Water conservancy construction drainage equipment
By introducing spiral drainage devices and torque motor-driven transmission systems into the water conservancy construction drainage equipment, the problems of existing equipment are solved and efficient guidance and drainage of water flow are achieved.
Patent Information
- Application Number
- CN202323589335.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2033-12-27
AI Technical Summary
Existing water conservancy construction drainage equipment is prone to blockage and inefficiency during drainage, especially when foreign objects are suctioned, the system is prone to blockage, and the limited working power of the pump machine leads to limitations in the suction volume.
A water conservancy construction drainage equipment including a drainage frame and a spiral drainage device is designed. The spiral drainage device is rotated and pumped through the spiral blades and the inner wall of the drainage barrel. The water is transported to the top layer by layer. The torque motor drives the transmission gear and gear system to improve the rotation efficiency. , achieve efficient drainage.
Through the structural design of the spiral drainage device, the drainage efficiency is improved, the problems of blockage and inefficiency are solved, and the smooth guidance and efficient drainage of the water flow are achieved.
Smart Images

Figure CN222101072U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of drainage equipment, in particular to drainage equipment for water conservancy construction. Background Art
[0002] Water conservancy projects are projects built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. Water is an indispensable and precious resource for human production and life, but its natural state does not fully meet human needs. Only by building water conservancy projects can we control water flow, prevent floods and waterlogging disasters, and regulate and distribute water to meet people's needs for water resources in life and production. In the process of water conservancy project construction, cofferdams are often required, and drainage and diversion devices are needed to discharge the water flow in the cofferdam to ensure smooth water flow;
[0003] Chinese patent number CN202222867894.7 discloses a water conservancy construction drainage equipment, including a movable support plate, a pump is installed above the movable support plate, and the input end of the pump is fixedly connected to a floating drainage component; the floating drainage component includes a suction hose fixedly connected to the input end of the pump, and one end of the suction hose is fixedly connected to a connecting pipe, the outer wall of the connecting pipe is fixedly sleeved with a first buoyancy ring and a second buoyancy ring, one end of the connecting pipe is equidistantly distributed in a circular ring with two connecting support rods, and a conical counterweight is welded to one end of the connecting support rod. Preferably, the first buoyancy ring and the second buoyancy ring are both bonded and fixed to the connecting pipe, the outer shape of the conical counterweight is set to be conical, and the conical counterweight is made of stainless steel.
[0004] From the above, it can be seen that by setting up a floating drainage component, there is no need for personnel to go into the water. After the conical counterweight block is directly thrown into the water, the bottom of the connecting pipe floats in the water under the action of the first buoyancy ring and the second buoyancy ring. In this way, the downward adjustment can be achieved to absorb water without sucking in sludge according to the water level. However, this case still has the following shortcomings: when draining, when the suction hose sucks in foreign matter, it may cause the overall drainage system to be blocked. At the same time, drainage work is carried out by a pump. Due to the limited working power of the pump, the water sucked in has certain limitations, resulting in the overall drainage work efficiency is relatively low.
[0005] Therefore, a water conservancy construction drainage equipment is proposed to address the above problems. Utility Model Content
[0006] In order to make up for the shortcomings of the prior art and the problem of relatively low drainage efficiency, the utility model proposes a water conservancy construction drainage equipment.
[0007] The technical solution adopted by the utility model to solve its technical problems is: a water conservancy construction drainage equipment described in the utility model includes a drainage frame and a spiral drainage device; the spiral drainage device is installed with a drainage cylinder, a water flow plate is fixedly installed on one side of the drainage cylinder, a spiral blade is matched with the inner wall gap of the drainage cylinder, an output shaft is penetrated and fixedly installed on one side of the spiral blade, a first fixed bearing is movably installed on one end of the output shaft, and a second fixed bearing is movably installed on the other end of the output shaft.
[0008] Preferably, the drainage frame is installed with a fixing frame, two first fixing piles are movably installed on one side of the bottom of the fixing frame, two second fixing piles are movably installed on one side of the bottom of the fixing frame, and a drainage cylinder is fixedly installed on the top of the fixing frame.
[0009] Preferably, a first fixed bearing is fixedly connected to one side of the top of the fixing frame, a second fixed bearing is fixedly connected to one side of the top of the fixing frame, a support frame is fixedly connected to one side of the fixing frame, and a torque motor is fixedly installed on the top of the support frame.
[0010] Preferably, one end of the output shaft is fixedly connected to a linkage shaft, one side of the linkage shaft passes through and is fixedly installed with a transmission gear, and one end of the linkage shaft passes through and is movably installed with a limit protection compartment.
[0011] Preferably, a transmission shaft is passed through and movably installed on one side of the limit protection bin, a torque motor is fixedly installed on one end of the transmission shaft, an output gear is passed through and fixedly installed on one end of the transmission shaft, and one side of the output gear is transmission-connected with an output gear.
[0012] Preferably, four water-proof sealing sleeves are fixedly installed around the limiting protection bin, a transmission shaft is movably installed on the inner wall of the water-proof sealing sleeve, a linkage shaft is movably installed on the inner wall of the water-proof sealing sleeve, and a support frame is fixedly connected to the bottom of the limiting protection bin.
[0013] The utility model is beneficial in that:
[0014] The utility model adopts the structural design of the spiral drainage device, and one side of the drainage tube is fully in contact with water, and then the spiral blade is driven to rotate clockwise, so that the bottom of the spiral blade is connected with the water, and the surrounding of the spiral blade cooperates with the inner wall of the drainage tube to extract water, so that the water is transported layer by layer to the top. When the water is transported to the top, it flows out through the water flow plate, realizing the function of guiding the water flow for drainage, solving the problem of low drainage efficiency, and improving the efficiency of drainage. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 It is an exploded schematic diagram of the overall structure of the utility model;
[0018] Figure 3 It is a schematic cross-sectional view of the spiral drainage device structure of the utility model;
[0019] Figure 4 For the utility model Figure 3 Schematic diagram of the structural explosion at A in the middle;
[0020] Figure 5 This is a schematic diagram of the drainage frame structure of the utility model.
[0021] In the figure: 1. drainage frame; 2. spiral drainage device; 11. first fixed pile; 12. fixed frame; 13. second fixed pile; 14. support frame; 21. drainage cylinder; 22. water flow plate; 23. first fixed bearing; 24. output shaft; 25. spiral blade; 26. second fixed bearing; 27. torque motor; 28. transmission shaft; 29. output gear; 201. transmission gear; 202. linkage shaft; 203. limit protection compartment; 204. water-proof sealing sleeve. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1-Figure 5 As shown, a water conservancy construction drainage equipment comprises a drainage frame 1 and a spiral drainage device 2; the spiral drainage device 2 is provided with a drainage cylinder 21, a water flow plate 22 is fixedly installed on one side of the drainage cylinder 21, a spiral blade 25 is fitted in the inner wall gap of the drainage cylinder 21, an output shaft 24 is passed through and fixedly installed on one side of the spiral blade 25, a first fixed bearing 23 is movably installed on one end of the output shaft 24, and a second fixed bearing 26 is movably installed on the other end of the output shaft 24;
[0024] During operation, the first fixed bearing 23 and the second fixed bearing 26 are used to ensure that the output shaft 24 can rotate continuously, and the output shaft 24 is fixedly supported. The output shaft 24 is limited to ensure that the spiral blade 25 maintains a consistent rotation trajectory on the inner wall of the drainage tube 21.
[0025] Furthermore, the drainage frame 1 is equipped with a fixing frame 12, two first fixing piles 11 are movably installed on one side of the bottom of the fixing frame 12, two second fixing piles 13 are movably installed on one side of the bottom of the fixing frame 12, and a drainage cylinder 21 is fixedly installed on the top of the fixing frame 12;
[0026] During operation, the drainage tube 21 is fixed and supported by the fixing frame 12, which is conducive to the stable operation of the drainage tube 21. The whole is fixed by the first fixing pile 11 and the second fixing pile 13. The second fixing pile 13 is fixed underwater, and the first fixing pile 11 is fixed at the drainage location, so that one side of the drainage tube 21 is fully in contact with the water, which is conducive to guiding the water flow.
[0027] Furthermore, a first fixed bearing 23 is fixedly connected to one side of the top of the fixing frame 12, a second fixed bearing 26 is fixedly connected to one side of the top of the fixing frame 12, a support frame 14 is fixedly connected to one side of the fixing frame 12, and a torque motor 27 is fixedly installed on the top of the support frame 14;
[0028] During operation, when the fixed frame 12 moves, the torque motor 27 moves together through the support frame 14, which is conducive to stable transmission of the torque motor 27. At the same time, the first fixed bearing 23 and the second fixed bearing 26 can drive the output shaft 24 and the spiral blade 25 to move synchronously with the movement of the fixed frame 12.
[0029] Furthermore, one end of the output shaft 24 is fixedly connected to a linkage shaft 202, one side of the linkage shaft 202 is penetrated and fixedly installed with a transmission gear 201, and one end of the linkage shaft 202 is penetrated and movably installed with a limited position protection compartment 203;
[0030] When working, the output shaft 24 and the linkage shaft 202 are used to facilitate the transmission of the output shaft 24 . During the transmission, the limit protection bin 203 provides limit support for the linkage shaft 202 , which is conducive to orderly operation.
[0031] Furthermore, a transmission shaft 28 is movably installed through one side of the limit protection bin 203, a torque motor 27 is fixedly installed on one end of the transmission shaft 28, an output gear 29 is traversed and fixedly installed on one end of the transmission shaft 28, and one side of the output gear 29 is transmission-connected with the output gear 29;
[0032] When working, the torque motor 27 provides power to drive the transmission shaft 28 to rotate, so that the transmission shaft 28 transmits the transmission gear 201 through the output gear 29. During the transmission process, the limit support of the limit protection bin 203 ensures that the transmission of the transmission shaft 28 to the transmission gear 201 will not be interrupted.
[0033] Furthermore, four water-proof sealing sleeves 204 are fixedly installed around the limit protection bin 203, a transmission shaft 28 is movably installed on the inner wall of the water-proof sealing sleeve 204, a linkage shaft 202 is movably installed on the inner wall of the water-proof sealing sleeve 204, and a support frame 14 is fixedly connected to the bottom of the limit protection bin 203;
[0034] During operation, the installation of the waterproof sealing sleeve 204 is beneficial to the overall drainage work, and the transported water flow cannot enter the interior of the limit protection chamber 203 through the connection between the transmission shaft 28 and the linkage shaft 202, thereby protecting the output gear 29 and the transmission gear 201 inside the limit protection chamber 203.
[0035] Working principle: The drive shaft 28 drives the output gear 29 to rotate by driving the torque motor 27. When the output gear 29 is working, it transmits the transmission gear 201, so that the transmission gear 201 drives the linkage shaft 202 and the output shaft 24 to rotate. At the same time, the spiral blades 25 fixed around the output shaft 24 will perform synchronous rotation. When the spiral blades 25 rotate clockwise, they connect with the water through the bottom and cooperate with the inner wall gap of the drainage tube 21 around them to extract water from the inner wall of the drainage tube 21, so that the water is transported layer by layer to the top. When it is transported to the top, the water flows out through the water flow plate 22. In this way, the drainage work of the water conservancy project is implemented by rotating the spiral blades 25 inside the drainage tube 21.
[0036] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.
Claims
1. A water conservancy construction drainage equipment, Features: The invention comprises a drainage frame (1) and a spiral drainage device (2); the spiral drainage device (2) is provided with a drainage cylinder (21); a water flow plate (22) is fixedly installed on one side of the drainage cylinder (21); a spiral blade (25) is fitted in the inner wall gap of the drainage cylinder (21); an output shaft (24) is passed through and fixedly installed on one side of the spiral blade (25); a first fixed bearing (23) is movably installed on one end of the output shaft (24); and a second fixed bearing (26) is movably installed on the other end of the output shaft (24).
2. A water conservancy construction drainage equipment according to claim 1, Features: The drainage frame (1) is installed with a fixing frame (12), two first fixing piles (11) are movably installed on one side of the bottom of the fixing frame (12), two second fixing piles (13) are movably installed on one side of the bottom of the fixing frame (12), and a drainage cylinder (21) is fixedly installed on the top of the fixing frame (12).
3. A water conservancy construction drainage equipment according to claim 2, Features: A first fixed bearing (23) is fixedly connected to one side of the top of the fixed frame (12), a second fixed bearing (26) is fixedly connected to one side of the top of the fixed frame (12), a support frame (14) is fixedly connected to one side of the fixed frame (12), and a torque motor (27) is fixedly mounted on the top of the support frame (14).
4. A water conservancy construction drainage equipment according to claim 1, Features: One end of the output shaft (24) is fixedly connected to a linkage shaft (202), one side of the linkage shaft (202) is penetrated by and fixedly mounted with a transmission gear (201), and one end of the linkage shaft (202) is penetrated by and movably mounted with a limit protection bin (203).
5. A water conservancy construction drainage equipment according to claim 4, Features: A transmission shaft (28) is passed through and movably mounted on one side of the position limiting protection bin (203); a torque motor (27) is fixedly mounted on one end of the transmission shaft (28); an output gear (29) is passed through and fixedly mounted on one end of the transmission shaft (28); and one side of the output gear (29) is drivingly connected to the output gear (29).
6. A water conservancy construction drainage equipment according to claim 5, Features: Four water-proof sealing sleeves (204) are fixedly installed around the limiting protection bin (203), a transmission shaft (28) is movably installed on the inner wall of the water-proof sealing sleeve (204), a linkage shaft (202) is movably installed on the inner wall of the water-proof sealing sleeve (204), and a support frame (14) is fixedly connected to the bottom of the limiting protection bin (203).