Aerial work platform for highway bridge construction

By designing the U-shaped frame and support system, the problem of frequent position adjustment of high-altitude working platforms in bridge construction is solved, and efficient and safe construction on multiple surfaces is achieved.

CN222119972UActive Publication Date: 2024-12-06INNER MONGOLIA TONGYUAN CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422712520.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-07
Publication Date
2024-12-06
Estimated Expiration
2034-11-07

AI Technical Summary

Technical Problem

During bridge construction, the position of the aerial working platform needs to be adjusted multiple times to perform bridge pier cleaning and other operations, resulting in a long operation time.

Method used

A high-altitude working platform including a U-shaped frame, a U-shaped inner frame, a protective door, a support plate and a U-shaped plug-in was designed. By setting up a wire rope and a vertical rod, the support plate can be fixed in multiple positions, and the protective door can be opened to protect it. Support the plate to reduce the number of position adjustments.

Benefits of technology

It realizes the reduction of position adjustment times while constructing multiple surfaces of the bridge pier, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222119972U_ABST
    Figure CN222119972U_ABST
Patent Text Reader

Abstract

The utility model provides an aerial work platform for highway bridge construction, and belongs to the technical field of construction tools. Comprising a U-shaped frame, a U-shaped inner frame is fixed to the inner wall of the U-shaped frame, an assembling base is fixed to the bottom of the U-shaped frame, and two inlets and outlets are formed in the positions, close to the ends, of the inner wall of the U-shaped frame. By arranging the U-shaped frame, the U-shaped inner frame, the protective door, the bottom frame, the supporting plate and the U-shaped inserting piece, in the construction process of the bridge pier, a worker stands in the U-shaped frame and the U-shaped inner frame, and after the U-shaped frame and the U-shaped inner frame are attached to a bridge section, construction can be conducted on multiple positions of the bridge pier at the same time; the two supporting plates can be fixed together through the U-shaped plug-in to form a supporting platform, after the protective door is opened outwards, the positions of the two supporting plates can be protected, at the moment, construction can be conducted on multiple faces of the pier, the supporting position does not need to be adjusted many times, and the time spent on adjustment is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction tools, in particular to an aerial work platform for highway bridge construction. Background Art

[0002] During the construction of a bridge, it is necessary to clean the surface of the bridge piers. Before construction, personnel first stand on the aerial work platform, then use a lift to send the aerial work platform to a high altitude, and then clean the piers.

[0003] The aerial work platform is raised by a lift to carry out construction on the bridge pier. When the construction on one side of the bridge pier is completed, the aerial work platform needs to be lowered, and then the personnel walk out of the aerial work platform, and then the lift is moved to the other side of the bridge pier. Then the personnel enter the aerial work platform again, and the aerial work platform is sent to the air by the lift again to carry out construction on the other side of the bridge pier. During this process, the position of the aerial work platform needs to be adjusted many times, and the operation takes a long time. Therefore, the present application provides an aerial work platform for highway bridge construction to meet the needs. Utility Model Content

[0004] The technical problem to be solved by the utility model is to provide an aerial work platform for highway bridge construction to solve the problem that when cleaning bridge piers, the position of the aerial work platform needs to be adjusted many times and the operation takes a long time.

[0005] In order to solve the above technical problems, the utility model provides the following technical solutions:

[0006] The invention relates to an aerial work platform for highway bridge construction, comprising a U-shaped frame, wherein the inner wall of the U-shaped frame is fixed with a U-shaped inner frame, the bottom of the U-shaped frame is fixed with an assembly seat, an inlet and outlet are provided at the inner wall of the U-shaped frame near the end position, the number of the inlet and outlet is two, the inlet and outlet of the U-shaped frame are rotatably connected with protective doors through hinges, the tops of the two protective doors are fixed with internal thread seats, the inner wall of the U-shaped frame is provided with two fixing holes, the inner wall of the internal thread seat is threadedly connected with a fixing bolt, one end of the fixing bolt is inserted into the fixing hole, and the outer side of the U-shaped inner frame and near the end position is provided with a fixing bolt. There are notches, two of which are provided. A mounting seat is fixed on the outer side of the U-shaped frame near the end position. There are two mounting seats. Support rods are fixed on the two mounting seats. The surfaces of the support rods are movably sleeved with bottom frames. The two bottom frames are located in the notches. Support plates are fixed on the two bottom frames. The bottom of the protective door is attached to the top of the support plate. Positioning holes are provided on the top of the two support plates. A support block is fixed to the inner wall of the U-shaped inner frame. A U-shaped plug-in is placed on the support block. After the two support plates are close to each other, they are inserted into the two positioning holes through the U-shaped plug-in.

[0007] Preferably, a steel wire rope is arranged in the U-shaped frame, one end of the steel wire rope is fixed in the U-shaped frame, the other end of the steel wire rope movably passes through the U-shaped frame and is fixed with a vertical rod, and a connecting rod is fixed between the vertical rod and the bottom frame.

[0008] Preferably, a through groove is provided on a side of the U-shaped inner frame close to the steel wire rope.

[0009] Preferably, magnets are embedded on the sides of the two bottom frames that are close to each other.

[0010] Preferably, a plurality of buckle grooves are provided on the tops of the two support plates.

[0011] Preferably, an arc-shaped groove is provided on the inner wall of the U-shaped plug-in.

[0012] Preferably, the bottom of the U-shaped plug-in is provided with an arc chamfer.

[0013] Preferably, a limiting block is fixed at the end of the support rod, and the limiting block is located in the insertion hole.

[0014] Compared with the prior art, the utility model has at least the following beneficial effects:

[0015] In the above scheme, by setting up a U-shaped frame, a U-shaped inner frame, a protective door, a bottom frame, a support plate and a U-shaped plug-in, during the construction of the bridge pier, the personnel stand in the U-shaped frame and the U-shaped inner frame. After the U-shaped frame and the U-shaped inner frame are attached to the bridge section, construction can be carried out on multiple positions of the bridge pier at the same time, and the two support plates can be fixed together by the U-shaped plug-in to form a support platform. After the protective door is opened outward, the positions of the two support plates can be protected. At this time, construction can be carried out on multiple surfaces of the bridge pier without adjusting the support position multiple times, thereby reducing the time required for adjustment.

[0016] By setting up vertical rods, steel wire ropes and connecting rods, when the bottom frame and the support plate move toward each other, the bottom frame can simultaneously drive the vertical rods to move through the connecting rods. The vertical rods will drive the steel wire ropes to straighten, and the steel wire ropes can play a protective role at the edge of the support plate, making the overall construction safer. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings, which are incorporated herein and constitute a part of the specification, illustrate embodiments of the present disclosure and, together with the description, further serve to explain the principles of the present disclosure and to enable those skilled in the relevant art to make and use the present disclosure.

[0018] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the three-dimensional structure of the U-shaped plug-in of the utility model;

[0020] Figure 3 This is a cross-sectional view of the bottom frame of the utility model;

[0021] Figure 4 For this utility model Figure 3 A magnified view of the structure at center;

[0022] Figure 5 This is a cross-sectional view of the mounting seat of the utility model;

[0023] Figure 6 This is a schematic diagram of the three-dimensional structure of the connecting rod of the utility model;

[0024] Figure 7 It is a schematic diagram of the three-dimensional structure of the support rod of the utility model.

[0025] Reference numerals:

[0026] 1. U-shaped frame; 2. U-shaped inner frame; 3. Assembly seat; 4. Inlet and outlet; 5. Protective door; 6. Internal thread seat; 7. Fixing bolt; 8. Fixing hole; 9. Notch; 10. Mounting seat; 11. Support rod; 12. Bottom frame; 13. Plug hole; 14. Buckle groove; 15. Magnet; 16. Support block; 17. U-shaped plug-in; 18. Positioning hole; 19. Through groove; 20. Wire rope; 21. Vertical rod; 22. Connecting rod; 23. Support plate; 24. Limit block.

[0027] As shown in the figure, in order to clearly implement the structure of the embodiment of the utility model, specific structures and devices are marked in the figure, but this is only for illustrative purposes and is not intended to limit the utility model to the specific structure, device and environment. According to specific needs, ordinary technicians in this field can adjust or modify these devices and environments, and the adjustments or modifications made are still included in the scope of the attached claims. DETAILED DESCRIPTION

[0028] The following is a detailed description of an aerial work platform for highway bridge construction provided by the utility model in combination with the accompanying drawings and specific embodiments. At the same time, it is explained here that in order to make the embodiments more detailed, the following embodiments are the best and preferred embodiments, and those skilled in the art may also adopt other alternative methods to implement some known technologies; and the accompanying drawings are only for more specific description of the embodiments, and are not intended to specifically limit the utility model.

[0029] It should be noted that the references to "one embodiment", "embodiment", "exemplary embodiments", "some embodiments" and the like in the specification indicate that the embodiments described may include specific features, structures or characteristics, but not every embodiment may include the specific features, structures or characteristics. In addition, when a specific feature, structure or characteristic is described in conjunction with an embodiment, it should be within the knowledge of a person skilled in the art to implement such feature, structure or characteristic in conjunction with other embodiments (whether or not explicitly described).

[0030] In general, a term can be understood, at least in part, from its use in context. For example, depending, at least in part, on the context, the term "one or more" as used herein can be used to describe any feature, structure, or characteristic in the singular sense, or can be used to describe a combination of features, structures, or characteristics in the plural sense. Additionally, the term "based on" can be understood as not necessarily intended to convey an exclusive set of factors, but can instead, depending, at least in part, on the context, allow for the presence of other factors that are not necessarily explicitly described.

[0031] like Figure 1-Figure 7 As shown, an embodiment of the utility model provides an aerial work platform for highway bridge construction, including a U-shaped frame 1, an inner wall of the U-shaped frame 1 is fixed with a U-shaped inner frame 2, an assembly seat 3 is fixed to the bottom of the U-shaped frame 1, the assembly seat 3 is used to connect with the elevator, an inner wall of the U-shaped frame 1 is provided with an inlet and outlet 4 near the end position, the number of the inlet and outlet 4 is two, and the inlet and outlet 4 of the U-shaped frame 1 are rotatably connected with a protective door 5 through a hinge. In the initial state, the protective door 5 is used for protecting one side of the U-shaped inner frame 2. After the protective door 5 is rotated ninety degrees and fixed, the protective door 5 can protect one side of the support plate 23. The tops of the two protective doors 5 are fixed with internal threaded seats 6, and the inner wall of the U-shaped frame 1 is provided with two fixing holes 8. The inner wall of the internal threaded seat 6 is threadedly connected with a fixing bolt 7, one end of the fixing bolt 7 is inserted into the fixing hole 8, and the U-shaped inner frame 2 is provided with a notch 9 on the outside and near the end position, and the number of the notches 9 is two. A mounting seat 10 is fixed on the outside and near the end position of the U-shaped frame, and the number of the mounting seats 10 is two. A support rod 11 is fixed on each of the two mounting seats 10, and a bottom frame 12 is movably sleeved on the surface of the support rod 11. The two bottom frames 12 are both located in the notch 9. A support plate 23 is fixed on each of the two bottom frames 12. The bottom of the protective door 5 is attached to the top of the support plate 23. The top of the two support plates 23 is provided with a positioning hole 18. A support block 16 is fixed to the inner wall of the U-shaped inner frame 2, and a U-shaped plug-in 17 is placed on the support block 16. After the two support plates 23 are close to each other, they are inserted into the two positioning holes 18 through the U-shaped plug-in 17. The U-shaped plug-in 17 is used to fix the two support plates 23 to prevent the support plates 23 from separating during use, thereby improving safety performance.

[0032] like Figure 1 , Figure 3 and Figure 7 As shown, in this embodiment, a steel wire rope 20 is arranged in the U-shaped frame 1, one end of the steel wire rope 20 is fixed in the U-shaped frame 1, and the other end of the steel wire rope 20 is movable through the U-shaped frame 1 and is fixed with a vertical rod 21, and a connecting rod 22 is fixed between the vertical rod 21 and the bottom frame 12. After the steel wire rope 20 is straightened, it can protect personnel, avoid accidents, and improve safety during use.

[0033] like Figure 1 , Figure 3 and Figure 7 As shown, in this embodiment, a through groove 19 is provided on one side of the U-shaped inner frame 2 close to the steel wire rope 20. By providing the through groove 19, the through groove 19 allows the palm to pass through the U-shaped inner frame 2, making it easy to pull the steel wire rope 20 back to its original position from the inside of the U-shaped inner frame 2.

[0034] like Figure 6 As shown, in this embodiment, magnets 15 are embedded on the sides of the two bottom frames 12 that are close to each other. By setting the magnets 15, after the two support plates 23 are attached together, the magnetic force of the magnets 15 can magnetically attract the bottom frames 12 together to prevent the bottom frames 12 from separating.

[0035] like Figure 6 As shown, in this embodiment, a plurality of buckle grooves 14 are provided on the top of the two support plates 23. By providing the buckle grooves 14 on the support plates 23, a part of the buckle grooves 14 can increase the friction on the top of the support plates 23 to prevent people from sliding on it, and the other part can provide friction to the fingers to facilitate moving the support plates 23.

[0036] like Figure 2 As shown, in this embodiment, an arc-shaped groove is provided on the inner wall of the U-shaped plug-in 17. After the U-shaped plug-in 17 is inserted into the positioning hole 18, when the U-shaped plug-in 17 needs to be removed, the arc-shaped groove can provide space for fingers to hold, thereby facilitating the removal of the U-shaped plug-in 17 from the positioning hole 18.

[0037] like Figure 2 As shown, in this embodiment, the bottom of the U-shaped plug 17 is provided with an arc chamfer, and the chamfer at the bottom of the U-shaped plug 17 can play a guiding role, making it easier for the U-shaped plug 17 to be inserted into the positioning hole 18.

[0038] like Figure 3 and Figure 4 As shown, in this embodiment, a limit block 24 is fixed at the end of the support rod 11, and the limit block 24 is located in the insertion hole 13. By setting the limit block 24, the bottom frame 12 can be prevented from detaching from the support rod 11, thereby improving the stability of the bottom frame 12 during use.

[0039] Working principle: The U-shaped frame 1 is installed on the elevator through the assembly seat 3, and then the personnel enters the U-shaped inner frame 2, and then the protective door 5 is closed, and the fixing bolt 7 on the internal thread seat 6 is turned, and the fixing bolt 7 moves in the direction of the fixing hole 8 until the fixing bolt 7 is inserted into the fixing hole 8, and then the U-shaped frame 1 is moved to the surface of the pier through the elevator, and then the two support plates 23 are moved toward each other, and the two support plates 23 slide on the surface of the support rod 11 through the bottom frame 12 until the two bottom frames 12 are magnetically attracted to each other through the magnet 15, and then the fixing bolt 7 is screwed out of the fixing hole 8, and the protective door 5 is turned ninety degrees, and the fixing bolt 7 on one of the internal thread seats 6 is removed, and the other internal thread seat 6 is turned. The fixing bolts 7 on the bottom frame 12 are made to pass through the two internal thread seats 6 at the same time to fix the two protective doors 5. At the same time, the U-shaped plug-in 17 is removed from the support block 16, and the U-shaped plug-in 17 is inserted into the positioning holes 18 of the two support plates 23 to prevent the two support plates 23 from being separated from each other during use. At the same time, when the bottom frame 12 is moving, the bottom frame 12 will drive the vertical rod 21 to move through the connecting rod 22, and the vertical rod 21 will drive the wire rope 20 to straighten. The straightened wire rope 20 and the protective door 5 after rotating ninety degrees can protect the two support plates 23. After that, the personnel can process multiple surfaces at the same horizontal position of the pier through the U-shaped inner frame 2 and the support plate 23, and there is no need to adjust it many times.

[0040] When the pier construction is completed, the U-shaped plug-in 17 is removed from the positioning hole 18, and the U-shaped plug-in 17 is hung on the support block 16 again, the support plate 23 is separated, and the protective door 5 is reset to the initial position.

[0041] The present invention covers any substitution, modification, equivalent method and scheme made on the essence and scope of the present invention. In order to make the public have a thorough understanding of the present invention, the specific details are described in detail in the above preferred embodiments of the present invention, and those skilled in the art can fully understand the present invention without the description of these details.

[0042] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.

Claims

1. An aerial work platform for highway bridge construction, characterized in that: The invention comprises a U-shaped frame (1), wherein a U-shaped inner frame (2) is fixed to the inner wall of the U-shaped frame (1), an assembly seat (3) is fixed to the bottom of the U-shaped frame (1), an inlet and outlet (4) is provided on the inner wall of the U-shaped frame (1) near the end position, and the number of the inlet and outlet (4) is two, and the inlet and outlet (4) of the U-shaped frame (1) are rotatably connected to protective doors (5) through hinges, and the tops of the two protective doors (5) are fixed with internal thread seats (6), and the inner wall of the U-shaped frame (1) is provided with two fixing holes (8), and the inner wall of the internal thread seat (6) is threadedly connected with a fixing bolt (7), and one end of the fixing bolt (7) is inserted into the fixing hole (8), and a notch (9) is provided on the outer side of the U-shaped inner frame (2) near the end position, and the number of the notch (9) is two, A mounting seat (10) is fixed on the outer side of the U-shaped frame and near the end position, the number of the mounting seats (10) is two, a support rod (11) is fixed on each of the two mounting seats (10), a bottom frame (12) is movably sleeved on the surface of the support rod (11), the two bottom frames (12) are both located in the notch (9), a support plate (23) is fixed on each of the two bottom frames (12), the bottom of the protective door (5) is attached to the top of the support plate (23), the top of the two support plates (23) are provided with a positioning hole (18), a support block (16) is fixed on the inner wall of the U-shaped inner frame (2), a U-shaped plug-in (17) is placed on the support block (16), and after the two support plates (23) are close to each other, they are inserted into the two positioning holes (18) through the U-shaped plug-in (17).

2. The aerial work platform for highway bridge construction according to claim 1, characterized in that: A steel wire rope (20) is arranged in the U-shaped frame (1), one end of the steel wire rope (20) is fixed in the U-shaped frame (1), the other end of the steel wire rope (20) movably passes through the U-shaped frame (1) and is fixed with a vertical rod (21), and a connecting rod (22) is fixed between the vertical rod (21) and the bottom frame (12).

3. The aerial work platform for highway bridge construction according to claim 2, characterized in that: A through groove (19) is formed on one side of the U-shaped inner frame (2) close to the steel wire rope (20).

4. The aerial work platform for highway bridge construction according to claim 1, characterized in that: Magnets (15) are embedded on the sides of the two bottom frames (12) that are close to each other.

5. The aerial work platform for highway bridge construction according to claim 1, characterized in that: A plurality of buckle grooves (14) are provided on the tops of the two support plates (23).

6. The aerial work platform for highway bridge construction according to claim 1, characterized in that: The inner wall of the U-shaped plug-in unit (17) is provided with an arc-shaped groove.

7. The aerial work platform for highway bridge construction according to claim 1, characterized in that: The bottom of the U-shaped plug-in unit (17) is provided with an arc chamfer.

8. The aerial work platform for highway bridge construction according to claim 1, characterized in that: A limit block (24) is fixed to the end of the support rod (11), and the limit block (24) is located in the insertion hole (13).