Heating device and water purification system

By using the design of water circuit board and integrated flow regulating valve in the heating device, the problems of messy internally and low assembly efficiency of the heating device are solved, and the compactness and assembly efficiency of the heating device are improved, and warm or boiling water can be effectively provided.

CN222086306UActive Publication Date: 2024-11-29GUANGDONG LIZI TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323631779.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-11-29
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

The existing heating devices are messy, compact and low assembled, making it difficult to meet the requirements for warm or boiling water.

Method used

A heating device is designed, using a water circuit board and integrating a flow regulating valve and a water inlet valve on it, simplifying the cold water input, warm water output, and the mixing process of cold water and hot water, and improving the compactness and assembly efficiency of the heating device.

Benefits of technology

By simplifying the internal wiring of the heating device, it improves its compactness and assembly efficiency, and can effectively provide warm or boiling water to meet users' requirements for improving water purification systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222086306U_ABST
    Figure CN222086306U_ABST
Patent Text Reader

Abstract

The utility model discloses a heating device and a water purification system. Wherein the heating device comprises a heating tank, a waterway plate, a first water inlet valve and a flow regulating valve; the heating tank comprises a first cold water inlet and a first hot water outlet; the waterway plate comprises a first pipeline, a second pipeline and a third pipeline; the first pipeline comprises a second cold water inlet, a second hot water outlet, a first communication site and a second communication site, the first communication site is arranged close to the second cold water inlet, and the second communication site is arranged close to the second hot water outlet; one end of the second pipeline communicates with the first communication site, and the other end communicates with the first cold water inlet; one end of the third pipeline communicates with the second communication site, and the other end communicates with the first hot water outlet; the first water inlet valve is arranged on the second pipeline, and the flow adjusting valve is arranged between the first communication site and the second communication site. According to the heating device provided by the utility model, the internal wiring is simple, and the compactness and the assembly efficiency are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water treatment, in particular to a heating device and a water purification system. Background Art

[0002] With the improvement of living standards, people's requirements for water purification systems are gradually increasing. In addition to the basic water purification requirements, they also require the provision of warm water or boiling water. Therefore, the heating device has become an indispensable component of the water purification system. In the related art, since multiple hoses are arranged in a circuitous manner in the heating device to introduce and lead water and mix cold water and hot water, the heating device is messy inside, not compact, and has low assembly efficiency. Utility Model Content

[0003] The first purpose of the utility model is to provide a heating device, which aims to solve the technical problems of the interior of the heating device being messy and the assembly efficiency being low.

[0004] To achieve the above object, the utility model provides a solution: a heating device, applied to a water purification system, comprising a heating tank, a waterway plate, a first water inlet valve and a flow regulating valve; the heating tank comprises a first cold water inlet and a first hot water outlet, the waterway plate comprises a first pipeline, a second pipeline and a third pipeline;

[0005] The first pipeline includes a second cold water inlet, a second hot water outlet, a first communication point and a second communication point, the first communication point is arranged close to the second cold water inlet, and the second communication point is arranged close to the second hot water outlet; one end of the second pipeline is connected to the first communication point, and the other end of the second pipeline is connected to the first cold water inlet; one end of the third pipeline is connected to the second communication point, and the other end of the third pipeline is connected to the first hot water outlet;

[0006] The first water inlet valve is arranged on the second pipeline to control the on-off of the second pipeline; the flow regulating valve is arranged between the first connecting point and the second connecting point to control the flow rate of water flowing through.

[0007] As an implementation manner, the flow regulating valve is further used to disconnect the water flow between the first communication point and the second communication point.

[0008] As an embodiment, the first pipeline further includes a third communication point, and the third communication point is located between the second cold water inlet and the first communication point;

[0009] The water circuit plate also includes a fourth pipeline, and the heating device also includes a second water inlet valve; one end of the fourth pipeline is connected to the third connecting point, and the other end of the fourth pipeline is used to connect to the faucet; the second water inlet valve is arranged on the fourth pipeline to control the on and off of the fourth pipeline.

[0010] As an embodiment, at least parts of the second pipeline, the third pipeline and the fourth pipeline are arranged on the same side of the first pipeline; and / or,

[0011] The first water inlet valve, the second water inlet valve and the flow regulating valve are all arranged on the same side of the first pipeline.

[0012] As an implementation mode, the first pipeline includes a first pipe segment, a second pipe segment and a third pipe segment; the first pipe segment and the second pipe segment are arranged in parallel, and the third pipe segment is connected between the first pipe segment and the second pipe segment;

[0013] The second cold water inlet is arranged at one end of the first pipe section away from the third pipe section, the second hot water outlet is arranged at one end of the second pipe section away from the third pipe section, and the second cold water inlet and the second hot water outlet are both arranged on the same side of the third pipe section.

[0014] As an embodiment, the waterway plate further includes a fixing plate, and the first pipeline is connected to the fixing plate and is coplanar with the fixing plate.

[0015] As an implementation manner, the waterway plate is an integrally formed structure.

[0016] As an embodiment, the heating device further comprises a flow meter, which is arranged on the first pipeline and located between the flow regulating valve and the second communication point; and / or,

[0017] The heating device further comprises a pump body, which is arranged on a pipeline connecting the first hot water outlet and the third pipeline, and is at least used to provide power for water to flow toward the third pipeline.

[0018] As an embodiment, the heating device further includes a housing assembly;

[0019] The housing assembly comprises an outer shell and a middle frame, wherein the middle frame is arranged in the outer shell, the middle frame is provided with a first cavity, and is enclosed with the outer shell to form a second cavity communicating with the first cavity;

[0020] The heating tank is accommodated in the first cavity, and the waterway plate is accommodated in the second cavity.

[0021] The second object of the utility model is to provide a water purification system, including a water purifier and the above-mentioned heating device, wherein the pure water outlet end of the water purifier is connected to the second cold water inlet of the first pipeline for conveying pure water to the first pipeline.

[0022] The heating device and water purification system provided by the utility model, by setting a water circuit board and integrating a flow regulating valve and a first water inlet valve on the water circuit board, control the input of cold water, the output of warm water and the mixing of cold water and hot water, can simplify the internal wiring of the heating device and improve the compactness and assembly efficiency of the heating device. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0024] Figure 1 It is a structural schematic diagram of a heating device provided in an embodiment of the utility model;

[0025] Figure 2 It is a structural schematic diagram of the heating device provided by the embodiment of the utility model without the second cover;

[0026] Figure 3 It is a structural schematic diagram of a heating device provided by an embodiment of the utility model with a housing component removed from one viewing angle;

[0027] Figure 4 is a structural schematic diagram of the heating device provided by an embodiment of the utility model with the housing component removed from another perspective;

[0028] Figure 5 This is a structural schematic diagram of the heating device provided by the embodiment of the utility model with the housing assembly removed from another viewing angle;

[0029] Figure 6 This is a structural schematic diagram of a waterway plate provided by an embodiment of the utility model from one perspective;

[0030] Figure 7 This is a schematic structural diagram of the waterway plate provided by an embodiment of the utility model from another perspective;

[0031] Figure 8 It is a structural schematic diagram of the housing assembly provided by an embodiment of the utility model without the second cover body.

[0032] Description of Figure Numbers:

[0033] 100. Heating device; 10. Heating tank; 11. First cold water inlet; 12. First hot water outlet; 20. Waterway plate; 21. First pipeline; 211. Second cold water inlet; 212. Second hot water outlet; 213. First connecting point; 214. Second connecting point; 215. Third connecting point; 216. First pipe section; 217. Second pipe section; 218. Third pipe section; 22. Second pipeline; 23. Third pipeline; 24. Fourth pipeline; 241. Fourth pipe section; 242. Fifth pipe section; 25. Fixing plate; 30. First water inlet valve; 40. Flow regulating valve; 50. Second water inlet valve; 60. Flow meter; 70. Pump body; 80. Shell assembly; 81. Shell; 811. Shell body; 812. First cover body; 82. Middle frame; 83. First cavity; 84. Second cavity.

[0034] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0036] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.

[0037] It should also be noted that when an element is referred to as being "fixed on" or "disposed on" another element, it may be directly on the other element or there may be an intermediate element at the same time. When an element is referred to as being "connected to" another element, it may be directly connected to the other element or there may be an intermediate element at the same time.

[0038] In addition, the descriptions of "first", "second", etc. in the present utility model are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in this field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present utility model.

[0039] like Figures 1 to 5 As shown, the heating device 100 provided in the embodiment of the utility model is applied to a water purification system, and includes a heating tank 10, a waterway plate 20, a first water inlet valve 30, and a flow regulating valve 40. The heating tank 10 is used to heat the water inside it, and includes a first cold water inlet 11 and a first hot water outlet 12. The first cold water inlet is used for cold water to flow into the heating tank 10, and the first hot water outlet 12 is used for hot water in the heating tank 10 to flow out.

[0040] Reference Figures 4 to 7 As shown, the waterway plate 20 includes a first pipeline 21, a second pipeline 22 and a third pipeline 23; the first pipeline 21 includes a second cold water inlet 211, a second hot water outlet 212, a first communication point 213 and a second communication point 214, the first communication point 213 is arranged near the second cold water inlet 211, and the second communication point 214 is arranged near the second hot water outlet 212, that is, the first communication point 213 is arranged upstream of the second communication point 214. One end of the second pipeline 22 is connected to the first communication point 213, and the other end of the second pipeline 22 is connected to the first cold water inlet 11; one end of the third pipeline 23 is connected to the second communication point 214, and the other end of the third pipeline 23 is connected to the first hot water outlet 12; the first water inlet valve 30 is arranged on the second pipeline 22, and is used to control the on-off of the second pipeline 22; the flow regulating valve 40 is arranged between the first communication point 213 and the second communication point 214, and is used to control the flow rate of the water flowing through. The waterway plate 20 has a simple structure, is easy to manufacture and has low cost. Exemplarily, the second pipeline 22 and the third pipeline 23 are connected to the first cold water inlet 11 and the first hot water outlet 12 through hoses, respectively.

[0041] When in use, cold water enters the first pipeline 21 from the second cold water inlet 211, a portion of the cold water enters the heating tank 10 from the second pipeline 22 to be heated, and the other portion of the cold water continues to flow in the first pipeline 21. After the water in the heating tank 10 is heated, it is transported to the third pipeline 23 from the first hot water outlet 12, and then mixed with the other portion of the cold water in the first pipeline 21 to form warm water, which is discharged from the second hot water outlet 212. Among them, the flow regulating valve 40 can adjust the size of the water flow in the pipeline between the first connecting point 213 and the second connecting point 214, that is, it can adjust the amount of cold water mixed with hot water, thereby controlling the temperature of the warm water (i.e., the degree of coldness or hotness). The first water inlet valve 30 can control the on-off of the second pipeline 22. For example, when the water in the hot water tank has reached a preset amount, the second pipeline 22 can be controlled to be disconnected when the hot water tank is heated.

[0042] It can be understood that the first communication point 213 and the second communication point 214 divide the first pipeline 21 into three sections, which are defined as the first section, the second section and the third section along the water flow direction. Specifically, part of the cold water in the first section flows into the heating tank 10 through the second pipeline 22, and the other part flows into the second section, and then merges with the hot water / boiling water in the third pipeline 23 to form warm water in the third section and be discharged.

[0043] By setting up a water circuit board 20 and integrating a flow regulating valve 40 and a first water inlet valve 30 on the water circuit board 20 to control the input of cold water, the output of warm water, and the mixing of cold water and hot water, the internal wiring of the heating device 100 can be simplified and the compactness and assembly efficiency of the heating device 100 can be improved.

[0044] As an embodiment, the flow regulating valve 40 is also used to disconnect the water flow between the first communication point 213 and the second communication point 214. At this time, no cold water is mixed with the hot water / boiling water in the third pipeline 23, so that the water purification system can provide boiling water.

[0045] As an implementation method, refer to Figure 1 , Figure 5 and Figure 6 As shown, the first pipeline 21 also includes a third communication point 215, and the third communication point 215 is located between the second cold water inlet 211 and the first communication point 213, that is, located upstream of the first communication point 213; the waterway plate 20 also includes a fourth pipeline 24, and the heating device 100 also includes a second water inlet valve 50; one end of the fourth pipeline 24 is connected to the third communication point 215, and the other end of the fourth pipeline 24 is used to connect the faucet; the second water inlet valve 50 is arranged on the fourth pipeline 24, and is used to control the on-off of the fourth pipeline 24. In this way, cold water (i.e., normal temperature water that has not been heated) can be provided through the fourth pipeline 24. In addition, the cold water pipeline and the warm water / boiling water pipeline are set separately, and the two do not affect each other, thereby avoiding the occurrence of temperature concurrence at the water outlet.

[0046] As an implementation mode, the first water inlet valve 30, the second water inlet valve 50 and the flow regulating valve 40 are all arranged on the same side of the first pipeline 21. Compared with the solution in which the first water inlet valve 30, the second water inlet valve 50 and the flow regulating valve 40 are arranged on different sides of the first pipeline 21, the thickness of the waterway plate 20 can be reduced, which is conducive to the miniaturization design of the equipment.

[0047] As an implementation mode, at least part of the second pipeline 22, the third pipeline 23 and the fourth pipeline 24 are all arranged on the same side of the first pipeline 21. In this way, it is beneficial for the first water inlet valve 30 and the second water inlet valve 50 to be arranged on the same side of the first pipeline 21. Preferably, the second pipeline 22, the third pipeline 23 and the fourth pipeline 24 are all arranged on the same side of the first pipeline 21. In this way, on the one hand, it is beneficial for the first water inlet valve 30 and the second water inlet valve 50 to be arranged on the same side of the first pipeline 21, and on the other hand, compared with the solution in which the second pipeline 22, the third pipeline 23 and the fourth pipeline 24 are respectively arranged on different sides of the first pipeline 21, the thickness of the waterway plate 20 can be reduced.

[0048] Reference Figure 1 and Figure 7 As shown, the first pipeline 21 includes a first pipe section 216, a second pipe section 217 and a third pipe section 218; the first pipe section 216 and the second pipe section 217 are arranged in parallel, and the third pipe section 218 is connected between the first pipe section 216 and the second pipe section 217; the second cold water inlet 211 is arranged at one end of the first pipe section 216 away from the third pipe section 218, and the second hot water outlet 212 is arranged at one end of the second pipe section 217 away from the third pipe section 218, and the second cold water inlet 211 and the second hot water outlet 212 are both arranged on the same side of the third pipe section 218. In this way, the second cold water inlet 211 and the second hot water outlet 212 are close to each other, which facilitates the connection of the heating device 100 with the external pipeline. Specifically, the first pipeline 21 can be set to an inverted "U" shape or a "П" shape.

[0049] As an implementation method, refer to Figure 1 , Figures 5 to 7As shown, the fourth pipeline 24 includes a fourth pipe section 241 arranged along the water flow direction and a fifth pipe section 242 connected to the fourth pipe section 241, the fourth pipe section 241 is arranged near the third connecting point 215, the fifth pipe section 242 is arranged near the second cold water inlet 211, the second water inlet valve 50 is arranged on the fourth pipe section 241, and the end of the fifth pipe section 242 away from the fourth pipe section 241 is used to connect the faucet. Through this arrangement, the end of the fifth pipe section 242 away from the fourth pipe section 241 is arranged near the second cold water inlet 211, which is convenient for the heating device 100 to be connected to the external pipeline. Preferably, the fifth pipe section 242 is arranged between the second cold water inlet 211 and the second hot water outlet 212. Among them, the fourth pipe section 241 and the fifth pipe section 242 can be connected through a hose.

[0050] As an implementation method, refer to Figure 7 As shown, the waterway plate 20 further includes a fixing plate 25, and the first pipeline 21 is connected to the fixing plate 25 and is coplanar with the fixing plate 25. By providing the fixing plate 25, it is convenient to install the first pipeline 21. By making the first pipeline 21 coplanar with the fixing plate 25, the thickness of the waterway plate 20 can be reduced, which is conducive to the miniaturization design of the equipment.

[0051] As an implementation method, the waterway plate 20 is an integrally formed structure. On the one hand, the assembly efficiency of the waterway plate 20 can be accelerated; on the other hand, water leakage at the connection of the pipeline due to assembly error can be avoided, thereby improving the sealing performance of the waterway plate 20.

[0052] As an implementation method, refer to Figure 1 , Figure 4 and Figure 6 As shown, the heating device 100 further includes a flow meter 60, which is disposed on the first pipeline 21 and is located between the flow regulating valve 40 and the second communication point 214. By providing the flow meter 60, the flow rate of the water flow in the pipeline can be monitored. Preferably, the flow meter 60, the flow regulating valve 40, the first water inlet valve 30 and the second water inlet valve 50 are located on the same side of the first pipeline 21.

[0053] As an implementation method, refer to Figure 1 , Figures 4 to 6 As shown, the heating device 100 further includes a pump body 70, which is disposed on a pipeline connecting the first hot water outlet 12 and the third pipeline 23, and is at least used to provide power for water to flow to the third pipeline 23. A hose is disposed between the first hot water outlet 12 and the third pipeline 23, and the pump body 70 is connected to the hose and fixedly mounted on the fixing plate 25. Preferably, the pump body 70 is a hot water pump.

[0054] As an implementation method, refer to Figure 1 , Figure 3 and Figure 8As shown, the heating device 100 also includes a shell assembly 80; the shell assembly 80 includes an outer shell 81 and a middle frame 82, the middle frame 82 is arranged in the outer shell 81, the middle frame 82 is provided with a first cavity 83, and is enclosed with the outer shell 81 to form a second cavity 84 connected to the first cavity 83; the heating tank 10 is accommodated in the first cavity 83, and the waterway plate 20 is accommodated in the second cavity 84. In this way, the heating tank 10 and the waterway plate 20 are discharged separately, which improves the neatness of the interior of the heating device 100. In addition, the shell assembly 80 has a simple structure and is easy to install. Among them, the shape of the first cavity 83 matches the shape of the heating tank 10, so that the heating tank 10 is stably installed in the first cavity 83.

[0055] As an implementation mode, the first cavity 83 and the second cavity 84 are arranged along the radial direction of the housing 81. Of course, in a specific application, as an alternative implementation mode, the first cavity 83 and the second cavity 84 are arranged along the axial direction of the housing 81.

[0056] As an embodiment, the housing 81 includes a housing body 811, a first cover body 812 and a second cover body (not shown), the first cover body 812 and the second cover body are respectively located at two ends of the housing body 811, and at least one of the first cover body 812 and the second cover body is detachably connected to the housing body 811. In this way, it is easy to disassemble and install.

[0057] Furthermore, the embodiment of the utility model also provides a water purification system, including a water purifier and the above-mentioned heating device 100, wherein the pure water outlet of the water purifier is connected to the second cold water inlet 211 of the first pipeline 21, and is used to transport pure water to the first pipeline 21. By adopting the above-mentioned heating device 100, the assembly efficiency of the heating device 100 is improved, and the miniaturization design of the water purification system is facilitated.

[0058] The above description is only a preferred embodiment of the utility model, and does not limit the patent scope of the utility model. All equivalent structural changes made by using the contents of the utility model specification and drawings under the utility model concept, or directly / indirectly used in other related technical fields are included in the patent protection scope of the utility model.

Claims

1. A heating device, used in a water purification system, It is characterized in that It includes a heating tank, a waterway plate, a first water inlet valve and a flow regulating valve; the heating tank includes a first cold water inlet and a first hot water outlet, and the waterway plate includes a first pipeline, a second pipeline and a third pipeline; The first pipeline includes a second cold water inlet, a second hot water outlet, a first communication point and a second communication point, the first communication point is arranged close to the second cold water inlet, and the second communication point is arranged close to the second hot water outlet; One end of the second pipeline is connected to the first communication point, and the other end of the second pipeline is connected to the first cold water inlet; One end of the third pipeline is connected to the second communication point, and the other end of the third pipeline is connected to the first hot water outlet; The first water inlet valve is arranged on the second pipeline, and is used to control the on-off of the second pipeline; The flow regulating valve is arranged between the first communication point and the second communication point, and is used to control the flow rate of water flowing therethrough.

2. The heating device according to claim 1, It is characterized in that The flow regulating valve is further used to cut off the water flow between the first communication point and the second communication point.

3. The heating device according to claim 1, It is characterized in that The first pipeline further includes a third communication site, and the third communication site is located between the second cold water inlet and the first communication site; The water circuit plate also includes a fourth pipeline, and the heating device also includes a second water inlet valve; one end of the fourth pipeline is connected to the third connecting point, and the other end of the fourth pipeline is used to connect to the faucet; the second water inlet valve is arranged on the fourth pipeline to control the on and off of the fourth pipeline.

4. The heating device according to claim 3, It is characterized in that At least parts of the second pipeline, the third pipeline and the fourth pipeline are arranged on the same side of the first pipeline; and / or, The first water inlet valve, the second water inlet valve and the flow regulating valve are all arranged on the same side of the first pipeline.

5. The heating device according to claim 1, It is characterized in that The first pipeline includes a first pipe segment, a second pipe segment and a third pipe segment; the first pipe segment and the second pipe segment are arranged in parallel, and the third pipe segment is connected between the first pipe segment and the second pipe segment; The second cold water inlet is arranged at one end of the first pipe section away from the third pipe section, the second hot water outlet is arranged at one end of the second pipe section away from the third pipe section, and the second cold water inlet and the second hot water outlet are both arranged on the same side of the third pipe section.

6. The heating device according to claim 1, It is characterized in that The waterway plate also includes a fixing plate, and the first pipeline is connected to the fixing plate and is coplanar with the fixing plate.

7. The heating device according to any one of claims 1 to 6, It is characterized in that The waterway plate is an integrally formed structure.

8. The heating device according to claim 1, It is characterized in that The heating device further comprises a flow meter, which is arranged on the first pipeline and located between the flow regulating valve and the second communication point; and / or, The heating device further comprises a pump body, which is arranged on a pipeline connecting the first hot water outlet and the third pipeline, and is at least used to provide power for water to flow toward the third pipeline.

9. The heating device according to claim 1, It is characterized in that The heating device also includes a housing assembly; The housing assembly comprises an outer shell and a middle frame, wherein the middle frame is arranged in the outer shell, the middle frame is provided with a first cavity, and is enclosed with the outer shell to form a second cavity communicating with the first cavity; The heating tank is accommodated in the first cavity, and the waterway plate is accommodated in the second cavity.

10. A water purification system, It is characterized in that It comprises a water purifier and a heating device as claimed in any one of claims 1 to 9, wherein the pure water outlet of the water purifier is connected to the second cold water inlet of the first pipeline for conveying pure water to the first pipeline.