House building mechanical and electrical installation pipeline mechanism

By designing a mechanical and electrical installation pipeline mechanism for building construction, including a base, a mobile station and an electric push rod, the problems of unstable and chaotic wire fixation in the prior art are solved, and a more efficient and stable wire fixation effect is achieved.

CN222072700UInactive Publication Date: 2024-11-26陕西建工集团股份有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420680911.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In house construction projects, the existing wire fixing methods mainly use cable ties or wire staples, which leads to the wire being easily confused and unstable. Construction workers need to spend a lot of time and energy to install multiple times to ensure the correct fixation of the wires.

Method used

A mechanical and electrical installation pipeline mechanism is designed, including a base, a mobile station, an upper ply plate and an electric push rod. The wires are clamped and fixed through pipeline ducts and threaded columns, and tightened through fixing rods, threaded rods, limit plates and locks. The mating of the nuts adjusts the clamping position to adapt to wires of different lengths and improves fixing stability.

Benefits of technology

This mechanism makes the wire fixing more convenient and fast, avoids the chaos and fall off of wires, improves the stability and efficiency of fixing, and reduces the workload of construction workers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222072700U_ABST
    Figure CN222072700U_ABST
Patent Text Reader

Abstract

The utility model relates to a housing construction mechanical and electrical installation pipeline mechanism which comprises a base, two movable tables and two upper clamping plates, and the pipeline mechanism is arranged outside the movable tables. The pipeline mechanism comprises a mounting platform fixedly connected to the top of the moving table, electric push rods are fixedly mounted on the periphery of the top of the mounting platform, output shafts of the electric push rods are fixedly connected with a lower clamping plate, threaded holes are formed in the periphery of the bottom of the lower clamping plate, and threaded columns are in threaded connection with the interiors of the threaded holes. A handle is fixedly connected to the top of the threaded column, through holes are formed in the periphery of the top of the upper clamping plate, the threaded column penetrates through the through holes, pipeline grooves are formed in the top of the lower clamping plate and the bottom of the upper clamping plate, and insulation pads are bonded to the inner sides of the pipeline grooves. According to the housing construction mechanical and electrical installation pipeline mechanism, through the arrangement of the pipeline mechanism, compared with an existing mode that electric wires are fixed through ribbons or wire clamping nails, more convenience is achieved, and the situation that the electric wires are disordered is not likely to happen.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline mechanisms, in particular to a mechanical and electrical installation pipeline mechanism for building construction. Background Art

[0002] Housing construction projects refer to various types of housing buildings and their ancillary facilities and the supporting lines, pipelines, equipment installation projects and indoor and outdoor decoration projects. "Housing buildings" refer to projects with roofs, beams, columns, walls, foundations and the ability to form internal space to meet people's needs for production, residence, study, public activities, etc. Housing construction projects are generally referred to as construction projects, which refer to the various technical work such as survey, planning, design, construction, installation and maintenance for the construction, reconstruction or expansion of housing buildings and ancillary structures and the completed engineering entities. Wires refer to conductors for transmitting electrical energy, which are divided into bare wires, electromagnetic wires and insulated wires. Bare wires have no insulation layer, including copper, aluminum flat wires, overhead stranded wires and various profiles (such as profiled wires, busbars, copper bars, aluminum bars, etc.). They are mainly used for outdoor overhead and indoor busbars and switch boxes. Electromagnetic wires are insulated wires that generate magnetic fields or induce currents in magnetic fields when energized. They are mainly used for motor and transformer windings and other related electromagnetic equipment. Different insulating materials can be used to obtain different properties.

[0003] During the mechanical and electrical installation of housing construction projects, it is generally necessary to fix the wires to designated positions to facilitate the construction workers to route the wires. Currently, most of the existing wire fixing methods use cable ties or wire clips to fix the wires. Although cable ties can fix multiple wires together, they are relatively messy. When a short circuit occurs, it is easy to distinguish which wire is which. In addition, although wire clips can fix multiple wires separately, they are time-consuming and labor-intensive, requiring construction workers to install them multiple times, which is relatively troublesome. Therefore, a housing construction mechanical and electrical installation pipeline mechanism is proposed to solve the above-mentioned problems. Utility Model Content

[0004] In view of the deficiencies in the prior art, the utility model provides a mechanical and electrical installation pipeline mechanism for building construction, which solves the problem that most wires are fixed with cable ties or wire clips. Although cable ties can fix multiple wires together, they are relatively messy. When a short circuit occurs, it is easy to distinguish which wire is which. In addition, although wire clips can fix multiple wires separately, they are time-consuming and labor-intensive, requiring construction workers to perform multiple installations, which is relatively troublesome.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pipeline mechanism for mechanical and electrical installation of building construction, comprising a base, two moving platforms and two upper clamping plates, wherein the pipeline mechanism is arranged outside the moving platforms;

[0006] The pipeline mechanism includes a mounting platform fixedly connected to the top of the mobile platform, an electric push rod is fixedly installed around the top of the mounting platform, the output shaft of the electric push rod is fixedly connected to a lower clamping plate, threaded holes are opened around the bottom of the lower clamping plate, the internal threads of the threaded holes are connected to threaded columns, a handle is fixedly connected to the top of the threaded column, through holes are opened around the top of the upper clamping plate, the threaded column passes through the through holes, pipeline grooves are opened on the top of the lower clamping plate and the bottom of the upper clamping plate, and insulating pads are bonded to the inner side of the pipeline grooves.

[0007] Furthermore, a fixing rod is fixedly connected to the inner side of the base, and the fixing rod is slidably connected to the moving platform.

[0008] Furthermore, the front and back sides of the mounting platform are fixedly connected with threaded rods for limiting, and the front and back sides of the base are fixedly connected with limiting plates and positioning blocks, respectively.

[0009] Furthermore, a strip-shaped hole is provided on the top of the limiting plate, the threaded rod passes through the strip-shaped hole, and a locking nut is threadedly sleeved on the outer surface of the threaded rod.

[0010] Furthermore, the number of the positioning blocks is four, and a positioning hole is formed on the top of the positioning block.

[0011] Furthermore, the lower clamping plate is consistent in size with the upper clamping plate, and the base, the lower clamping plate and the upper clamping plate are all made of hard plastic.

[0012] Furthermore, the base is in a rectangular shape, and the electric push rod is electrically connected to an external power supply and a controller.

[0013] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0014] 1. The mechanical and electrical installation pipeline mechanism of the building, by setting up the pipeline mechanism, when in use, only need to place the electric cable into the inner side of the pipeline groove, and then turn the threaded column by the handle to make the upper clamping plate close to the position of the lower clamping plate, and clamp and fix multiple wires separately. Among them, before use, the electric push rod can adjust the horizontal height of the lower clamping plate to match the positions of wires at different horizontal heights, so as to avoid pulling the wires and reduce the possibility of falling off. Compared with the existing method of fixing the wires with cable ties or wire clips, it is more convenient and less likely to cause wire confusion.

[0015] 2. The mechanical and electrical installation pipeline mechanism of the building construction, through the cooperation of the fixed rod, threaded rod, limit plate, bar hole and locking nut, the construction personnel can adjust the clamping position by pushing the mobile platform left and right, so as to match the wires of different lengths and improve the fixing stability. Among them, when the position adjustment is completed, it is only necessary to tighten the locking nut to the outer surface of the threaded rod so that it rests against the bottom of the limit plate to fix the position of the mobile platform and avoid deviation. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a side view of the structure of the utility model;

[0017] Figure 2 This is a schematic diagram of the top view structure of the utility model;

[0018] Figure 3 It is a schematic diagram of the three-dimensional structure of the lower clamping plate of the utility model.

[0019] In the figure: 1 base, 2 moving platform, 3 mounting platform, 4 electric push rod, 5 lower clamping plate, 6 threaded hole, 7 threaded column, 8 handle, 9 upper clamping plate, 10 through hole, 11 pipeline groove, 12 insulating pad, 13 fixing rod, 14 threaded rod, 15 limit plate, 16 positioning block, 17 bar hole, 18 locking nut, 19 positioning hole. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-3 In this embodiment, a pipeline mechanism for mechanical and electrical installation of a building construction includes a base 1, two mobile platforms 2 and two upper clamping plates 9, and a pipeline mechanism is arranged outside the mobile platform 2;

[0022] The pipeline mechanism includes a mounting platform 3 fixedly connected to the top of the moving platform 2 . An electric push rod 4 is fixedly installed around the top of the mounting platform 3, and the output shaft of the electric push rod 4 is fixedly connected to the lower clamping plate 5. Threaded holes 6 are provided around the bottom of the lower clamping plate 5, and threaded columns 7 are connected to the internal threads of the threaded holes 6. A handle 8 is fixedly connected to the top of the threaded column 7. Through holes 10 are provided around the top of the upper clamping plate 9, and the threaded column 7 passes through the through holes 10. Pipeline grooves 11 are provided on the top of the lower clamping plate 5 and the bottom of the upper clamping plate 9. Insulating pads 12 are bonded to the inner side of the pipeline groove 11. By setting the pipeline mechanism, when in use, it is only necessary to place the electric cable into the inner side of the pipeline groove 11, and then rotate the threaded column 7 through the handle 8, so that the upper clamping plate 9 is close to the position of the lower clamping plate 5, and multiple wires are clamped and fixed respectively. Before use, the electric push rod 4 can adjust the horizontal height of the lower clamping plate 5 to match the positions of wires at different horizontal heights, thereby avoiding pulling the wires and reducing the possibility of falling off. Compared with the existing method of fixing the wires with cable ties or wire clips, it is more convenient and less likely to cause wire confusion.

[0023] Among them, a fixing rod 13 is fixedly connected to the inner side of the base 1, and the fixing rod 13 is slidably connected to the moving platform 2. The front and back sides of the mounting platform 3 are fixedly connected with threaded rods 14 for limiting. The front and back sides of the base 1 are respectively fixedly connected with a limiting plate 15 and a positioning block 16. A strip hole 17 is provided on the top of the limiting plate 15, and the threaded rod 14 passes through the strip hole 17. A locking nut 18 is threadedly sleeved on the outer surface of the threaded rod 14. Through the cooperation of the fixing rod 13, the threaded rod 14, the limiting plate 15, the strip hole 17 and the locking nut 18, the construction personnel can adjust the clamping position by pushing the moving platform 2 left and right, so as to match with wires of different lengths and improve the fixing stability. Among them, when the position adjustment is completed, it is only necessary to tighten the locking nut 18 to the outer surface of the threaded rod 14 so that it rests against the bottom of the limiting plate 15 to fix the position of the moving platform 2, thereby avoiding displacement.

[0024] It should be noted that there are four positioning blocks 16, and a positioning hole 19 is provided on the top of the positioning block 16. By providing the positioning block 16 and the positioning hole 19, it is convenient for construction workers to fix the mechanism to the ground or wall by nails.

[0025] It should be understood that the lower splint 5 is the same size as the upper splint 9, the base 1, the lower splint 5 and the upper splint 9 are all made of hard plastic, the base 1 is rectangular in shape, the electric push rod 4 is electrically connected to an external power supply and a controller, and the base 1, the lower splint 5 and the upper splint 9 made of hard plastic have good insulation, low manufacturing cost, and acceptable overall strength, and are not easy to pinch wires.

[0026] The working principle of the above embodiment is:

[0027] When using the mechanical and electrical pipeline installation mechanism for building construction, it is only necessary to place the electric cable inside the pipeline groove 11, and then rotate the threaded column 7 through the handle 8, so that the upper clamping plate 9 is close to the position of the lower clamping plate 5, and multiple wires are clamped and fixed separately. Before use, the electric push rod 4 can adjust the horizontal height of the lower clamping plate 5 to match the positions of wires at different horizontal heights, thereby avoiding pulling the wires and reducing the possibility of falling off. In addition, before use, the construction personnel can adjust the clamping position by pushing the moving platform 2 left and right to match the wires of different lengths and improve the fixing stability. After the position adjustment is completed, it is only necessary to tighten the locking nut 18 to the outer surface of the threaded rod 14 so that it is against the bottom of the limit plate 15 to fix the position of the moving platform 2, thereby avoiding displacement.

[0028] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A mechanical and electrical installation pipeline mechanism for building construction, comprising a base (1), two moving platforms (2) and two upper clamping plates (9), characterized in that: A pipeline mechanism is arranged outside the mobile platform (2); The pipeline mechanism comprises a mounting platform (3) fixedly connected to the top of the moving platform (2), an electric push rod (4) fixedly installed around the top of the mounting platform (3), an output shaft of the electric push rod (4) fixedly connected to a lower clamping plate (5), threaded holes (6) are provided around the bottom of the lower clamping plate (5), a threaded column (7) is connected to the inner thread of the threaded hole (6), a handle (8) is fixedly connected to the top of the threaded column (7), a through hole (10) is provided around the top of the upper clamping plate (9), the threaded column (7) passes through the through hole (10), a pipeline groove (11) is provided on the top of the lower clamping plate (5) and the bottom of the upper clamping plate (9), and an insulating pad (12) is bonded to the inner side of the pipeline groove (11).

2. A mechanical and electrical installation pipeline mechanism for building construction according to claim 1, characterized in that: A fixing rod (13) is fixedly connected to the inner side of the base (1), and the fixing rod (13) is slidably connected to the moving platform (2).

3. A mechanical and electrical installation pipeline mechanism for building construction according to claim 1, characterized in that: The front and back sides of the installation platform (3) are fixedly connected with threaded rods (14) for limiting position, and the front and back sides of the base (1) are respectively fixedly connected with limiting plates (15) and positioning blocks (16).

4. A mechanical and electrical installation pipeline mechanism for building construction according to claim 3, characterized in that: A strip-shaped hole (17) is provided on the top of the limiting plate (15), the threaded rod (14) passes through the strip-shaped hole (17), and a locking nut (18) is threadedly sleeved on the outer surface of the threaded rod (14).

5. A mechanical and electrical installation pipeline mechanism for building construction according to claim 3, characterized in that: The number of the positioning blocks (16) is four, and a positioning hole (19) is formed on the top of the positioning block (16).

6. A mechanical and electrical installation pipeline mechanism for building construction according to claim 1, characterized in that: The lower clamping plate (5) and the upper clamping plate (9) are of the same size, and the base (1), the lower clamping plate (5) and the upper clamping plate (9) are all made of hard plastic.