Eagle beak type funnel for cast-in-place sleeve shoe pouring
By setting up an eagle-beak funnel between the support block and the track bed in the railway tunnel, efficient casting of elastic shoe covers is achieved, and the problem of cumbersome deformation and maintenance of shoe covers is solved, construction efficiency and safety are improved, and application is strong. Cost economy.
Patent Information
- Application Number
- CN202323472011.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2033-12-19
AI Technical Summary
In railway tunnels, elastically supported block ball-free track boots are prone to deformation and cracking during operation, resulting in reduced vibration damping effect and cumbersome maintenance process, making it difficult to quickly and safely replace and repair within limited sunroof time , affects the safety and operational efficiency of the track structure.
The cast-in-place shoe filling is carried out in the cavity between the support block and the track bed by using an eagle-beak funnel and the eagle-beak diversion channel to achieve efficient casting of shoe materials, simplifying the construction process and reducing the number of equipment , improve construction efficiency.
The construction organization is optimized, the construction process is simplified, the construction efficiency is improved, the process connection and the number of equipment is reduced, and the rapid and safe replacement and repair within the sunroof time is achieved, ensuring the safety and operational efficiency of the track structure.
Smart Images

Figure CN222100515U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building components, in particular to an eagle-beak funnel for pouring cast-in-place boots. Background Art
[0002] Ballastless tracks are widely used in passenger and freight railway tunnels in my country, including elastic support block type, double block type, long sleeper embedded type and plate type. In addition, ballastless track structures are used in subway construction in major cities to ease traffic pressure in cities. The track structure in the tunnel is inconvenient to maintain and repair. Considering the reduction of maintenance and repair workload in the tunnel and the improvement of line smoothness, it is suitable to lay ballastless tracks with less maintenance and repair in long tunnels. Generally, elastic support block ballastless tracks are used in tunnels with a length of more than 1km on ordinary passenger and freight railways. This structure is safe and reliable, with good vibration reduction performance and better maintainability than other types of ballastless tracks. Elastic support block cast-in-place concrete ballast bed is a ballastless track structure set up in special areas. It consists of concrete ballast bed, prefabricated elastic boots and pads, prefabricated support blocks, fasteners and rails from bottom to top. Prefabricated elastic boots, pads and support blocks are key structures that connect the upper and lower parts and undertake vibration reduction, force transmission and other functions. However, during the service life of the track structure, it is subjected to the influence of train cyclic dynamic loads, temperature loads, and rain erosion. The elastic boots are deformed, cracked, and damaged. The vibration impact is enhanced under the train load, resulting in a reduction or loss of the excellent vibration reduction effect, and causing track unevenness and varying degrees of damage to the roadbed. It is necessary to ensure the safety of the track structure by replacing the elastic support blocks.
[0003] Since maintenance work can only be carried out on operating railway lines during the window time, the window time is limited (generally only 3-4 hours), and due to the limited conditions for accessing the railway, it is only possible to access the railway through small access doors, and large equipment cannot be put into operation; in addition, the tunnel is long, and to reach the track maintenance work site, only one end of the tunnel can be entered and exited. In addition, there are many toolings, which will result in a lot of time being wasted on going back and forth to the work site and moving various toolings up and down, which will affect the efficiency of maintenance and repair work on the operating railway. When replacing the overshoes using the cast-in-place method, the ballast bed is polluted, and the ballast bed needs to be polished and cleaned later, which increases the workload. Therefore, how to quickly and safely replace and repair damaged overshoes of elastic support blocks during the window time is a problem that needs to be solved urgently in this field.
[0004] In the prior art, the paper "Research and Practice on Replacing Elastic Support Blocks in Urban Rail" removes and replaces the damaged elastic support blocks as a whole, but is unable to repair the gap between the overshoe and the track bed concrete.
[0005] The papers "Research on the Correction Scheme for Excessive Bottom Slope of Elastic Support Block Ballastless Track in Tunnels" and "Damage Analysis and Correction of Elastic Support Block Ballastless Track on Passenger and Freight Railways" will remove and replace the damaged elastic support blocks as a whole, and inject high-strength mortar or high-strength resin into the gap between the overshoes and the ballast bed concrete for repair. There are many processes within the window time, and the gap between the cut overshoes and the ballast bed plate is small, making it difficult to fill it fully with high-strength mortar or high-strength resin to ensure quality.
[0006] The invention patent "A method for repairing failure of rubber overboots CN201510631495.2" is to remove and replace the damaged elastic support block as a whole, first apply epoxy resin on the support block and the ballast concrete surface, and then glue the overboot to the ballast concrete and the support block through the epoxy resin layer to repair the gap. However, for larger gaps, this method may cause damage and deformation of the overboot or easily cause gaps. Utility Model Content
[0007] In view of the above problems, the utility model provides an eagle-beak funnel for pouring cast-in-place boots. By arranging the eagle-beak funnel in the cavity between the supporting block and the ballast bed, the cast-in-place boot material can flow into the eagle-beak guide groove through the inverted trapezoidal funnel, and be injected into the cavity from the flat injection port at the bottom to realize the casting of the boot. The construction organization can be optimized, the construction process can be simplified and concentrated in one skylight, thereby reducing the connection between the processes and the number of tools and equipment on the track, and the construction efficiency is improved. The device is practical, reliable, cost-effective, highly applicable, and can be used sustainably.
[0008] To achieve the above-mentioned purpose, the utility model provides an eagle-beak funnel for cast-in-place boot pouring, comprising: an inverted trapezoidal funnel, an eagle-beak guide groove and a placement connecting piece;
[0009] The inverted trapezoidal funnel adopts an inverted trapezoidal structure with a larger opening at the top and a smaller opening at the bottom, and the eagle-beak-shaped guide groove adopts a transverse prism structure with a larger opening at the top and a smaller opening at the bottom and an eagle-beak-shaped cross section, and the lower opening of the inverted trapezoidal funnel is connected to the upper opening of the eagle-beak-shaped guide groove;
[0010] The placement connecting piece is connected between the two connected groups of the inverted trapezoidal funnels and the hawk-beak-type guide grooves, and the two groups of the inverted trapezoidal funnels and the hawk-beak-type guide grooves are respectively hung on both sides of the rail by the placement connecting piece;
[0011] The bottom flat injection port of the eagle-beak type guide groove is an eagle-beak type curved structure, and the eagle-beak type guide grooves on both sides of the rail extend into the cavity between the support block and the ballast bed respectively.
[0012] In the above technical solution, preferably, the bottom flat injection ports of the two groups of eagle-beak-type guide grooves are bent and inclined toward the same side.
[0013] In the above technical solution, preferably, the outer width of the bottom flat injection port of the eagle-beak type guide groove is less than 7 mm, and the inner width is 5 mm.
[0014] In the above technical solution, preferably, the lower opening of the inverted trapezoidal funnel is 2 to 3 mm narrower than the upper opening of the eagle-beak type guide groove.
[0015] In the above technical solution, preferably, the width of the placement connecting piece is not less than 50 mm and the thickness is greater than 2 mm, and the middle part of the placement connecting piece is provided with the same curved shape as the top of the rail.
[0016] In the above technical solution, preferably, the placement connecting plate is made of a steel sheet or a hard structural sheet.
[0017] Compared with the prior art, the utility model has the following beneficial effects: by arranging an eagle-beak funnel in the cavity between the supporting block and the ballast bed, the cast-in-place boot material can flow into the eagle-beak guide groove through the inverted trapezoidal funnel, and be injected into the cavity from the flat injection port at the bottom to realize the casting of the boot, thereby optimizing the construction organization, simplifying and concentrating the construction process in one skylight, thereby reducing the process connection and the number of on-track tools, improving the construction efficiency, and the device is practical, reliable, cost-effective, highly applicable, and can be used sustainably. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural schematic diagram of an eagle-beak funnel for pouring cast-in-place boots disclosed in an embodiment of the utility model;
[0019] Figure 2 The utility model is a schematic diagram of an application method of an eagle-beak funnel for pouring cast-in-place boots disclosed in an embodiment.
[0020] In the figure, the corresponding relationship between each component and the reference numeral is as follows:
[0021] 1. Support block, 2. Ballast bed, 3-1. Eagle-beak guide trough, 3-2. Placement connecting piece, 3-3. Inverted trapezoidal funnel. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] The utility model is further described in detail below in conjunction with the accompanying drawings:
[0024] like Figure 1 and Figure 2 As shown, a hawk-beak funnel for cast-in-place boot pouring provided by the utility model comprises: an inverted trapezoidal funnel 3-3, a hawk-beak guide groove 3-1 and a placement connecting piece 3-2;
[0025] The inverted trapezoidal funnel 3-3 adopts an inverted trapezoidal structure with a larger opening at the top and a smaller opening at the bottom, and the eagle-beak-shaped guide groove 3-1 adopts a horizontal prism structure with a larger opening at the top and a smaller opening at the bottom and an eagle-beak-shaped cross section, and the lower opening of the inverted trapezoidal funnel 3-3 is connected to the upper opening of the eagle-beak-shaped guide groove 3-1;
[0026] The connecting piece 3-2 is connected between the two connected groups of inverted trapezoidal funnels 3-3 and the hawk-beak type guide trough 3-1, and the two groups of inverted trapezoidal funnels 3-3 and the hawk-beak type guide trough 3-1 are respectively hung on both sides of the rail by the connecting piece 3-2;
[0027] The bottom flat injection port of the eagle-beak type guide groove 3 - 1 is an eagle-beak type curved structure, and the eagle-beak type guide grooves 3 - 1 on both sides of the rail extend into the cavity between the support block 1 and the ballast bed 2 respectively.
[0028] In this embodiment, by setting an eagle-beak funnel in the cavity between the support block 1 and the ballast bed 2, the cast-in-place boot material can flow into the eagle-beak guide groove 3-1 through the inverted trapezoidal funnel 3-3, and be injected into the cavity from the flat injection port at the bottom to realize the casting of the boot, thereby optimizing the construction organization, simplifying and concentrating the construction process in a skylight, thereby reducing the process connection and the number of on-track tools, improving the construction efficiency, and the device is practical, reliable, cost-effective, highly applicable, and can be used sustainably.
[0029] Specifically, during the implementation process, the method of using the hawkbill funnel for the above-mentioned cast-in-place boot pouring is: drop the rail and support block 1 into place → install fasteners and fine-tune the rail → place hawkbill funnels on both sides of the support block 1 → pour liquid boot material → remove the hawkbill funnel → restore the line.
[0030] During the implementation process, after the rails are in place, a built-in cavity is formed between the support block 1 and the concrete surface of the ballast bed 2. The hawk-beak funnel is used to ensure that when the cast-in-place boot material is poured, the boot material smoothly enters the cavity between the support block 1 and the ballast bed 2 along the inclined surface of the funnel wall and the hawk-beak injection port, and forms an edge boss of a certain size on the surface of the ballast bed 2. After the boot under one support block 1 is poured, the hawk-beak funnel is moved along the rail to the position of the next support block 1 by placing the connecting piece 3-2 for pouring.
[0031] In the above embodiment, preferably, the bottom flat injection ports of the two groups of hawk-beak guide grooves 3-1 are bent and inclined to the same side, so that when the hawk-beak funnels on both sides of the rail pour the boot material into the cavity, the hawk-beak funnels on both sides can pour the boot material into both sides of the cavity at the same time.
[0032] In the above embodiment, preferably, the outer width of the bottom flat injection port of the eagle-beak guide groove 3-1 is less than 7 mm, and the inner width is 5 mm, which can not only ensure the smooth infusion of the liquid boot material, but also enable the bottom flat injection port of the eagle-beak funnel to be inserted into the cavity gap between the support block 1 and the roadbed 2.
[0033] In the above embodiment, preferably, the lower opening of the inverted trapezoidal funnel 3-3 is 2 to 3 mm narrower than the upper opening of the hawk-beak type guide groove 3-1, and the inverted trapezoidal funnel 3-3 is inserted into the upper opening of the hawk-beak type guide groove 3-1 to prevent the liquid boot material from flowing out from the interface gap.
[0034] In the above embodiment, preferably, the width of the mounting connecting piece 3-2 is not less than 50 mm and the thickness is greater than 2 mm, and the middle part of the mounting connecting piece 3-2 is provided with a curved shape identical to the top of the rail. Preferably, the mounting connecting piece 3-2 is made of a steel sheet or a hard structural sheet, which not only ensures stable support for the inverted trapezoidal funnel 3-3 and the hawk-beak guide trough 3-1 on both sides, but also enables the hawk-beak funnel to slide back and forth along the rail as a whole, thereby facilitating construction.
[0035] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An eagle-beak funnel for cast-in-place overshoe pouring, characterized in that: include: Inverted trapezoidal funnel, eagle-beak-shaped guide trough and placement connecting piece; The inverted trapezoidal funnel adopts an inverted trapezoidal structure with a larger opening at the top and a smaller opening at the bottom, and the eagle-beak-shaped guide groove adopts a transverse prism structure with a larger opening at the top and a smaller opening at the bottom and an eagle-beak-shaped cross section, and the lower opening of the inverted trapezoidal funnel is connected to the upper opening of the eagle-beak-shaped guide groove; The placement connecting piece is connected between the two connected groups of the inverted trapezoidal funnels and the hawk-beak-type guide grooves, and the two groups of the inverted trapezoidal funnels and the hawk-beak-type guide grooves are respectively hung on both sides of the rail by the placement connecting piece; The bottom flat injection port of the eagle-beak type guide groove is an eagle-beak type curved structure, and the eagle-beak type guide grooves on both sides of the rail extend into the cavity between the support block and the ballast bed respectively.
2. The hawk-beak funnel for cast-in-place overshoe pouring according to claim 1, characterized in that: The bottom flat injection ports of the two groups of eagle-beak type guide grooves are bent and inclined toward the same side.
3. The hawk-billed funnel for cast-in-place overshoe pouring according to claim 1, characterized in that: The outer width of the bottom flat injection port of the eagle-beak type guide groove is less than 7 mm, and the inner width is 5 mm.
4. The hawk-billed funnel for cast-in-place overshoe pouring according to claim 1, characterized in that: The lower opening of the inverted trapezoidal funnel is 2 to 3 mm narrower than the upper opening of the eagle-beak type guide groove.
5. The hawk-billed funnel for cast-in-place overshoe pouring according to claim 1, characterized in that: The width of the placement connecting piece is not less than 50 mm and the thickness is greater than 2 mm. The middle part of the placement connecting piece is provided with the same curved shape as the top of the rail.
6. The hawk-beak funnel for cast-in-place overshoe pouring according to claim 5, characterized in that: The placement connecting piece is made of a steel sheet or a hard structural sheet.
