Mine precipitation system
By setting up sewage sedimentation tanks and water inlet pipes on both sides of the mine drainage tunnel, the problem of inconvenient cleaning of coal sludge in coal mine sewage is solved, reducing the frequency of cleaning and resource utilization of coal sludge, and improving the reliability of the mine drainage system .
Patent Information
- Application Number
- CN202420297626.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-18
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-02-18
AI Technical Summary
During the coal mine production process, the inconvenience of cleaning coal sludge in mine sewage affects the use of tunnel equipment, and the existing cleaning methods have problems such as manual participation, equipment restrictions, poor ventilation and environmental protection risks.
Design a mine sedimentation system, by setting up sedimentation tanks on both sides of the drainage tunnel and using the water inlet pipe to control sedimentation tanks, the sedimentation of sedimentation can be achieved first sedimentation, reducing the coal slime content, and avoiding frequent cleaning. The coal slime after sedimentation can be directly Enter the raw coal transportation system to reduce environmental protection risks.
It effectively reduces the cleaning frequency of the central water tank, avoids interruption of tunnel equipment, improves the reliability of the mine drainage system, and realizes the resource utilization of coal slime.
Smart Images

Figure CN222102090U_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of mine sedimentation, and in particular to a mine sedimentation system. Background Art
[0002] During the coal mine production process, in order to achieve the purpose of safe production, a large amount of clean water is consumed for equipment cooling, spray dust reduction, sanitary cleaning, etc. At the same time, water gushing is also generated in the mining working face, tunnels and other locations. All mine water is discharged to the central water tank through the pipeline system, and then discharged to the ground sewage treatment plant through the central water pump room or directly processed and reused underground. In the relevant technology, the mine sewage treatment method is to discharge it after sedimentation in the central water tank. The precipitated coal slime needs to be cleaned in time, and the amount of coal slime to be cleaned is huge and the cleaning times are frequent. The discharge of sewage often needs to be suspended during cleaning, which also affects the use process of tunnel equipment. In addition, the existing cleaning method is manual and mechanical cleaning. The central water tank is usually arranged at a low elevation, with a small space, which is not convenient for the use of large equipment; the ventilation is poor, and local fans need to be used to supply air during the cleaning process. The workers are exposed to toxic and harmful gases and the risk of suffocation; due to the high water content of the coal slime, cleaning and disposal are very difficult. The coal slime cleared from the water tank is in a semi-fluid state and cannot be directly transported to the raw coal transportation system or to the ground. It needs to be processed in an appropriate way underground, which increases the processing cost. Utility Model Content
[0003] The purpose of the present disclosure is to provide a mine sedimentation system to solve the problem in the prior art that the coal slime in the drainage lane is inconvenient to clean and the cleaning process affects the use of lane equipment.
[0004] In order to achieve the above objectives, the present disclosure provides a mine sedimentation system, comprising:
[0005] A drainage lane, the drainage lane being connected to the central water tank;
[0006] Two sedimentation tanks are respectively arranged on both sides of the drainage lane and are used to be arranged in the lane, and the tops of the sedimentation tanks are connected to the drainage lane; and
[0007] The water inlet pipe has one end for connecting to the outside and the other end for communicating with the two sedimentation tanks respectively.
[0008] Optionally, a first side wall is formed between the drainage lane and the sedimentation tank, and a second side wall is formed on a side of the sedimentation tank away from the drainage lane, and the height of the first side wall is lower than the height of the second side wall.
[0009] Optionally, a third side wall is further provided in the sedimentation tank, and the third side wall is spaced between the first side wall and the second side wall, and can separate the sedimentation tank into a first sedimentation tank and a second sedimentation tank. The first sedimentation tank is connected to the water inlet pipe, and the second sedimentation tank is connected to the drainage lane.
[0010] Optionally, the height of the third side wall is greater than the height of the first side wall, and the height of the third side wall is less than the height of the second side wall.
[0011] Optionally, a first pipeline is opened at the bottom of the third side wall, the first pipeline can connect the first sedimentation tank and the second sedimentation tank, and a first filter is provided in the first pipeline.
[0012] Optionally, a fourth side wall is provided between the first side wall and the third side wall, a second pipeline is connected between the fourth side wall and the first side wall, a second filter is provided in the second pipeline, and both ends of the second pipeline can be opened and closed to connect to the second sedimentation tank and the drainage lane respectively.
[0013] Optionally, the water inlet pipeline includes:
[0014] Main water inlet line for connection to the outside; and
[0015] The two water inlet branches are respectively connected to the water inlet main road in an openable and closable manner, and the two water inlet branches are connected to the two sedimentation tanks in a one-to-one correspondence.
[0016] Optionally, a stop valve is further provided on the water inlet pipeline, and the stop valve is respectively provided on the two water inlet branches.
[0017] Optionally, a drainage pipeline is provided at the bottom of the drainage lane, and the drainage pipeline is used to communicate with the central water tank.
[0018] Optionally, the water inlet pipeline is connected to the top of the sedimentation tank.
[0019] Through the above technical solution, sedimentation tanks are set up on both sides of the drainage tunnel connected to the central water tank, so that sewage containing coal slime can be precipitated before entering the central water tank through the drainage tunnel, thereby reducing the coal slime content of the sewage entering the central water tank and reducing the frequency of cleaning the central water tank. In addition, the water inlet pipeline can be connected to the two sedimentation tanks respectively, so the sewage entering the corresponding sedimentation tank can be controlled as needed, so that the two sedimentation tanks can be used in rotation, one for use and one for backup. This does not delay the cleaning of the sedimentation tanks, nor does it suspend sewage discharge due to sedimentation tank cleaning, affecting the use of tunnel equipment. At the same time, the precipitated coal slime can be directly entered into the raw coal transportation system after sufficient water removal, reducing the environmental risks faced by coal slime processing and allowing the coal slime to be utilized as a resource. The sedimentation tank can also be used as an emergency drainage tank, enhancing the reliability of the mine drainage system.
[0020] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following detailed description, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings:
[0022] Figure 1 is a schematic diagram of a mine sedimentation system according to an embodiment of the present disclosure.
[0023] Figure 2 This is a schematic diagram of the connection between the water inlet pipeline and the sedimentation tank of a mine sedimentation system according to one embodiment of the present disclosure.
[0024] Description of Reference Numerals
[0025] 1-drainage lane; 101-first side wall; 11-drainage pipeline; 2-sedimentation tank; 201-second side wall; 202-third side wall; 203-fourth side wall; 21-first sedimentation tank; 22-second sedimentation tank; 23-first pipeline; 24-second pipeline; 3-water inlet pipeline; 31-main water inlet; 32-branch water inlet; 33-stop valve; 4-tunnel ground. DETAILED DESCRIPTION
[0026] The following describes the specific embodiments of the present disclosure in detail with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are only used to illustrate and explain the present disclosure and are not intended to limit the present disclosure.
[0027] In this disclosure, unless otherwise indicated, directional terms such as "inner" and "outer" are defined relative to the outlines of the corresponding components. Terms such as "first" and "second" are used to distinguish between different components and do not imply order or importance. Furthermore, in the following description, when referring to the drawings, unless otherwise indicated, identical reference numerals in different drawings represent identical or similar elements.
[0028] According to one embodiment of the present disclosure, Figure 1 and Figure 2 As shown, a mine sedimentation system is provided, comprising a drainage tunnel 1, two sedimentation tanks 2, and a water inlet pipeline 3. The drainage tunnel 1 is connected to a central water tank; the two sedimentation tanks 2 are disposed on opposite sides of the drainage tunnel 1 and are arranged within the tunnel, with the tops of the sedimentation tanks 2 connected to the drainage tunnel 1. One end of the water inlet pipeline 3 is connected to the outside, and the other end is connected to each of the two sedimentation tanks 2.
[0029] Here, it should be noted that the sedimentation tank 2 can be independently manufactured with side walls and bottom walls, and placed in the tunnel after being manufactured, or only the side walls can be independently manufactured, and after being manufactured, the side walls are sealed and connected to the tunnel ground 4, or the side walls of the tunnel and the tunnel ground 4 are used, and two sedimentation tanks 2 are arranged relative to each other along the extension direction of the tunnel, and retaining walls are only made in the direction of passage of the tunnel (i.e., the first side wall 101, the second side wall 201, the third side wall 202 and the fourth side wall 203 hereinafter), and the retaining walls are sealed and connected to the side walls of the tunnel and the tunnel ground 4 to form the sedimentation tank 2, and the present disclosure does not limit this. In addition, the drainage lane 1 and the two sedimentation tanks 2 can be set on one side of the central water tank, or the drainage lane 1 and the two sedimentation tanks 2 can be set on both sides of the central water tank, and the present disclosure does not limit this either.
[0030] Through the above technical solution, sedimentation tanks 2 are set up on both sides of the drainage tunnel 1 connected to the central water tank, so that the sewage containing coal slime can be precipitated before entering the central water tank through the drainage tunnel 1, thereby reducing the coal slime content of the sewage entering the central water tank and reducing the frequency of cleaning the central water tank. In addition, the water inlet pipe 3 can be connected to the two sedimentation tanks 2 respectively, so that the sewage entering the corresponding sedimentation tank 2 can be controlled as needed, so that the two sedimentation tanks 2 can be used in rotation, one for use and one for backup, without delaying the cleaning of the sedimentation tank 2, nor will the sewage discharge be suspended due to the cleaning of the sedimentation tank 2, affecting the use process of the tunnel equipment. At the same time, the precipitated coal slime can be directly entered into the raw coal transportation system after sufficient water removal, reducing the environmental risks faced by the treatment of coal slime, and the coal slime can also be utilized as a resource. The sedimentation tank 2 can also be used as an emergency drainage tank, enhancing the reliability of the mine drainage system.
[0031] Furthermore, if Figure 1As shown, a first sidewall 101 may be formed between the drainage tunnel 1 and the sedimentation tank 2, and a second sidewall 201 may be formed on the side of the sedimentation tank 2 away from the drainage tunnel 1. The height of the first sidewall 101 is lower than that of the second sidewall 201. In this way, when the sewage in the sedimentation tank 2 is higher than the first sidewall 101, it can flow into the drainage tunnel 1 from the first sidewall 101. At this time, due to the sewage flowing into the drainage tunnel 1, the water level of the sedimentation tank 2 is no higher than the height of the first sidewall 101. Therefore, the sewage will not overflow from the second sidewall 201, thereby effectively preventing the occurrence of sewage overflow.
[0032] Furthermore, if Figure 1 As shown, the sedimentation tank 2 may further be provided with a third side wall 202, which is spaced between the first side wall 101 and the second side wall 201, and can separate the sedimentation tank 2 into a first sedimentation tank 21 and a second sedimentation tank 22. The first sedimentation tank 21 is connected to the water inlet pipe 3, and the second sedimentation tank 22 is connected to the drainage lane 1. In this way, when sewage containing coal slime enters the sedimentation tank 2 from the water inlet pipe 3, it can first undergo a first sedimentation in the first sedimentation tank 21. After the first sedimentation, the sewage can flow into the second sedimentation tank 22 for a second sedimentation, and then flow into the drainage lane 1 after the second sedimentation. This can effectively reduce the coal slime content of the sewage flowing into the drainage lane 1 and reduce the possibility of clogging of the drainage lane 1. The first sedimentation tank 21 and the second sedimentation tank 22 can be connected by a pipeline, or the height of the third side wall 202 can be greater than the height of the first side wall 101, and the height of the third side wall 202 can be less than the height of the second side wall 201. In this way, after the sewage fills the first sedimentation tank 21, it can flow into the second sedimentation tank 22 through the top of the third side wall 202. At this time, due to the sewage flowing into the second sedimentation tank 22, the horizontal surface of the first sedimentation tank 21 is not higher than the height of the second side wall 201. Therefore, the sewage will not overflow from the second side wall 201, effectively preventing the occurrence of sewage overflow. The third side wall 202 can also be set at intervals to divide the sedimentation tank 2 into more partitions, and the height can also gradually decrease from the second side wall 201 to the first side wall 101. In this way, the sewage can be precipitated multiple times in the sedimentation tank 2 to further reduce the coal slime content of the sewage entering the drainage lane 1. This is not limited in the present disclosure.
[0033] According to one embodiment of the present disclosure, Figure 1As shown, a first pipe 23 can be provided at the bottom of the third side wall 202 to balance the water pressure on both sides. The first pipe 23 can connect the first sedimentation tank 21 and the second sedimentation tank 22. A first filter screen is provided in the first pipe 23. The first pipe 23 can be a pipe with a pipe diameter of 200 mm. The outer wall of the first pipe 23 and the third side wall 202 can also be filled with cement mortar to ensure sealing. The first filter screen can be a 200-mesh metal filter screen to effectively prevent sludge from flowing from the first pipe 23 into the second sedimentation tank 22. The first filter screen can be set as one, or multiple filters can be set at intervals along the length direction of the first pipe 23, which is not limited in this disclosure. The number of first pipes 23 can be set at intervals, which is also not limited in this disclosure.
[0034] According to one embodiment of the present disclosure, Figure 1 As shown, a fourth sidewall 203 may be provided between the first sidewall 101 and the third sidewall 202. A second pipe 24 is connected between the fourth sidewall 203 and the first sidewall 101 to balance the water pressure on both sides. A second filter is provided in the second pipe 24, and the two ends of the second pipe 24 are openably and closably connected to the second sedimentation tank 22 and the drainage tunnel 1. In this way, the sewage between the third sidewall 202 and the first sidewall 101 can also undergo secondary sedimentation. The height of the fourth sidewall 203 can be between the heights of the first sidewall 101 and the third sidewall 202. In this way, sewage from the first sedimentation tank 21 enters the space between the third sidewall 202 and the fourth sidewall 203 for sedimentation. When the sewage level reaches the top of the fourth sidewall 203, it can flow between the fourth sidewall 203 and the first sidewall 101 for secondary sedimentation, and finally flow into the drainage tunnel 1 from the top of the first sidewall 101, thereby reducing the coal slime content of the sewage entering the central water tank through the drainage tunnel 1. The second pipeline 24 can be a pipeline with a diameter of 200 mm. The outer wall of the first pipeline 23 and the space between the fourth side wall 203 and the first side wall 101 can also be filled with cement mortar to ensure sealing. The second filter can be a 400-mesh metal filter. Since the sewage in the second sedimentation tank 22 has already been precipitated once in the first sedimentation tank 21, the sludge settled in the second sedimentation tank 22 is finer than that in the first sedimentation tank 21. Therefore, a filter with a higher mesh size is used to effectively prevent the sludge from flowing into the drainage alley 1 from the second pipeline 24. The second filter can be set as one, or multiple filters can be set at intervals along the length of the second pipeline 24. This is not limited in this disclosure. The number of second pipelines 24 can be set at intervals, which is also not limited in this disclosure.
[0035] It should be noted that, since the second side wall 201 has water only on one side, it can be a 1m thick reinforced concrete wall that can withstand a single-sided hydrostatic water pressure of not less than 4m in height. Since water can be present on both sides of the first side wall 101, the third side wall 202, and the fourth side wall 203 can all be 0.5m thick brick walls. When the water storage height on both sides of the brick wall is consistent, water pressure balance can be achieved. This is not limited in this disclosure. The first side wall 101, the second side wall 201, the third side wall 202, and the fourth side wall 203 can all be arranged at intervals along the extension direction of the tunnel. This is also not limited in this disclosure.
[0036] According to one embodiment of the present disclosure, Figure 2 As shown, the water inlet pipeline 3 may include a main water inlet line 31 and two branch water inlet lines 32. The main water inlet line 31 is used to connect to the outside. The two branch water inlet lines 32 are respectively connected to the main water inlet line 31 in an openable and closable manner, and the two branch water inlet lines 32 are connected to the two sedimentation tanks 2 in a one-to-one correspondence. In this way, when one sedimentation tank 2 needs to be cleaned, the corresponding branch water inlet line 32 can be controlled to close, allowing the sewage to flow into the other sedimentation tank 2. This neither delays the cleaning of the sedimentation tank 2 nor suspends sewage discharge due to the cleaning of the sedimentation tank 2, thereby affecting the use of the roadway equipment.
[0037] Furthermore, if Figure 2 As shown, a shut-off valve 33 is also provided on the water inlet pipe 3. The shut-off valve 33 can be respectively provided on two water inlet branches 32. By opening and closing the shut-off valve 33, the opening and closing of the water inlet branch 32 can be controlled, thereby controlling the corresponding discharge position of the sewage. Two water inlet branches 32 corresponding to each sedimentation tank 2 can also be provided, and shut-off valves 33 are provided on both water inlet branches 32. In this way, when water from both sides of the roadway enters one sedimentation tank 2, both water inlet branches 32 can be opened to increase the water intake of the sedimentation tank 2. When water from both sides of the roadway can enter two sedimentation tanks 2, only one water inlet branch 32 can be opened for one sedimentation tank 2. A shut-off valve 33 can also be provided on the water inlet main road 31 to facilitate the control of drainage on the water inlet main road 31. This is not limited in the present disclosure.
[0038] According to one embodiment of the present disclosure, the water inlet pipe 3 can be connected to the top of the sedimentation tank 2. In this way, when sewage is discharged into the sedimentation tank 2 from the outside, discharge from the top can not affect the sludge settled in the sedimentation tank 2.
[0039] According to one embodiment of the present disclosure, Figure 1 As shown, a drainage pipe 11 is provided at the bottom of the drainage lane 1, which is used to communicate with the central water tank. When the sewage in the drainage lane 1 accumulates to a certain level, the drainage pipe 11 can be opened and closed to drain the water in the drainage lane 1 into the central water tank.
[0040] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings. However, the present disclosure is not limited to the specific details of the above embodiments. Within the technical concept of the present disclosure, various simple modifications can be made to the technical solutions of the present disclosure, and these simple modifications all fall within the scope of protection of the present disclosure.
[0041] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any appropriate manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.
[0042] In addition, the various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.
Claims
1. A mine sedimentation system, characterized in that: include: A drainage lane, the drainage lane is used to communicate with the central water tank; Two sedimentation tanks are respectively arranged on both sides of the drainage lane and are used to be arranged in the lane, and the tops of the sedimentation tanks are connected to the drainage lane; and The water inlet pipeline has one end for connecting to the outside and the other end respectively connected to the two sedimentation tanks.
2. The mine sedimentation system according to claim 1, characterized in that: A first side wall is formed between the drainage lane and the sedimentation tank, and a second side wall is formed on a side of the sedimentation tank away from the drainage lane. The height of the first side wall is lower than that of the second side wall.
3. The mine sedimentation system according to claim 2, characterized in that: The sedimentation tank is also provided with a third side wall, and the third side wall is spaced between the first side wall and the second side wall, and can separate the sedimentation tank into a first sedimentation tank and a second sedimentation tank. The first sedimentation tank is connected to the water inlet pipeline, and the second sedimentation tank is connected to the drainage alley.
4. The mine sedimentation system according to claim 3, characterized in that: The height of the third side wall is greater than the height of the first side wall, and the height of the third side wall is less than the height of the second side wall.
5. The mine sedimentation system according to claim 3, characterized in that: A first pipeline is provided at the bottom of the third side wall. The first pipeline can connect the first sedimentation tank and the second sedimentation tank. A first filter is provided in the first pipeline.
6. The mine sedimentation system according to claim 3, characterized in that: A fourth side wall is also arranged between the first side wall and the third side wall, a second pipeline is connected between the fourth side wall and the first side wall, a second filter is arranged in the second pipeline, and both ends of the second pipeline are respectively openably and closably connected to the second sedimentation tank and the drainage lane.
7. The mine sedimentation system according to claim 1, characterized in that: The water inlet pipeline comprises: Main water inlet for connection to the outside; and The two water inlet branches are respectively connected to the water inlet main road in an openable and closable manner, and the two water inlet branches are connected to the two sedimentation tanks in a one-to-one correspondence.
8. The mine sedimentation system according to claim 7, characterized in that: The water inlet pipeline is also provided with a stop valve, and the stop valve is respectively arranged on the two water inlet branches.
9. The mine sedimentation system according to claim 1, characterized in that: A drainage pipeline is arranged at the bottom of the drainage lane, and the drainage pipeline is used to communicate with the central water tank.
10. The mine sedimentation system according to claim 1, characterized in that: The water inlet pipeline is connected to the top of the sedimentation tank.
