Panel bottom grouting device for pavement concrete precast slab

By designing a concrete prefabricated slab bottom grouting device for pavement with grouting rods, vibration springs and extended pipes, the blockage problem caused by poor slurry flow is solved, the full injection and vibration of slurry is achieved, and the prefabricated road surface is improved structural strength.

CN222119865UActive Publication Date: 2024-12-06SHANDONG SHITONG HIGHWAY CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420464045.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2024-12-06
Estimated Expiration
2034-03-11

AI Technical Summary

Technical Problem

The slurry flow at the bottom of the prefabricated pavement panel is not smooth, which can easily cause blockage, resulting in hollows at the bottom of the board and reducing the structural strength of the prefabricated pavement.

Method used

A prefabricated concrete slab bottom grouting device for pavement is designed, including grouting rod, vibration spring, vibrator and extension tube. The slurry is vibrated through the grouting hole of the grouting rod and the vibration spring, combining the extension and control of the extension tube. The control of the device ensures that the slurry is fully injected into the bottom of the plate and air is discharged, avoiding clogging, and improving the density and structural strength of the slurry.

Benefits of technology

It effectively avoids blockage during the grouting process of the plate base, improves the integrity of the grouting and the tightness of the slurry, and enhances the structural strength of the prefabricated road surface.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222119865U_ABST
    Figure CN222119865U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pavement construction equipment, in particular to a pavement concrete precast slab bottom grouting device which comprises a grouting rod, a plurality of sets of grouting holes are formed in the surface of the grouting rod, the left end of the grouting rod is fixedly connected with a plurality of sets of vibration springs, and the left ends of the vibration springs are fixedly connected with vibrators. The surface of the vibrator is fixedly connected with an exhaust mesh enclosure, the right side surface of the exhaust mesh enclosure is fixedly connected with two groups of first exhaust pipes, the surface of the grouting rod is fixedly connected with a plurality of groups of first clamping blocks, the first clamping blocks are fixedly clamped with the first exhaust pipes, the right side of the grouting rod is in threaded connection with an extension pipe, and the right side of the extension pipe is provided with a controller. Through cooperation of the multiple sets of lengthened pipes, the grouting rods penetrate into the plate bottom, the grouting integrity is improved, then the structural strength of the prefabricated concrete pavement is improved, meanwhile, during grouting, the vibrator vibrates slurry, air in the slurry is exhausted, cavities are prevented from being generated during plate bottom grouting, and the structural strength of the prefabricated concrete pavement is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road construction equipment, in particular to a grouting device for the bottom of a prefabricated pavement concrete slab. Background Art

[0002] Prefabricated assembled cement concrete pavement is an excellent pavement technology. By producing and storing the designed assembled road panels in the prefabrication plant, the quality of the road panels is guaranteed, the contradiction between the long setting and hardening time of cement concrete and the short construction time in pavement construction is solved, and the pollution caused by on-site construction is minimized.

[0003] After the prefabricated assembled pavement is installed, grouting is required at the bottom of the prefabricated board to fill the gaps at the bottom of the prefabricated board and improve the structural strength of the prefabricated pavement. However, due to the poor flow of the slurry at the bottom of the board, it is easy to cause blockage, resulting in voids at the bottom of the prefabricated board, which reduces the structural strength of the prefabricated pavement.

[0004] Therefore, it is necessary to invent a pavement concrete prefabricated slab bottom grouting device to solve the above problems. Utility Model Content

[0005] The utility model aims to provide a grouting device for the bottom of a prefabricated pavement concrete slab, so as to solve the problem that the slurry at the bottom of the slab does not flow smoothly, which is easy to cause blockage, resulting in voids at the bottom of the prefabricated slab and reducing the structural strength of the prefabricated pavement.

[0006] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a grouting device for the bottom of a prefabricated pavement concrete slab, comprising a grouting rod, a plurality of grouting holes being opened on the surface of the grouting rod, a plurality of vibration springs being fixedly connected to the left end of the grouting rod, a vibrator being fixedly connected to the left end of the vibration spring, an exhaust mesh cover being fixedly connected to the surface of the vibrator, two groups of first exhaust pipes being fixedly connected to the right surface of the exhaust mesh cover, a plurality of first clamping blocks being fixedly connected to the surface of the grouting rod, the first clamping blocks being clamped and fixed to the group of first exhaust pipes, an extension pipe being threadedly connected to the right side of the grouting rod, and a controller being arranged on the right side of the extension pipe.

[0007] By adopting the above technical solution, corresponding extension pipes are installed according to the required grouting length, so that the grouting rod can be extended to the bottom of the bottom of the plate for grouting, avoiding blockage during the grouting process and improving the integrity of the grouting. In the process of grouting, the vibrator is started to vibrate the slurry to increase the compactness of the slurry, avoid residual air inside the slurry, and improve the structural strength of the road surface. The exhausted air penetrates into the interior of the exhaust mesh cover and is discharged through the first exhaust pipe.

[0008] Optionally, a first threaded groove is formed at the right end of the grouting rod, a first threaded block is fixedly connected to the left end of the extension tube, and the first threaded block is threadedly connected to the first threaded groove.

[0009] By adopting the above technical solution, the first thread block is threadedly connected with the first thread groove, and the grouting rod and the extension tube are fixed.

[0010] Optionally, a second threaded slot is provided at the right end of the extension tube, a connecting pipe is fixedly connected to the left side of the controller, a second threaded block is fixedly connected to the left end of the connecting pipe, and the second threaded block is threadedly connected to the second threaded slot.

[0011] By adopting the above technical solution, the second threaded block is threadedly connected to the second threaded groove, and the extension tube is fixedly connected to the controller. The use of the extension tube can be increased or decreased according to the actual use length.

[0012] Optionally, a plurality of groups of second clamping blocks are fixedly connected to the surface of the extension tube, an extension hose is fixedly connected to the surface of the second clamping block, and the extension hose is plugged and fixed to the first exhaust pipe.

[0013] By adopting the above technical solution, the first exhaust pipe is a metal pipe, which is located inside the slurry during use. The extension hose is made of hose material. After adding the extension tube, the extension hose is plugged and fixed to the first exhaust pipe to achieve air discharge.

[0014] Optionally, a plurality of groups of third clamping blocks are fixedly connected to the surface of the connecting pipe, a second exhaust pipe is fixedly connected to the surface of the third clamping block, and the second exhaust pipe is plugged and fixed to the extension hose.

[0015] By adopting the above technical solution, the second exhaust pipe is a hose, and after the extension pipe is installed, the extension hose is plugged and fixed to the second exhaust pipe.

[0016] Optionally, a control valve is fixedly connected to the upper surface of the controller, and a lifting rod is fixedly connected to the side of the controller.

[0017] By adopting the above technical solution, after the grouting rod penetrates into the bottom of the board, the valve is opened to inject grout into the bottom of the board.

[0018] Optionally, the right end of the controller is fixedly connected to an infusion tube, the right end of the infusion tube is fixedly connected to a handle, and the right end of the handle is fixedly connected to a grouting hose.

[0019] By adopting the above technical solution, the grouting hose is convenient for adjusting the position of the grouting rod.

[0020] Optionally, a transmission pipeline is fixedly connected inside the controller, and two ends of the transmission pipeline are fixedly connected to the connecting pipeline and the infusion tube respectively, and a through hole for grouting is opened inside the handle.

[0021] By adopting the above technical solution, a control switch is fixedly connected to the surface of the controller for controlling the start and stop of the vibrator.

[0022] In the above technical solution, the technical effects and advantages provided by the utility model are:

[0023] 1. The utility model has several groups of grouting holes opened on the surface of the grouting rod, and the right side of the grouting rod is threadedly connected with an extension pipe, and a controller is arranged on the right side of the extension pipe. The extension pipe is increased or decreased according to the actual use needs, so that the grouting pipe can penetrate into the bottom of the bottom plate, grouting is performed on the bottom of the bottom plate, and voids are avoided at the bottom, thereby improving the structural strength of the prefabricated pavement, solving the problem that the slurry at the bottom of the plate is not smooth, which is easy to cause blockage, resulting in voids at the bottom of the prefabricated plate, and reducing the structural strength of the prefabricated pavement;

[0024] 2. The utility model has multiple groups of vibration springs fixedly connected to the left end of the grouting rod, the left end of the vibration spring is fixedly connected to a vibrator, the surface of the vibrator is fixedly connected to an exhaust mesh cover, and the right surface of the exhaust mesh cover is fixedly connected to two groups of first exhaust pipes. During the grouting process, the vibrator continuously vibrates the slurry and discharges the air inside the slurry through the exhaust pipe, thereby improving the structural strength of the slurry after solidification and further improving the structural strength of the pavement. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0026] Figure 2 This is a schematic diagram of the grouting rod structure of the utility model;

[0027] Figure 3 This is a schematic diagram of the structure of the vibrator of the utility model;

[0028] Figure 4 This is a schematic diagram of the extension tube structure of the utility model;

[0029] Figure 5 This is a schematic diagram of the controller structure of the utility model.

[0030] Description of reference numerals:

[0031] 1. Grouting rod; 11. Grouting hole; 12. First clamping block; 13. First exhaust pipe; 14. Vibration spring; 15. Vibrator; 16. Exhaust mesh cover; 17. First threaded slot; 2. Extension tube; 21. First threaded clamping block; 22. Second threaded slot; 24. Second clamping block; 25. Extension hose; 3. Controller; 31. Control valve; 32. Lifting rod; 33. Connecting pipe; 34. Second threaded clamping block; 35. Third clamping block; 36. Second exhaust pipe; 37. Infusion tube; 38. Handle; 39. Grouting hose. DETAILED DESCRIPTION

[0032] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0033] The utility model provides Figures 1 to 5 A pavement concrete precast slab bottom grouting device shown includes a grouting rod 1, a plurality of grouting holes 11 are opened on the surface of the grouting rod 1, a plurality of vibration springs 14 are fixedly connected to the left end of the grouting rod 1, a vibrator 15 is fixedly connected to the left end of the vibration spring 14, an exhaust mesh cover 16 is fixedly connected to the surface of the vibrator 15, two groups of first exhaust pipes 13 are fixedly connected to the right surface of the exhaust mesh cover 16, a plurality of first clamping blocks 12 are fixedly connected to the surface of the grouting rod 1, the first clamping blocks 12 are clamped and fixed to the first exhaust pipes 13, an extension pipe 2 is threadedly connected to the right side of the grouting rod 1, and a controller 3 is arranged on the right side of the extension pipe 2.

[0034] During use, a corresponding number of extension tubes 2 are installed according to the depth of the space at the bottom of the slab, and the grouting rod 1 is inserted into the bottom of the slab. At this time, grouting is performed on the bottom of the slab. During the grouting process, the extension tube 2 is swung to evenly grout the bottom of the slab. While grouting, the vibrator 15 is turned on to vibrate the slurry, and the air inside the slurry is discharged to the outside through the exhaust pipe, thereby improving the structural strength of the precast concrete pavement.

[0035] See also Figures 2 to 4A first threaded slot 17 is provided at the right end of the grouting rod 1, a first threaded block 21 is fixedly connected to the left end of the extension tube 2, and the first threaded block 21 is threadedly connected to the first threaded slot 17; a second threaded slot 22 is provided at the right end of the extension tube 2; a connecting pipe 33 is fixedly connected to the left side of the controller 3, a second threaded block 34 is fixedly connected to the left end of the connecting pipe 33, and the second threaded block 34 is threadedly connected to the second threaded slot 22; a plurality of groups of second blocks 24 are fixedly connected to the surface of the extension tube 2, an extension hose 25 is fixedly connected to the surface of the second block 24, and the extension hose 25 is plugged and fixed to the first exhaust pipe 13; a plurality of groups of third blocks 35 are fixedly connected to the surface of the connecting pipe 33, a second exhaust pipe 36 is fixedly connected to the surface of the third block 35, and the second exhaust pipe 36 is plugged and fixed to the extension hose 25.

[0036] Specifically, during the installation of the extension tube 2, the first threaded block 21 at the left end of the extension tube 2 is first threadedly connected to the first threaded groove 17 at the right end of the grouting rod 1. After the extension tube 2 and the grouting rod 1 are connected, the extension hose 25 on the side of the extension tube 2 is plugged and fixed to the right end of the first exhaust pipe 13 to extend the first exhaust pipe 13. Similarly, the extension tube 2 is increased to the required length.

[0037] See also Figure 5 A control valve 31 is fixedly connected to the upper surface of the controller 3, a lifting rod 32 is fixedly connected to the side of the controller 3, a liquid infusion tube 37 is fixedly connected to the right end of the controller 3, a handle 38 is fixedly connected to the right end of the liquid infusion tube 37, a grouting hose 39 is fixedly connected to the right end of the handle 38, a transmission pipeline is fixedly connected to the inside of the controller 3, both ends of the transmission pipeline are fixedly connected to the connecting pipeline 33 and the liquid infusion tube 37 respectively, and a through hole for grouting is opened inside the handle 38.

[0038] At the same time, during grouting, the grouting hose 39 is connected to the tank storing the slurry, and the slurry enters the infusion pipe 37 through the grouting hose 39, then enters the interior of the connecting pipe 33 through the transmission pipe, and then enters the interior of the grouting rod 1 through multiple groups of extension pipes 2, and is discharged from the grouting hole 11 for grouting.

[0039] Working principle of the utility model: in order to avoid the formation of voids during grouting at the bottom of the slab and to improve the structural strength of the precast concrete pavement, a plurality of groups of extension pipes 2 are used to cooperate to allow the grouting rod 1 to penetrate into the interior of the bottom of the slab, and grout is sequentially injected outward to improve the completeness of the grouting, thereby improving the structural strength of the precast concrete pavement. At the same time, during the grouting, the vibrator 15 vibrates the slurry to expel the air inside it.

[0040] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only preferred examples of the utility model, and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.

Claims

1. A grouting device for the bottom of a prefabricated pavement concrete slab, comprising a grouting rod (1), characterized in that: The surface of the grouting rod (1) is provided with a plurality of grouting holes (11); the left end of the grouting rod (1) is fixedly connected to a plurality of vibration springs (14); the left end of the vibration spring (14) is fixedly connected to a vibrator (15); the surface of the vibrator (15) is fixedly connected to an exhaust mesh cover (16); the right side surface of the exhaust mesh cover (16) is fixedly connected to two groups of first exhaust pipes (13); the surface of the grouting rod (1) is fixedly connected to a plurality of first clamping blocks (12); the first clamping blocks (12) are clamped and fixed to the first exhaust pipes (13); the right side of the grouting rod (1) is threadedly connected to an extension tube (2); and a controller (3) is provided on the right side of the extension tube (2).

2. A grouting device for the bottom of a prefabricated pavement concrete slab according to claim 1, characterized in that: The right end of the grouting rod (1) is provided with a first threaded groove (17), the left end of the extension tube (2) is fixedly connected with a first threaded block (21), and the first threaded block (21) is threadedly connected to the first threaded groove (17).

3. A grouting device for the bottom of a prefabricated pavement concrete slab according to claim 2, characterized in that: A second threaded groove (22) is formed at the right end of the extension tube (2); a connecting pipe (33) is fixedly connected to the left side of the controller (3); a second threaded block (34) is fixedly connected to the left end of the connecting pipe (33); and the second threaded block (34) is threadedly connected to the second threaded groove (22).

4. A grouting device for the bottom of a prefabricated pavement concrete slab according to claim 3, characterized in that: The surface of the extension tube (2) is fixedly connected to a plurality of groups of second clamping blocks (24), the surface of the second clamping block (24) is fixedly connected to an extension hose (25), and the extension hose (25) is plugged and fixedly connected to the first exhaust pipe (13).

5. A grouting device for the bottom of a prefabricated pavement concrete slab according to claim 4, characterized in that: The surface of the connecting pipe (33) is fixedly connected to a plurality of third clamping blocks (35), the surface of the third clamping blocks (35) is fixedly connected to a second exhaust pipe (36), and the second exhaust pipe (36) is plugged and fixedly connected to the extension hose (25).

6. A grouting device for the bottom of a prefabricated pavement concrete slab according to claim 5, characterized in that: A control valve (31) is fixedly connected to the upper surface of the controller (3), and a lifting rod (32) is fixedly connected to the side surface of the controller (3).

7. A grouting device for the bottom of a prefabricated pavement concrete slab according to claim 6, characterized in that: The right end of the controller (3) is fixedly connected to a liquid infusion tube (37), the right end of the liquid infusion tube (37) is fixedly connected to a handle (38), and the right end of the handle (38) is fixedly connected to a grouting hose (39).

8. The grouting device for the bottom of a prefabricated pavement concrete slab according to claim 7, characterized in that: A transmission pipeline is fixedly connected inside the controller (3), and two ends of the transmission pipeline are respectively fixedly connected to the connecting pipeline (33) and the infusion tube (37), and a through hole for grouting is provided inside the handle (38).