Bridge deck pavement structure capable of preventing water accumulation
By setting up drainage pipes and collecting pipes in the bridge deck paving structure to form an internal drainage channel, the problem of laminated water in the bridge deck paving is solved, preventing water damage and extending the service life of the bridge deck.
Patent Information
- Application Number
- CN202322846693.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-24
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2033-10-24
AI Technical Summary
The bridge deck paving layer is prone to accumulation of water during construction, resulting in water damage, and the existing technology lacks effective treatment methods.
A bridge deck paving structure was designed, including bridge deck panels, guardrails, paving layers, gravel blind ditches, drainage pipes, collecting pipes and drainage pipes, permeable asphalt concrete middle surface layer and asphalt concrete upper layer, and drainage pipes run through the bridge The panel is connected to the blind groove of the gravel, the water collection pipe extends longitudinally along the bridge deck, and the lower ends are connected to the drain pipes at intervals to form an internal drainage channel.
Effectively discharge water accumulation in the paving layer to prevent water damage, avoid the occurrence of "day shift" phenomenon, and extend the service life of the bridge deck.
Smart Images

Figure CN222100609U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge deck pavement, in particular to a bridge deck pavement structure for preventing water accumulation. Background Art
[0002] The bridge deck pavement structure is generally made of cement concrete and asphalt concrete, with a waterproof bonding layer between the pavement layers. However, in the actual construction process, due to factors such as large fluctuations in the flatness of the bridge deck cement concrete, irregular cross slopes of the bridge deck, and fluctuations in the compaction quality of the bridge deck asphalt concrete, water is easily accumulated inside the bridge deck pavement layer. The water accumulation area exists randomly, is generally small and discontinuous, and cannot be found when the temperature is dry. It can only be found after rain. Since it can only be found after construction, the area of the water accumulation area is small and discontinuous, and there is currently no mature process or simple technology to treat it. However, if it is not treated, the bridge deck pavement will produce a "white shift" phenomenon in the water accumulation area after it is completed and opened to traffic, which will seriously lead to early water damage. Summary of the invention
[0003] In view of the problems existing in the prior art, the utility model provides a bridge deck pavement structure for preventing water accumulation, which can effectively solve the problem of water accumulation inside the pavement layer and prevent water damage to the bridge pavement layer.
[0004] The technical solution adopted by the utility model is: to provide a bridge deck paving structure for preventing water accumulation, including a bridge deck, guardrails are arranged on both side edges of the bridge deck, a paving layer is arranged between the guardrails on both sides, a gravel blind ditch is arranged between the paving layer and the guardrail, the paving layer is composed of a cast-in-place cement concrete layer, an SBS modified asphalt adhesive layer, a permeable asphalt concrete middle surface layer and an asphalt concrete upper surface layer from bottom to top, a drainage pipe, a water collecting pipe and a drainage pipe are arranged at the gravel blind ditch, one end of the drainage pipe passes through the bridge deck and is connected with the gravel blind ditch, and the other end is connected with the drainage pipe, the drainage pipe is fixed under the bridge deck and extends longitudinally along the bridge deck, and a plurality of drainage pipes are connected to the lower end of the drainage pipe at intervals.
[0005] As a preferred embodiment of the present technical solution, the middle layer of the permeable asphalt concrete is 6 cm, and the upper layer of the asphalt concrete is 4 cm.
[0006] As a preferred embodiment of the present technical solution, the water collecting pipe is provided with a plurality of inspection ports at intervals, and the inspection ports are provided between two drain pipes.
[0007] As a preferred embodiment of the present technical solution, a pipe cover is provided at one end of the drain pipe communicating with the gravel blind ditch, and the pipe cover is in a grid shape.
[0008] After adopting the above structure, compared with the prior art, the water that seeps into the pavement layer in the utility model flows into the gravel blind ditch through the permeable asphalt concrete, effectively draining the accumulated water in the pavement layer, avoiding the "white shift" phenomenon in the seepage area, and preventing water damage to the bridge pavement. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 It is a structural schematic diagram of the utility model.
[0010] Figure 2 It is a schematic diagram of the connection of the drain pipe of the utility model.
[0011] Figure 3 It is a schematic diagram of the pavement layer structure of the utility model.
[0012] Figure 4 It is a schematic diagram of water pipe connection of the utility model. Implementation
[0013] The utility model is described in detail below with reference to the accompanying drawings and embodiments.
[0014] like Figure 1-4 As shown, the utility model provides a bridge deck pavement structure for preventing water accumulation, including a bridge deck 1, guardrails 2 are arranged on both side edges of the bridge deck 1, a pavement layer 3 is arranged between the guardrails 2 on both sides, the pavement layer 3 is paved on the bridge deck 1, a gravel blind ditch 4 is arranged between the side ends of the pavement layer 3 and the guardrails 2, the bridge deck 1 is a prefabricated small box beam concrete, the pavement layer 3 is composed of a cast-in-place cement concrete layer 3.1, an SBS modified asphalt adhesive layer 3.2, a permeable asphalt concrete middle surface layer 3.3 and an asphalt concrete upper surface layer 3.4 from bottom to top, the cast-in-place cement concrete layer 3.1 is a reinforced concrete layer, a drain pipe 5, a water collecting pipe 6 and a drainage pipe 7 are arranged at the gravel blind ditch 4, one end of the drain pipe 5 passes through the bridge deck 1 and is connected with the gravel blind ditch 4, and the other end is connected with the water collecting pipe 6, the water collecting pipe 6 is fixed under the bridge deck 1 and extends along the length direction of the bridge deck, and a plurality of drainage pipes 7 are connected to the lower end of the water collecting pipe 6 at intervals.
[0015] During the specific implementation of the utility model, the middle surface layer 3.3 of the permeable asphalt concrete is 6 cm, and the upper surface layer 3.4 of the asphalt concrete is 4 cm. The water collecting pipe 6 is provided with a plurality of inspection ports at intervals, and the inspection ports are provided between two drainage pipes 7. A pipe cover 4.1 is provided at one end of the drainage pipe 7 connected to the gravel blind ditch 4, and the pipe cover 4.1 is in a grid shape. The utility model is composed of the permeable asphalt mixed concrete middle surface layer 3.3, the gravel blind ditch 4, the drainage pipe 5, the water collecting pipe 6 and the drainage pipe 7, which together form the internal drainage channel of the bridge deck pavement structure, so as to achieve the purpose of removing the internal water accumulation of the bridge deck pavement as soon as possible, and prevent the accumulated water from being retained in the pavement layer 3 to cause water damage.
[0016] The above is a clear and complete description of the technical solution of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments, and cannot be understood as limitations on the utility model. For those skilled in the art, the utility model can have various changes and variations. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the utility model should be included in the protection scope of the utility model.
Claims
1. A bridge deck paving structure for preventing water accumulation, comprising a bridge deck, guardrails are arranged on both side edges of the bridge deck, a paving layer is arranged between the guardrails on both sides, and a gravel blind ditch is arranged between the paving layer and the guardrails, characterized in that: The pavement layers are, from bottom to top, cast-in-place cement concrete layer, SBS modified asphalt adhesive layer, permeable asphalt concrete middle layer and asphalt concrete upper layer. Drain pipes, water collecting pipes and drainage pipes are arranged at the gravel blind ditch. One end of the drain pipe passes through the bridge deck and is connected with the gravel blind ditch, and the other end is connected with the water collecting pipe. The water collecting pipe is fixed under the bridge deck and extends longitudinally along the bridge deck. A plurality of drainage pipes are connected to the lower end of the water collecting pipe at intervals.
2. The bridge deck pavement structure for preventing water accumulation according to claim 1 is characterized in that: The middle layer of the permeable asphalt concrete is 6 cm thick, and the upper layer of the asphalt concrete is 4 cm thick.
3. The bridge deck pavement structure for preventing water accumulation according to claim 1 is characterized in that: The water collecting pipe is provided with a plurality of inspection ports at intervals, and the inspection ports are arranged between two drainage pipes.
4. The bridge deck pavement structure for preventing water accumulation according to claim 1 is characterized in that: A pipe cover is arranged at one end of the drain pipe communicating with the gravel blind ditch, and the pipe cover is in a grid shape.