Slurry filling type slurry stopping bag for treating anchor cable slurry leakage caused by cut slope cracks

By designing a filling slurry-reducing bag, using non-woven or permeable canvas materials and steel stranded wire structures, the slurry leakage problem caused by slope cracks in anchor cable construction is solved, the construction cost is reduced and the slope is strengthened is ensured. Effect.

CN222100833UActive Publication Date: 2024-12-03SINOHYDRO HARBOR CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202420100425.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-16
Publication Date
2024-12-03
Estimated Expiration
2034-01-16

AI Technical Summary

Technical Problem

During the construction of anchor cable, slurry leakage caused by road cutting slope cracks, which increased construction costs and the inability to effectively reinforce the slope.

Method used

A slurry-filled slurry bag is designed, including the first and second slurry-reducing heads, slurry-reducing bag body and cable ties. The slurry-reducing bag body is arranged outside the slurry-reducing head, tied by a cable ties, and provided with a through-passing The slurry filling tube of the slurry stop head is made of non-woven fabric or permeable canvas. It is equipped with steel strands, grouting tubes and slurry return tubes inside to prevent slurry from leaking during grouting.

Benefits of technology

It has achieved the reduction of construction costs, avoided waste of slurry, ensured slope reinforcement effect, low material cost, simple operation, and no complex mechanical equipment required, effectively solved the problem of slurry leakage and reduced construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222100833U_ABST
    Figure CN222100833U_ABST
Patent Text Reader

Abstract

The utility model discloses a slurry filling type slurry stopping bag for treating anchor cable slurry leakage caused by cut slope cracks, and relates to the related technical field of anchor cable construction. A second grout stop head; and a grout stopping bag body. Wherein the first grout stopping head and the second grout stopping head are located at openings in the left end and the right end of the grout stopping bag body respectively, the first grout stopping head and the second grout stopping head are sleeved with the grout stopping bag body, and the left end and the right end of the grout stopping bag body are bound with the first grout stopping head or the second grout stopping head through binding belts; a grout stopping bag filling pipe penetrating through the first grout stopping head is further arranged in the grout stopping bag. According to the utility model, the cost is saved, the construction period is shortened, a predetermined effect on slope support is achieved, and the problems that the slope cannot be filled with grout, the grout is wasted and the cost is increased due to cracks of the slope and grout leakage in the grouting process are solved; and meanwhile, the problem that the slope reinforcing effect cannot be achieved if the anchoring effect is not good is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field related to anchor cable construction, in particular to a grout-filling stopper bag for treating anchor cable grout leakage caused by cracks on the side slope of a road cut. Background Art

[0002] The anchor cable is a prestressed steel strand that passes through the sliding surface of the slope with its outer end fixed to the slope surface and the other end anchored in the stable rock mass within the sliding surface. It directly generates anti-sliding resistance on the sliding surface, increases the anti-sliding friction resistance, and puts the structural surface in a compressed state to improve the integrity of the slope rock mass, thereby fundamentally improving the mechanical properties of the rock mass, effectively controlling the displacement of the rock mass, and promoting its stability, so as to achieve the purpose of regulating bedding, landslides, and dangerous rocks and stones.

[0003] In the existing technology, the comprehensive unit price of anchor cable from drilling to grouting is about 230 yuan / m, so the cost of a single hole with a depth of 30 meters is as high as 6,900 yuan, of which the unit price of grout is about 770 yuan / m 3 Therefore, once leakage occurs during the grouting process, it is unknown how much slurry can be injected to fill the grouting space, and the grouting volume exceeding the designed volume is often not included in the comprehensive unit price, which increases the construction cost. Therefore, it is urgent to design a grout-filled stop bag that can deal with the leakage of anchor cables caused by cracks in the road cut slope to solve the above problem. Utility Model Content

[0004] The utility model aims to provide a grout-filled grout-stopping bag for treating anchor cable grout leakage caused by cracks in the road cutting slope, so as to solve the problems raised in the above-mentioned background technology.

[0005] In order to achieve the above utility model purpose, the utility model adopts the following technical solutions:

[0006] The utility model provides a grout-filling stopper bag for treating anchor cable grout leakage caused by cracks in the road cutting slope, comprising:

[0007] The first stopper;

[0008] The second stopper;

[0009] and a slurry stop bag body;

[0010] Wherein, the first stop slurry head and the second stop slurry head are respectively located at the left and right openings of the stop slurry bag body, the stop slurry bag body is sleeved outside the first stop slurry head and the second stop slurry head, and the left and right ends of the stop slurry bag body are tied to the first stop slurry head or the second stop slurry head through a cable tie;

[0011] The interior of the slurry stopping bag is also provided with a slurry stopping bag filling pipe which passes through the first slurry stopping head.

[0012] Preferably, the first stopper and the second stopper are both hard PVC tubes with a diameter of φ90 mm, and the lengths of the first stopper and the second stopper are both 10-20 cm, and the distance between the first stopper and the second stopper is 20 cm.

[0013] Preferably, the material of the slurry-stopping bag body is non-woven fabric or water-permeable canvas, and the length of the slurry-stopping bag body is 50 cm.

[0014] Preferably, the diameter of the grout-stopping bag body is larger than the diameter of the anchor cable drilling hole.

[0015] Preferably, the first grout stopper and the second grout stopper are further provided with steel strands, grouting pipes and grout return pipes.

[0016] Compared with the prior art, one or more of the above technical solutions have the following beneficial effects:

[0017] 1. The utility model is simple to manufacture, low in cost, and convenient to obtain local materials. At the same time, the on-site operation is simple and does not require the aid of complex mechanical equipment, making it easy to implement.

[0018] 2. The utility model not only saves costs and construction period, but also achieves the expected effect on slope support, avoiding the problem of failure to fill the grout, slurry waste and cost increase caused by slurry leakage during grouting due to cracks in the slope; it also avoids the problem of failure to achieve slope reinforcement effect due to poor anchoring effect.

[0019] 3. In the existing technology, the comprehensive unit price of a prestressed anchor cable from drilling to grouting in a certain project is 230 yuan / m, and the cost of a single hole with a depth of 30 meters is as high as 6,900 yuan, of which the unit price of grout is 770 yuan / m 3 Therefore, once leakage occurs during the grouting process, it is unknown how much slurry can be injected to fill the space, and the grouting amount exceeding the design amount is often not included in the comprehensive unit price, which increases the construction cost. The material and labor costs of a grout-stop bag in the utility model are about 50 yuan in total, which has a high cost-effectiveness and effectively saves construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.

[0021] In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0022] Figure 1 It is a schematic diagram of the overall structure of the slurry-stopping bag of the utility model;

[0023] Figure 2 It is an exploded view of the slurry-stopping bag of the utility model;

[0024] Figure 3 It is a cross-sectional view of the slurry-stopping bag of the utility model;

[0025] Figure 4 This utility model Figure 2 The enlarged view of point A in the middle;

[0026] Figure 5 This is a schematic diagram of the installation position of the slurry stop bag of the utility model;

[0027] In the figure:

[0028] 1. The first grout stopper; 2. The grout stopper bag body; 3. The second grout stopper; 4. Cable tie; 5. Grout stopper bag filling pipe; 6. Steel strand; 7. Grouting pipe; 8. Grout return pipe. DETAILED DESCRIPTION

[0029] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0030] See also Figure 1-Figure 5 , a grout-filling stopper bag for treating anchor cable grout leakage caused by cracks in the road cutting slope, comprising:

[0031] The first stopper 1;

[0032] The second stopper 3;

[0033] and a slurry-stopping bag body 2;

[0034] The first stop mortar head 1 and the second stop mortar head 3 are respectively located at the left and right openings of the stop mortar bag body 2, the stop mortar bag body 2 is sleeved on the outside of the first stop mortar head 1 and the second stop mortar head 3, and the left and right ends of the stop mortar bag body 2 are tied to the first stop mortar head 1 or the second stop mortar head 3 through the cable tie 4;

[0035] A slurry-stop bag filling pipe 5 penetrating through the first slurry-stop head 1 is also provided inside the slurry-stop bag.

[0036] Furthermore, the first stopper 1 and the second stopper 3 are both hard PVC tubes with a diameter of φ90 mm, and the lengths of the first stopper 1 and the second stopper 3 are both 10-20 cm, and the distance between the first stopper 1 and the second stopper 3 is 20 cm.

[0037] Furthermore, the material of the slurry-stopping bag body 2 is non-woven fabric or water-permeable canvas, and the length of the slurry-stopping bag body 2 is 50 cm. Specifically, the slurry-stopping bag body 2 is made of a dense, relatively soft, and tough water-permeable and non-slurry-permeable cloth material. The slurry-stopping bag body 2 is sewn into a straight cylindrical shape with openings at both ends so that the first slurry-stopping head 1 and the second slurry-stopping head 3 can be embedded in the two ends.

[0038] Furthermore, steel strands 6 , grouting pipes 7 and grout return pipes 8 are also provided inside the first grout stopper 1 and the second grout stopper 3 .

[0039] When installing the first grout stopper 1 and the second grout stopper 3, firstly pass the steel strand 6, the grouting pipe 7 and the grout return pipe 8 through the first grout stopper 1 and the second grout stopper 3. After passing through, the first grout stopper 1 and the second grout stopper 3 are filled with 1:2 cement mortar. The cement mortar is filled manually. Considering that the gap between the steel strands 6 is very small, fine sand is preferably used to ensure that the filling is dense and has no pores. At the same time, an accelerating setting agent and an expanding agent can be added to the cement mortar to increase the setting speed of the cement slurry and the compactness of the grout stopper.

[0040] When the cement mortar in the first grouting head 1 and the second grouting head 3 is completely solidified and there is no gap on the surface, the grouting bag body 2 is put on the grouting head, and the openings at both ends are manually folded into pleats, and then tied firmly with cable ties 4. To ensure firmness, more cable ties 4 can be appropriately added for bundling. At the same time, in order to prevent the grouting bag body 2 from being damaged by friction with sharp rocks in the anchor hole, it is best to use a double-layer grouting bag to complete the installation of the entire grouting bag.

[0041] Further, please refer to the specific use of the slurry stop bag as a whole Figure 5After the slope is excavated to the designed position, a skilled worker operates a rock drill to drill a hole on the slope. During the drilling process, attention is always paid to the changes in the drill rod footage. The position of the sliding surface or broken zone in the geological survey report and the design drawings is verified according to the sudden change in the drill rod speed and the empty drilling situation. If the verification is correct, the anchor cable with a grouting bag is inserted after the drilling is completed. The grouting bag is fixed at the boundary between the anchoring section and the free section of the anchor cable. When grouting, the grouting bag filling pipe 5 is first used to grout the interior of the grouting bag body 2 (the grouting bag filling pipe 5 is located inside the first grouting head 1, so the first grouting head 1 should be connected to the free section of the anchor cable). Under the action of the grouting pressure, the slurry first fills the grouting bag body 2, causing it to expand rapidly until the bag is dense, preventing the slurry of the next anchoring section from flowing into the crack, and finally achieving the purpose of grouting; the slurry of the anchoring section continues to be injected through the grouting pipe 7 under the action of the grouting pressure until the grouting operation is completed.

[0042] In addition, in order to achieve the purpose of stopping grouting after the expansion of the grout-stopping bag body 2, the expanded diameter of the grout-stopping bag body 2 should be slightly larger than the diameter of the anchor cable drilling hole. For example, if the diameter of the anchor cable drilling hole is 150 mm, the diameter of the grout-stopping bag should not be less than 180 mm.

[0043] If during the drilling process, it is found that the position of the sliding surface or broken zone is obviously inconsistent with the geological survey description or design drawings, or the grouting bag does not work during grouting, geological radar and other survey equipment can be used to conduct additional surveys on the geological conditions of the working face, reconfirm the sliding surface or broken zone, redesign the anchor cable length and anchoring section, and then use the above method for grouting.

[0044] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A grout-filled stopper bag for treating anchor cable grout leakage caused by cracks in the road cutting slope, characterized in that: include: A first stopper (1); A second stopper (3); and a slurry-stopping bag body (2); The first stop slurry head (1) and the second stop slurry head (3) are respectively located at the left and right openings of the stop slurry bag body (2); the stop slurry bag body (2) is sleeved on the outside of the first stop slurry head (1) and the second stop slurry head (3); and the left and right ends of the stop slurry bag body (2) are tied to the first stop slurry head (1) or the second stop slurry head (3) through a cable tie (4); The interior of the slurry stopping bag is also provided with a slurry stopping bag filling pipe (5) which passes through the first slurry stopping head (1).

2. The grout-filling stopper bag for treating anchor cable grout leakage caused by cracks in the road cutting slope according to claim 1 is characterized in that: The first stopper (1) and the second stopper (3) are both hard PVC tubes with a diameter of φ90 mm, and the lengths of the first stopper (1) and the second stopper (3) are both 10-20 cm, and the distance between the first stopper (1) and the second stopper (3) is 20 cm.

3. The grout-filling stopper bag for treating anchor cable grout leakage caused by cracks in the road cutting slope according to claim 1 is characterized in that: The material of the slurry-stopping bag body (2) is non-woven fabric or water-permeable canvas, and the length of the slurry-stopping bag body (2) is 50 cm.

4. The grout-filling stopper bag for treating anchor cable grout leakage caused by cracks in the road cutting slope according to claim 1 is characterized in that: The diameter of the grout-stopping bag body (2) is larger than the diameter of the anchor cable drilling hole.

5. The grout-filling stopper bag for treating anchor cable grout leakage caused by cracks in the road cutting slope according to claim 1 is characterized in that: Steel strands (6), grouting pipes (7) and grout return pipes (8) are also provided inside the first grout stop head (1) and the second grout stop head (3).

Citation Information

Cited By

  • Grouting anchor cable device and equipment

    CN121701265A

  • Anchor cable self-adaptive expansion grouting device and using method thereof

    CN122280155A

  • An anchor structure for reducing grout leakage during construction and its application method

    CN123064511A