Device for measuring erosion influence of impurity-containing natural gas on blind tee joint
By designing a device including methane gas cylinder, pressurization pump, ball valve, sand funnel, hydrogen gas cylinder and circulation pump, the measurement problem of blind tees in different sand content and hydrogen mixing pipelines is solved. , realizes accurate assessment of blind tee erosion, extends measurement accuracy and safety, and helps evaluate the life and potential risks of the collection and transportation pipeline.
Patent Information
- Application Number
- CN202420114251.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-01-17
Smart Images

Figure CN222087530U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipeline erosion measurement, in particular to a device for measuring the influence of impurity-containing natural gas on the erosion of a blind tee. Background Art
[0002] In the process of oil and gas extraction, sand is often produced, which causes erosion and wear of the gathering and transportation pipelines. Through research, it is found that the special structure of the blind tee, which is used in the process of gathering and transportation pipeline extraction, has a special "air cushion" structure, which can not only save space while improving the anti-erosion performance of the pipeline, but also extend the service life of the oil and gas gathering and transportation pipeline. After a long period of erosion and wear accumulation, the pressure bearing capacity of the blind tee gathering and transportation pipeline is weakened. In severe cases, rupture and perforation may occur, resulting in natural gas leakage, and ultimately causing serious economic losses.
[0003] In the prior art, there is no system capable of measuring the erosion of the blind tee under different sand contents and the mixed hydrogen gathering and transportation pipeline under different hydrogen contents when the pipeline contains sand. Utility Model Content
[0004] The technical problem to be solved by the utility model is to provide a device for measuring the influence of natural gas containing impurities on the erosion of the blind tee in view of the deficiencies of the prior art.
[0005] The utility model solves the above technical problems with the following technical solutions: a device for measuring the effect of natural gas containing impurities on the erosion of a blind tee, comprising: a methane cylinder, a first pressure pump, a first ball valve, a second ball valve, a sand funnel, a hydrogen cylinder, a second pressure pump, a third ball valve, a fourth ball valve, a blind tee inlet, a blind tee, a blind tee outlet, a fifth ball valve, a circulation pump, a sixth ball valve, a seventh ball valve, a vent valve, a sand buffer, and a sand collection bucket, wherein the methane cylinder is connected to the first pressure pump through a pipeline, the first pressure pump is connected to the first ball valve through a pipeline, the sand funnel is connected to the second ball valve through a pipeline, and the hydrogen cylinder is connected to the second The pressure pump is connected, the second pressure pump is connected to the third ball valve through a pipeline, the blind tee is respectively connected to the blind tee inlet and the blind tee outlet, the blind tee outlet is connected to the fifth ball valve through a pipeline, the fifth ball valve is connected to the circulation pump through a pipeline, the circulation pump is respectively connected to the sixth ball valve and the seventh ball valve through pipelines, the seventh ball valve is connected to the sand buffer through a pipeline, the sand buffer is respectively connected to the vent valve and the sand collecting bucket, the first ball valve, the second ball valve, the third ball valve, the blind tee inlet, and the sixth ball valve are all connected to the fourth ball valve through a pipeline.
[0006] The beneficial effects of the technical solution of the utility model are as follows: by setting a circulation loop for 24-hour erosion, it can truly simulate the 24-hour non-stop operation of the gathering and transportation pipeline under actual working conditions. By setting different sand contents for comparative measurement, the results provide a reference for the life of the gathering and transportation pipeline containing blind tees when gathering and transportation with different sand contents on site. By setting different hydrogen contents in the mixed hydrogen gathering and transportation pipeline for measurement, a reference is provided for the life of the gathering and transportation pipeline containing blind tees when the mixed hydrogen gathering and transportation pipeline containing hydrogen and sand is gathered and transported under actual working conditions on site. The erosion of the blind tee in the gathering and transportation pipeline containing a mixture of sand and natural gas, and a mixture of sand and natural gas and hydrogen is measured. Not only can the erosion depth of the blind tee be measured for different sand contents in the gathering and transportation pipeline, but also the erosion depth of the blind tee can be measured for different hydrogen contents in the mixed hydrogen gathering and transportation pipeline, which can truly simulate the complex situation in the gathering and transportation pipeline under actual working conditions, and the measurement results are more accurate.
[0007] Furthermore, a first gas flow meter is provided on the pipeline between the first pressure pump and the first ball valve, and a second gas flow meter is provided on the pipeline between the second pressure pump and the third ball valve.
[0008] The beneficial effect of adopting the above further technical solution is that the provision of a gas flow meter facilitates real-time flow detection and facilitates control of the flow of methane and hydrogen according to actual needs.
[0009] Furthermore, the blind tee is connected to the blind tee inlet and the blind tee outlet via detachable joints respectively.
[0010] The beneficial effects of adopting the above further technical solution are: the provision of a detachable joint facilitates the installation and disassembly of the blind tee, facilitates the replacement of a new blind tee, and improves measurement efficiency.
[0011] Furthermore, the blind tee includes: an inlet section, a blind section, and an outlet section, the inlet section is connected to the outlet section, the inlet section is perpendicular to the outlet section, the blind section is located at the connection position between the inlet section and the outlet section, the blind section is coaxially arranged with the inlet section, the inlet section is connected to the inlet of the blind tee, and the outlet section is connected to the outlet of the blind tee.
[0012] The beneficial effect of adopting the above further technical solution is: the erosion of the blind tee in the gathering and transportation pipeline containing a mixture of sand and natural gas, or a mixture of sand, natural gas and hydrogen can be measured. Not only can the erosion depth of the blind section be measured for different sand contents in the gathering and transportation pipeline, but also the erosion depth of the blind section be measured for different hydrogen contents in the mixed hydrogen gathering and transportation pipeline. It can truly simulate the complex conditions in the gathering and transportation pipeline under actual working conditions, and measure in an open environment, ensuring safety while making the measurement results more accurate.
[0013] Furthermore, the inlet section is installed with a first pressure sensor, the outlet section is installed with a second pressure sensor, and the first pressure sensor and the second pressure sensor are both connected to a monitoring system.
[0014] The beneficial effect of adopting the above further technical solution is that the first pressure sensor and the second pressure sensor are connected to the monitoring system to measure the change of the pressure at the inlet and outlet of the blind tee. By setting two pressure sensors and the monitoring system, it is monitored whether the displacement of the circulating pump circulates according to the set displacement, thereby improving the simulation authenticity.
[0015] Furthermore, the length of the blind section is 60 mm, the diameter of the blind tee is 244.5 mm, the material of the blind tee is N80 steel, the length of the inlet section is 1500 mm, and the length of the outlet section is 1500 mm.
[0016] The beneficial effect of adopting the above further technical solution is: making the structure of the blind three-way communication system identical to that of a real blind three-way communication system, thereby improving the accuracy of the measurement structure.
[0017] Furthermore, a sand retaining block is provided in the sand buffer.
[0018] The beneficial effect of adopting the above further technical solution is that the kinetic energy of the sand particles is reduced after impacting the sand retaining block, thereby achieving a buffering effect.
[0019] Furthermore, the sand retaining block is a 45° elliptical sand retaining block.
[0020] The beneficial effect of adopting the above further technical solution is: the 45° elliptical sand retaining block makes it easy for sand particles to hit the 45° elliptical sand retaining block and fall into the sand collecting bucket. The kinetic energy of the sand particles is reduced after impacting the sand retaining block, thereby achieving a buffering effect.
[0021] Furthermore, the methane gas cylinder is provided with methane, the sand funnel is provided with sand with a sand particle size of 3 mm, and the hydrogen gas cylinder is provided with hydrogen.
[0022] The beneficial effects of adopting the above further technical solution are: the methane gas cylinder contains methane gas, which is used to simulate the transportation of natural gas under actual working conditions. The hydrogen gas cylinder contains hydrogen gas, which is mixed with methane gas to simulate the mixed hydrogen gathering and transportation pipeline under actual working conditions.
[0023] Advantages of additional aspects of the present invention will be partially given in the following description, and partially become apparent from the following description, or be understood through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1A schematic diagram of the structure of a device for measuring the effect of impure natural gas on the erosion of a blind tee provided in an embodiment of the utility model.
[0025] Figure 2 A schematic structural diagram of a sand buffer provided in an embodiment of the utility model.
[0026] Figure 3 A curve diagram showing the relationship between different sand contents in a gathering and transportation pipeline and the erosion depth of a blind section provided in an embodiment of the utility model.
[0027] Figure 4 A curve diagram showing the relationship between different hydrogen contents in a mixed hydrogen gathering and transportation pipeline and the erosion depth of a blind section provided in an embodiment of the utility model.
[0028] Explanation of the accompanying drawings: 1. Methane gas cylinder; 2. First booster pump; 3. First gas flowmeter; 4. First ball valve; 5. Second ball valve; 6. Sand funnel; 7. Hydrogen gas cylinder; 8. Second booster pump; 9. Second gas flowmeter; 10. Third ball valve; 11. Fourth ball valve; 12. Blind tee inlet; 13. Removable joint; 14. First pressure sensor; 15. Inlet section; 16. Blind tee; 17. Blind section; 18. Outlet section; 19. Second pressure sensor; 20. Blind tee outlet; 21. Fifth ball valve; 22. Circulation pump; 23. Monitoring system; 24. Sixth ball valve; 25. Seventh ball valve; 26. Vent valve; 27. Sand buffer; 28. Sand collection bucket; 29. Sand block. DETAILED DESCRIPTION
[0029] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The embodiments given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0030] like Figure 1 and Figure 2As shown, an embodiment of the utility model provides a device for measuring the influence of impure natural gas on the erosion of a blind tee, comprising: a methane cylinder 1, a first pressure pump 2, a first ball valve 4, a second ball valve 5, a sand funnel 6, a hydrogen cylinder 7, a second pressure pump 8, a third ball valve 10, a fourth ball valve 11, a blind tee inlet 12, a blind tee 16, a blind tee outlet 20, a fifth ball valve 21, a circulation pump 22, a sixth ball valve 24, a seventh ball valve 25, a vent valve 26, a sand buffer 27, and a sand collecting bucket 28. The methane cylinder 1 is connected to the first pressure pump 2 through a pipeline, the first pressure pump 2 is connected to the first ball valve 4 through a pipeline, the sand funnel 6 is connected to the second ball valve 5 through a pipeline, and the hydrogen cylinder 7 is connected to the second pressure pump 8 through a pipeline. The second pressure pump 8 is connected to the third ball valve 10 through a pipeline, the blind tee 16 is respectively connected to the blind tee inlet 12 and the blind tee outlet 20, the blind tee outlet 20 is connected to the fifth ball valve 21 through a pipeline, the fifth ball valve 21 is connected to the circulation pump 22 through a pipeline, the circulation pump 22 is respectively connected to the sixth ball valve 24 and the seventh ball valve 25 through pipelines, the seventh ball valve 25 is connected to the sand buffer 27 through a pipeline, the sand buffer 27 is respectively connected to the vent valve 26 and the sand collecting bucket 28, the first ball valve 4, the second ball valve 5, the third ball valve 10, the blind tee inlet 12, and the sixth ball valve 24 are all connected to the fourth ball valve 11 through a pipeline.
[0031] The beneficial effects of the technical solution of the utility model are as follows: by setting a circulation loop for 24-hour erosion, it can truly simulate the 24-hour non-stop operation of the gathering and transportation pipeline under actual working conditions. By setting different sand contents for comparative measurement, the results provide a reference for the life of the gathering and transportation pipeline containing blind tees when gathering and transportation with different sand contents on site. By setting different hydrogen contents in the mixed hydrogen gathering and transportation pipeline for measurement, a reference is provided for the life of the gathering and transportation pipeline containing blind tees when the mixed hydrogen gathering and transportation pipeline containing hydrogen and sand is gathered and transported under actual working conditions on site. The erosion of the blind tee in the gathering and transportation pipeline containing a mixture of sand and natural gas, and a mixture of sand and natural gas and hydrogen is measured. Not only can the erosion depth of the blind tee be measured for different sand contents in the gathering and transportation pipeline, but also the erosion depth of the blind tee can be measured for different hydrogen contents in the mixed hydrogen gathering and transportation pipeline, which can truly simulate the complex situation in the gathering and transportation pipeline under actual working conditions, and the measurement results are more accurate.
[0032] Among them, the first ball valve, the second ball valve, the third ball valve, the fourth ball valve, the fifth ball valve, the sixth ball valve, and the seventh ball valve are the same ball valves, which belong to the prior art and will not be described in detail here. After the measurement, a long ruler is used to measure the depth of erosion in the blind section, which belongs to the prior art and will not be described in detail here.
[0033] like Figure 1 and Figure 2 As shown, further, a first gas flow meter 3 is provided on the pipeline between the first booster pump 2 and the first ball valve 4 , and a second gas flow meter 9 is provided on the pipeline between the second booster pump 8 and the third ball valve 10 .
[0034] The beneficial effect of adopting the above further technical solution is that the provision of a gas flow meter facilitates real-time flow detection and facilitates control of the flow of methane and hydrogen according to actual needs.
[0035] like Figure 1 and Figure 2 As shown, further, the blind tee 16 is connected to the blind tee inlet 12 and the blind tee outlet 20 respectively through a detachable joint 13.
[0036] The beneficial effects of adopting the above further technical solution are: the provision of a detachable joint facilitates the installation and disassembly of the blind tee, facilitates the replacement of a new blind tee, and improves measurement efficiency.
[0037] like Figure 1 and Figure 2 As shown, further, the blind tee 16 includes: an inlet section 15, a blind section 17, and an outlet section 18, the inlet section 15 is connected to the outlet section 18, the inlet section 15 is perpendicular to the outlet section 18, the blind section 17 is located at the connection position between the inlet section 15 and the outlet section 18, the blind section 17 is coaxially arranged with the inlet section 15, the inlet section 15 is connected to the blind tee inlet 12, and the outlet section 18 is connected to the blind tee outlet 20.
[0038] The beneficial effect of adopting the above further technical solution is: the erosion of the blind tee in the gathering and transportation pipeline containing a mixture of sand and natural gas, or a mixture of sand, natural gas and hydrogen can be measured. Not only can the erosion depth of the blind section be measured for different sand contents in the gathering and transportation pipeline, but also the erosion depth of the blind section be measured for different hydrogen contents in the mixed hydrogen gathering and transportation pipeline. It can truly simulate the complex conditions in the gathering and transportation pipeline under actual working conditions, and measure in an open environment, ensuring safety while making the measurement results more accurate.
[0039] like Figure 1 and Figure 2 As shown, further, the inlet section 15 is installed with a first pressure sensor 14 , the outlet section 18 is installed with a second pressure sensor 19 , and the first pressure sensor 14 and the second pressure sensor 19 are both connected to a monitoring system 23 .
[0040] The beneficial effect of adopting the above further technical solution is that the first pressure sensor and the second pressure sensor are connected to the monitoring system to measure the change of the pressure at the inlet and outlet of the blind tee. By setting two pressure sensors and the monitoring system, it is monitored whether the displacement of the circulating pump circulates according to the set displacement, thereby improving the simulation authenticity.
[0041] like Figure 1 and Figure 2 As shown, further, the length of the blind section 17 is 60 mm, the diameter of the blind tee 16 is 244.5 mm, the material of the blind tee 16 is N80 steel, the length of the inlet section 15 is 1500 mm, and the length of the outlet section 18 is 1500 mm.
[0042] The beneficial effect of adopting the above further technical solution is: making the structure of the blind three-way communication system identical to that of a real blind three-way communication system, thereby improving the accuracy of the measurement structure.
[0043] like Figure 1 and Figure 2 As shown, further, a sand retaining block 29 is provided in the sand buffer 27 .
[0044] The beneficial effect of adopting the above further technical solution is that the kinetic energy of the sand particles is reduced after impacting the sand retaining block, thereby achieving a buffering effect.
[0045] like Figure 1 and Figure 2 As shown, further, the sand retaining block 29 is a 45° elliptical sand retaining block.
[0046] The beneficial effect of adopting the above further technical solution is: the 45° elliptical sand retaining block makes it easy for sand particles to hit the 45° elliptical sand retaining block and fall into the sand collecting bucket. The kinetic energy of the sand particles is reduced after impacting the sand retaining block, thereby achieving a buffering effect.
[0047] like Figure 1 and Figure 2 As shown, further, the methane cylinder 1 is provided with methane, the sand funnel 6 is provided with sand with a sand particle size of 3 mm, and the hydrogen cylinder 7 is provided with hydrogen.
[0048] The beneficial effects of adopting the above further technical solution are: the methane gas cylinder contains methane gas, which is used to simulate the transportation of natural gas under actual working conditions. The hydrogen gas cylinder contains hydrogen gas, which is mixed with methane gas to simulate the mixed hydrogen gathering and transportation pipeline under actual working conditions.
[0049] When measuring the amount of sand in the gathering and transportation pipeline, 500g, 1000g, 1500g, and 2000g were placed in the gathering and transportation pipeline for measurement. When measuring the hydrogen content in the mixed hydrogen gathering and transportation pipeline, the hydrogen content was measured at 15%, 30%, and 45% under the condition of 1000g of sand particles.
[0050] The blind tee 16 is mainly composed of an inlet section 15, a blind section 17, and an outlet section 18. The methane cylinder 1 is connected to the first booster pump 2, the first gas flowmeter 3, and the first ball valve 4 in sequence. The hydrogen cylinder 7 is connected to the second booster pump 8, the second gas flowmeter 9, and the third ball valve 10 in sequence. The fourth ball valve 11 forms a circulation loop with the blind tee inlet 12, the blind tee outlet 20, the fifth ball valve 21, the circulation pump 22, and the sixth ball valve 24; the sand funnel 6 is located on the pipeline of the methane cylinder 1.
[0051] The blind tee inlet 12 and the blind tee outlet 20 of the blind tee 16 are both provided with detachable joints 13, which adopt a detachable design.
[0052] The first pressure sensor 14 is disposed at the lower right corner of the inlet section 15 , and the second pressure sensor 19 is disposed at the lower right corner of the outlet section 18 .
[0053] The length of the blind section 17 is 60 mm.
[0054] The blind tee 16 has a diameter of 244.5 mm and is made of N80 steel. The length of the inlet section 15 is 1500 mm and the length of the outlet section 18 is 1500 mm.
[0055] A vent valve 26 is provided on the upper portion of the sand buffer 27, and a 45° elliptical sand retaining block is provided inside, with an oblique angle of 45°.
[0056] The measurement plan is: under the condition of cyclic erosion for 24 hours, the first is to measure the depth of erosion of the blind section when 500g, 1000g, 1500g and 2000g are respectively put into the gathering and transportation pipeline under the condition of only natural gas pipeline and sand; the second is to measure the depth of erosion of the blind section when the hydrogen content in the mixed hydrogen gathering and transportation pipeline is 15%, 30% and 45% respectively under the condition of constant sand content of 1000g.
[0057] like Figure 1As shown, it is a schematic diagram of the structure of the device for measuring the influence of impurity-containing natural gas flow on the erosion of the blind tee (device for measuring the influence of impurity-containing natural gas on the erosion of the blind tee) provided by the utility model. When performing the first measurement, first close all valves, and open the methane gas cylinder 1, the first booster pump 2, the first ball valve 4, the fourth ball valve 11, the fifth ball valve 21, the circulation pump 22, the seventh ball valve 25, and the vent valve 26 in sequence; the methane gas in the methane gas cylinder 1 is pressurized by the first booster pump 2, and the first gas flowmeter 3 enters the blind tee 16 from the blind tee inlet 12 after metering, and the methane gas flows from right to left in the blind tee 16, enters the blind section 17, and flows downward to the outlet section 18 after passing through the blind section 17, and finally flows out from the blind tee outlet 20, and after being pressurized by the circulation pump 22, enters the sand buffer 27, and then flows out from the vent valve 26. When methane gas flows out of the vent valve 26, immediately close the seventh ball valve 25 and open the sixth ball valve 24 to drive out the air in the pipeline. After opening the sixth ball valve 24, open the second ball valve 5 at the same time to let 500g of sand particles in the sand funnel 6 flow into the pipeline. After the flow is completed, immediately close the methane cylinder 1, the first booster pump 2, and the first ball valve 4 in sequence, adjust the circulation pump 22 to the specified displacement, and start timing for 24 hours. 500g of sand particles (sand) and methane gas, under the action of the circulation pump 22, form a circulation loop through the fourth ball valve 11 and the blind tee inlet 12, the blind tee outlet 20, the fifth ball valve 21, the circulation pump 22, and the sixth ball valve 24. The sand particles and methane gas continuously erode the blind section 17 during the circulation process. After 24 hours, the circulation pump 22 and the sixth ball valve 24 are closed in turn, and the seventh ball valve 25 is opened. The mixture of sand particles and methane gas enters the sand buffer 27 together. The sand particles impact the 45° elliptical sand retaining block (sand retaining block 29) to reduce kinetic energy, and methane gas flows out from the vent valve 26. It is then disassembled through the detachable joint 13 to measure the depth of the wall surface of the blind section 17 after erosion. The monitoring system 23 records the pressure change of the blind tee 16 within 24 hours through the first pressure sensor 14 and the second pressure sensor 19. Replace the new blind tee 16, repeat the above steps, put 1000g, 1500g, 2000g sand particles into the sand funnel 6 respectively for measurement, and the same steps will not be repeated here. After the measurement, the depth of the wall surface of the blind section 17 after erosion is recorded respectively.
[0058] When conducting the second measurement, first measure 15% of the hydrogen content in the mixed hydrogen gathering and transportation pipeline, close all valves, load 1000g of sand particles into the sand funnel 6, and then open the methane cylinder 1, the first booster pump 2, the first ball valve 4, the hydrogen cylinder 7, the second booster pump 8, the third ball valve 10, the fourth ball valve 11, the fifth ball valve 21, the circulation pump 22, the seventh ball valve 25, and the vent valve 26 in sequence; adjust the valve opening of the methane cylinder 1 to 17 / 20 of full open, and the valve opening of the hydrogen cylinder 7 to 3 / 20 of full open. The methane gas in the methane cylinder 1 is pressurized by the first booster pump 2, and the first gas flowmeter 3 is measured and the hydrogen in the hydrogen cylinder 7 is pressurized by the second booster pump 8. After the second gas flowmeter 9 measures, the methane and hydrogen gas mixture flows from the blind tee inlet 12 into the blind tee 16, and flows from right to left in the blind tee 16, enters the blind section 17, flows downward to the outlet section 18 after passing through the blind section 17, and finally flows out from the blind tee outlet 20, and after being pressurized by the circulating pump 22, enters the sand buffer 27, and then flows out from the vent valve 26. When the methane and hydrogen gas mixture flows out of the vent valve 26, the seventh ball valve 25 is immediately closed, and the sixth ball valve 24 is opened, and the air in the pipeline is driven out at this time. After opening the sixth ball valve 24, open the second ball valve 5 at the same time, and let 1000g of sand particles in the sand funnel 6 flow into the pipeline. Immediately after the flow is completed, close the methane cylinder 1, the first booster pump 2, the hydrogen cylinder 7, the first ball valve 4, the second booster pump 8, and the third ball valve 10 in sequence, adjust the circulation pump 22 to the specified displacement, and start timing for 24 hours. 1000g of the mixture of sand particles, methane and hydrogen are together formed into a circulation loop by the fourth ball valve 11, the blind tee inlet 12, the blind tee outlet 20, the fifth ball valve 21, the circulation pump 22 and the sixth ball valve 24 under the action of the circulation pump 22. The mixture of sand particles, methane and hydrogen continuously erodes the blind section 17 during the circulation process. After 24 hours, the circulation pump 22 and the sixth ball valve 24 are closed in turn, and the seventh ball valve 25 is opened. The mixture of sand particles, methane and hydrogen enters the sand buffer 27 together. The sand particles impact the 45° elliptical sand retaining block (sand retaining block 29) to reduce kinetic energy, and methane and hydrogen gas flow out from the vent valve 26. Then, it is disassembled through the detachable joint 13 to measure the depth of the wall surface of the blind section 17 after erosion. The monitoring system 23 records the pressure change of the blind tee 16 within 24 hours through the first pressure sensor 14 and the second pressure sensor 19. Replace the new blind tee 16, repeat the above steps, keep the 1000g sand particles in the sand funnel 6 unchanged, adjust the opening of the methane cylinder 1 and the hydrogen cylinder 7 according to the hydrogen content of 30% and 45% respectively, and measure. The same steps are not repeated here. After the measurement, record the depth of the wall surface of the blind section 17 after erosion.
[0059] like Figure 3 The figure shows the relationship between different sand contents in the gathering and transportation pipeline and the erosion depth of the blind section. Figure 3In the figure, the horizontal axis is the sand content in the gathering and transportation pipeline, in g, and the vertical axis is the erosion depth of the blind section, in mm. It can be seen from the figure that as the sand content in the gathering and transportation pipeline increases, the erosion depth of the blind section generally shows a trend of gradual increase, and the slope is the largest when the sand content is 500g-1000g; when the sand content is 2000g, the maximum erosion depth of the blind section reaches 0.26mm.
[0060] like Figure 4 The figure shows the relationship between different hydrogen contents in the mixed hydrogen gathering and transportation pipeline and the erosion depth of the blind section. Figure 4 In the figure, the horizontal axis is the hydrogen content in the mixed hydrogen gathering and transportation pipeline, in percentage, and the vertical axis is the erosion depth of the blind section, in mm. It can be seen from the figure that as the hydrogen content in the mixed hydrogen gathering and transportation pipeline increases, the erosion depth of the blind section generally shows a trend of gradually decreasing. The reason is that the increase in hydrogen content leads to a decrease in the weight of the mixture of sand particles, methane gas and hydrogen, which reduces the impact on the blind tee, resulting in a decrease in the erosion depth of the blind section. When the hydrogen content in the mixed hydrogen gathering and transportation pipeline is 45%, the erosion depth of the blind section is the smallest, which is 0.1mm.
[0061] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solution deviate from the scope of the technical solution of the embodiments of the utility model.
Claims
1. A device for measuring the effect of impure natural gas on the erosion of blind tee, It is characterized in that include: A methane gas cylinder (1), a first booster pump (2), a first ball valve (4), a second ball valve (5), a sand funnel (6), a hydrogen gas cylinder (7), a second booster pump (8), a third ball valve (10), a fourth ball valve (11), a blind three-way inlet (12), a blind three-way (16), a blind three-way outlet (20), a fifth ball valve (21), a circulation pump (22), a sixth ball valve (24), a seventh ball valve (25), a vent valve (26), a sand buffer (27), and a sand collection bucket (28). The methane gas cylinder (1) is connected to the first booster pump (2) through a pipeline, the first booster pump (2) is connected to the first ball valve (4) through a pipeline, the sand funnel (6) is connected to the second ball valve (5) through a pipeline, the hydrogen gas cylinder (7) is connected to the second booster pump (8) through a pipeline, and the second booster pump (8) is connected to the The third ball valve (10) is connected to the blind three-way valve (16), the blind three-way valve (16) is respectively connected to the blind three-way valve inlet (12) and the blind three-way valve outlet (20), the blind three-way valve outlet (20) is connected to the fifth ball valve (21) through a pipeline, the fifth ball valve (21) is connected to the circulation pump (22) through a pipeline, the circulation pump (22) is respectively connected to the sixth ball valve (24) and the seventh ball valve (25) through pipelines, the seventh ball valve (25) is connected to the sand buffer (27) through a pipeline, the sand buffer (27) is respectively connected to the vent valve (26) and the sand collecting bucket (28), the first ball valve (4), the second ball valve (5), the third ball valve (10), the blind three-way valve inlet (12), and the sixth ball valve (24) are all connected to the fourth ball valve (11) through pipelines.
2. A device for measuring the effect of impure natural gas on blind tee erosion according to claim 1, It is characterized in that A first gas flow meter (3) is provided on the pipeline between the first booster pump (2) and the first ball valve (4), and a second gas flow meter (9) is provided on the pipeline between the second booster pump (8) and the third ball valve (10).
3. A device for measuring the effect of impure natural gas on blind tee erosion according to claim 1, It is characterized in that The blind tee (16) is connected to the blind tee inlet (12) and the blind tee outlet (20) respectively through a detachable joint (13).
4. A device for measuring the effect of impure natural gas on blind tee erosion according to claim 1, It is characterized in that The blind tee (16) comprises: an inlet section (15), a blind section (17), and an outlet section (18); the inlet section (15) is connected to the outlet section (18); the inlet section (15) and the outlet section (18) are perpendicular to each other; the blind section (17) is located at the connection position between the inlet section (15) and the outlet section (18); the blind section (17) and the inlet section (15) are coaxially arranged; the inlet section (15) is connected to the inlet (12) of the blind tee; and the outlet section (18) is connected to the outlet (20) of the blind tee.
5. A device for measuring the effect of impure natural gas on blind tee erosion according to claim 4, It is characterized in that The inlet section (15) is installed with a first pressure sensor (14), the outlet section (18) is installed with a second pressure sensor (19), and the first pressure sensor (14) and the second pressure sensor (19) are both connected to a monitoring system (23).
6. A device for measuring the effect of impure natural gas on blind tee erosion according to claim 4, It is characterized in that The length of the blind section (17) is 60 mm, the diameter of the blind tee (16) is 244.5 mm, the material of the blind tee (16) is N80 steel, the length of the inlet section (15) is 1500 mm, and the length of the outlet section (18) is 1500 mm.
7. A device for measuring the effect of impure natural gas on blind tee erosion according to claim 1, It is characterized in that The sand buffer (27) is provided with a sand retaining block (29).
8. A device for measuring the effect of impure natural gas on blind tee erosion according to claim 7, It is characterized in that The sand retaining block (29) is a 45° elliptical sand retaining block.
9. The device for measuring the effect of impure natural gas on blind tee erosion according to claim 1, It is characterized in that The methane gas cylinder (1) is provided with methane, the sand funnel (6) is provided with sand, the sand particle size is 3 mm, and the hydrogen gas cylinder (7) is provided with hydrogen.