanger 12 and is collected in the first water collector 18, and then is pumped to the first cooling tower 11. The third temperature sensor 110 at the outlet end of the cooling tower 11 detects whether the outlet water temperature of the cooling tower 11 reaches the set temperature. The set temperature in this embodiment is 32°C. The controller controls the frequency of the cooling fan and the spray pump of the cooling tower 11 in real time according to the received temperature signal to reduce the temperature of the cooling water to the set temperature. The cooling water cooled by the first cooling tower 11 is then transported to the low-temperature preheating heat exchanger 15 and the soft water preheating heat exchanger 16, respectively, to exchange heat with the production tap water and softened water on the heat absorption side, respectively; the outlet water of the cooling tower 11 is cooled again, and then sent back to the condenser 1 through the low-temperature cooling water supply pipe.

[0032] After the softened water is heated once with the soft water preheating heat exchanger 16, it is sent to the high temperature heat exchanger 12 for secondary heat exchange, and the high temperature cooling water is cooled and dissipated once. At the same time, the softened water obtains high temperature heat energy and is stored in the soft water insulation water tank 2. If the second temperature sensor 121 detects that the outlet water temperature of the condenser 1 is lower than the set temperature, the temperature control table controls the relay to close and then controls the high temperature cooling electric valve to close, so as to prevent the cooling water that does not meet the temperature requirements from entering the high temperature heat exchanger 12 and affecting the heat recovery grade of the softened water; at this time, the cooling water in the condenser 1 is cooled to the set temperature through the medium temperature heat exchanger, the cooling tower 11, and the low temperature heat exchanger. At the same time, the production tap water is heated up by the heat absorption side of the low temperature preheater and the medium temperature heat exchanger in turn, and then sent to the heat exchange circuit of the production hot water tank 19 through the pipeline and heat exchanged with the low temperature water in the production hot water tank 19, so as to increase the water temperature of the low temperature water stored in the production hot water tank 19.

[0033] A bypass low-temperature pipeline is connected in parallel at both ends of the heat absorption side of the low-temperature preheating heat exchanger 15, and the bypass low-temperature pipeline is provided with a bypass valve; the soft water insulation water tank 2 is connected to the soft water replenishment pipe 25 through the soft water supply pipe 24, and the soft water replenishment pipe 25 is connected to the soft water supply pipe 24 through the replenishment three-way valve 21, and the soft water supply pipe 24 is connected to the soft water heating pipe 23 through the water supply three-way valve 22, and one end of the soft water heating pipe 23 is connected to the water inlet end of the heat absorption side of the high-temperature heat exchanger 12.

[0034] When the low-temperature heat exchanger is not needed for heat exchange in low-temperature climate, and the cooling water can be directly reduced to the set temperature through the cooling tower 11, the bypass valve is opened, and the production tap water flows directly to the medium-temperature heat exchanger through the bypass pipeline for heat exchange and heating; at the same time, the water supply three-way valve 22 makes the soft water supply pipe 24 close to the side of the soft water insulation water tank 2 connected with the soft water heating pipe 23, so that the water in the soft water tank is directly sent to the high-temperature heat exchanger 12 through the soft water heating pipe 23 for heat exchange and heating, and then sent back to the soft water insulation water tank 2. At this time, the water replenishment three-way valve 21 makes the soft water replenishment pipe 25 connected to the soft water supply pipe 24, the soft water preheating heat exchanger 16 does not work, and the soft water replenishment pipe 25 does not provide low-temperature softened water to the soft water preheating heat exchanger 16; at the same time, due to the water supply three-way valve 22, the soft water supply pipe 24 is connected to the soft water heating pipe 23 on the side close to the soft water insulation water tank 2, and the soft water replenishment pipe 25 is also not connected to the soft water heating pipe 23, that is, the soft water replenishment pipe 25 is kept closed; when the softened water level in the soft water insulation tank is lower than the set value, the soft water supply pipe 24 is close to the soft water replenishment pipe 25 on one side and the soft water heating pipe 23 through the water supply three-way valve 22, and the softened water in the replenishment pipe passes through the water replenishment three-way valve 21, the water supply three-way valve 22, the soft water heating pipe 23, and the high-temperature heat exchanger 12 and then flows into the soft water insulation water tank 2.

[0035] Example 2 is as shown in the attached Figure 3As shown, the same parts as Example 1 are not repeated here, and the difference is that a boiler flue gas heat recovery system is also provided; the economizer 31 installed in the existing boiler is already a standard configuration, and the boiler flue gas heat recovery system is established based on the existing standard configuration of the boiler.

[0036] The boiler flue gas heat recovery system includes a fresh air preheating chamber and a flue gas heat exchanger and an air preheating heat exchanger 34 which are arranged at the exhaust pipe 3 of the boiler from bottom to top. The inlet of the water medium pipeline of the flue gas heat exchanger is connected to the soft water insulation water tank 2 through a pipeline, and the outlet of the water medium pipeline of the flue gas heat exchanger is connected to the second water collector 51, and the second water collector 51 is respectively connected to the high temperature insulation water tank 5 and the heat exchange unit. The water outlet end of the heat exchange unit on the heat dissipation side is connected to the soft water insulation water tank 2 through a pipeline. The heat exchange unit includes a domestic hot water heat exchange unit, a building The heating heat exchanger unit and the production heat exchanger unit, the heat absorption side pipeline of the production heat exchanger unit is connected in series with the hot water exchange circuit of the production hot water tank 19 through a pipeline, and the water in the production hot water tank 19 that has been heated by the medium-temperature heat exchanger is heated again; the water medium pipeline of the air preheating heat exchanger 34 is connected to the air heating heat exchanger 4, and the air heating heat exchanger 4 is installed in the fresh air preheating room. The fresh air preheating room is connected to the air supply pipe 41, one end of the air supply pipe 41 is connected to the air collecting chamber 42 of the boiler, and the air supply pipe 41 is located at one end of the fresh air preheating room and a blower is provided.

[0037] The second water collector 51 is connected to the water inlet of the boiler economizer 31 through the boiler water supply pipe. The boiler water supply pipe is provided with a deoxygenation tank 35 for removing oxygen from the softened water. The flue gas heat exchanger includes a primary heat exchanger 32 and a secondary heat exchanger 33 arranged in sequence along the flue gas discharge direction. The soft water insulation water tank 2 is connected to the water inlet end of the secondary heat exchanger 33 through a pipeline, the water outlet end of the secondary heat exchanger 33 is connected to the water inlet end of the primary heat exchanger 32, the water outlet end of the primary heat exchanger 32 is connected to the second water collector 51, and the primary heat exchanger 32 is arranged close to the economizer 31.

[0038] The operation of the boiler flue gas heat recovery system is divided into two parts: softened water heating heat recovery and boiler blast heat recovery. The softened water heating heat recovery operation process is as follows: the 55°C softened water heated by the cascade cooling heat recovery system is transported to the secondary heat exchanger 33, and heat exchanged with the secondary high temperature flue gas discharged after heat exchange by the primary heat exchanger 32 to heat up. The heated softened water enters the primary heat exchanger 32 and heats up the high temperature flue gas discharged by the economizer 31 for a second time to 65-70°C. After heating, it enters the second water collector 51 to supply Each heat-using unit or enters the high-temperature water storage tank for storage; the heated softened water is pumped to the deaerator 35 to increase the water inlet temperature of the deaerator 35 and deoxygenate the deaerator 35, and then the deoxygenated softened water is transported to the economizer 31, and after heat exchange with the high-temperature flue gas discharged by the boiler, the softened water temperature is ultimately increased to 85-90°C and then sent to the steam boiler. Because the inlet temperature of the boiler is increased in multiple stages, the heat required to form steam is reduced, the steam production efficiency of the boiler is improved, and fuel consumption is saved.

[0039] Boiler blast heat recovery operation process: the flue gas discharged from the boiler enters the air preheating heat exchanger 34 after heat exchange through the flue gas heat exchanger. At the same time, the low-temperature return water after heat exchange with the fresh air in the air heating heat exchanger 4 is pumped to the air preheating heat exchanger 34. The low-temperature return water exchanges heat with the flue gas in the air preheating heat exchanger 34. After the flue gas temperature drops, it is discharged from the exhaust pipe 3. After the low-temperature return water is heated, it enters the air heating heat exchanger 4 again to exchange heat with the fresh air. The heated fresh air is pressurized by the blower and sent to the air collecting chamber 42 through the air supply pipe 41, providing the blower with preheated fresh air heated by heat recovery, thereby improving the boiler production efficiency.

[0040] Example 3 is as shown in the attached Figure 4 As shown, the same parts as those in Example 1 and Example 2 are not repeated here. The difference lies in that the warm cooling water supply pipe is also connected to a refrigeration auxiliary heat exchanger 17, the refrigeration auxiliary heat exchanger 17 is connected in series with the low-temperature heat exchanger, and the heat absorption side pipeline of the refrigeration auxiliary heat exchanger 17 is connected to an auxiliary refrigeration and heating system, the auxiliary refrigeration and heating system includes a heat pump unit 6, an energy storage tank 7 and a second cooling tower 8, the chilled water prepared by the heat pump unit 6 is stored in the energy storage tank 7, the energy storage tank 7 is connected to the heat absorption side inlet of the refrigeration auxiliary heat exchanger 17 through a chilled water supply pipe, and the heat absorption side outlet of the refrigeration auxiliary heat exchanger 17 is connected to the evaporator side of the heat pump unit 6 through a pipeline; the water outlet of the condenser 1 of the heat pump unit 6 is connected to the second cooling tower 8 through a heat pump water supply branch 63, and the second cooling tower 8 is connected to the water inlet of the condenser 1 of the heat pump unit 6 through a heat pump return branch 64.

[0041] The medium-temperature cooling return pipe is also provided with a second medium-temperature heat exchanger 14 connected in parallel with the first medium-temperature heat exchanger 13. The energy storage tank 7 is connected to the heat absorption side pipeline inlet of the second medium-temperature heat exchanger 14 through the heat pump evaporation water supply pipe 65, and the heat absorption side pipeline outlet of the second medium-temperature heat exchanger 14 is connected to the water inlet of the evaporator of the heat pump unit 6 through the heat pump evaporation return pipe 66, and the water outlet of the evaporator is connected to the energy storage tank 7; the water outlet end of the condenser 1 of the heat pump unit 6 is connected to the second water collector 51 through the heat pump water supply pipe 61, and the water outlet end of the heat exchanger unit on the heat dissipation side is also connected to the water inlet end of the condenser 1 of the heat pump unit 6 through the heat pump return pipe 62, and the high-temperature insulation water tank 5 is connected to the heat pump return pipe 62 through the water outlet branch pipe.

[0042] The low-temperature cooling water supply pipe is also provided with a first temperature sensor 171, and the chilled water supply pipe is provided with a chilled water circulation pump 651 and a chilled water electric valve 172. The first temperature sensor 171 is electrically connected to a first controller, and the output end of the first controller is electrically connected to the chilled water circulation pump 651 and the chilled water electric valve 172 respectively. The first controller is used to control the opening and closing of the chilled water electric valve 172 and the opening and closing of the chilled water circulation pump 651 according to the signal input by the first temperature sensor 171.

[0043] The chilled water circulation pump can be a variable frequency circulation pump with a built-in valve, so that the opening and closing of the chilled water circulation pump can be automatically controlled by the first controller to realize the opening and closing control of the chilled water pipeline of the refrigeration auxiliary heat exchanger 17 without the need for opening and closing control through the chilled water electric valve.

[0044] The auxiliary cooling and heating system operates in two working conditions. When in high temperature climate, the auxiliary cooling and heating system provides auxiliary cooling function for the cascade cooling heat recovery system.

[0045] When the first temperature sensor detects that the temperature of the low-temperature cooling water supply pipe is higher than the set value, which is 28°C in this embodiment, it means that the cooling water still does not reach the temperature after the first cooling tower 11 is cooled at full load and the low-temperature heat exchanger is cooled. The first controller controls the chilled water electric valve 172 and the chilled water circulation pump 651 to open. At the same time, the first controller controls the operating frequency of the chilled water circulation pump 651 in real time according to the temperature signal detected by the first temperature sensor 171, and sends the chilled water of 7-12°C in the energy storage tank 7 to the heat absorption side of the refrigeration auxiliary heat exchanger 17, thereby starting the refrigeration auxiliary heat exchanger 17, and further cools the cooling water to the set temperature and then sends it back to the condenser 1. When the temperature of the chilled water in the energy storage tank 7 reaches the set lower limit, the heat pump unit 6 is started to prepare chilled water for the energy storage tank 7. When preparing chilled water, if the high-temperature insulated water tank 5 needs to be heated or insulated, the circulation pipeline on the side of the heat pump condenser 1 passes through the heat pump water supply pipe 61 and the heat pump return pipe 62, so that the condenser 1 of the heat pump unit 6 and the high-temperature insulated water tank 5 circulate water, and the heat pump unit 6 prepares chilled water for the energy storage tank 7 while providing high-temperature hot water to the high-temperature insulated water tank 5. When the high-temperature insulated water tank 5 does not need heat, the condenser 1 of the heat pump unit 6 and the second cooling tower 8 are cooled by water circulation through the heat pump water supply branch pipe 63 and the heat pump return branch pipe 64.

[0046] When in low temperature climate, the refrigeration auxiliary heat exchanger 17 does not need chilled water auxiliary cooling, and the auxiliary refrigeration and heating system operates to assist production and life heat preparation functions. The auxiliary refrigeration and heating system can provide heating and constant temperature thermal energy for the high-temperature insulation water tank 5, and the condenser 1 of the heat pump unit 6 and the high-temperature insulation water tank 5 are circulated through the heat pump water supply pipe 61 and the heat pump return water pipe 62; the second medium-temperature heat exchanger 14 and the energy storage tank 7 are circulated with the evaporator water of the heat pump unit 6 through the heat pump evaporation water supply pipe 65 and the heat pump evaporation return water pipe 66. The cold water after the evaporator of the heat pump unit 6 absorbs heat and cools down is stored in the energy storage tank 7. The water in the energy storage tank 7 is sent to the second medium-temperature heat exchanger 14 for heat exchange and temperature increase, and the medium-temperature heat of the medium-temperature cooling water in the second medium-temperature heat exchanger 14 is obtained, and then sent back to the evaporator. Through the heat energy conversion of the heat pump unit 6, the medium-temperature heat energy is converted into high-temperature heat energy and released to the condenser 1 of the heat pump unit 6, and then the heat is transported to the high-temperature insulation water tank 5 through the heat pump water supply pipe 61 and the heat pump return water pipe 62 to store heat energy or supply heat energy. Therefore, the heat pump unit 6 has the characteristics of high efficiency and energy saving. In addition, the temperature of the cold water after heat exchange and temperature increase with the medium-temperature cooling water is higher than the cold water in the natural environment and the temperature is stable, so the energy efficiency of the heat pump unit 6 can reach 1:8, and the heating cost is extremely low.

[0047] The high-quality heat obtained by the production cooling water heat recovery, boiler flue gas heat recovery and heat pump unit 6 systems is stored in the high-temperature insulated water tank 5. A large amount of heat energy can provide heat energy for life and production. The domestic hot water heat exchanger unit can be connected to the hot water pipes of the factory shower, canteen, toilet, office, and dormitory to provide domestic hot water needs without extra energy consumption, thus saving energy and reducing emissions. The building heating heat exchanger unit is connected to the air conditioning and heating facilities in the factory office building, dormitory, packaging workshop and other areas to reduce or avoid building heating energy consumption, saving energy and reducing emissions. The production heat exchanger unit will heat the sub-high temperature water that has been heat exchanged by the first medium-temperature heat exchanger 13 and stored in the production hot water tank 19 and raise the temperature again; thus, when it is necessary to heat the hot water in the production hot water tank 19 again through the heating water tank to a higher temperature, heat recovery is used to reduce the heating load of the heating water tank, saving production fuel consumption, and saving energy and reducing emissions. In addition, the heat pump system recovers cold air while running for heating. The cold water supply pipe and the cold water return pipe can be connected to the evaporator of the heat pump unit 6 to supply cold air for production and life. It can provide low-temperature water of 7°C to office buildings, dormitories, packaging workshops and other areas, meet the needs of building refrigeration and production refrigeration, reduce refrigeration power consumption, save energy and reduce emissions.

[0048] The above is only an embodiment of the utility model, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the utility model, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. A winery heat comprehensive utilization system, Features: It comprises a cascade cooling heat recovery system; the cascade cooling heat recovery system comprises a condenser, a first cooling tower, and a first water collector, a water cavity and a heat exchange tube located in the water cavity are arranged in the shell of the condenser, a high-temperature cooling return water pipe is arranged on the upper part of the water cavity, a medium-temperature cooling return water pipe is arranged in the middle part of the water tank, and a low-temperature cooling water supply pipe is arranged at the bottom of the water cavity, the high-temperature cooling return water pipe and the medium-temperature cooling return water pipe are respectively connected to the high-temperature heat exchanger and the first medium-temperature heat exchanger, the cooling water outlet pipes of the high-temperature heat exchanger and the first medium-temperature heat exchanger are both connected to the first water collector, the first water collector is connected to the cooling tower, the water outlet end of the cooling tower is connected to the low-temperature heat exchanger, and the low-temperature heat exchanger is connected to the low-temperature cooling water supply pipe; The low-temperature heat exchanger includes a low-temperature preheating heat exchanger and a soft water preheating heat exchanger connected in parallel. The heat absorption sides of the low-temperature preheating heat exchanger and the medium-temperature heat exchanger are connected in series through pipelines to a production hot water tank. The water inlet end of the heat absorption side of the low-temperature preheating heat exchanger is connected to the production tap water pipeline. The production tap water is heated up by the low-temperature preheating heat exchanger and the medium-temperature heat exchanger in turn and then enters the production hot water tank. The production hot water tank is connected to the heat absorption side inlet of the medium-temperature heat exchanger through a medium-temperature heat recovery return pipe; the heat absorption sides of the soft water preheating heat exchanger and the high-temperature heat exchanger are connected in series with a soft water insulation water tank through pipelines. The water inlet end of the hot side of the soft water preheating heat exchanger is connected to a normal-temperature soft water replenishment pipe. The normal-temperature soft water is heated up by the soft water preheating heat exchanger and the high-temperature heat exchanger in turn and then stored in the soft water insulation water tank.

2. A winery heat comprehensive utilization system according to claim 1, Features: The boiler flue gas heat recovery system is also included. The boiler flue gas heat recovery system includes a fresh air preheating chamber and a flue gas heat exchanger and an air preheating heat exchanger arranged at the exhaust pipe of the boiler. The inlet of the water medium pipeline of the flue gas heat exchanger is connected to the soft water insulation water tank through a pipeline, and the outlet of the water medium pipeline of the flue gas heat exchanger is connected to the second water collector, and the second water collector is respectively connected to the high-temperature insulation water tank and the heat-using heat exchanger unit. The water outlet end of the heat-dissipating side of the heat-using heat exchanger unit is connected to the soft water insulation water tank through a pipeline. The heat-using heat exchanger unit includes a production heat exchanger unit, and the heat absorption side pipeline of the production heat exchanger unit is connected in series with the production hot water tank through a pipeline; the water medium pipeline of the air preheating heat exchanger is connected to the air heating heat exchanger, and the air heating heat exchanger is installed in the fresh air preheating chamber. The fresh air preheating chamber is connected to an air supply pipe, one end of which is connected to the air collecting chamber of the boiler. The air supply pipe is located at one end of the fresh air preheating chamber and is provided with a blower.

3. A winery heat comprehensive utilization system according to claim 2, Features: The low-temperature cooling water supply pipe is also connected to a refrigeration auxiliary heat exchanger, which is connected in series with the low-temperature heat exchanger. The heat absorption side pipeline of the refrigeration auxiliary heat exchanger is connected to an auxiliary refrigeration and heating system. The auxiliary refrigeration and heating system includes a heat pump unit, an energy storage tank and a second cooling tower. The chilled water prepared by the heat pump unit is stored in the energy storage tank. The energy storage tank is connected to the heat absorption side inlet of the refrigeration auxiliary heat exchanger through a chilled water supply pipe. The heat absorption side outlet of the refrigeration auxiliary heat exchanger is connected to the evaporator side of the heat pump unit through a pipeline; the water outlet of the condenser of the heat pump unit is connected to the second cooling tower through a heat pump water supply branch pipe, and the second cooling tower is connected to the water inlet of the condenser of the heat pump unit through a heat pump return branch pipe.

4. A winery heat comprehensive utilization system according to claim 3, Features: The medium-temperature cooling return pipe is also provided with a second medium-temperature heat exchanger connected in parallel with the first medium-temperature heat exchanger. The energy storage tank is connected to the heat absorption side pipeline inlet of the second medium-temperature heat exchanger through the heat pump evaporation water supply pipe, and the heat absorption side pipeline outlet of the second medium-temperature heat exchanger is connected to the water inlet of the evaporator of the heat pump unit through the heat pump evaporation return pipe, and the water outlet of the evaporator is connected to the energy storage tank; the water outlet of the condenser of the heat pump unit is connected to the second water collector through the heat pump water supply pipe, and the water outlet of the heat exchanger unit on the heat dissipation side is also connected to the water inlet of the condenser of the heat pump unit through the heat pump return pipe.

5. A winery heat comprehensive utilization system according to claim 3, Features: The low-temperature cooling water supply pipe is also provided with a first temperature sensor, the chilled water supply pipe is provided with a chilled water circulation pump, the first temperature sensor is electrically connected to a first controller, the output ends of the first controller are respectively electrically connected to the chilled water circulation pump, and the first controller is used to control the frequency of the chilled water circulation pump according to the signal input by the first temperature sensor.

6. A winery heat comprehensive utilization system according to claim 1, Features: A second temperature sensor and a high-temperature cooling electric valve are provided on the side of the high-temperature cooling return pipe close to the condenser. The second temperature sensor is electrically connected to a temperature control meter, the temperature control meter is electrically connected to a relay, the relay is electrically connected to the high-temperature cooling electric valve, and the temperature control meter is used to control the opening and closing of the relay according to the signal of the second temperature sensor and thus control the opening and closing of the high-temperature cooling electric valve.

7. A winery heat comprehensive utilization system according to claim 2, Features: The second water collector is connected to the water inlet of the boiler through a boiler water supply pipe, and a deaerator tank is provided on the boiler water supply pipe.

8. A winery heat comprehensive utilization system according to claim 2, Features: The flue gas heat exchanger includes a primary heat exchanger and a secondary heat exchanger which are sequentially arranged along the flue gas discharge direction. The soft water insulation water tank is connected to the water inlet end of the secondary heat exchanger through a pipeline, the water outlet end of the secondary heat exchanger is connected to the water inlet end of the primary heat exchanger, and the water outlet end of the primary heat exchanger is connected to the second water collector.

9. A winery heat comprehensive utilization system according to claim 2, Features: A third temperature sensor is provided at the water outlet of the first cooling tower, and the third temperature sensor is electrically connected to a second controller. The output end of the second controller is electrically connected to the cooling fan and spray pump of the cooling tower respectively, and the second controller is used to control the cooling fan and spray pump frequency according to the third temperature sensor signal.