Pool for simulation test of oil and gas equipment

By designing a water tank for simulating and testing oil and gas equipment, and utilizing facilities such as an intelligent infrared network PTZ camera, a waterproof underwater high-definition camera, and an airtightness testing system, the problem of low efficiency in existing marine oil and gas equipment testing has been solved, enabling efficient and safe marine environment simulation and performance testing on land.

CN222087289UActive Publication Date: 2024-11-29CHINA UNIV OF PETROLEUM (BEIJING) +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420812394.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2024-11-29
Estimated Expiration
2034-04-18

AI Technical Summary

Technical Problem

Existing technologies are insufficient to efficiently simulate marine environments for testing oil and gas equipment on land, resulting in low testing efficiency and high costs. Furthermore, there is a lack of suitable pool designs to simulate the testing conditions for marine oil and gas equipment.

Method used

Design a water tank for simulating oil and gas equipment testing, including adjustable-height wellhead test piles, intelligent infrared high-definition network PTZ cameras, waterproof underwater high-definition cameras, airtightness testing systems, and submersible pumps, etc., to simulate different marine environments on land and conduct performance testing and safety assessment of oil and gas equipment.

Benefits of technology

It enables efficient and safe simulation of marine environment for oil and gas equipment testing on land, reducing transportation and sea trial costs, improving testing efficiency, and ensuring the safety and continuity of the testing process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222087289U_ABST
    Figure CN222087289U_ABST
Patent Text Reader

Abstract

The utility model relates to a pool for simulation test of oil and gas equipment, which comprises a bottom wall and an open pool formed by sequentially connecting a first short side wall, a first long side wall, a second short side wall and a second long side wall along the edge of the bottom wall, and a Christmas tree test pile with adjustable height is arranged on the bottom wall; a plurality of submersible sewage pumps are mounted at the bottom of the inner side wall of the first short side wall, and the outer side wall of the first short side wall is connected with an airtight test system; the inner side wall of the first short side wall is also provided with a 360-degree intelligent infrared high-definition network ball machine and a waterproof underwater high-definition camera, and the two are electrically connected with the airtightness test system. According to the pool, different marine environments can be simulated in the same pool under the condition that a marine drilling platform marine test is not carried out, test conditions required for testing the performance of the marine oil and gas equipment are conveniently simulated, the structural safety of the large marine oil and gas equipment is simulated and evaluated based on the pool device test, time and labor are saved, and safety and high efficiency are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a water pool used for simulation testing of oil and gas equipment, belonging to the technical field of marine oil and gas exploitation. Background Art

[0002] Simulating the marine environment in which marine oil and gas equipment is put into production and testing the performance of oil and gas equipment are the key to the problem of marine oil and gas equipment testing. The current common practice is to transport the marine oil and gas equipment to be tested to an offshore drilling platform for on-site sea trials of the performance of the marine oil and gas equipment. This approach is time-consuming and labor-intensive, with extremely high operating costs, and is easily restricted by the offshore environment and operations, resulting in low test efficiency and failure to meet the needs of oil and gas production.

[0003] On the other hand, there is currently no water pool design structure that can simulate the marine simulation environment required for testing marine oil and gas equipment, and can simulate the test conditions required for marine oil and gas equipment. Therefore, it is necessary to design a simulated water pool to test the performance of oil and gas equipment. Summary of the invention

[0004] In view of the above technical problems, the utility model provides a water pool for simulation testing of oil and gas equipment. The water pool can simulate different marine environments in the same water pool without conducting sea trials of offshore drilling platforms, which is convenient for simulating the test conditions required for testing the performance of marine oil and gas equipment. In addition, the structural safety of large-scale marine oil and gas equipment can be simulated and evaluated based on the test of this water pool device, which saves time and effort and is safe and efficient.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A water pool for oil and gas equipment simulation testing, comprising: a bottom wall and an open water pool formed by sequentially connecting a first short side wall, a first long side wall, a second short side wall and a second long side wall along the edge of the bottom wall, wherein a height-adjustable Christmas tree test pile is arranged on the bottom wall;

[0007] The inner side wall of the first short side wall is equipped with a plurality of submersible sewage pumps, and the outer side wall is connected to the airtightness test system;

[0008] A 360-degree intelligent infrared high-definition network ball camera and a waterproof underwater high-definition camera are also installed on the inner wall of the first short side wall, and both are electrically connected to the airtight testing system.

[0009] The water pool for oil and gas equipment simulation testing preferably has a book page-like groove on the wall surface at the connecting corner between the first short side wall and the adjacent first long side wall and the second long side wall and close to the water pool opening, and the two 360-degree smart infrared high-definition network ball cameras are respectively placed in the book page-like grooves and are electrically connected to the airtight testing system through the smart infrared network ball camera cable.

[0010] The water pool for oil and gas equipment simulation testing is preferably provided with four rectangular grooves in an array on the inner wall of the first short side wall below the maximum water level, and one of the waterproof underwater high-definition cameras is installed in each of the rectangular grooves.

[0011] The water pool used for simulation testing of oil and gas equipment preferably has a pipe opened from the two rectangular grooves near the bottom wall to the water pool mouth, and waterproof cables and water supply plastic line pipes are laid in the pipes. The water supply plastic line pipes are laid from the lower side of the two rectangular grooves near the bottom wall to the bottom wall.

[0012] The water pool used for simulation testing of oil and gas equipment is preferably provided with a water pool maintenance ladder on the second short side wall.

[0013] In the water pool for oil and gas equipment simulation testing, preferably, detachable guardrails are installed above the first short side wall, the first long side wall, the second short side wall and the second long side wall.

[0014] The water pool for simulating the testing of oil and gas equipment, preferably, the airtightness testing system includes a secondary booster, an air pressure control system and an air storage tank, the air pressure control system is respectively connected to the secondary booster and the air storage tank, and the secondary booster is connected to the first short side wall.

[0015] The water pool for oil and gas equipment simulation testing, preferably, has two display screens in the air pressure control system.

[0016] In the water pool for oil and gas equipment simulation testing, preferably, the first short side wall, the first long side wall, the second short side wall and the second long side wall are all concrete cast side walls.

[0017] In the water pool for oil and gas equipment simulation testing, preferably, the Christmas tree test pile is a cylindrical hollow test pile, and the base of the Christmas tree test pile is a stainless steel base.

[0018] The utility model adopts the above technical solution, which has the following advantages:

[0019] 1. This utility model makes full use of the intelligent infrared network ball camera. By watching the display screen of the air pressure control system, the staff can monitor the dynamics of the pool in real time. The underwater waterproof high-definition camera used is dustproof and waterproof, and can be used for a long time in an underwater environment. After being coated with corrosive materials, it can meet the marine corrosive environment. Through the display screen, the staff can monitor the underwater dynamics in real time, and can also monitor the dynamics of marine oil and gas equipment testing in real time. It is convenient for the staff to control the progress of the marine oil and gas equipment testing, and it is convenient to archive the whole process of the simulated test equipment, which solves many problems existing in the sea trial.

[0020] 2. The utility model utilizes a water supply pipe and a submersible sewage pump to realize the pumping and drainage function of the pool. In particular, the submersible sewage pump has a compact structure and a long operating time, which can meet the needs of the pool sewage discharge. It is convenient to provide the required pool conditions for multiple tests.

[0021] 3. The utility model has a 1.2m high detachable guardrail built around the pool, which can effectively prevent workers outside the pool from falling into the pool or other equipment from accidentally falling into the pool, effectively ensuring the continuity of testing marine oil and gas equipment. It greatly protects personal safety and the testing environment.

[0022] 4. The water pool maintenance ladder of the utility model is convenient for maintenance personnel to enter the water pool to make preparations before testing, and is also convenient for divers to enter the water pool to test oil and gas equipment.

[0023] 5. The electric hoist bridge crane of the utility model has a compact and stable structure, light weight, saves time and effort, and is convenient for workers to efficiently transport oil and gas equipment to the water tank for testing.

[0024] 6. The airtightness test system of the utility model, through the functions of the secondary booster and the air storage tank, can meet the different sizes of psi required for oil and gas equipment testing, so as to facilitate the testing. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 An overall schematic diagram of a water pool for oil and gas equipment simulation testing provided by an embodiment of the utility model;

[0026] Figure 2 A schematic diagram of a side wall of a pool provided in this embodiment of the utility model;

[0027] Figure 3 A schematic diagram of a Christmas tree device provided in this embodiment of the utility model;

[0028] The marks in the figure are as follows:

[0029] 1-water tank, 11-first short side wall, 111-waterproof underwater high-definition camera, 112-rectangular groove, 113-pipeline, 114-waterproof cable, 115-water supply plastic wire tube, 116-intelligent infrared network ball camera cable, 117-page groove, 118-360-degree intelligent infrared high-definition network ball camera; 12-first long side wall, 13-second short side wall, 14-second long side wall; 2-detachable guardrail; 3-submersible sewage pump; 4-Christmas tree test pile, 41-Christmas tree device, 411-Christmas tree mechanical connector, 412-Christmas tree top test cover; 5-water tank maintenance ladder; 6-electric hoist bridge crane; 7-bottom wall; 8-airtightness test system, 81-secondary booster, 82-air pressure control system, 821-display screen, 83-gas storage tank. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model is described clearly and completely below. Obviously, the described embodiments are part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary persons in the field without creative work are within the scope of protection of the utility model.

[0031] Unless otherwise defined, the technical or scientific terms used in the present invention shall have the usual meanings understood by persons with ordinary skills in the field to which the present invention belongs. The words "first", "second", "third", "fourth" and similar terms used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. Words such as "include" or "comprise" and the like mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. Words such as "connect" or "connected" and the like are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect.

[0032] For ease of description, spatially relative terms may be used herein to describe the relationship of one element or feature relative to another element or feature as shown in the figures, such as "inside", "outside", "inner side", "outer side", "below", "above", etc. Such spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation depicted in the figures.

[0033] Simulating the marine environment in which marine oil and gas equipment is put into production and testing the performance of oil and gas equipment are the key to the problem of marine oil and gas equipment testing. The current common practice is to transport the marine oil and gas equipment to be tested to an offshore drilling platform for on-site sea trials of the performance of the marine oil and gas equipment. This practice is time-consuming and labor-intensive, with extremely high operating costs, and is easily restricted by the offshore environment and operations, resulting in low test efficiency and unable to meet the needs of oil and gas production. On the other hand, there is currently no water pool design structure that can simulate the marine simulation environment required for marine oil and gas equipment testing, and can simulate the test conditions required for marine oil and gas equipment, so it is necessary to design a simulated water pool to test the performance of oil and gas equipment.

[0034] Based on the above problems, the utility model provides a water pool for simulation testing of oil and gas equipment. The water pool can simulate different marine environments in the same water pool without conducting sea trials of offshore drilling platforms, which is convenient for simulating the test conditions required for testing the performance of marine oil and gas equipment. In addition, the structural safety of large-scale marine oil and gas equipment can be simulated and evaluated based on the test of this water pool device, which saves time and effort and is safe and efficient.

[0035] like Figure 1 , 2 As shown, the water pool for oil and gas equipment simulation test provided by the utility model comprises: a first short side wall 11 and a second short side wall 13 arranged oppositely, a first long side wall 12 and a second long side wall 14 arranged oppositely, and a bottom wall 7. The first short side wall 11, the first long side wall 12, the second short side wall 13 and the second long side wall 14 are sequentially connected and simultaneously connected to the bottom wall 7 to form a rectangular trough structure. The four side walls and the bottom wall 7 are all cast in concrete, and the four side walls are all paved with ceramic tiles; a cylindrical hollow Christmas tree test pile 4 with adjustable height is arranged in the center of the bottom wall 7; after water is filled, the water level of the water pool 1 is located at the position of the Christmas tree test pile 4. According to the testing needs of different equipment, the Christmas tree base with adjustable height is set at different heights, and the water level also changes accordingly. The length of the short side wall (first short side wall 11, second short side wall 13) is 8m, the length of the long side wall (first long side wall 12, second long side wall 14) is 8.5m, and the height of the pool is 10m; all four walls are paved with 25*25mm tiles. After water is filled, the water level of the pool is located at the position of the Christmas tree test pile.

[0036] like Figure 1As shown, four submersible sewage pumps 3 (stainless steel cutting submersible sewage pumps, which are corrosion-resistant, acid-resistant, alkali-resistant, energy-saving and efficient) are installed in a regular arrangement on the left side of the first short side wall 11, and a pool maintenance ladder 5 is provided in the middle of the second short side wall 13. Removable guardrails 2 are installed above the first short side wall 11, the first long side wall 12, the second short side wall 13 and the second long side wall 14. The materials used for the removable guardrails 2 (1.2m) above the surrounding walls and the pool maintenance ladder 5 are all steel materials, and the removable guardrails 2 are all painted yellow (the maintenance ladder and guardrails are made of stainless steel materials, which are durable, corrosion-resistant, wear-resistant, and have a high safety factor. The guardrail paint is yellow, which has a certain warning effect to prevent staff from accidentally falling into the pool.). The submersible sewage pump 3 is used to drain the pool 1; the diver enters the pool 1 through the pool maintenance ladder 5, connects the oil and gas equipment to be tested with the Christmas tree test pile 4 (a cylindrical hollow test pile, the base of which is made of stainless steel to prevent corrosion, with a maximum height of about 4m and the outer wall of the pile painted yellow), and observes the test situation in the pool 1.

[0037] Furthermore, if Figure 1 As shown, the right side of the first short side wall 11 of the pool 1 is connected to an airtight test system 8, which includes a secondary booster 81, an air pressure control system 82 and an air storage tank 83. The airtight test system 8 is used to achieve the air pressure required for oil and gas equipment testing, and the secondary booster 81 and the air pressure control system 82 are used to change different test conditions.

[0038] like Figure 1 , 2 As shown, taking the first short side wall 11 of the pool 1 as an example, the walls of the first short side wall 11, the second short side wall 13, the first long side wall 12, and the second long side wall 14 of the pool 1 are all installed with the following equipment: a book page-like groove 117 (the length and width of the "page" are both 0.7m) is opened on the wall surface on the left and right sides of the connection between the first short side wall 11 and the adjacent long side walls (the first long side wall 12 and the second long side wall 14); four rectangular grooves 112 are regularly opened in the center of the first short side wall 11 at the maximum water level, and a pipe 113 is opened from the top middle of the two lower rectangular grooves 112 parallel to the wall surface to the pool mouth wall surface.

[0039] A 360-degree intelligent infrared high-definition network ball camera 118 is installed in the book-page groove 117 of the first short side wall 11, and an intelligent infrared network ball camera cable 116 (about 2 meters in length) is laid between the upper part of the page spine of the book-page groove 117 and the side wall seam. Waterproof underwater high-definition cameras 111 are installed in the four rectangular grooves 112 on the wall of the first short side wall 11, and a waterproof cable 114 (about 7 meters in length) is laid in the pipe 113 opened from the top middle part of the two rectangular grooves 112 on the lower side to the wall of the pool mouth; the pipe 113 of the first short side wall 11 and the lower side of the two rectangular grooves 112 to the bottom wall 7 of the pool are all laid with water supply plastic wire pipes 115 (about 10 meters in length).

[0040] Furthermore, the 360-degree intelligent infrared high-definition network ball camera 118 and the waterproof underwater high-definition camera 111 both adopt Hikvision brand equipment, among which the model selected for the 360-degree intelligent infrared high-definition infrared network ball camera 118 is: DS-2DE4223IW-DE; the model of the waterproof underwater high-definition camera is: DS-2XC6225F-L.

[0041] Furthermore, the 360-degree intelligent infrared network ball camera 118 and the display screen 821 are used to monitor the situation during the oil and gas equipment testing and the water surface situation in real time; the pumping water level and drainage situation are monitored to meet the needs of oil and gas equipment testing; the waterproof underwater high-definition camera 111 is dustproof and waterproof, can work for a long time in an underwater environment, and can meet the marine corrosion environment after being coated with corrosive materials; the waterproof underwater high-definition camera 111 and the display screen 821 (used for image output of the 360-degree intelligent infrared high-definition network ball camera 118 and the waterproof underwater high-definition camera 111) are used to monitor the underwater situation in real time, and the high-definition image is fed back to the display screen 821, and the underwater dynamics during the marine oil and gas equipment testing are monitored in real time, which is convenient for the staff to control the progress of the marine oil and gas equipment testing, and to archive the entire process of simulating the test equipment, thereby solving many problems existing in sea trials.

[0042] like Figure 3 As shown, the Christmas tree device 41 equipped with the Christmas tree test pile 4 includes a Christmas tree mechanical connector 411 and a Christmas tree top test cover 412. The Christmas tree mechanical connector 411 is used to unlock the Christmas tree device 41, and the Christmas tree mechanical connector 411 is lifted by the electric hoist bridge crane 6; the Christmas tree top test cover 412 is unlocked when the test is to be carried out. The Christmas tree device structure is made of steel material and painted red. The electric hoist bridge crane 6 is used, which has a compact and stable structure and light weight, and is more suitable for use in this application scenario.

[0043] The working principle of the utility model device is as follows:

[0044] When conducting a test of marine oil and gas equipment, drainage is first performed, and sewage in the pool 1 is discharged using a submersible sewage pump 3 .

[0045] Preparation: Start the airtight test system 8 for pre-inflation; there is no water in the water pool 1, connect the pipeline of the airtight test system 8 to the test pile 4; connect the Christmas tree mechanical connector 411 to the Christmas tree device 41; adjust the Christmas tree test pile 4 to the required height of the Christmas tree device 41 for the test; lift the Christmas tree device 41 with the electric hoist bridge crane 6, slowly put it into the water pool 1, and slowly lower it when it is close to the position of the Christmas tree test pile 4, align the center of the Christmas tree device 41 with the center of the Christmas tree test pile 4, and then assemble and lock it; use a wrench to lift the Christmas tree device 41. The mechanical connector 411 of the oil tree is unlocked from the oil tree device 41, and the electric hoist bridge crane 6 lifts and takes out the mechanical connector 411 of the oil tree; the top test cover 412 of the oil tree is lifted and put into the water pool 1, and slowly lowered when it is close to the upper position of the oil tree device 41, and the operator locks the top test cover 412 of the oil tree to the oil tree device 41. After the operators evacuate to the land, the operators outside the water pool inject water into the water pool water level line to the position above the oil tree test pile 4 through the water supply plastic line pipe 115, and check whether the pressure test conditions are met.

[0046] Testing phase: perform airtight segmented pressure test, inject air at 10,000 psi, and maintain pressure for 15 minutes; view images fed back by the 360-degree intelligent infrared high-definition network ball camera 118 and the waterproof underwater high-definition camera 111 through the display screen 821 to check whether there is pressure leakage, etc.; after the pressure test is completed, release the air circuit pressure to normal pressure.

[0047] The diver enters the test area through the pool maintenance ladder 5, unlocks the test cover 412 on the top of the oil tree and connects it to the rigging, the electric hoist bridge crane 6 lifts the test cover 412 on the top of the oil tree to the ground outside the pool, the electric hoist bridge crane 6 lifts the oil tree mechanical connector 411 and enters the test area, and the diver connects the oil tree 41 and the oil tree mechanical connector 411.

[0048] During the entire test process, technicians monitored the test situation in real time through dual monitoring using a 360-degree intelligent infrared high-definition network dome camera 118 and a waterproof underwater high-definition camera 111.

[0049] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the utility model.

Claims

1. A water pool for simulation testing of oil and gas equipment, It is characterized in that include: A bottom wall (7) and an open water pool (1) formed by sequentially connecting a first short side wall (11), a first long side wall (12), a second short side wall (13) and a second long side wall (14) along the edge of the bottom wall (7), wherein a height-adjustable Christmas tree test pile (4) is arranged on the bottom wall (7); The inner side wall of the first short side wall (11) is installed with a plurality of submersible sewage pumps (3), and the outer side wall is connected to an airtightness testing system (8); A 360-degree intelligent infrared high-definition network dome camera (118) and a waterproof underwater high-definition camera (111) are also installed on the inner side wall of the first short side wall (11), and both are electrically connected to the airtightness testing system (8).

2. The water pool for oil and gas equipment simulation testing according to claim 1, It is characterized in that A book page-like groove (117) is provided on the wall surface at the connecting corner between the first short side wall (11) and the adjacent first long side wall (12) and the second long side wall (14) and close to the opening of the pool (1); two 360-degree intelligent infrared high-definition network dome cameras (118) are respectively placed in the book page-like groove (117) and are electrically connected to the airtight test system (8) via an intelligent infrared network dome camera cable (116).

3. The water pool for oil and gas equipment simulation testing according to claim 1, It is characterized in that The inner side wall of the first short side wall (11) is provided with four rectangular grooves (112) in an array below the maximum water level, and one of the waterproof underwater high-definition cameras (111) is installed in each of the rectangular grooves (112).

4. The water pool for oil and gas equipment simulation testing according to claim 3, It is characterized in that A pipe (113) is provided from the two rectangular grooves (112) close to the bottom wall (7) to the opening of the pool (1), a waterproof cable (114) and a water supply plastic line pipe (115) are laid in the pipe (113), and the water supply plastic line pipe (115) is laid from the lower side of the two rectangular grooves (112) close to the bottom wall (7) to the bottom wall (7).

5. The water pool for oil and gas equipment simulation testing according to claim 1, It is characterized in that A pool maintenance ladder (5) is provided on the second short side wall (13).

6. The water pool for oil and gas equipment simulation testing according to claim 1, It is characterized in that A detachable guardrail (2) is installed above the first short side wall (11), the first long side wall (12), the second short side wall (13) and the second long side wall (14).

7. The water pool for oil and gas equipment simulation testing according to claim 1, It is characterized in that The airtightness test system (8) comprises a secondary booster (81), an air pressure control system (82) and an air storage tank (83); the air pressure control system (82) is connected to the secondary booster (81) and the air storage tank (83) respectively; and the secondary booster (81) is connected to the first short side wall (11).

8. The water pool for oil and gas equipment simulation testing according to claim 7, It is characterized in that The air pressure control system (82) is provided with two display screens (821).

9. The water pool for oil and gas equipment simulation testing according to claim 1, It is characterized in that The first short side wall (11), the first long side wall (12), the second short side wall (13) and the second long side wall (14) are all concrete cast side walls.

10. The water pool for oil and gas equipment simulation testing according to claim 1, It is characterized in that The Christmas tree test pile (4) is a cylindrical hollow test pile, and the base of the Christmas tree test pile (4) is a stainless steel base.