Prefabricated wallboard mounting structure under I-shaped steel beam

By setting installation holes and fixing clamping parts on the top of the prefabricated wall panel, combining bolt and nut components and U-shaped structure, the damage to the structure and construction complexity of prefabricated plate installation in the prior art is solved, and simple construction and connection are achieved Stable prefabricated wall panel installation structure, suitable for I-beams of various sizes.

CN222083822UActive Publication Date: 2024-11-29CHINA CONSTR THIRD ENG BUREAU GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420742575.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-11
Publication Date
2024-11-29
Estimated Expiration
2034-04-11

AI Technical Summary

Technical Problem

Prior Art In prefabricated buildings, the installation method of prefabricated plates causes damage to the original structural beams, and the construction is complicated and the dismantling and modification efficiency is low.

Method used

Design a prefabricated wall panel installation structure under the I-beam. By opening installation holes on the top of the prefabricated wall panel, fixing clamping parts and bolt nut components are set to realize the detachable snap-in connection with the I-beam. The U-shaped structure and vertical stiffener enhance the connection stability, and the toothed structure and locking washer prevent loosening.

Benefits of technology

It realizes simple and convenient construction without destroying the original structure, stable connection and easy dismantling and modification. It is suitable for connecting I-shaped steel beams of various sizes and prefabricated wall panels, extending the service life of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083822U_ABST
    Figure CN222083822U_ABST
Patent Text Reader

Abstract

The utility model discloses a prefabricated wallboard installation structure under an I-shaped steel beam, which comprises a prefabricated wallboard and an I-shaped steel beam, the top of the prefabricated wallboard is provided with an installation hole, the top of the prefabricated wallboard is provided with a fixing mechanism, and the fixing mechanism comprises fixed clamping pieces installed on the two sides of the prefabricated wallboard. The fixing and clamping piece comprises a lower positioning plate and an upper connecting part, a connecting hole is formed in the lower positioning plate, a bolt and nut assembly is detachably arranged between the connecting hole and the mounting hole and used for pressing and connecting the lower positioning plate to the surface of the prefabricated wall plate, a horizontal connecting groove is formed in the upper connecting part, and the lower positioning plate is fixedly connected with the upper connecting part through the bolt and nut assembly. The horizontal connecting grooves of the fixed clamping pieces on the two sides are connected with the flange plate of the I-shaped steel beam in a clamped mode. The connecting structure has the advantages of being convenient to construct and maintain, free of damaging an original structure and stable in connection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of wall panel installation, and in particular relates to a prefabricated wall panel installation structure under an I-beam. Background Art

[0002] Prefabricated buildings are the support and guarantee for the construction of new urbanization. Prefabricated structures are also increasingly widely used due to their ease of construction and high efficiency.

[0003] During the construction of prefabricated buildings, with regard to the construction of prefabricated panels under structural beams, in the current construction process, when the structural beams are concrete beams, most of the time, expansion bolts are used to drive the reinforcement pipe clamps that are fixed in advance on the prefabricated panels into the structural beams. If the structural beams are steel structural beams, welding is used to weld the reinforcement pipe clamps that are fixed in advance on the prefabricated panels to the steel beams.

[0004] The problem with the existing technology is that the installation method of prefabricated panels causes certain damage to the original structural beam structure, and the construction is relatively complicated; if this type of installation and reinforcement method is adopted, if there is a need for subsequent demolition and modification, it will lead to difficulties in demolition and modification and low efficiency. Summary of the invention

[0005] The utility model aims to solve the problems existing in the prior art and provides a prefabricated wall panel installation structure under an I-beam, which has the advantages of convenient construction and maintenance, no need to destroy the original structure and stable connection.

[0006] To achieve the above-mentioned purpose, the technical solution adopted by the utility model is: a prefabricated wall panel installation structure under an I-beam, comprising a prefabricated wall panel and an I-beam, a mounting hole being opened on the top of the prefabricated wall panel, a fixing mechanism being arranged on the top of the prefabricated wall panel, the fixing mechanism comprising fixing clamps installed on both sides of the prefabricated wall panel, the fixing clamps comprising a lower positioning plate and an upper connecting portion, a connecting hole being opened on the lower positioning plate, a bolt and nut assembly being detachably arranged between the connecting hole and the mounting hole, the bolt and nut assembly being used to press and connect the lower positioning plate to the surface of the prefabricated wall panel, a horizontal connecting groove being opened at the upper connecting portion, and the horizontal connecting grooves of the fixing clamps on both sides are clamped and connected with the flange plate of the I-beam.

[0007] In the above scheme, the connection of the bolt and nut assembly is facilitated by opening a mounting hole at the top of the prefabricated wall panel and a connecting hole at the lower positioning plate of the fixed clamp, so that the fixed clamp is fixed to the two side surfaces of the top of the prefabricated wall panel, and the lower positioning plate of the fixed clamp is used to fit and position with the side wall of the prefabricated wall panel to ensure a stable connection between the fixed clamp and the prefabricated wall panel, and the horizontal connecting groove of the upper connecting part is used to engage and connect with the flange plate of the I-beam to fix the prefabricated wall panel to the bottom of the I-beam.

[0008] Furthermore, the upper connecting portion is a U-shaped structure, a threaded hole is provided on a side surface of the upper connecting portion, and a transverse clamping piece for cooperating with the flange plate is screwed into the threaded hole.

[0009] A horizontal connection groove is formed by a transversely arranged U-shaped structure to engage with the flange plate. A threaded hole is provided on the upper connection part to connect a transverse clamping piece. The transverse clamping piece can be adjusted transversely to clamp the side of the flange plate to ensure the positioning of the prefabricated wall panel.

[0010] Furthermore, a fixing sleeve is provided in the mounting hole, and the bolt and nut assembly cooperates with the inner hole of the fixing sleeve.

[0011] By arranging a fixing sleeve in the installation hole, the connection strength between the prefabricated wall panel and the bolt and nut assembly is strengthened to make the connection stable.

[0012] Furthermore, the bolt and nut assembly includes a bolt, a nut and a locking washer, and the head of the bolt is provided with a toothed structure for cooperating with the lower positioning plate.

[0013] A toothed structure is provided on the side of the bolt head that fits the lower positioning plate to enhance the anti-rotation performance, and a locking washer is provided between the nut and the lower positioning plate to enhance the anti-rotation performance of the nut, thereby ensuring the locking performance of the bolt and nut assembly to prevent loosening.

[0014] Furthermore, a vertical stiffening portion is provided between the upper connecting portion and the lower positioning plate, and the vertical stiffening portion is distributed on the left and right sides of the fixed clamping member.

[0015] A vertical stiffening part is provided to strengthen the structural strength of the upper connecting part and the lower positioning plate. The vertical stiffening part is provided on the outside of the fixed clamping part. By being provided on both sides of the fixed clamping part, the installation of the bolt and nut assembly is facilitated.

[0016] Furthermore, a positioning groove is provided on the top of the prefabricated wall panel, and the positioning groove corresponds to the shape of the lower positioning plate.

[0017] By arranging a positioning groove body on the top of the prefabricated wall panel to be connected correspondingly with the lower positioning plate, it is convenient to position and install the fixed clamping member so that the fixed clamping member can be kept in a vertical state.

[0018] Compared with the prior art, the beneficial effects of the utility model are:

[0019] 1. By setting a mounting hole on the top of the prefabricated wall panel, the fixing clamps are installed on both sides of the prefabricated wall panel with the bolt and nut assembly, and the horizontal connection groove of the fixing clamps is used to realize the detachable snap connection with the flange plate of the I-beam beam, which is simple and convenient to construct; and there is no need to destroy the original beam body and wall panel structure, thus ensuring the service life of the structure;

[0020] 2. The clamping and disassembly between the fixed clamping parts and the flange plate of the I-beam can be achieved by loosening and tightening the bolt and nut assembly. The installation and disassembly are convenient, and the later disassembly and modification of the device are convenient without damaging the prefabricated plate. The device can be used repeatedly;

[0021] 3. The structural strength of the fixed clamp is ensured by setting a vertical stiffener on the fixed clamp, and the connection stability between the I-beam and the prefabricated wall panel is ensured; the fastening effect of the bolt and nut assembly is ensured by the toothed structure and locking washer to prevent loosening and make the connection stable;

[0022] 4. By setting a transverse clamp on the upper connection part, the horizontal connection and fixation are ensured, and the positioning stability of the prefabricated wall panels is ensured. It is suitable for the connection of I-beams and prefabricated wall panels of various sizes. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 This is a structural cross-sectional view of a prefabricated wall panel installation structure under an I-beam according to Example 1 of the utility model;

[0024] Figure 2 This is a structural stereogram of a prefabricated wall panel installation structure under an I-beam according to Example 1 of the utility model;

[0025] Figure 3 This is a structural stereogram of the bolt and nut assembly in Example 1 of the utility model;

[0026] Figure 4 This is a structural cross-sectional view of a prefabricated wall panel installation structure under an I-beam according to Example 2 of the utility model;

[0027] Figure 5 This is a structural stereogram of a prefabricated wall panel installation structure under an I-beam according to Embodiment 2 of the present utility model;

[0028] In the figure: 1. prefabricated wall panel; 2. I-beam; 3. triangle plate; 4. mounting hole; 5. lower positioning plate; 6. upper connecting part; 7. connecting hole; 8. bolt and nut assembly; 801. bolt; 802. nut; 803. locking washer; 9. horizontal connecting groove; 10. U-shaped plate; 11. flange plate; 12. threaded hole; 13. transverse clamping piece; 14. fixing sleeve; 15. toothed structure; 16. positioning groove body. DETAILED DESCRIPTION

[0029] The technical solution of the utility model will be clearly and completely described below in conjunction with the drawings in the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative labor are within the scope of protection of the utility model. In the description of the utility model, it should be noted that the terms front, back, left, right, etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings, or the directions or positional relationships in which the utility model product is usually placed when used. They are only for the convenience of describing the utility model or simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed or operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.

[0030] Example 1

[0031] like Figure 1-3 As shown, a prefabricated wall panel 1 installation structure under an I-beam 2 comprises a prefabricated wall panel 1 and an I-beam 2, wherein a mounting hole 4 is provided at the top of the prefabricated wall panel 1, and a fixing mechanism is provided at the top of the prefabricated wall panel 1, wherein the fixing mechanism comprises fixing clamps installed on both sides of the prefabricated wall panel 1, and the fixing clamps comprise a lower positioning plate 5 and an upper connecting portion 6, wherein a connecting hole 7 is provided on the lower positioning plate 5, and a bolt and nut assembly 8 is detachably provided between the connecting hole 7 and the mounting hole 4, and the bolt and nut assembly 8 is used for pressing and connecting the lower positioning plate 5 to the surface of the prefabricated wall panel 1, and a horizontal connecting groove 9 is provided at the upper connecting portion 6, and the horizontal connecting grooves 9 of the fixing clamps on both sides are engaged and connected with the flange plate 11 of the I-beam 2.

[0032] In the above scheme, by opening a mounting hole 4 at the top of the prefabricated wall panel 1 and a connecting hole 7 at the lower positioning plate 5 of the fixed clamp, it is convenient to connect the bolt and nut assembly 8, so that the fixed clamp is fixed to the two side surfaces of the top of the prefabricated wall panel 1, and the lower positioning plate 5 of the fixed clamp is used to fit and position with the side wall of the prefabricated wall panel 1 to ensure that the fixed clamp is stably connected to the prefabricated wall panel 1, and the horizontal connecting groove 9 of the upper connecting part 6 is used to engage and connect with the flange plate 11 of the I-beam 2, so as to fix the prefabricated wall panel 1 to the bottom of the I-beam 2.

[0033] The I-beam 2 comprises two flange plates 11 and a web plate. A plurality of mounting holes 4 are provided along the top of the prefabricated wall panel 1 .

[0034] Furthermore, a fixing sleeve 14 is provided in the mounting hole 4 , and the bolt and nut assembly 8 cooperates with the inner hole of the fixing sleeve 14 .

[0035] By arranging the fixing sleeve 14 in the mounting hole 4, the connection strength between the prefabricated wall panel 1 and the bolt and nut assembly 8 is strengthened to make the connection stable.

[0036] Furthermore, the bolt and nut assembly 8 includes a bolt 801 , a nut 802 and a locking washer 803 , and the head of the bolt 801 is provided with a toothed structure 15 for cooperating with the lower positioning plate 5 .

[0037] A toothed structure 15 is provided on the side of the head of the bolt 801 that is in contact with the lower positioning plate 5 to enhance the anti-rotation performance, and a locking washer 803 is provided between the nut 802 and the lower positioning plate 5 to enhance the anti-rotation performance of the nut 802, thereby ensuring the locking performance of the bolt and nut assembly 8 to prevent loosening.

[0038] The toothed structure 15 includes a plurality of teeth arranged along a ring shape and is integrated with the head of the bolt 801 .

[0039] Example 2

[0040] like Figure 4-5 As shown, a prefabricated wall panel installation structure under an I-beam in this embodiment is further modified as follows on the basis of Embodiment 1:

[0041] Furthermore, the upper connecting portion 6 is a U-shaped structure, and a threaded hole 12 is opened on the side surface of the upper connecting portion 6 . A transverse clamping piece 13 for cooperating with the flange plate 11 is screwed into the threaded hole 12 .

[0042] A horizontal connecting groove 9 is formed by a transversely arranged U-shaped structure to engage with the flange plate 11. A threaded hole 12 is provided on the upper connecting portion 6 to connect a transverse clamping member 13. The transverse clamping member 13 can be adjusted transversely to clamp the side of the flange plate 11 to ensure the positioning of the prefabricated wall panel 1.

[0043] The transverse clamping element 13 comprises a clamping screw.

[0044] Furthermore, a vertical stiffening portion is provided between the upper connecting portion 6 and the lower positioning plate 5 , and the vertical stiffening portion is distributed on the left and right sides of the fixed clamping member.

[0045] A vertical stiffening portion is provided to strengthen the structural strength of the upper connecting portion 6 and the lower positioning plate 5 . The vertical stiffening portion is provided on the outside of the fixing clamping member. By being provided on both sides of the fixing clamping member, the installation of the bolt and nut assembly 8 is facilitated.

[0046] The vertical stiffening part may be a plate body or a rib body structure, and the vertical stiffening part comprises a lower triangular plate 3 and an upper U-shaped plate 10 of equal thickness.

[0047] Furthermore, a positioning groove 16 is provided on the top of the prefabricated wall panel 1 , and the positioning groove 16 corresponds to the shape of the lower positioning plate 5 .

[0048] By arranging a positioning groove 16 on the top of the prefabricated wall panel 1 to be connected correspondingly to the lower positioning plate 5, it is convenient to position and install the fixing clamping member so that the fixing clamping member can be kept in a vertical state.

[0049] The positioning groove body 16 is a rectangular groove, and the lower positioning plate 5 is a rectangular plate.

[0050] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A prefabricated wall panel installation structure under an I-beam, characterized in that: It includes a prefabricated wall panel and an I-beam. The top of the prefabricated wall panel is provided with an installation hole. The top of the prefabricated wall panel is provided with a fixing mechanism. The fixing mechanism includes fixing clamps installed on both sides of the prefabricated wall panel. The fixing clamps include a lower positioning plate and an upper connecting portion. The lower positioning plate is provided with a connecting hole. A bolt and nut assembly is detachably provided between the connecting hole and the installation hole. The bolt and nut assembly is used to press and connect the lower positioning plate to the surface of the prefabricated wall panel. The upper connecting portion is provided with a horizontal connecting groove. The horizontal connecting grooves of the fixing clamps on both sides are clamped and connected with the flange plate of the I-beam.

2. The prefabricated wall panel installation structure under the I-beam according to claim 1 is characterized in that: The upper connecting part is a U-shaped structure, and a threaded hole is provided on the side surface of the upper connecting part. A transverse clamping piece for cooperating with the flange plate is screwed to the threaded hole.

3. The prefabricated wall panel installation structure under the I-beam according to claim 1, characterized in that: A fixing sleeve is arranged in the mounting hole, and the bolt and nut assembly cooperates with the inner hole of the fixing sleeve.

4. The prefabricated wall panel installation structure under the I-beam according to claim 1, characterized in that: The bolt and nut assembly comprises a bolt, a nut and a locking washer, and the head of the bolt is provided with a toothed structure for cooperating with the lower positioning plate.

5. The prefabricated wall panel installation structure under the I-beam according to claim 1, characterized in that: A vertical stiffening portion is arranged between the upper connecting portion and the lower positioning plate, and the vertical stiffening portion is distributed on the left and right sides of the fixed clamping member.

6. The prefabricated wall panel installation structure under the I-beam according to claim 1, characterized in that: A positioning groove is provided on the top of the prefabricated wall panel, and the positioning groove corresponds to the shape of the lower positioning plate.