Main transformer system for extra-high voltage transformer substation in high-altitude and high-earthquake area

By using the main transformer and lightning arrester adjacent arrangement scheme and earthquake isolation device in the ultra-high voltage substation in high altitude seismic areas, the problem of increasing distance between the main transformer and the main transformer and length of the casing is solved, and the main transformer is realized. Quick replacement and convenient transportation of earthquake isolation devices adapt to the environmental needs of high altitude and high earthquake intensity.

CN222107435UActive Publication Date: 2024-12-03四川电力设计咨询有限责任公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420047816.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-09
Publication Date
2024-12-03
Estimated Expiration
2034-01-09

AI Technical Summary

Technical Problem

In ultra-high voltage substations in high-altitude seismic areas, the distance between the main transformer lightning arrester and the main transformer increases, resulting in overvoltage problems; the length of the main transformer casing becomes longer, resulting in difficulty in connecting the metal tools and difficulty in rapid transport of the earthquake isolation device.

Method used

The main transformer and lightning arrester are arranged immediately adjacent to each other, and a herringbone column is formed through the door-shaped frame and oblique rod. The main transformer is set in the center and is equipped with a shock isolation device and a transfer trolley to ensure that the main transformer casing leads down the line is arranged vertically and reduce the terminal tension. , and quickly switch the backup phase through the transport track.

Benefits of technology

It meets the distance between the main transformer lightning arrester and the main transformer in high altitude environment, reduces the tension of the main transformer casing down the line, realizes the rapid replacement of the main transformer and the convenient transportation of the earthquake isolation device, and adapts to high seismic intensity. Requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222107435U_ABST
    Figure CN222107435U_ABST
Patent Text Reader

Abstract

The utility model relates to a main transformer system for an extra-high voltage transformer substation in a high-altitude and high-earthquake area, which comprises a power distribution device and a lightning arrester which are arranged adjacent to main transformers in the extra-high voltage transformer substation, and three main transformers form a group; the firewall is separated from a main transformer in the extra-high voltage transformer substation by a preset distance; the firewalls are connected together through a door-shaped framework, the door-shaped framework is arranged at the upper ends of the firewalls, one outer side face of the door-shaped framework is connected with an inclined rod, and the outer side face of the door-shaped framework and the inclined rod form a herringbone column. And a foundation body is arranged below the main transformer. The arrangement scheme that the main transformer and the lightning arrester are adjacent to the main transformer is adopted, and the lightning arrester of a main transformer incoming line is arranged on the main transformer side of a main transformer transportation road, so that the situation that the interval width of a power distribution device is increased, the appearance of part of equipment is increased, and the distance between the 1000kV incoming line lightning arrester and the main transformer is reduced is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of ultra-high voltage substation design, in particular to a main transformer system for ultra-high voltage substations in high-altitude and high-seismic areas. Background Art

[0002] According to the grid planning, in order to meet the needs of hydropower and new energy transmission in the southwest, it is planned to build UHV substations in these areas. The sites of UHV substations in such areas are located at high altitudes and have high earthquake intensity.

[0003] Under this environmental condition, the main transformer system of the UHV substation has the following problems:

[0004] 1. According to the layout plan of previous projects, the main transformer incoming line arrester is arranged on the 1000 kV GIS side of the main transformer transportation road. Due to the increase in air gap of high-altitude substations, the increase in the width of distribution device intervals, and the increase in the size of some equipment, the distance between the 1000kV incoming line arrester and the main transformer increases. The conventional main transformer incoming line arrester layout plan cannot meet the overvoltage requirements.

[0005] 2. The station is located at a high altitude, the main transformer bushing has increased, and the length of the 1000kV tension string has become longer after altitude correction, resulting in a shorter distance between the bushing and the main transformer cross-line, difficulty in connecting hardware, and high stress on the main transformer terminals. The traditional main transformer frame layout is difficult to adapt to the requirements of high altitudes.

[0006] 3. The station is located in a remote area, and a backup phase of the main transformer needs to be set up, and the backup phase of the main transformer needs to have the function of rapid replacement. The earthquake intensity at the station is relatively high, and the main transformer needs to be equipped with a seismic isolation device. How to cooperate with the rapid transportation of the seismic isolation device is another problem. Utility Model Content

[0007] The technical problem to be solved by the utility model is to provide a main transformer system for ultra-high voltage substations in high-altitude and high-seismic areas. The main transformer and the lightning arrester are arranged close to the main transformer, and the lightning arrester of the main transformer incoming line is arranged on the main transformer side of the main transformer transportation road, so as to avoid the increase in the width of the distribution device interval and the increase in the appearance of some equipment, and reduce the distance between the 1000kV incoming line lightning arrester and the main transformer.

[0008] The technical solution adopted by the utility model to solve its technical problems is:

[0009] A main transformer system for a UHV substation in a high altitude and high earthquake zone, comprising:

[0010] A power distribution device and a lightning arrester 13 arranged adjacent to a main transformer 1 in a UHV substation, wherein the main transformer 1 is grouped in three;

[0011] A firewall 2 separated by a preset distance from a main transformer 1 in a UHV substation;

[0012] The firewalls 2 are connected together by a door-shaped frame 3, the door-shaped frame 3 is arranged at the upper end of the firewall 2, an outer side surface of the door-shaped frame 3 is connected to an inclined rod 4, and the outer side surface of the door-shaped frame 3 and the inclined rod 4 form a herringbone column;

[0013] A basic body 5 is disposed below the main transformer 1 .

[0014] The power distribution device includes a 110kV power distribution device, a 500kV power distribution device and a 1000kV power distribution device, and the main transformer 1 is arranged at the center of the substation.

[0015] The distance between the firewalls 2 on both sides of the transformer 1 is 22.5m, the distance between the main transformer 1 and the lightning arrester 13 is 7.25m, and the height of the portal frame 3 is 34m.

[0016] A seismic isolation device is arranged on the base body 5 , and the seismic isolation device includes a vibration isolator 6 . A seismic isolation steel frame 7 is connected above the vibration isolator 6 , and the main transformer 1 is placed on the upper end surface of the seismic isolation steel frame 7 .

[0017] An oil pool 8 is arranged below the main transformer 1 , the basic body 5 is arranged in the oil pool 8 , sleepers are laid in the oil pool 8 , temporary tracks 9 are arranged on the sleepers, and the temporary tracks 9 are at the same height as the seismic isolation steel frame 7 .

[0018] A transfer track 10 is laid at the outer end of the oil pool 8 , and a transfer trolley 11 is movably arranged on the transfer track 10 .

[0019] The beneficial effects of the utility model are:

[0020] 1. The main transformer and the lightning arrester are arranged close to the main transformer. The lightning arrester of the main transformer incoming line is arranged on the main transformer side of the main transformer transportation road. It is arranged as close to the main transformer as possible while meeting the live distance to the firewall. At the same time, considering the live distance of the spare phase transportation when the main transformer is quickly replaced, the lightning arrester of the 1000kV main transformer incoming line is as close to the main transformer as possible while meeting the A1 value of the spare phase. At the same time, in order to ensure that the down conductor of the main transformer bushing is arranged as vertically as possible and reduce the tension on the terminal, the relative position of the main transformer incoming line frame and the main transformer needs to be further increased to offset the increase in the length of the 1000kV tension string after the altitude correction, to avoid the increase in the width of the distribution device interval, the increase in the appearance of some equipment, and the reduction in the distance between the 1000kV incoming line arrester and the main transformer.

[0021] 2. In order to ensure that the down conductor of the main transformer bushing is arranged as vertically as possible and reduce the pulling force on the terminal, the relative position of the main transformer incoming line frame and the main transformer needs to be further increased. One end of the herringbone column of the main transformer frame is placed above the firewall and the other end is placed on the ground to offset the increase in the length of the 1000kV tension string after altitude correction.

[0022] 3. When the main transformer fails, consider reinforcing the high-voltage bushing, transporting the transformer body, bushing, cooling device, and oil storage cabinet as a whole via rails and transfer carts to achieve rapid switching between the standby phase and the faulty phase of the main transformer. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the structure of the utility model;

[0024] Figure 2 It is a schematic diagram of the structure of the transformer, the basic body and the transfer trolley;

[0025] Figure 3 This is an enlarged structural diagram of the connection between the transformer and the basic body;

[0026] Figure 4 It is the top view of the seismic isolation steel frame;

[0027] Figure numerals: 1-main transformer; 2-firewall; 3-portal frame; 4-diagonal rod; 5-foundation body; 6-vibration isolator; 7-seismic isolation steel frame; 8-oil tank; 9-temporary track; 10-transfer track; 11-transfer trolley; 12-limiter; 13-lightning arrester. DETAILED DESCRIPTION

[0028] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0029] like Figures 1 to 4 As shown, a main transformer system for a UHV substation in a high altitude and high earthquake zone comprises:

[0030] A power distribution device and a lightning arrester 13 arranged adjacent to a main transformer 1 in a UHV substation, wherein the main transformer 1 is multiple and three main transformers 1 form a group;

[0031] A firewall 2 separated from a main transformer 1 in the UHV substation by a preset distance, wherein there are multiple firewalls 2 and the main transformer 1 is arranged between the firewalls 2;

[0032] The firewalls 2 are connected together by a gate-shaped frame 3, the gate-shaped frame 3 is arranged at the upper end of the firewall 2, an outer side surface of the gate-shaped frame 3 is connected to an inclined rod 4, the outer side surface of the gate-shaped frame 3 and the inclined rod 4 form a herringbone column, and the herringbone column includes two supporting columns, one supporting column (the outer side column of the gate-shaped frame 3) is placed above the firewall 2, and the other supporting column (inclined rod 4) is placed on the ground on the side of the firewall 2;

[0033] A basic body 5 is disposed below the main transformer 1 .

[0034] The power distribution device includes a 110kV power distribution device, a 500kV power distribution device and a 1000kV power distribution device, and the main transformer 1 is arranged at the center of the substation.

[0035] The distance between the firewalls 2 on both sides of the transformer 1 is 22.5m, the distance between the main transformer 1 and the lightning arrester 13 is 7.25m, and the height of the portal frame 3 is 34m.

[0036] The base body 5 is provided with a seismic isolation device and a limiter 12 , wherein the seismic isolation device includes a seismic isolator 6 , and a seismic isolation steel frame 7 is connected above the seismic isolator 6 , and the main transformer 1 is placed on the upper end surface of the seismic isolation steel frame 7 , and the limiter 12 is arranged next to the seismic isolator 6 .

[0037] An oil pool 8 is arranged below the main transformer 1 , the basic body 5 is arranged in the oil pool 8 , sleepers are laid in the oil pool 8 , temporary tracks 9 are arranged on the sleepers, and the temporary tracks 9 are at the same height as the seismic isolation steel frame 7 .

[0038] A transfer track 10 is laid at the outer end of the oil pool 8 , and a transfer trolley 11 is movably arranged on the transfer track 10 .

[0039] Main transformer system of UHV substation in 8-degree earthquake intensity zone at 3500m above sea level: Main transformer 1 is closely connected with 1000kV distribution device, 500kV distribution device and 110kV distribution device in layout. Main transformer 1 is arranged in the central area of ​​the substation and is close to 110kV distribution device. Considering the fire protection requirements between single-phase transformers, firewall 2 is set between each single-phase transformer. Under the condition of meeting the safety clearance and considering a certain margin, the distance between two single-phase transformers is considered to be 22.5m. Each single-phase transformer is provided with a 22.5m wide frame. Each group of main transformers adopts 3 continuous gate frames. Firewall 2 between phases of main transformer 1 and herringbone columns of gate frame 3 are combined and arranged. Two groups of transformer frames are connected by transition frames. Due to altitude correction, the bushing height of main transformer 1 needs to be corrected, and the height of gate frame 3 is taken as 34m.

[0040] The main transformer 1 is transported without the seismic isolation steel frame 7. During the transportation, sleepers, load-bearing platforms, etc. are laid in the oil pool 8, and the laying height of the temporary track 9 is consistent with the height of the seismic isolation steel frame 7; the main transformer 1 is lifted up by a jack, and temporary tracks 9 are laid at both ends of the seismic isolation steel frame 1, and the temporary tracks 9 are laid to the outside of the oil pool 8 through the load-bearing platforms; the main transformer 1 is pushed up to the position of the transfer trolley 11 by using a pushing device; the main transformer 1 is then lifted up by a jack, so that the main transformer 1 is placed above the transfer trolley 11, and the transfer trolley 11 is transported to the target position through the transfer track 10;

[0041] It is necessary to lay a temporary track 9 between the foundation body 5 and the oil pool 8; it is not necessary to dismantle the seismic isolation frame 7; there is no problem of matching the seismic isolator 6 with the seismic isolation steel frame 7, the main transformer 1 with the seismic isolation frame of the compensation transformer; the transformer is easy to operate in place, and it takes 1-2 days to lay the temporary steel track 9, 1-2 days for transportation, and a total of 3-4 days;

[0042] The design scheme of the main transformer foundation is raft + pier foundation (commonly known as strip foundation). There are a total of 5 strip piers in the main transformer, which are integrated with the lower raft foundation. There are 4 maintenance passages between the piers; the 4 maintenance passages have a net width of about 600mm and a height of about 550mm, which can meet the maintenance requirements of the seismic isolation device and the requirement of extending the trolley track to the main transformer foundation.

[0043] The main transformer 1 includes a main transformer operating phase and a main transformer spare phase, both of which can be replaced by a transfer trolley 11. Considering the live distance of the main transformer spare phase during rapid replacement, the arrester adopts a detachable equipment bracket.

[0044] The main transformer 1 and the lightning arrester 13 are arranged close to the main transformer. The lightning arrester 13 of the main transformer incoming line is arranged on the main transformer side of the main transformer 1 transportation road. It is arranged as close to the main transformer as possible while meeting the live distance to the firewall. At the same time, when the main transformer is quickly replaced, the live distance of the spare phase transportation is considered. Under the condition of meeting the A1 value of the spare phase, the lightning arrester of the 1000kV main transformer incoming line is as close to the main transformer as possible. At the same time, in order to ensure that the down conductor of the main transformer bushing is arranged as vertically as possible and reduce the tension on the terminal, the relative position of the main transformer incoming line frame and the main transformer needs to be further increased to offset the increase in the length of the 1000kV tension string after altitude correction.

[0045] In order to ensure that the down conductor of the main transformer bushing is arranged as vertically as possible and reduce the pulling force on the terminal, the relative position of the main transformer incoming line frame and the main transformer needs to be further increased. One end of the herringbone column of the main transformer frame is placed above the firewall 2, and the other end is placed on the ground to offset the increase in the length of the 1000kV tension string after altitude correction.

[0046] When the main transformer fails, the high-voltage bushing is reinforced, and the transformer body, bushing, cooling device, and oil storage cabinet are transported as a whole through the transfer track 10 and the transfer trolley 11 to achieve rapid switching between the standby phase and the faulty phase of the main transformer.

[0047] The seismic isolator 6 and the limit device are pre-buried in the transformer foundation, the seismic isolation steel frame 7 is placed above the seismic isolator 6 by bolt connection, a seismic isolation device is arranged between the base of the main transformer 1 and the foundation body 5, and the main transformer 1 equipment is placed on the seismic isolation steel frame 7.

[0048] The main transformer 1 is transported without the seismic isolation steel frame 7, thereby avoiding the problem of bolt alignment between the seismic isolator 6 and the seismic isolation steel frame 7, and between the main transformer and the isolation frame of the compensation transformer.

[0049] The foundation body 5 adopts a strip foundation with a larger slab foundation, which can save about 40m of reinforced concrete. 3 , saving about 70,000 yuan (single-phase foundation). At the same time, the strip foundation facilitates the maintenance of the seismic isolation device.

[0050] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A main transformer system for a UHV substation in a high altitude and high earthquake zone, characterized in that: include: A power distribution device and a lightning arrester (13) arranged adjacent to a main transformer (1) in an ultra-high voltage substation, wherein the main transformers (1) are grouped in three; A firewall (2) separated by a preset distance from a main transformer (1) in a UHV substation; The firewalls (2) are connected together via a door-shaped frame (3), the door-shaped frame (3) is arranged at the upper end of the firewall (2), an outer side surface of the door-shaped frame (3) is connected to an inclined rod (4), and the outer side surface of the door-shaped frame (3) and the inclined rod (4) form a herringbone column; A basic body (5) is arranged below the main transformer (1).

2. A main transformer system for a UHV substation in a high altitude and high earthquake zone according to claim 1, characterized in that: The power distribution device comprises a 110 kV power distribution device, a 500 kV power distribution device and a 1000 kV power distribution device, and the main transformer (1) is arranged at the center of the substation.

3. A main transformer system for a UHV substation in a high altitude and high earthquake zone according to claim 1, characterized in that: The distance between the firewalls (2) on both sides of the transformer (1) is 22.5 m, the distance between the main transformer (1) and the lightning arrester (13) is 7.25 m, and the height of the portal frame (3) is 34 m.

4. A main transformer system for a UHV substation in a high altitude and high earthquake zone according to claim 1, characterized in that: A seismic isolation device is arranged on the base body (5), the seismic isolation device comprises a vibration isolator (6), a seismic isolation steel frame (7) is connected above the vibration isolator (6), and a main transformer (1) is placed on the upper end surface of the seismic isolation steel frame (7).

5. A main transformer system for a UHV substation in a high altitude and high earthquake zone according to claim 4, characterized in that: An oil pool (8) is arranged below the main transformer (1), the basic body (5) is arranged in the oil pool (8), sleepers are laid in the oil pool (8), temporary tracks (9) are arranged on the sleepers, and the temporary tracks (9) are at the same height as the seismic isolation steel frame (7).

6. A main transformer system for a UHV substation in a high altitude and high earthquake zone according to claim 5, characterized in that: A transfer track (10) is laid on the outer end of the oil pool (8), and a transfer trolley (11) is movably arranged on the transfer track (10).