Precast tubular pile core soil sampling device
By designing a prefabricated pipe pile core soil extraction device, the combination of rod body, rotating cutter plate and legs is used to solve the problems of low efficiency and safety risks of traditional manual pile core cleaning, and efficient and stable pile core soil extraction operation is achieved.
Patent Information
- Application Number
- CN202420742711.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-10
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-10
AI Technical Summary
When traditional manual use of soil shovel knives to clean the core of prefabricated pipe piles, the construction efficiency is low, the soil cleaning depth is small, and there is a safety risk.
A prefabricated pipe pile core soil extraction device is designed, including a rod body, a rotating cutter plate, a base and a leg. Through the combination of the rod body and a rotating cutter plate, the base and a leg provide a stable fulcrum, reducing the labor force of the operator, and The stability of the legs is improved by anchoring rings and connecting rings, and efficient soil cutting and extraction of the pile core is achieved.
The soil extraction construction efficiency is improved, the labor input of operators is reduced, and the base instability is avoided through the stability of multiple legs, which enhances the safety and efficiency of construction.
Smart Images

Figure CN222120237U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated pipe pile construction tools, in particular to a prefabricated pipe pile core soil taking device. Background Art
[0002] At present, with the rapid development of high-rise buildings, prefabricated pipe piles have been widely used in the construction industry due to their large single pile bearing capacity, fast construction speed, and low environmental pollution. Prestressed pipe piles can be constructed by hammering and static pressure. According to relevant standards and specifications, the core of the pipe should be filled after the pile is formed. The core filling depth is generally large, and the core cleaning has become a difficult problem in on-site construction operations: At present, the core cleaning of prefabricated piles mainly adopts traditional manual shovels to clean the core, which has low construction efficiency, small cleaning depth, and certain safety risks. Therefore, a prefabricated pipe pile core soil extraction device is proposed. Utility Model Content
[0003] The utility model aims to provide a prefabricated pipe pile core soil taking device to solve the problems raised in the above background technology.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a prefabricated pipe pile core soil taking device, comprising a rod body and a rotating cutter disc connected to the outer peripheral surface of the rod body, the outer peripheral surface of the rod body is also provided with a base located above the rotating cutter disc, the rod body and the base are threadedly connected, and the base is equipped with a plurality of legs for fixing the base position.
[0005] As a further solution of the utility model: a handle for driving the rod body to rotate is installed at the upper end of the rod body, and the handle is in a disc shape.
[0006] As a further solution of the utility model: anchor rings are installed at positions near the insertion ends on the outer circumferences of the plurality of legs.
[0007] As a further solution of the utility model: a plurality of the legs are connected in series via a connecting ring.
[0008] As a further solution of the utility model: the number of the supporting legs is four, and the four supporting legs are diagonally arranged at four corners of the lower end surface of the base.
[0009] As a further solution of the utility model: the rotating cutter disc is adapted to the inner diameter of the pipe core of the prefabricated pipe pile.
[0010] As a further solution of the utility model: the base, the legs and the connecting ring are welded into an integrated structure, and the rotating cutter disc is located in the middle of the integrated structure.
[0011] Compared with the prior art, the beneficial effects of the utility model are:
[0012] 1. Through the combination of the rod body and the rotating cutter disc, when the rod body rotates squarely, the rotating cutter disc moves upward or downward. This movement process can cut and take soil from the pile core. Secondly, under the action of the base, a relatively stable fulcrum can be provided for the rod body. When the rotating cutter disc moves upward or downward, the labor invested by the operator is less than that of the operator directly holding the rod body to drive the rotating cutter disc to move. In addition, under the action of multiple legs, the stability of the base can be guaranteed to avoid the base being disturbed by external forces during use, thereby preventing instability and further improving the efficiency of soil taking construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0014] Figure 2 This is a schematic diagram of the handle of the utility model;
[0015] Figure 3 It is a schematic diagram of the combination of the rotary cutter disc and the rod body of the utility model;
[0016] Figure 4 This is a schematic diagram of the rod body and handle combination of the utility model;
[0017] Figure 5 This is a schematic diagram of the base and legs combination of the utility model;
[0018] Figure 6 It is a schematic diagram of the combination of the support leg and the anchor ring of the utility model;
[0019] In the figure: 1. rotating cutter disc; 2. rod body; 3. handle; 4. base; 5. support leg; 6. anchor ring; 7. connecting ring. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] See also Figure 1-6In an embodiment of the utility model, a prefabricated pipe pile core soil taking device includes a rod body 2 and a rotating cutter head 1 connected to the outer peripheral surface of the rod body 2. The outer peripheral surface of the rod body 2 is also provided with a base 4 located above the rotating cutter head 1. The rod body 2 and the base 4 are threadedly connected. A plurality of legs 5 for fixing the position of the base 4 are installed on the base 4. The number of legs 5 is not limited. In this embodiment, preferably, the number of legs 5 is four, and the four legs 5 are diagonally arranged at the four corners of the lower end surface of the base 4.
[0022] Specifically, the rotary cutter head 1 is integrally welded to the position near the lower end of the outer peripheral surface of the rod body 2 to ensure that the rotary cutter head 1 can enter the pile core synchronously when the rod body 2 is extended into the pile core. The outer peripheral surface of the rod body 2 above the rotary cutter head 1 is formed with an external thread, and the middle part of the base 4 is penetrated with an internal thread hole, and the internal thread hole is adapted to the external thread on the rod body 2 to realize the free up and down movement of the rod body 2. When the position of the base 4 is fixed, rotating the rod body 2 in the positive and negative directions can synchronously drive the rotary cutter head 1 to rotate up or down. The rotary cutter head 1 rotates and descends inside the pile core to cut the soil, and the rotary cutter head 1 can bring out the internal soil while rotating and rising, and the soil can be removed manually. Then, the multiple legs 5 on the base 4 can fix the height of the base 4, and at the same time can prevent the base 4 from rotating together with the rotation direction of the rod body 2. If the base 4 also rotates, it will affect the soil removal inside the pile core.
[0023] See also Figure 2 In one embodiment, in this embodiment, preferably, a handle 3 for driving the rod body 2 to rotate is installed at the upper end of the rod body 2, and the handle 3 is disc-shaped, further facilitating the operation of construction workers.
[0024] See also Figure 5 In one embodiment, in this embodiment, preferably, anchor rings 6 are installed at positions near the insertion ends of the outer circumferences of the plurality of legs 5 .
[0025] Specifically, the legs 5 and the anchor rings 6 are detachably arranged. When the legs 5 are inserted into the soil near the pile, the anchor rings 6 are installed at corresponding positions according to the insertion depth of the legs 5, so as to further improve the stability of the multiple legs 5.
[0026] See also Figure 5 In one embodiment, in this embodiment, preferably, the plurality of legs 5 are connected in series via a connecting ring 7. Further, the connecting ring 7 connects the plurality of legs 5 together, which can increase the connectivity between the plurality of legs 5, thereby increasing the strength of the legs 5.
[0027] See also Figure 1 In one embodiment, in this embodiment, preferably, the rotary cutter head 1 is adapted to the inner diameter of the tube core of the prefabricated pipe pile, so as to facilitate the insertion of the rotary cutter head 1 into the interior of the tube core of the prefabricated pipe pile.
[0028] See also Figure 5 In one embodiment, in this embodiment, preferably, the base 4, the legs 5 and the connecting ring 7 are welded into an integrated structure, and the rotating cutter head 1 is located in the middle of the integrated structure.
[0029] The working principle and use process of the utility model are as follows: first, the ends of the multiple legs 5 are inserted into the soil around the pipe pile to fix the position of the base 4, and then the anchor ring 6 is assembled on the surface of the leg 5 to further improve the stability of the leg 5, and then the worker rotates the handle 3 to make the rod body 2 rotate synchronously. At this time, since the position of the base 4 is fixed, the rod body 2 will rotate and descend at the same time. When the rotating cutter head 1 descends to the inside of the pile core, the rod body 2 rotates downward, and the soil is cut by the rotating cutter head 1. The rod body 2 rotates upward to take the soil, and the soil on the rotating cutter head 1 is cleaned manually to achieve the effect of taking the soil.
[0030] Although this specification is described according to implementation modes, not every implementation mode includes only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
[0031] Therefore, the above description is only a preferred embodiment of the present application and is not intended to limit the scope of implementation of the present application; that is, all equivalent changes made according to the scope of the claims of the present application are within the protection scope of the claims of the present application.
Claims
1. A prefabricated pipe pile core soil taking device, It is characterized in that The invention comprises a rod body (2) and a rotating cutter disc (1) connected to the outer peripheral surface of the rod body (2); the outer peripheral surface of the rod body (2) is also provided with a base (4) located above the rotating cutter disc (1); the rod body (2) and the base (4) are threadedly connected; and a plurality of legs (5) for fixing the position of the base (4) are mounted on the base (4).
2. The prefabricated pipe pile core soil taking device according to claim 1, It is characterized in that A handle (3) for driving the rod body (2) to rotate is installed at the upper end of the rod body (2), and the handle (3) is in the shape of a disc.
3. The prefabricated pipe pile core soil taking device according to claim 1, It is characterized in that Anchor rings (6) are installed at positions near the insertion ends of the outer peripheral surfaces of the plurality of legs (5).
4. The prefabricated pipe pile core soil taking device according to claim 1, It is characterized in that The plurality of legs (5) are connected in series via a connecting ring (7).
5. The prefabricated pipe pile core soil taking device according to claim 1, It is characterized in that The number of the supporting legs (5) is four, and the four supporting legs (5) are diagonally arranged at four corners of the lower end surface of the base (4).
6. The prefabricated pipe pile core soil taking device according to claim 1, It is characterized in that The rotating cutter disc (1) is adapted to the inner diameter of the pipe core of the prefabricated pipe pile.
7. The prefabricated pipe pile core soil taking device according to claim 4, It is characterized in that The base (4), the supporting legs (5) and the connecting ring (7) are welded into an integrated structure, and the rotating cutter disc (1) is located in the middle of the integrated structure.
