Rapid and uniform concrete pouring device

By designing an angle-adjustable feed pipe and collection hopper, combined with an infrared rangefinder and flow control valve, the problem of difficult to ensure the pouring speed and uniformity of concrete in the existing technology is solved, and the rapid and uniform pouring of concrete on different sections is achieved. , ensuring high-quality pouring of concrete.

CN222084039UActive Publication Date: 2024-11-29CCCC SECOND HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420115158.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-11-29
Estimated Expiration
2034-01-17

AI Technical Summary

Technical Problem

The existing concrete material separation device is difficult to ensure the pouring speed and uniformity in large-section and large-volume concrete structures, resulting in the initial setting and over-vibration of concrete, and it is difficult to adapt to the cross-sectional needs of different sizes and shapes.

Method used

A fast and uniform pouring device for concrete including a collection hopper and an adjustable angled feed pipe is designed. Through flexible rubber pipe connection, screw rod and infrared rangefinder and other devices, flexible adjustment of feed pipes and real-time flow control are achieved. , ensure uniform pouring.

Benefits of technology

The rapid and uniform pouring of concrete on different sections is achieved, which ensures high-quality pouring of concrete. Through adjustable material separation pipes and real-time flow control, the synchronization and uniformity of the pouring process are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222084039U_ABST
    Figure CN222084039U_ABST
Patent Text Reader

Abstract

The utility model discloses a rapid and uniform concrete pouring device which comprises a material collecting hopper and a material distributing pipe. The plurality of material distributing pipes are connected with the bottom of the material collecting hopper in an angle-adjustable manner; the collecting hopper is composed of a circular closed bin, and a protrusion is arranged at the bottom of the collecting hopper and located on the side of the distributing pipe. The material distributing pipe is of a detachable structure with the adjustable length. The concrete pouring device can meet the concrete pouring requirements of sections with different sizes and different shapes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of cast-in-place concrete structures in the field of civil engineering, and more specifically, to a device for quickly and evenly pouring concrete. Background Art

[0002] At present, cast-in-place concrete structures are mostly poured by pumping or directly unloading from hoppers, and the pouring technology and equipment are extremely mature. For large-section and large-volume concrete structures, such as bridge abutments, concrete bridge towers, etc., higher requirements are placed on the speed and uniformity of concrete pouring; if the pouring speed is too slow, the concrete will initially set before the pouring cycle is completed, forming cracks; if the material distribution on the section is uneven, a vibrator is required to rush the material, resulting in over-vibration of the concrete, affecting the quality of the concrete pouring. Multi-point synchronous distribution is an ideal process for large-section concrete pouring, but due to factors such as site layout and cost of measures, it is difficult for a pump truck or hopper to be equipped with one set at each distribution point. For this reason, the engineering field has begun to use concrete distribution devices to solve the problem of uniformity of distribution, such as Figure 1 It is a typical conventional concrete distributing device.

[0003] Conventional concrete distributors are mainly composed of centralized hoppers, distributor pipes and support systems. Concrete is centrally supplied to the distributor hopper through a pump truck or hopper, and then transported to the pouring point through the distributor pipe, so that the concrete of the same section of the components can be poured simultaneously. However, conventional concrete distributors are relatively simple in length, the dimensions of each component are fixed, and the cross-section adaptability is poor; and due to the inconsistent slopes of the distributor pipes, the pouring speeds of each distributor pipe vary greatly, and the uniformity of concrete distribution is still difficult to ensure. Utility Model Content

[0004] The utility model aims to provide a device for quickly and evenly pouring concrete, which can meet the needs of pouring concrete sections of different sizes and shapes.

[0005] The utility model adopts a technical solution to solve the technical problem: a device for quickly and evenly pouring concrete, comprising a collecting hopper and a distribution pipe; a plurality of distribution pipes are connected to the bottom of the collecting hopper at adjustable angles.

[0006] Preferably, the collecting hopper is composed of a circular closed bin, and a protrusion is provided at the bottom of the collecting hopper on the side of the distribution pipe.

[0007] Preferably, the material distribution pipe is a detachable and length-adjustable structure.

[0008] Preferably, the distribution pipe is connected to the discharge port of the collecting hopper through a flexible rubber tube.

[0009] Preferably, it also includes an adjusting screw rod, one end of which is connected to the material distribution pipe, and the other end of which is connected to the outer wall of the collecting hopper.

[0010] Preferably, a plurality of material distribution pipes are arranged at intervals along the circumference of the bottom of the collecting hopper, and a protrusion is arranged at the center of the bottom of the collecting hopper.

[0011] Preferably, a flow control valve is provided at the top of the distribution pipe.

[0012] Preferably, an infrared rangefinder is provided at the bottom of the material distribution pipe.

[0013] Preferably, the device further comprises a controller connected to the infrared rangefinder and the flow control valve.

[0014] The utility model includes at least the following beneficial effects: the cross-section concrete rapid uniform pouring device can adapt to the pouring of concrete of various cross-sections by setting an adjustable and easily disassembled distribution pipe, and can be used repeatedly. By integrating infrared ranging, flow control valve and other devices on the distribution pipe, the concrete liquid level and pouring speed can be measured in real time, the pouring of each distribution pipe can be guaranteed to be synchronous, the uniformity of the concrete pouring of the entire cross-section can be ensured, and high-quality concrete pouring can be achieved.

[0015] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a typical conventional concrete distributing device in the prior art;

[0017] Figure 2 This is a schematic diagram of the structure of the utility model large-section concrete rapid and uniform pouring device;

[0018] Figure 3 This is a large sample drawing of the material distribution pipe of the utility model;

[0019] Figure 4 This is a large sample drawing of the adjusting screw rod of the utility model;

[0020] Figure 5 is a schematic diagram of step 1 in embodiment 1;

[0021] Figure 6 It is a schematic diagram of step 2 in embodiment 1;

[0022] Figure 7 This is a schematic diagram of step three in embodiment one.

[0023] Explanation of reference numerals: 1 collecting hopper, 2 material distribution pipe, 3 protrusion, 4 flexible rubber tube, 5 support frame, 6 flange, 7 flow control valve, 8 infrared rangefinder, 9 adjusting screw rod, 10 connecting ear plate, 11 feed inlet, 12 structure to be cast, 13 pump pipe. DETAILED DESCRIPTION

[0024] The utility model is described in detail and completely below in conjunction with the accompanying drawings. A person of ordinary skill in the art will be able to implement the utility model based on these descriptions. Before describing the utility model in conjunction with the accompanying drawings, it should be particularly pointed out that the technical solutions and technical features provided in each part of the utility model, including the following description, can be combined with each other without conflict.

[0025] In addition, the embodiments of the present invention involved in the following description are generally only a part of the embodiments of the present invention, rather than all of the embodiments. Therefore, based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0026] The following is a further detailed description of the utility model in conjunction with the accompanying drawings and implementations, and its specific implementation process is as follows:

[0027] like Figures 1 to 4 As shown, the utility model provides a device for rapid and uniform concrete pouring, comprising: a collecting hopper 1 and a distribution pipe 2; a plurality of distribution pipes 2 are connected to the bottom of the collecting hopper 1 at adjustable angles, and the collecting hopper 1 is supported by a support frame 5.

[0028] The present technical solution may also include the following technical details to better achieve the technical effect: the aggregate hopper 1 is composed of a circular closed bin with a feed port 11 on the top. To prevent concrete from accumulating at the bottom of the aggregate hopper 1, a protrusion 3 is provided at the bottom of the aggregate hopper 1 on the side of the distribution pipe 2 for guiding the material, so that the concrete can quickly enter the distribution pipe 2 without accumulating material.

[0029] The technical solution may also include the following technical details to better achieve the technical effect: the material distribution pipe 2 is a detachable and adjustable length structure. In this embodiment, the material distribution pipe 2 is formed by connecting a number of standard pump pipes with a diameter of 125 mm, and the standard pump pipes are connected by flanges 6, which can be quickly assembled and disassembled, can adapt to different cross-sectional sizes, and are convenient for cleaning pipe sections.

[0030] The technical solution may also include the following technical details to better achieve the technical effect: the distribution pipe 2 is connected to the discharge port of the aggregate hopper 1 through a flexible rubber tube 4. Specifically, a connecting pipe is provided at the discharge port of the aggregate hopper 1, and the connecting pipe is connected to the distribution pipe 2 through a flexible rubber tube 4, so as to facilitate the angle adjustment of the distribution pipe 2. This connection method allows the pipe opening of the distribution pipe 2 to be adjusted in a small range on the plane. Therefore, the length of the pipe section of the distribution pipe 2 and the plane position of the distribution port can be adjusted to meet the requirements of concrete pouring of sections of different sizes and shapes.

[0031] The technical solution may also include the following technical details to better achieve the technical effect: it also includes an adjusting screw rod 9, one end of which is connected to the material distribution pipe 2, and the other end of which is connected to the outer wall of the collecting hopper 1. Specifically, both ends of the adjusting screw rod 9 are threadedly connected with connecting ear plates 10, which are connected to the material distribution pipe 2 and the collecting hopper 1 through the connecting ear plates 10, so as to facilitate the rapid adjustment of the pipe section. Multiple adjusting screw rods 9 can be set between a material distribution pipe 2 and the collecting hopper 1, and are not limited to installing one adjusting screw rod 9. The installation position of the adjusting screw rod 9 can be set and adjusted as needed.

[0032] The present technical solution may also include the following technical details to better achieve the technical effect: a plurality of distribution pipes 2 are arranged at circumferential intervals along the bottom of the aggregate hopper 1, and a protrusion 3 is arranged at the center of the bottom of the aggregate hopper 1 to ensure that the concrete can quickly enter the distribution pipes 2 located around the protrusion 3.

[0033] The technical solution may also include the following technical details to better achieve the technical effect: in order to achieve uniform distribution of the distribution pipes 2 with different inclination angles, a flow control valve 7 for measuring the concrete flow is set at the top of the distribution pipe 2, and the flow control valve 7 adopts a hydraulic control valve.

[0034] The technical solution may also include the following technical details to better achieve the technical effect: an infrared rangefinder 8 is arranged at the bottom of the distribution pipe 2 to measure the liquid level of the poured concrete.

[0035] The technical solution may also include the following technical details to better achieve the technical effect: a controller is also included, which is connected to the infrared rangefinder 8 and the flow control valve 7. Through the controller, the flow control valve 7 is linked with the infrared rangefinder 8 at the bottom of the distribution pipe 2. The infrared rangefinder 8 measures the liquid level of the poured concrete and transmits it to the controller. The controller adjusts the concrete flow in different distribution pipes 2 in real time according to the concrete liquid level height data. If the concrete liquid level under a distribution pipe 2 is lower than that under others, the flow control valve 7 is adjusted larger, otherwise it is adjusted smaller.

[0036] Embodiment 1

[0037] The construction is carried out using a large-section concrete rapid and uniform pouring device, which specifically includes the following steps:

[0038] like Figure 5 As shown, step 1, determine the length of the fabric pipe and the number of standard sections according to the structural size and shape, assemble them, and adjust the pipe sections to the appropriate angles.

[0039] like Figure 6 As shown, step 2, concrete is poured into the collecting hopper 1 through a hopper or a pump truck, and at this time, the control valve at the top of the distribution pipe 2 is in a closed state.

[0040] like Figure 7As shown, step three, after the concrete in the aggregate hopper 1 is filled to 2 / 3, the flow control valve 7 of the distribution pipe 2 is fully opened, and the concrete is distributed to the structure to be poured through the distribution pipe 2. The infrared ranging of the concrete liquid level is started, the height of the concrete liquid level is measured in real time, and the flow control valve 7 is adjusted according to the height difference of the liquid level until the concrete pouring is completed. After the concrete pouring is completed, the pouring device is lifted off, and the pipe section is disassembled for flushing to prevent the subsequent use of the device from being affected after the concrete hardens.

[0041] Features of large-section concrete rapid and uniform pouring device:

[0042] (1) The structure has strong adaptability and can meet the needs of large-section concrete pouring with different cross-sectional shapes and sizes.

[0043] (2) The protrusion 3 at the bottom of the aggregate hopper 1 is provided to prevent concrete from accumulating.

[0044] (3) The concrete liquid level can be measured in real time, and the pouring flow rate can be controlled according to the liquid level conditions to ensure the uniformity of concrete pouring.

[0045] Although the implementation scheme of the utility model has been disclosed as above, it is not limited to the applications listed in the specification and implementation scheme. It can be fully applied to various fields suitable for the utility model. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the utility model is not limited to the specific details and the embodiments shown and described herein.

Claims

1. A device for quickly and evenly pouring concrete. It is characterized in that include: A collecting hopper and a distribution pipe; a plurality of distribution pipes are connected to the bottom of the collecting hopper at adjustable angles; a flow control valve is arranged at the top of the distribution pipe; an infrared rangefinder is arranged at the bottom of the distribution pipe.

2. The device for rapid and uniform concrete pouring as claimed in claim 1, It is characterized in that The collecting hopper is composed of a circular closed bin, and a protrusion is arranged at the bottom of the collecting hopper and at the side of the material distribution pipe.

3. The device for rapid and uniform concrete pouring as claimed in claim 1, It is characterized in that The material distribution pipe is a detachable and length-adjustable structure.

4. The device for rapid and uniform concrete pouring as claimed in claim 1, It is characterized in that The distribution pipe is connected with the discharge port of the collecting hopper through a flexible rubber tube.

5. The device for rapid and uniform pouring of concrete according to claim 1 or 4, It is characterized in that It also includes an adjusting screw rod, one end of which is connected to the material distribution pipe, and the other end of which is connected to the outer wall of the collecting hopper.

6. The device for rapid and uniform concrete pouring as claimed in claim 1, It is characterized in that A plurality of material distribution pipes are arranged at intervals along the circumference of the bottom of the collecting hopper, and a protrusion is arranged at the center of the bottom of the collecting hopper.

7. The device for rapid and uniform concrete pouring as claimed in claim 1, It is characterized in that The utility model also comprises a controller which is connected with the infrared range finder and the flow control valve.