Dust collecting and discharging chute for grinding head of cement grinding mill
By replacing the screw conveyor with a square feeding trough, transition feeding component, and feeding pipe trough in cement mill production, and by using high-pressure air to transport powder, the problem of powder blockage was solved, and the stable operation and efficient dust collection of the dust collection equipment were achieved.
Patent Information
- Application Number
- CN202420187785.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-25
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-01-25
AI Technical Summary
In the existing technology, during the cement mill production process, the screw conveyor is prone to blockage due to powder adhesion, which affects the safe, stable operation and efficiency of the dust collection equipment.
The screw conveyor is replaced by a square discharge trough, a transition discharge component, and a discharge pipe trough. The powder is transported by high-pressure air. The design of the perforated plate and air pipeline reduces powder adhesion and ensures stable operation of the equipment.
It effectively solved the problem of powder blockage, ensured the safe and stable operation of the dust collection equipment, reduced the system operating resistance, and improved the dust collection efficiency.
Smart Images

Figure CN222076826U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of material conveying, and in particular to a cement grinding head dust collection and discharge chute. Background Art
[0002] Cement mill is an important equipment for producing cement. In the process of producing cement, a lot of dust will be generated. The dust needs to be collected by a dust collector to avoid polluting the environment.
[0003] In the prior art, an auger screw conveyor is often used to discharge materials from the bottom of the grinding head dust collecting bin. However, in the process of producing cement by cement mill, the ingredients contain gypsum, which has a high moisture content and has a great impact on the discharge of materials from the grinding head dust collecting bin. The powder is easy to adhere to the spiral blades of the auger screw conveyor, which will cause the auger to be blocked over time and the middle shaft of the spiral blade to be overloaded and damaged, which affects the safe and stable operation of the dust collecting equipment, increases the system operation resistance, and reduces the dust collecting efficiency. Summary of the invention
[0004] The purpose of the embodiments of the present application is to provide a cement mill grinding head dust collection and discharge chute, which can solve the technical problems raised by the background technology.
[0005] An embodiment of the present application provides a cement mill grinding head dust collection and discharge chute, comprising a discharge square trough, the bottom of the discharge square trough is inclined, the lower end of the discharge square trough is connected to a transition discharge piece, the transition discharge piece is connected to a discharge pipe trough, the discharge pipe trough is inclined, the inclination angle of the discharge pipe trough is smaller than the inclination angle of the bottom of the discharge square trough, the lower end of the discharge pipe trough is connected to a discharge elbow, the bottom of the discharge square trough is connected to a plurality of first gas pipelines along the material flow direction, and the first gas pipelines are perpendicular to the bottom of the discharge square trough.
[0006] Furthermore, a first porous plate is fixedly provided in the square feeding trough, the first porous plate is parallel to the bottom of the square feeding trough, and the first porous plate is located above the air inlet of the first gas pipeline.
[0007] Furthermore, the bottom inclination angle of the square feeding trough is 10° to 20°.
[0008] Furthermore, the bottom of the transition blanking piece is connected to a second gas pipeline.
[0009] Furthermore, an inspection port is provided at the top of the transition blanking piece, and a sealing door is installed at the inspection port.
[0010] Furthermore, a second porous plate is fixedly provided in the transition blanking piece, and the second porous plate is located above the air inlet of the second air pipeline.
[0011] Furthermore, a third gas pipeline is connected to the bottom of the feed pipe trough, and the third gas pipeline is perpendicular to the bottom of the feed pipe trough.
[0012] Furthermore, a third porous plate is fixedly provided in the feed pipe trough, and the third porous plate is located above the air inlet of the third air pipeline.
[0013] Beneficial effects of the utility model:
[0014] Compared with the prior art, the utility model utilizes a material discharge square trough, a transition material discharge piece and a material discharge pipe trough to replace the auger screw conveyor in the prior art, and at the same time transmits high-pressure air to the material discharge square trough through the first air transmission pipeline, and the high-pressure air transports the powder, effectively solving the blockage problem caused by the powder adhering to the spiral blades of the auger screw conveyor, ensuring the safe and stable operation of the dust collecting equipment, reducing the system operation resistance, and improving the dust collecting efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 This is a schematic diagram of the structure of some embodiments of the present application;
[0017] Figure 2 It is a cross-sectional view of some embodiments of the present application;
[0018] The reference numerals are:
[0019] 1. Material discharge square trough; 11. First porous plate; 2. Transition material discharge piece; 21. Sealing door; 22. Second porous plate; 3. Material discharge pipe trough; 31. Third porous plate; 4. Material discharge elbow; 5. First gas pipeline; 6. Second gas pipeline; 7. Third gas pipeline. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
[0021] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0022] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0023] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the application is usually placed when in use. They are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0024] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0025] In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances. Specific embodiment:
[0027] like Figure 1 and Figure 2As shown, the present application provides a cement mill grinding head dust collection and discharge chute, including a discharge square trough 1, the bottom of the discharge square trough 1 is inclined, the lower end of the discharge square trough 1 is connected with a transition discharge piece 2, the transition discharge piece 2 is connected with a discharge pipe trough 3, the discharge pipe trough 3 is inclined, the inclination angle of the discharge pipe trough 3 is smaller than the inclination angle of the bottom of the discharge square trough 1, in actual use, a support frame can be arranged at the bottom of the discharge pipe trough 3 according to the length of the discharge pipe trough 3, so that the structural support is stable, the lower end of the discharge pipe trough 3 is connected with a discharge elbow 4, the bottom of the discharge square trough 1 is connected with a plurality of first gas pipelines 5 along the material flow direction, the first gas pipeline 5 is perpendicular to the bottom of the discharge square trough 1, and when in use, the discharge square trough 1 is connected to the water The mud mill head is connected to the bottom of the dust collecting and unloading bin, and the first air supply pipeline 5 is connected to the high-pressure fan. The high-pressure fan provides high-pressure air. When the powder falls into the unloading square trough 1, the powder is transported by the high-pressure air. The powder enters the transition unloading piece for buffering, and then continues to be transported along the unloading pipe trough 3, and finally flows out from the unloading elbow 4. Compared with the prior art, the unloading square trough 1, the transition unloading piece 2 and the unloading pipe trough 3 are used to replace the auger screw conveyor in the prior art, and the powder is transported by high-pressure air at the same time, which effectively solves the blockage problem caused by the powder adhering to the spiral blades of the auger screw conveyor, ensures the safe and stable operation of the dust collecting equipment, reduces the system operation resistance, and improves the dust collecting efficiency.
[0028] like Figure 2 As shown, a first porous plate 11 is fixedly provided in the material discharge square trough 1. The first porous plate 11 is parallel to the bottom of the material discharge square trough 1. The first porous plate 11 is located above the air inlet of the first gas pipeline 5. When the first gas pipeline 5 blows air into the material discharge square trough 1, the airflow will form a downward airflow in the material discharge square trough 1, which can reduce the contact between the powder and the first porous plate 11 and reduce the resistance to the powder transportation. The first porous plate 11 can disperse the airflow, increase the contact area between the airflow and the powder, and make the powder easier to be transported.
[0029] like Figure 1 and Figure 2 As shown, the bottom inclination angle of the material discharge square trough 1 is 10° to 20°. In this embodiment, the bottom inclination angle of the material discharge square trough 1 is 15°, and the inclination angle of the material discharge pipe trough 3 is 10°, so that the powder can slide down smoothly.
[0030] like Figure 1 and Figure 2 As shown, the bottom of the transition blanking piece 2 is connected to a second air pipeline 6. When in use, the second air pipeline 6 is connected to a high-pressure blower. The second air pipeline 6 delivers high-pressure air to the transition blanking piece 2. The powder rushes into the transition blanking piece 2 and is buffered by the blanking transition piece. Then, the high-pressure air input by the second air pipeline 6 blows the powder to transport it downward.
[0031] like Figure 1 and Figure 2 As shown, an inspection port is provided at the top of the transition blanking piece 2, and a sealing door 21 is installed at the inspection port. By opening the sealing door 21, the interior of the transition blanking piece 2 can be inspected and repaired. When congestion occurs, the sealing door 21 can also be opened and tools can be used to clear the blockage.
[0032] like Figure 2 As shown, a second porous plate 22 is fixedly provided in the transition blanking member 2, and the second porous plate 22 is located above the air inlet of the second air pipeline 6. The second porous plate 22 can disperse the high-pressure air input by the second air pipeline 6, increase the contact area with the powder, and facilitate blowing the powder.
[0033] like Figure 1 and Figure 2 As shown, the bottom of the feeding pipe trough 3 is connected to a third air pipeline 7, and the third air pipeline 7 is perpendicular to the bottom of the feeding pipe trough 3, so that high-pressure air is blown vertically into the bottom of the feeding pipe trough 3 to reduce wind loss.
[0034] like Figure 2 As shown, a third porous plate 31 is fixedly provided in the discharge pipe groove 3, and the third porous plate 31 is located above the air inlet of the third air pipeline 7. When in use, the third air pipeline 7 is connected to the high-pressure blower, and the third porous plate 31 can disperse the high-pressure air input by the third air pipeline 7, thereby increasing the contact area with the powder and facilitating the blowing of the powder.
[0035] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A cement grinding head dust collection and discharging chute, characterized in that: It includes a square trough for material discharge, the bottom of which is inclined, the lower end of which is connected to a transition material discharge piece, the transition material discharge piece is connected to a material discharge pipe trough, the material discharge pipe trough is inclined, the inclination angle of the material discharge pipe trough is smaller than the inclination angle of the bottom of the square trough, the lower end of the material discharge pipe trough is connected to a material discharge elbow, the bottom of the square trough is connected to a plurality of first gas pipelines along the material flow direction, and the first gas pipelines are perpendicular to the bottom of the square trough for material discharge.
2. The cement mill head dust collecting and discharging chute according to claim 1, characterized in that: A first porous plate is fixedly arranged in the square feeding trough, the first porous plate is parallel to the bottom of the square feeding trough, and the first porous plate is located above the air inlet of the first air pipeline.
3. The cement mill head dust collection and discharge chute according to claim 1, characterized in that: The bottom inclination angle of the square feeding trough is 10° to 20°.
4. The cement mill head dust collecting and discharging chute according to claim 1, characterized in that: The bottom of the transition blanking piece is connected with a second gas pipeline.
5. The cement mill head dust collecting and discharging chute according to claim 4, characterized in that: An inspection port is provided at the top of the transition blanking piece, and a sealing door is installed at the inspection port.
6. The cement mill head dust collecting and discharging chute according to claim 5, characterized in that: A second porous plate is fixedly arranged in the transition blanking piece, and the second porous plate is located above the air inlet of the second air pipeline.
7. The cement mill head dust collection and discharge chute according to claim 1, characterized in that: The bottom of the feed pipe trough is connected to a third gas pipeline, and the third gas pipeline is perpendicular to the bottom of the feed pipe trough.
8. The cement mill head dust collecting and discharging chute according to claim 7, characterized in that: A third porous plate is fixedly arranged in the feed pipe groove, and the third porous plate is located above the air inlet of the third air pipeline.
