Landfill leakage repairing system
Through the use of the landfill leakage repair system, precise positioning and repair of the leakage points is used by drilling heads and grouting nozzles, which solves the high cost, long construction period and high safety risks of landfill leakage repair in the prior art. The problem has achieved low cost, short construction period and high safety repair effects.
Patent Information
- Application Number
- CN202420053809.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-01-09
AI Technical Summary
In the prior art, excavation repair of landfill leakage repair has problems such as high cost, long construction period and high safety risks.
Provide a landfill leakage repair system, including a repair machine, drilling rod and pulping station, spraying the repair slurry directly to the leakage point through the grouting nozzle on the drilling head, and using a seismic wave transmitter and guide head Accurate positioning and repair, combining endoscope and camera to assist in adjusting the drilling process.
Compared with excavation and repair, the repair cost is low, the construction period is short, and the safety is high, and it has broad market application prospects.
Smart Images

Figure CN222120313U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of geotechnical engineering, and specifically relates to a landfill leakage repair system. Background Art
[0002] According to statistics, the amount of harmless treatment of domestic waste in my country in 2021 is 248.393 million tons, of which 52.085 million tons are landfilled. Landfills have many negative effects. For example, the leachate produced during the landfill process contains high concentrations of organic matter, heavy metals and other pollutants. Once leaked, it will pose a potential hazard to the groundwater, soil, ecological environment and human health around the landfill. Therefore, landfills at home and abroad mostly use an anti-seepage system built with high-density polyethylene film (HDPE) as the core to prevent leachate leakage and protect soil and groundwater safety.
[0003] The risk of leakage in my country's landfills is huge. By testing the damage of the HDPE geomembrane in the anti-seepage layer of domestic garbage and hazardous waste landfills across the country, the main causes of leakage in the anti-seepage layer are summarized into the following four situations: quality problems of the membrane itself, stones or other sharp objects under the membrane penetrating the membrane, welding or other improper operations, and damage caused by machinery during the construction process. Among them, the damage caused by the construction stage before the landfill is put into operation is the most serious. Mechanical operation can easily cause tears in the HDPE membrane, and the number of holes accounts for 14% of all holes, and the average hole area can reach 4.26×10 3 cm 2 The number of holes caused by welding problems is comparable to that of mechanical damage, with an average hole area of 1.79×10 3 cm 2 The hole area caused by sharp objects is relatively small, with an average hole area of 2.32×10 2 cm 2 , the number is relatively large, accounting for 69%. The number and area of original leaks are relatively small. Although the aging damage of the HDPE membrane during operation has not been detected, the membrane has been in a harsh environment such as complex media, high load, and strong corrosion for a long time, which is prone to stress damage and corrosion damage. Before the operation of the landfill, there was no landfill, the construction environment for leak repair was simple, and the repair was relatively easy. However, the landfill after operation and closure generally has many reasons such as deep landfill media and high leachate level. At this time, repair is more difficult. There is no better way except excavation repair, but the excavation repair cost is high, the excavation depth is large, there is a dangerous situation of landfill gas, the repair period is long, and the safety risk is high. Utility Model Content
[0004] In view of the various deficiencies of the existing technology, a landfill leakage repair system is proposed to solve the technical problems of high cost, long construction period and high risk in the existing technology of excavation repair work for leakage in operating or closed landfills.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A landfill leakage repair system, comprising an integrated repair machine, a drilling rod and a pulping station, wherein the first end of the drilling rod is connected to a power box and a receiving box, the receiving box is connected to the pulping station, the second end of the drilling rod is connected to a drilling head, the drilling head is located inside a garbage pile of the landfill, and the integrated repair machine and the pulping station are located on the surface;
[0007] The drilling head is provided with a grouting injection nozzle and an endoscope, the interior of the endoscope is provided with a light source and a camera, the integrated repair machine includes a controller, and the power box, the pulping station, the light source and the camera are all communicatively connected with the controller.
[0008] The technical solution is further configured as follows: the integrated repair machine also includes a movable chassis and a control room, wherein the control room is located above the movable chassis, and the controller is located inside the control room.
[0009] The technical solution is further configured that a drilling pick is provided on the periphery of the drilling head, and the drilling pick has a tip facing the garbage pile.
[0010] The technical solution is further configured that a rotating sleeve is provided at the connection between the drilling head and the drilling rod, the rotating sleeve is rotatably connected to the drilling rod, and the rotating sleeve is fixedly connected to the drilling head.
[0011] The technical solution is further configured that the drilling head is also provided with a flushing hole, and the flushing hole is located above the endoscope.
[0012] The technical solution is further configured as follows: a guide head is provided at the bottom of the drilling head, a speed detector is provided inside the guide head, and the speed detector is communicatively connected with the controller.
[0013] The technical solution is further configured such that a seismic wave transmitter and a display screen are also provided inside the control room, and both the seismic wave transmitter and the display screen are communicatively connected to the controller.
[0014] The technical solution is further configured such that the receiving box is connected to the pulping station via a first delivery pipeline, and the receiving box is connected to a flushing water source via a second delivery pipeline.
[0015] The beneficial effects of the utility model are:
[0016] The repair slurry prepared by the slurry making station enters the receiving box, and then is sprayed out through the drilling rod and the grouting nozzle on the drilling head to directly reach the leakage point for repair. Compared with excavation and repair operations, the repair cost is low, the construction period is short, the safety is high, and it has broad market application prospects. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of a landfill leakage repair system in an embodiment of the utility model;
[0018] Figure 2 It is a schematic diagram of a drilling head in an embodiment of the utility model.
[0019] In the attached figure: 1. garbage pile; 2. repairing machine; 3. drilling rod; 4. pulping station; 5. receiving box; 6. first conveying pipeline; 7. drilling head; 8. anti-seepage layer;
[0020] 701, rotating sleeve; 702, drilling pick; 703, grouting injection nozzle; 704, flushing hole; 705, endoscope; 706, light source; 707, camera. DETAILED DESCRIPTION
[0021] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention is clearly and completely described below in conjunction with the drawings of the present invention. Based on the embodiments in this application, other similar embodiments obtained by ordinary technicians in this field without making creative work should all fall within the scope of protection of this application. In addition, the directional words mentioned in the following embodiments, such as "up", "down", "left", "right", etc., are only referenced to the directions of the drawings. Therefore, the directional words used are used to illustrate rather than limit the invention.
[0022] The utility model is further described below in conjunction with the accompanying drawings and preferred embodiments.
[0023] According to the embodiment of the utility model, a landfill leakage repair system is provided. Figure 1 and Figure 2 , comprising a repairing machine 2, a drilling rod 3 and a pulping station 4, wherein the first end of the drilling rod 3 is connected to a power box and a receiving box 5, the receiving box 5 is communicated with the pulping station 4, the second end of the drilling rod 3 is connected to a drilling head 7, the drilling head 7 is located inside the garbage pile 1 of the landfill, and the repairing machine 2 and the pulping station 4 are located on the surface;
[0024] The drilling head 7 is provided with a grouting nozzle 703 and an endoscope 705, and the interior of the endoscope 705 is provided with a light source 706 and a camera 707. The repair machine 2 includes a controller, and the power box, the pulping station 4, the light source 706 and the camera 707 are all communicatively connected to the controller.
[0025] It should be noted that the repair slurry prepared by the slurry making station 4 enters the receiving box 5, and then is sprayed out from the grouting nozzle 703 on the drilling head 7 through the drilling rod 3, directly reaching the leakage point for repair. Compared with the excavation repair operation, the repair cost is low, the construction period is short, the safety is high, and it has broad market application prospects.
[0026] Specifically, the light source 706 and the camera 707 play an auxiliary adjustment role, adjusting the drilling speed and depth to ensure that the drilling head 7 accurately drills to the leakage point.
[0027] In the landfill leakage repair system of this embodiment, please refer to Figure 1 and Figure 2 The repairing machine 2 also includes a movable chassis and a control room. The control room is located above the movable chassis, and the controller is located inside the control room.
[0028] Specifically, the movable chassis adopts a crawler structure with a deadweight not exceeding 5 tons. The controller is provided with a self-drilling control module and a grouting module to realize self-drilling and grouting. At the same time, the controller can send and receive seismic waves to determine the leakage situation.
[0029] In the landfill leakage repair system of this embodiment, please refer to Figure 1 and Figure 2 The periphery of the drilling head 7 is provided with a drilling pick 702, and the drilling pick 702 has a tip facing the garbage pile 1.
[0030] It should be noted that drilling picks 702 are welded on both sides of the drilling head 7. The drilling picks 702 are conical, with three on each side, arranged at an angle of 45-60 degrees, and are made of alloy steel.
[0031] In the landfill leakage repair system of this embodiment, please refer to Figure 1 and Figure 2 A rotating sleeve 701 is provided at the connection between the drilling head 7 and the drilling rod 3. The rotating sleeve 701 is rotatably connected to the drilling rod 3. The rotating sleeve 701 is fixedly connected to the drilling head 7, so that the drilling head 7 can realize horizontal counterclockwise rotation drilling.
[0032] In the landfill leakage repair system of this embodiment, please refer to Figure 1 and Figure 2The drilling head 7 is also provided with a flushing hole 704 , and the flushing hole 704 is located above the endoscope 705 .
[0033] It should be noted that the water pressure at the flushing hole 704 is not less than 0.5 MPa, so the outer surface of the endoscope 705 can be flushed in time to ensure that the field of view of the endoscope 705 is clear.
[0034] In the landfill leakage repair system of this embodiment, please refer to Figure 1 and Figure 2 A guide head 708 is provided at the bottom of the drilling head 7, and a velocity detector is provided inside the guide head 708. The velocity detector is communicatively connected with the controller.
[0035] It should be noted that the guide head 708 is conical and made of alloy steel. The velocity detector can convert mechanical vibration into electrical signals. The detector weighs <200g, has a sensitivity of 250mv / cm / s, and a frequency range of 10-1000HZ (±10%).
[0036] In the landfill leakage repair system of this embodiment, please refer to Figure 1 and Figure 2 A seismic wave transmitter and a display screen are also provided inside the control room, and both the seismic wave transmitter and the display screen are communicatively connected to the controller.
[0037] It should be noted that the seismic wave transmitter emits seismic waves, and the guide head 708 detects and receives seismic wave signals. By analyzing the time domain spectrum electrical signal imaging cloud map, the location of the leakage point can be accurately determined, and the imaging cloud map will be displayed on the display screen.
[0038] In the landfill leakage repair system of this embodiment, please refer to Figure 1 and Figure 2 The receiving box 5 is connected to the pulping station 4 through a first conveying pipeline 6, and the receiving box 5 is connected to a flushing water source through a second conveying pipeline.
[0039] During operation, the electrical method (high-density electrical method / dipole method) is used to conduct preliminary positioning and detection of the leakage site of the landfill. The detection electrodes are arranged on the surface of the garbage pile 1 to preliminarily determine the approximate range of the leakage. Different detection methods are used according to the thickness of the garbage pile 1. The high-density electrical method is used when the thickness of the garbage pile 1 is greater than 10m, and the dipole method is used when the thickness of the garbage pile 1 is less than 10m. The repair integrated machine 2 is used to accurately locate the leakage point by receiving and sending seismic waves through the lead hole and self-drilling hole.
[0040] Specifically, holes are arranged in a plum blossom shape around the approximate leakage range at a spacing of 0.5*0.5m. For the garbage dump 1 that has been in operation or sealed, a geological drill is first used to make a preliminary hole because the upper covering layer is relatively hard after compaction. The geological drill can be an XY-100 model, and the hole diameter should not be greater than 110mm. According to the original design drawings and seismic wave positioning, the hole is made 1m above the impermeable layer 8. In order to ensure that the lower impermeable membrane is not damaged, the repair integrated machine 2 is used to drill the hole by itself, and the drilling stops when the top of the impermeable layer 8 is drilled. The seismic wave transmitter transmits seismic waves, and the guide head 708 detects and receives seismic wave signals. By analyzing the time domain spectrum electrical signal imaging cloud map, the leakage point location is accurately determined. The imaging cloud map will be displayed on the display screen. For reference, please refer to the literature such as "Research on the Positioning and Detection of Liner Repair in Landfill Based on Seismic Technology While Drilling", "Time Domain Analysis of Dielectric Layer Vibration Signal and Its Application in Landfill Leakage Repair Technology", "Application of Seismic Technology in Predicting the Range of Magmatic Rock Intrusion in Jining Mining Area", "Exploration of the Application of PDC Drill Bit Seismic Technology While Drilling in a Well Area of Shengli Oilfield", and "Overview of Drill Bit Seismic Technology While Drilling". During the drilling and descending process of the drilling head 7, the light source 706 is turned on, and the camera 707 captures the drilling impact and transmits it back to the control room to adjust the rotation speed and depth to assist in determining the leakage point location and grouting repair operations. The leakage point is accurately repaired by injecting repair slurry.
[0041] Specifically, the slurry station 4 prepares the repair slurry. The slurry station 4 can be made of concrete or fiberglass, and the tank capacity is set according to the daily grouting volume. The repair slurry uses foamed polyurethane resin, and the slurry preparation temperature is preferably between 5-40°. Grouting construction should be carried out immediately after preparation, with a grouting pressure of 0.5-1.0Mpa, and the waiting time should not exceed 3.0 hours. When the grouting rate is as low as 1L / min and lasts for 30min, the grouting can be stopped. If the grouting volume is large, intermittent grouting can be used.
[0042] The seismic wave transmitter emits a retest seismic wave. After the retest shows no leakage point, the drilling rod 3 is taken out to seal the hole and the hole repair process is completed. Then the next hole is changed to continue the above steps until the overall repair of the leakage point at the position is completed.
[0043] The present invention has been described in detail above. The above description is only a preferred embodiment of the present invention and should not limit the scope of implementation of the present invention. That is, all equivalent changes and modifications made within the scope of this application should still fall within the scope of the present invention.
Claims
1. A landfill leakage repair system, characterized in that: It comprises a repairing machine, a drilling rod and a pulping station, wherein the first end of the drilling rod is connected to a power box and a receiving box, the receiving box is connected to the pulping station, the second end of the drilling rod is connected to a drilling head, the drilling head is located inside the garbage pile of the landfill, and the repairing machine and the pulping station are located on the surface; The drilling head is provided with a grouting injection nozzle and an endoscope, the interior of the endoscope is provided with a light source and a camera, the integrated repair machine includes a controller, and the power box, the pulping station, the light source and the camera are all communicatively connected with the controller.
2. The landfill leakage repair system according to claim 1, characterized in that: The integrated repair machine also includes a movable chassis and a control room. The control room is located above the movable chassis, and the controller is located inside the control room.
3. The landfill leakage repair system according to claim 1, characterized in that: The periphery of the drilling head is provided with a drilling pick, and the drilling pick has a tip facing the garbage pile.
4. The landfill leakage repair system according to claim 3, characterized in that: A rotating sleeve is provided at the connection between the drilling head and the drilling rod. The rotating sleeve is rotatably connected to the drilling rod, and the rotating sleeve is fixedly connected to the drilling head.
5. The landfill leakage repair system according to claim 1, characterized in that: The drilling head is also provided with a flushing hole, and the flushing hole is located above the endoscope.
6. The landfill leakage repair system according to claim 1, characterized in that: A guide head is arranged at the bottom of the drilling head, a speed detector is arranged inside the guide head, and the speed detector is communicatively connected with the controller.
7. The landfill leakage repair system according to claim 2, characterized in that: A seismic wave transmitter and a display screen are also provided inside the control room, and both the seismic wave transmitter and the display screen are communicatively connected with the controller.
8. The landfill leakage repair system according to claim 5, characterized in that: The receiving box is in communication with the pulping station through a first delivery pipeline, and the receiving box is in communication with a flushing water source through a second delivery pipeline.