Slurry pump suction port pipeline of vertical heading machine

By adding the design of the second and third fluid fittings to the suction pipe of the slurry pump, the problem of insufficient slag deposition and slag absorption is solved, the working efficiency and slag discharge capacity of the boring machine are improved, and the equipment is extended Service life.

CN222102027UActive Publication Date: 2024-12-03TIANHE MECHANICAL EQUIP MFG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420046755.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-09
Publication Date
2024-12-03
Estimated Expiration
2034-01-09

AI Technical Summary

Technical Problem

In the construction of vertical boring machines, the design of the slurry pump suction pipe leads to the deposition of slag particles and mud, which is prone to blockage and insufficient slag absorption, affecting the excavation working conditions and construction quality.

Method used

A slurry pump suction pipe including a first fluid pipe fitting, a first pipe fitting joint, a second fluid pipe fitting and a third fluid pipe fitting are designed, and extending to the inside of the cutting plate through the second fluid pipe fitting and the third fluid pipe fitting, adding The suction capacity of the slag and improves the wear resistance and stability of the pipeline through wear-resistant components and protective components.

Benefits of technology

It improves the emission efficiency of slag, reduces slag accumulation, extends the service life of the tool, and reduces the cost and construction period of tool replacement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222102027U_ABST
    Figure CN222102027U_ABST
Patent Text Reader

Abstract

The utility model provides a vertical heading machine slurry pump suction port pipeline, which is characterized in that a first fluid pipe fitting is connected with a slurry pump suction port, a first end of a first pipe fitting joint is connected with the first fluid pipe fitting, a second end of the first pipe fitting joint is used as a cutter head upper side slag suction port, a second fluid pipe fitting is connected with a third end of the first pipe fitting joint, and a third end of the second pipe fitting joint is used as a cutter head upper side slag suction port. The first end of the third fluid pipe fitting is connected with the second fluid pipe fitting, and the second end of the third fluid pipe fitting extends into the cutter box to serve as a slag suction opening in the cutter head. On the premise that a slurry pump body is not changed, the end opening of the first pipe fitting connector is provided with the slag suction opening above the cutter head through the arrangement of the pipeline connection mode of the suction opening of the slurry pump, meanwhile, the third fluid pipe fitting can enter the cutter head through extension of the second fluid pipe fitting and the third fluid pipe fitting, and the slag suction opening is formed in the end opening of the first pipe fitting connector. The device helps discharge muck accumulated on a tunneling face, solves the problem that muck is accumulated in the cutterhead, accelerates the muck discharge speed, and greatly improves the working efficiency of the tunneling machine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of vertical tunneling construction, in particular to a slag discharge device for a vertical tunneling machine. Background Art

[0002] At present, the mainstream methods of slag removal in tunnel shafts are as follows: multi-absorption pump suction and lifting mixed well washing slag removal method, mud circulation slag removal method, slurry pump combined with lifting bucket, etc. Among them, the method of combining slurry pump with lifting bucket is to add a certain proportion of mud solution to the excavation face of the cutter head before the excavation work. The slag generated during excavation will be wrapped by the mud, and then sucked and discharged by the slurry pump to the mud treatment equipment above the tunnel boring machine. The slag is discharged to the bucket through the mud treatment equipment, and the bucket is controlled to lift and lower to transport the slag to the ground.

[0003] The key technical problem is the efficient and continuous slag discharge in the construction of tunnel shafts, especially in the construction of ultra-large and ultra-deep vertical tunnel boring machines. During the operation of the vertical tunnel boring machine, slag particles and mud deposits will be continuously generated, which are prone to blockage of the slurry pump suction port and low slag discharge. Its working efficiency will directly affect the excavation conditions and construction quality. Therefore, it is very important to improve the slag discharge capacity of the vertical tunnel boring machine.

[0004] The general structure of a slurry pump is a vertical slurry pump. The suction pipe is connected to a 90-degree long radius elbow. The other end of the elbow is welded to a horizontal straight section of fluid with a seamless steel pipe, and the final suction port of the pipeline is above the cutterhead. Therefore, the slag deep in the cutterhead excavation face cannot be sucked out, resulting in a small amount of slag sucked by the slurry pump. The mud slag is always easy to accumulate on the cutterhead excavation face and the back of the cutterhead. The slag suction capacity is limited, which greatly affects the working efficiency of the tunnel boring machine. Utility Model Content

[0005] Purpose of the invention: The purpose of the utility model is to address the deficiencies in the prior art and provide a vertical tunneling machine slurry pump suction pipeline that can increase the slag suction amount and improve the slag suction efficiency.

[0006] Technical solution: The utility model discloses a vertical tunneling machine slurry pump suction pipe, comprising:

[0007] a first fluid pipe fitting connected to a slurry pump suction port;

[0008] a first pipe joint, wherein a first end of the first pipe joint is connected to a first fluid pipe, and a second end of the first pipe joint serves as a slag suction port on an upper side of the cutter head;

[0009] a second fluid pipe fitting, the second fluid pipe fitting being connected to a third end of the first pipe fitting joint;

[0010] A third fluid pipe, wherein the first end of the third fluid pipe is connected to the second fluid pipe, and the second end of the third fluid pipe extends into the interior of the cutter box as a slag suction port inside the cutter disc.

[0011] Furthermore, the first fluid pipe is connected to the pump suction port flange.

[0012] Furthermore, the first fluid pipe is connected and fixed to the first pipe joint through a clamp.

[0013] Furthermore, the first pipe fitting joint is an equal-diameter tee joint.

[0014] Furthermore, the second end of the first pipe joint is connected to the concentric reducer, the large diameter interface of the concentric reducer is connected to the first pipe joint, and the small diameter interface serves as the slag suction port on the upper side of the cutter disc.

[0015] Furthermore, the third fluid pipe is connected to the second fluid pipe via a second fluid connector, and the second fluid connector is an elbow.

[0016] Furthermore, a wear-resistant component is provided on the portion of the third fluid pipe extending into the knife box.

[0017] Furthermore, protective components are provided on the outer sides of the first fluid pipe, the first pipe joint, the second fluid pipe, the second fluid joint, and the third fluid pipe.

[0018] Beneficial effect: Under the premise of not changing the slurry pump body, the utility model sets the pipe connection method of the slurry pump suction port, so that the port of the first pipe fitting joint has a slag suction port above the cutter disc, and at the same time, through the extension of the second fluid pipe fitting and the third fluid pipe fitting, the third fluid pipe fitting can enter the inside of the cutter disc to help discharge the slag accumulated on the excavation face, thereby solving the problem of slag accumulation inside the cutter disc, speeding up the slag discharge speed, and greatly improving the working efficiency of the tunnel boring machine; at the same time, it solves the problem of serious wear of the hob cutter and other tools of the cutter box due to slag accumulation, thereby reducing the cost of tool replacement and reducing the construction period delayed by tool replacement. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a structural schematic diagram of a vertical tunneling machine slurry pump suction pipe of the utility model;

[0020] Figure 2 for Figure 1 Cross-sectional view of AA in the middle;

[0021] Figure 3 This is a schematic diagram of the connection between the pipeline and the cutter disc of the utility model;

[0022] Figure 4 A cross-sectional view of the connector. DETAILED DESCRIPTION

[0023] The technical solution of the utility model is described in detail below with reference to the accompanying drawings, but the protection scope of the utility model is not limited to the embodiments.

[0024] A vertical tunnel boring machine slurry pump suction pipe, such as Figure 1 As shown, it includes a first fluid pipe 7, a first pipe connector 6, a second fluid pipe 8, a second fluid connector 9 and a third fluid pipe 10.

[0025] The first fluid pipe fitting 7 is a longitudinal seamless steel pipe for fluid, and the first end (upper end) of the first fluid pipe fitting 7 is connected to the slurry pump suction port flange. Specifically, the flange connection structure includes a first flange 1 welded to the slurry pump suction port, a second flange 1 welded to the upper end of the first fluid pipe fitting 7, and a flange gasket 2. The flange gasket 2 is arranged between the first flange 1 and the second flange 1 to seal and stop leakage. The first flange 1 and the second flange 1 are fastened by bolts 3, nuts 5 and spring washers 4 to ensure the close connection between the slurry pump suction port and the first fluid pipe fitting 7.

[0026] The second end (lower end) of the first fluid pipe 7 is connected and fixed to the first end of the first pipe joint 6 through a clamp structure. On the one hand, the connection method of the clamp structure facilitates the replacement and installation of the connected pipelines. On the other hand, the pipelines and clamps here will rotate with the rotation of the cutter disc. The use of the clamp structure can reduce the vibration generated when the cutter disc rotates and increase the stability of the overall pipeline. Specifically, the clamp structure includes a handcuff-type clamp and a first welding end and a second welding end connected by the handcuff-type clamp. The first welding end is welded to the second end of the first fluid pipe 7, and the second welding end is welded to the first end of the first pipe joint 6. The two welding ends are fixed by docking with the handcuff-type clamp.

[0027] In this embodiment, the first pipe fitting joint 6 adopts an equal-diameter tee joint, the first end is the upper interface of the equal-diameter tee joint, connected to the first fluid pipe fitting 7, the second end is used as a slag suction port, and the third end is connected to the second fluid pipe fitting 8. Specifically, the second end is connected to a concentric reducer 11, the large-diameter interface of the concentric reducer 11 is welded and fixed to the left interface of the equal-diameter tee joint, and the small-diameter interface of the concentric reducer pipe fitting is used as a slag suction port, mainly for sucking mud above the cutter box.

[0028] The second fluid pipe fitting 8 is connected to the third end of the first pipe fitting joint 6, namely the right interface of the equal-diameter tee joint. The fluid pipe fitting adopts a horizontally arranged seamless steel pipe for fluid, which is welded and fixed to the equal-diameter tee joint.

[0029] The third fluid pipe fitting 10 is connected to the second fluid pipe fitting 8 through the second fluid joint 9. The third fluid pipe fitting 10 is a vertically arranged seamless steel pipe for fluid. The second fluid joint 9 adopts a 90° short radius elbow, and the two ends of the elbow are respectively welded to the second fluid pipe fitting 8 and the third fluid pipe fitting 10. The lower end of the third fluid pipe fitting 10 is inserted into the inside of the cutter box, and is mainly used to suck mud from the cutter box position, so that more debris can be taken away from the deep of the cutter disc to prevent debris accumulation.

[0030] Since the entire pipeline is immersed in the mud, the pipeline will experience a certain degree of wear and tear, and the suction section is the most seriously worn. Therefore, the part of the third fluid pipe fitting 10 extending into the knife box is provided with a wear-resistant component. The wear-resistant component uses four steel plates 16 to weld around the steel pipe to complete the fixation, which protects the third fluid pipe fitting 10 and increases the wear resistance.

[0031] Since the entire modified pipeline is immersed in mud for a long time and is in a harsh environment, a protective component is provided on the outside of the first fluid pipe 7, the first pipe joint 6, the second fluid pipe 8, the second fluid joint 9, and the third fluid pipe 10. The protective component includes protective steel plates 12-15 welded circumferentially on the outer surfaces of the pipes and joints. In this embodiment, there are ten steel plates 12-15 welded on each component, which are evenly distributed around a circle. The central angle of each steel plate 12-15 is 36︒, as shown in FIG. Figure 2 It is used to reduce the wear of mud on pipelines and their accessories, thereby protecting the modified pipelines and extending their service life.

[0032] like Figure 3 As shown, the third fluid pipe 10 is fixedly connected to the cutter disc 30 through the connecting piece 20. The connecting piece 20 can be made of 20# steel plate, so that the two form an integral body, ensuring that the pipe is fixed reliably when rotating with the cutter disc 30. For example, Figure 4 As shown, the cross section of the connector 20 can be constructed as a ring or partial ring that matches the outer diameter of the third fluid pipe 10, ensuring that the third fluid pipe 10 is docked with the cutter head 30 and welded into a whole at the periphery of the pipeline.

[0033] As described above, although the present invention has been shown and described with reference to specific preferred embodiments, it should not be construed as limiting the present invention itself. Various changes in form and details may be made without departing from the spirit and scope of the present invention as defined in the appended claims.

Claims

1. A vertical tunnel boring machine slurry pump suction pipeline, characterized in that: include: a first fluid pipe fitting, the first fluid pipe fitting being connected to a suction port of a slurry pump; a first pipe joint, wherein a first end of the first pipe joint is connected to a first fluid pipe, and a second end of the first pipe joint serves as a slag suction port on an upper side of the cutter head; a second fluid pipe fitting, the second fluid pipe fitting being connected to a third end of the first pipe fitting joint; A third fluid pipe, wherein the first end of the third fluid pipe is connected to the second fluid pipe, and the second end of the third fluid pipe extends into the interior of the cutter box as a slag suction port inside the cutter disc.

2. The vertical tunnel boring machine slurry pump suction pipe according to claim 1, characterized in that: The first fluid pipe is connected to the pump suction port flange.

3. The vertical tunnel boring machine slurry pump suction pipe according to claim 1, characterized in that: The first fluid pipe is connected and fixed to the first pipe joint through a clamp.

4. The vertical tunnel boring machine slurry pump suction pipe according to claim 1, characterized in that: The first pipe fitting joint is an equal-diameter tee joint.

5. The vertical tunneling machine slurry pump suction pipe according to claim 4, characterized in that: The second end of the first pipe fitting joint is connected to the concentric reducer, the large diameter interface of the concentric reducer is connected to the first pipe fitting joint, and the small diameter interface serves as the slag suction port on the upper side of the cutter disc.

6. The vertical tunnel boring machine slurry pump suction pipe according to claim 1, characterized in that: The third fluid pipe is connected to the second fluid pipe via a second fluid connector, and the second fluid connector is an elbow.

7. The vertical tunnel boring machine slurry pump suction pipe according to claim 1, characterized in that: The portion of the third fluid pipe extending into the knife box is provided with a wear-resistant component.

8. The vertical tunneling machine slurry pump suction pipe according to claim 6, characterized in that: Protective components are provided on the outer sides of the first fluid pipe, the first pipe joint, the second fluid pipe, the second fluid joint and the third fluid pipe.