Detachable waterproof device for hoisting opening of underground comprehensive pipe gallery
By setting up a detachable drainage device at the hoisting entrance of the underground comprehensive pipeline corridor and hanging the side wall of the hoisting entrance with connectors, the waterproofing problem of the hoisting entrance when setting up the sidewalk is solved, and disassembly and reinstallation when needed is realized. Ensures smooth flow of materials and waterproof performance.
Patent Information
- Application Number
- CN202420776453.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-15
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-15
AI Technical Summary
When conditions are limited, the hoisting entrance of the underground comprehensive pipeline corridor needs to be set on the sidewalk, causing the hoisting entrance to rise above the ground, and rainwater flows into the pipeline corridor along the gaps of the cover plate, causing water accumulation and safety hazards. The existing drainage ditches are fixed to the side wall of the lifting entrance , affects use.
A detachable drainage device is designed, and the connecting piece is hung on the side wall of the hoisting port. The drainage piece is removably connected to the connecting piece, which is convenient for disassembly and reinstallation when needed, ensuring smooth flow of materials and preventing moisture from entering.
It achieves waterproofing effect without affecting the use of the hoisting port, ensures smooth flow of materials and prevents moisture from entering the pipe corridor, and improves safety and work efficiency.
Smart Images

Figure CN222101085U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of underground integrated pipe gallery, in particular to a detachable waterproof device for a hoisting port of an underground integrated pipe gallery. Background Art
[0002] The underground utility corridor is a public tunnel built underground in the city for laying municipal pipelines such as electricity, communications, water supply, drainage, and heat. It is also an important municipal infrastructure in modern cities. There are nodes such as lifting ports, air inlets, and escape ports in the underground utility corridor. The lifting port is a reserved port for sending equipment and pipes into the corridor. When no materials are transported, the lifting port is covered by a cover plate.
[0003] According to the requirements of 17GL101 "General Design and Illustration of Integrated Pipeline Gallery Project": The lifting port of the pipeline gallery should be set in the green belt. In order to prevent rainwater from flowing into the lifting port, the lifting port is usually 0.3-0.5m higher than the ground of the green belt. However, when conditions are limited, it can be set in an intensive manner in combination with road sidewalks and dividing strips, and waterproof measures should be taken at the lifting port.
[0004] When conditions are limited and the lifting port must be set on the sidewalk, the lifting port is higher than the ground, which will affect the appearance of the ground. However, if it is parallel to the ground, rainwater will flow into the corridor along the gap between the cover plates, causing water accumulation inside the corridor. In serious cases, it may cause safety hazards such as leakage. Therefore, when the lifting port is laid parallel to the sidewalk, it is particularly important to effectively take waterproof measures for the lifting port.
[0005] At present, a drainage ditch is usually arranged on the side wall of the lifting port to waterproof the lifting port. However, since the drainage ditch is generally fixed on the side wall of the lifting port, when the lifting port needs to be used, the drainage ditch will hinder the use of the lifting port and affect the work progress. Utility Model Content
[0006] The embodiment of the utility model aims to provide a detachable waterproof device for the lifting port of an underground comprehensive pipe gallery to solve the technical problems raised in the prior art.
[0007] The utility model embodiment solves its technical problems by adopting the following technical solutions:
[0008] Provided is a detachable waterproof device for the lifting port of an underground integrated pipe gallery, comprising:
[0009] A side wall of a pipe gallery hoisting opening, wherein the side wall of the pipe gallery hoisting opening is provided with a connecting piece;
[0010] A drainage ditch, wherein the drainage ditch is hung on the side wall of the pipe gallery hoisting opening through the connecting piece;
[0011] Wherein, the drainage ditch is detachably connected to the connecting piece.
[0012] In some embodiments, a nail hole is provided on the side wall of the pipe gallery hoisting port, and a hanging hole is provided on the drainage ditch. The connecting piece is passed through the hanging hole of the drainage ditch and fixed in the nail hole of the side wall of the pipe gallery hoisting port to fix the drainage ditch to the side wall of the pipe gallery hoisting port.
[0013] In some embodiments, the hanging opening is located at the upper end of the drainage ditch.
[0014] In some embodiments, the drainage ditch is provided with a plurality of hanging openings, and the side wall of the pipe gallery hoisting opening is provided with a plurality of nail openings;
[0015] The number of the nail openings is equal to the number of the hanging openings, and the spacing between two adjacent nail openings is equal to the spacing between two adjacent hanging openings.
[0016] In some embodiments, the connecting member is a hanging nail, and the hanging nail passes through the hanging opening and the nail opening in sequence and is fixed in the nail opening.
[0017] In some embodiments, the connecting member includes a fixing screw, a connecting plate, a first mounting plate and a second mounting plate, wherein one hanging nail is fixed to the first mounting plate and another hanging nail is fixed to the second mounting plate, and the first mounting plate and the second mounting plate are both detachably connected to the connecting plate.
[0018] In some embodiments, a first connecting rod and a first nut are provided on the first mounting plate, a first mounting hole is opened on the connecting plate, the first connecting rod is passed through the first mounting hole, and the first nut is sleeved on the first connecting rod and abuts against the first mounting hole.
[0019] In some embodiments, a second connecting rod and a second nut are provided on the second mounting plate, and a second mounting hole is also opened on the connecting plate, the second connecting rod is passed through the second mounting hole, and the second nut is sleeved on the second connecting rod and abuts against the second mounting hole.
[0020] In some embodiments, the drainage ditch is inclined at the side wall of the pipe gallery lifting port, and the laying slope of the drainage ditch is 5‰.
[0021] In some embodiments, the drainage ditch is made of PE material.
[0022] Compared with the prior art, the detachable waterproof device for the lifting port of the underground integrated pipe gallery provided in the embodiment of the utility model includes a side wall of the lifting port of the pipe gallery and a drainage ditch. The side wall of the lifting port of the pipe gallery is provided with a connecting piece; the drainage ditch is hung on the side wall of the lifting port of the pipe gallery through the connecting piece; wherein the drainage ditch is detachably connected to the connecting piece. By installing a detachable drainage ditch on the side wall of the lifting port of the pipe gallery, it can be easily disassembled and reconnected when necessary. When it is necessary to convey materials at the lifting port, the drainage ditch can be removed to ensure smooth flow of materials without being blocked. When materials are not being conveyed, the drainage ditch can be hung up again to ensure waterproof performance and prevent moisture from entering the pipe gallery. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] One or more embodiments are exemplarily described by the figures in the corresponding drawings, and these exemplifications do not constitute limitations on the embodiments. Elements with the same reference numerals in the drawings represent similar elements, and unless otherwise stated, the figures in the drawings do not constitute proportional limitations.
[0024] Figure 1 It is a plan view of a detachable waterproof device for the lifting port of an underground comprehensive pipe gallery provided by the utility model;
[0025] Figure 2 It is a structural schematic diagram of a detachable waterproof device for the lifting port of an underground comprehensive pipe gallery provided by the utility model;
[0026] Figure 3 It is a schematic diagram of the drainage ditch structure of the detachable waterproof device for the lifting port of the underground comprehensive pipe gallery provided by the utility model;
[0027] Figure 4 It is a structural schematic diagram of a detachable waterproof device for the lifting port of an underground integrated pipe gallery provided by another embodiment of the utility model;
[0028] Figure 5 yes Figure 4 Schematic diagram of the structure of the connecting parts.
[0029] Markings in the figure:
[0030] 100. Removable waterproof device for the lifting opening of underground integrated pipe gallery; 10. Side wall of the lifting opening of the pipe gallery; 11. Connecting piece; 111. Fixing screw; 112. Connecting plate; 113. First mounting plate; 1131. First connecting rod; 1132. First nut; 114. Second mounting plate; 1141. Second connecting rod; 1142. Second nut; 20. Drainage ditch; 21. Hanging opening. DETAILED DESCRIPTION
[0031] In order to facilitate the understanding of the utility model, the utility model is described in more detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that when an element is described as "connecting" another element, it can be directly on another element, or there can be one or more centered elements therebetween. The orientation or positional relationship indicated by the terms "upper", "lower", "left", "right", "upper end", "lower end", "top" and "bottom" used in this specification is based on the orientation or positional relationship shown in the accompanying drawings, only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0032] Unless otherwise defined, all technical and scientific terms used in this specification have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention.
[0033] Combine the following Figures 1 to 5 , the detachable waterproof device 100 for the lifting port of the underground comprehensive pipe gallery provided in the embodiment of the present application is described in detail through a specific embodiment.
[0034] Please also read Figures 1 to 5 , Figure 1 It is a plan view of a detachable waterproof device for the lifting port of an underground comprehensive pipe gallery provided by the utility model; Figure 2 It is a structural schematic diagram of a detachable waterproof device for the lifting port of an underground comprehensive pipe gallery provided by the utility model; Figure 3 It is a schematic diagram of the drainage ditch structure of the detachable waterproof device for the lifting port of the underground comprehensive pipe gallery provided by the utility model; Figure 4 It is a structural schematic diagram of a detachable waterproof device for the lifting port of an underground integrated pipe gallery provided by another embodiment of the utility model; Figure 5 yes Figure 4 Schematic diagram of the structure of the connecting parts. Figure 1 It is a structural schematic diagram of the detachable waterproof device for the lifting port of the underground comprehensive pipe gallery provided by the utility model. The detachable waterproof device 100 for the lifting port of the underground comprehensive pipe gallery provided by one embodiment of the utility model comprises a side wall 10 of the lifting port of the pipe gallery and a drainage ditch 20. The side wall 10 of the lifting port of the pipe gallery is provided with a connecting piece 11; the drainage ditch 20 is hung on the side wall 10 of the lifting port of the pipe gallery through the connecting piece 11; wherein the drainage ditch 20 is detachably connected to the connecting piece 11.
[0035] The pipe gallery hoisting opening side wall 10 refers to the side of the hoisting opening of the underground integrated pipe gallery. The connector 11 is used to connect the drainage ditch 20 so as to set the drainage ditch 20 on the pipe gallery hoisting opening side wall 10.
[0036] The drain ditch 20 is detachably connected to the connecting member 11, so that the connection between the drain ditch 20 and the connecting member 11 is detachable and can be removed or reconnected at any time.
[0037] In this embodiment, a detachable drain ditch 20 is installed on the side wall 10 of the pipe gallery hoisting port, so that it can be easily disassembled and reconnected when needed. When it is necessary to transport materials at the hoisting port, the drain ditch 20 can be removed to ensure smooth flow of materials without being blocked. When materials are not being transported, the drain ditch 20 can be hung up again to ensure waterproof performance and prevent moisture from entering the pipe gallery.
[0038] In some embodiments, a nail hole is provided on the side wall 10 of the pipe gallery hoisting port, and a hanging hole 21 is provided on the drainage ditch 20. The connecting piece 11 is passed through the hanging hole 21 of the drainage ditch 20 and fixed in the nail hole of the side wall 10 of the pipe gallery hoisting port to fix the drainage ditch 20 to the side wall 10 of the pipe gallery hoisting port.
[0039] A nail opening is provided on the side wall 10 of the pipe gallery hoisting port, and a hanging opening 21 is provided on the gutter 20. The gutter 20 is fixed to the side wall 10 of the pipe gallery hoisting port by passing the connecting piece 11 through the hanging opening 21 of the gutter 20 and fixing it in the nail opening of the side wall 10 of the pipe gallery hoisting port. Thus, the gutter 20 can be disassembled and reinstalled, which is convenient for maintenance and cleaning when necessary. Through the fixation of the connecting piece 11, the gutter 20 can be firmly installed on the side wall 10 of the pipe gallery hoisting port to ensure its stability and waterproof effect. When it needs to be disassembled, the gutter 20 can be conveniently removed by simply unfastening the fixing of the connecting piece 11. Through such a setting, the waterproof performance can be improved, and it is convenient to disassemble the gutter 20 when the hoisting port needs to be used.
[0040] In some embodiments, the hanging opening 21 is located at the upper end of the drainage ditch 20. By setting the hanging opening 21 at the upper end of the drainage ditch 20, when the drainage ditch 20 is connected to the side wall 10 of the pipe gallery hoisting opening through the hanging opening 21, the drainage ditch 20 can be located below the hoisting opening, thereby achieving drainage of the hoisting opening. Through such a setting, it is ensured that the drainage ditch 20 can effectively drain the hoisting opening.
[0041] In some embodiments, a plurality of hanging openings 21 are provided on the drainage ditch 20, and a plurality of nail openings are provided on the side wall 10 of the pipe gallery hoisting opening; the number of nail openings is equal to the number of hanging openings 21, and the spacing between two adjacent nail openings is equal to the spacing between two adjacent hanging openings 21.
[0042] The drain ditch 20 is provided with a plurality of hanging openings 21, and the side wall 10 of the pipe gallery hoisting port is provided with an equal number of nail openings. At the same time, the spacing between two adjacent nail openings is also equal to the spacing between two adjacent hanging openings 21. Through such a setting, the connection between the drain ditch 20 and the nail openings can be achieved, and the drain ditch 20 can be firmly fixed on the side wall of the hoisting port. By passing the connecting piece 11 through the corresponding positions between the hanging openings 21 of the drain ditch 20 and the nail openings of the side wall 10 of the pipe gallery hoisting port, the connection and fixation can be performed, so that the drain ditch 20 is in a stable position and can be detachably maintained and cleaned. In addition, by setting an equal number of hanging openings 21 and nail openings, and arranging them at equal spacing, the balance and symmetry between the drain ditch 20 and the pipe gallery hoisting port can be achieved, providing better structural stability and assembly.
[0043] In some embodiments, the connecting member 11 is a hanging nail, which passes through the hanging opening 21 and the nail opening in sequence and is fixed in the nail opening. The hanging nail is used to fix the drainage ditch 20 and the side wall 10 of the pipe gallery hoisting opening together. By passing the hanging nail through the hanging opening 21 and the nail opening of the drainage ditch 20 in sequence and fixing it in the nail opening, a firm connection between the drainage ditch 20 and the side wall of the hoisting opening can be achieved.
[0044] In some embodiments, the connecting member 11 includes a fixing screw 111, a connecting plate 112, a first mounting plate 113 and a second mounting plate 114, wherein one hanging nail is fixed to the first mounting plate 113, and the other hanging nail is fixed to the second mounting plate 114, and the first mounting plate 113 and the second mounting plate 114 are both detachably connected to the connecting plate 112.
[0045] The hanging nails on the first mounting plate 113 and the second mounting plate 114 can pass through the hanging opening 21 and the nail opening of the gutter 20, and are fixed in the nail opening using the fixing screws 111. The detachable connection between the connecting plate 112 and the first mounting plate 113 and the second mounting plate 114 can be easily disassembled and reinstalled. When it is necessary to convey materials at the lifting port, the first mounting plate 113 and the connecting plate 112 are disassembled, and then the hanging nails on the first mounting plate 113 can be separated from the side wall of the pipe gallery following the first mounting plate 113, or the second mounting plate 114 and the connecting plate 112 are disassembled, and then the hanging nails on the second mounting plate 114 can be separated from the gutter 20 following the second mounting plate 114. In this way, the gutter 20 can be separated from the side wall of the pipe gallery to ensure smooth flow of materials without being blocked. When materials are not being transported, the first mounting plate 113 is installed with the connecting plate 112, and the nails on the first mounting plate 113 can be connected to the side wall of the pipe gallery; or the second mounting plate 114 is installed with the connecting plate 112, and the fixings on the second mounting plate 114 can be connected to the drainage ditch 20, so that the drainage ditch 20 is connected to the side wall of the pipe gallery to prevent moisture from entering the pipe gallery.
[0046] In some embodiments, a first connecting rod 1131 and a first nut 1132 are provided on the first mounting plate 113. A first mounting hole is provided on the connecting plate 112. The first connecting rod 1131 is inserted into the first mounting hole. The first nut 1132 is sleeved on the first connecting rod 1131 and abuts against the first mounting hole. The first connecting rod 1131 is passed through the first mounting hole and fixed with the first nut 1132, so that the firmness and stability of the connection can be ensured. By tightening or loosening the first nut 1132, the first mounting plate 113 and the connecting plate 112 can be easily disassembled or reinstalled.
[0047] In some embodiments, a second connecting rod 1141 and a second nut 1142 are provided on the second mounting plate 114, and a second mounting hole is also provided on the connecting plate 112. The second connecting rod 1141 is inserted into the second mounting hole, and the second nut 1142 is sleeved on the second connecting rod 1141 and abuts against the second mounting hole. The second connecting rod 1141 is passed through the second mounting hole and fixed with the second nut 1142, so that the firmness and stability of the connection can be ensured. By tightening or loosening the second nut 1142, the second mounting plate 114 and the connecting plate 112 can be easily disassembled or reinstalled.
[0048] In some embodiments, the drain ditch 20 is inclined at the side wall 10 of the pipe gallery hoisting port, and the laying slope of the drain ditch 20 is 5‰. The drain ditch 20 is inclined at the side wall 10 of the pipe gallery hoisting port, and the laying slope of the drain ditch 20 is 5‰. This helps the water flow in the drain ditch 20 to flow smoothly and guide the water flow to the appropriate position. By setting it inclined, the drain ditch 20 can overcome the effect of gravity, so that the water flow flows in a predetermined direction, preventing water from being retained or backflowing in the pipeline, so as to ensure sufficient water flow speed to avoid water accumulation and blockage in the pipeline.
[0049] In some embodiments, the gutter 20 is made of PE material. The gutter 20 made of PE material has the characteristics of being light, durable, and having good plasticity, and is easy to install and maintain.
[0050] It should be specially noted that the detachable waterproof device 100 for the lifting port of the underground comprehensive pipe gallery provided in the embodiment of the utility model only shows the part related to the technical problem to be solved by the embodiment of the utility model. It can be understood that the detachable waterproof device 100 for the lifting port of the underground comprehensive pipe gallery provided in the embodiment of the utility model also includes other structures for realizing the functions of the detachable waterproof device 100 for the lifting port of the underground comprehensive pipe gallery, which will not be described one by one here.
[0051] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Under the idea of the present invention, the technical features in the above embodiments or different embodiments can also be combined, the steps can be implemented in any order, and there are many other changes in different aspects of the present invention as above, which are not provided in detail for the sake of simplicity. Although the present invention is described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the various embodiments of the present invention.
Claims
1. A detachable waterproof device for the lifting port of an underground comprehensive pipe gallery, characterized in that: include: A side wall of a pipe gallery hoisting opening, wherein the side wall of the pipe gallery hoisting opening is provided with a connecting piece; A drainage ditch, wherein the drainage ditch is hung on the side wall of the pipe gallery hoisting opening through the connecting piece; Wherein, the drainage ditch is detachably connected to the connecting piece.
2. The detachable waterproof device for the lifting port of the underground integrated pipe gallery according to claim 1 is characterized in that: A nail hole is arranged on the side wall of the pipe gallery hoisting opening, a hanging hole is arranged on the drainage ditch, the connecting piece is passed through the hanging hole of the drainage ditch and fixed in the nail hole of the side wall of the pipe gallery hoisting opening to fix the drainage ditch to the side wall of the pipe gallery hoisting opening.
3. The detachable waterproof device for the lifting port of the underground integrated pipe gallery according to claim 2 is characterized in that: The hanging opening is located at the upper end of the drainage ditch.
4. The detachable waterproof device for the lifting port of the underground integrated pipe gallery according to claim 3 is characterized in that: The drainage ditch is provided with a plurality of hanging openings, and the side wall of the pipe gallery hoisting opening is provided with a plurality of nail openings; The number of the nail openings is equal to the number of the hanging openings, and the spacing between two adjacent nail openings is equal to the spacing between two adjacent hanging openings.
5. The detachable waterproof device for the lifting port of the underground integrated pipe gallery according to claim 4 is characterized in that: The connecting piece is a hanging nail, which passes through the hanging opening and the nail opening in sequence and is fixed in the nail opening.
6. The detachable waterproof device for the lifting port of the underground integrated pipe gallery according to claim 1 is characterized in that: The connecting member includes a fixing screw, a connecting plate, a first mounting plate and a second mounting plate, wherein one hanging nail is fixed to the first mounting plate, and another hanging nail is fixed to the second mounting plate, and the first mounting plate and the second mounting plate are both detachably connected to the connecting plate.
7. The detachable waterproof device for the lifting port of the underground integrated pipe gallery according to claim 6 is characterized in that: A first connecting rod and a first nut are provided on the first mounting plate. A first mounting hole is opened on the connecting plate. The first connecting rod passes through the first mounting hole. The first nut is sleeved on the first connecting rod and abuts against the first mounting hole.
8. The detachable waterproof device for the lifting port of an underground comprehensive pipe gallery according to claim 6 is characterized in that: A second connecting rod and a second nut are provided on the second mounting plate. A second mounting hole is also opened on the connecting plate. The second connecting rod is passed through the second mounting hole. The second nut is sleeved on the second connecting rod and abuts against the second mounting hole.
9. The detachable waterproof device for the lifting port of an underground comprehensive pipe gallery according to claim 1 is characterized in that: The drainage ditch is inclined at the side wall of the pipe gallery hoisting port, and the laying slope of the drainage ditch is 5‰.
10. The detachable waterproof device for the lifting port of an underground comprehensive pipe gallery according to claim 1, characterized in that: The material of the drainage ditch is PE material.