Connecting structure of prefabricated floor slab and steel beam for fabricated building
By using rectangular steel columns, cross beams, installation beams, connecting plates and other components in the connection structure of prefabricated floor slabs and steel beams, the problems of complex installation and easy slack in the traditional connecting structure are solved, and the rapid and stable connection between prefabricated floor slabs and steel beams is achieved. Reduces construction costs and complexity.
Patent Information
- Application Number
- CN202420757881.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-12
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-12
AI Technical Summary
The connection structure of traditional prefabricated floor slabs and steel beams is complex and easy to relax, and lacks auxiliary reinforcement, which leads to high construction difficulty and high cost.
Using a structure including rectangular steel columns, cross beams, mounting beams, connecting plates, stressed steel mesh, fixed casing, connecting sleeves and fixed screws, these components enable rapid installation between prefabricated floor slabs and stable connection with steel beams. , avoid structural slack.
The rapid installation and stable connection between prefabricated floor slabs and steel beams is achieved, reducing construction complexity and cost, enhancing the stability of the structure, and avoiding structural slack.
Smart Images

Figure CN222120666U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of connection structures of prefabricated floor slabs and steel beams, in particular to a connection structure of prefabricated floor slabs and steel beams used in assembled buildings. Background Art
[0002] The prefabricated floor slab is connected to the steel beam through a certain structural method. The prefabricated floor slab is equipped with a prefabricated floor slab stress-bearing steel mesh extending along its length. These steel bars protrude from the prefabricated floor slab and are connected to the post-poured concrete.
[0003] The traditional connection structure between prefabricated floor slabs and steel beams has the following defects:
[0004] When using the traditional connection structure of prefabricated floor slabs and steel beams, it is more complicated to install the prefabricated floor slabs and steel beams because the traditional single prefabricated floor slabs and single prefabricated floor slabs cannot be installed;
[0005] When using the traditional connection structure of prefabricated floor slabs and steel beams, since there is no auxiliary reinforcement connection structure between the prefabricated floor slabs and steel beams, long-term use can easily lead to loosening of the connection structure. Utility Model Content
[0006] The utility model aims to provide a connection structure between prefabricated floor slabs and steel beams for assembled buildings, which is beneficial to strengthening the connection between the floor slabs and the beams, avoiding structural looseness, facilitating construction, and saving construction costs.
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a connection structure of prefabricated floor slabs and steel beams for assembled buildings, comprising four steel columns distributed in a rectangular shape, cross beams are fixedly arranged between the four adjacent steel columns, wherein a mounting beam is fixedly arranged between two of the cross beams, a connecting plate is fixedly connected to the top of the mounting beam, a prefabricated floor slab one and a prefabricated floor slab two are fixedly arranged on both sides of the connecting plate, a plurality of evenly distributed stress-bearing steel meshes are fixedly arranged in the prefabricated floor slab one and the prefabricated floor slab two, both ends of the plurality of stress-bearing steel meshes extend out of the four sides of the prefabricated floor slab one and the prefabricated floor slab two, a fixed sleeve is fixedly arranged between the stress-bearing steel meshes of the prefabricated floor slab one and the prefabricated floor slab two, and the fixed sleeve is used to connect the stress-bearing steel meshes in the two floor slabs.
[0008] Preferably, four sides of the prefabricated floor slab 1 and the prefabricated floor slab 2 are provided with trapezoidal groove structures, and the trapezoidal groove structures are used for equipment use.
[0009] Preferably, a plurality of evenly distributed through holes are provided on opposite sides of the prefabricated floor slab 1 and the prefabricated floor slab 2, and the through holes are used for installing the prefabricated floor slab 1 and the prefabricated floor slab 2.
[0010] Preferably, both ends of the fixed sleeve are fixedly connected with connecting hoops, and the ends of the connecting hoops are welded together with the stress-bearing steel mesh, and the stress-bearing steel mesh is used to strengthen the structure of prefabricated floor slab one and prefabricated floor slab two.
[0011] Preferably, a plurality of evenly distributed fixing screws are fixedly provided on both sides of the connecting plate, and the plurality of fixing screws extend through the connecting plate to the inside of the mounting beam, and the fixing screws are used to fix the connecting plate.
[0012] Preferably, the fixing sleeve, the connecting sleeve and the fixing screw are all located in the connecting plate, and the fixing sleeve is used to connect the stressed steel mesh.
[0013] Compared with the prior art, the beneficial effects of the utility model are as follows: the prefabricated floor slab one and the prefabricated floor slab two are connected by the fixing sleeve, the connecting sleeve and the fixing screw inside the connecting plate, which is beneficial to the rapid installation between the prefabricated floor slabs; at the same time, the prefabricated floor slab one and the prefabricated floor slab two are connected to the cross beam by using the installing beam, which is beneficial to strengthen the connection between the floor slabs and the cross beam, avoid structural looseness, facilitate construction and save construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a top view of the utility model;
[0015] Figure 2 It is a top cross-sectional view of the utility model;
[0016] Figure 3 It is a left view of the utility model;
[0017] Figure 4 It is an enlarged view of part A of the utility model.
[0018] In the figure: 1. Steel column; 2. Crossbeam; 3. Mounting beam; 4. Prefabricated floor slab 1; 5. Prefabricated floor slab 2; 6. Load-bearing steel mesh; 7. Through hole; 8. Connecting plate; 9. Fixing sleeve; 10. Connecting hoop; 11. Fixing screw; 12. Trapezoidal groove structure. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] See also Figure 1-4The utility model provides a connection structure of prefabricated floor slabs and steel beams for assembled buildings, comprising four steel columns 1 distributed in a rectangular shape, cross beams 2 are fixedly arranged between the four steel columns 1 adjacent to each other, a mounting beam 3 is fixedly arranged between two cross beams 2, a connecting plate 8 is fixedly connected to the top of the mounting beam 3, a prefabricated floor slab 1 4 and a prefabricated floor slab 2 5 are fixedly arranged on both sides of the connecting plate 8, a plurality of uniformly distributed stress-bearing steel meshes 6 are fixedly arranged in the prefabricated floor slab 1 4 and the prefabricated floor slab 2 5, both ends of the plurality of stress-bearing steel meshes 6 extend out of the four sides of the prefabricated floor slab 1 4 and the prefabricated floor slab 2 5, and a fixed sleeve 9 is fixedly arranged between the stress-bearing steel meshes 6 of the prefabricated floor slab 1 4 and the prefabricated floor slab 2 5.
[0021] When in use, the prefabricated floor 1 4 and the prefabricated floor 2 5 are both provided with stress-bearing steel meshes 6, which serve as the main load-bearing internal structure to ensure the strength of the prefabricated floor 1 4 and the prefabricated floor 2 5.
[0022] The four sides of the prefabricated floor 1 4 and the prefabricated floor 2 5 are provided with trapezoidal groove structures 12, and the two opposite sides of the prefabricated floor 1 4 and the prefabricated floor 2 5 are provided with multiple evenly distributed through holes 7, and both ends of the fixed sleeve 9 are fixedly connected with connecting hoops 10.
[0023] When in use, through holes 7 are provided on opposite sides of the prefabricated floor slab 1 4 and the prefabricated floor slab 2 5 , and the prefabricated floor slab 1 4 and the prefabricated floor slab 2 5 are installed through the through holes 7 .
[0024] Multiple evenly distributed fixing screws 11 are fixedly arranged on both sides of the connecting plate 8 . The multiple fixing screws 11 extend through the connecting plate 8 to the inside of the mounting beam 3 . The fixing sleeve 9 , the connecting hoop 10 and the fixing screws 11 are all located in the connecting plate 8 .
[0025] When in use, a plurality of evenly distributed fixing screws 11 are provided on both sides of the connecting plate 8 , and the connecting plate 8 and the mounting beam 3 are fixed by the fixing screws 11 .
[0026] During specific use, the utility model provides a connection structure between prefabricated floor slabs and steel beams for assembled buildings. When using the connection structure between prefabricated floor slabs and steel beams for assembled buildings, the prefabricated floor slab 1 4 and the prefabricated floor slab 2 5 are connected by the fixing sleeve 9, the connecting hoop 10 and the fixing screw 11 inside the connecting plate 8, which is beneficial to the rapid installation between the prefabricated floor slabs. At the same time, the prefabricated floor slab 1 4 and the prefabricated floor slab 2 5 are connected to the cross beam 2 using the mounting beam 3, which is beneficial to strengthening the connection between the floor slabs and the cross beam 2 and avoiding structural looseness. The two ends of the prefabricated floor slab 1 4 and the prefabricated floor slab 2 5 are fixed to the cross beam 2 through the through hole 7. This is the use process of the connection structure between prefabricated floor slabs and steel beams for assembled buildings.
[0027] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A connection structure between a prefabricated floor slab and a steel beam for an assembled building, comprising four steel columns (1) arranged in a rectangular shape, characterized in that: A crossbeam (2) is fixedly arranged between the four adjacent steel columns (1), wherein a mounting beam (3) is fixedly arranged between two of the crossbeams (2), a connecting plate (8) is fixedly connected to the top of the mounting beam (3), a prefabricated floor slab 1 (4) and a prefabricated floor slab 2 (5) are fixedly arranged on both sides of the connecting plate (8), a plurality of uniformly distributed stress-bearing steel meshes (6) are fixedly arranged in the prefabricated floor slab 1 (4) and the prefabricated floor slab 2 (5), both ends of the plurality of stress-bearing steel meshes (6) extend out of the four sides of the prefabricated floor slab 1 (4) and the prefabricated floor slab 2 (5), and a fixed sleeve (9) is fixedly arranged between the stress-bearing steel meshes (6) of the prefabricated floor slab 1 (4) and the prefabricated floor slab 2 (5).
2. The connection structure of a prefabricated floor slab and a steel beam for an assembled building according to claim 1, characterized in that: The four sides of the prefabricated floor slab 1 (4) and the prefabricated floor slab 2 (5) are each provided with a trapezoidal groove structure (12).
3. The connection structure between a prefabricated floor slab and a steel beam for an assembled building according to claim 1, characterized in that: The two opposite sides of the prefabricated floor slab 1 (4) and the prefabricated floor slab 2 (5) are each provided with a plurality of evenly distributed through holes (7).
4. The connection structure between a prefabricated floor slab and a steel beam for an assembled building according to claim 1, characterized in that: Both ends of the fixed sleeve (9) are fixedly connected to connecting hoops (10).
5. The connection structure between a prefabricated floor slab and a steel beam for an assembled building according to claim 1, characterized in that: A plurality of evenly distributed fixing screws (11) are fixedly disposed on both sides of the connection plate (8), and the plurality of fixing screws (11) pass through the connection plate (8) and extend to the interior of the mounting beam (3).
6. The connection structure of a prefabricated floor slab and a steel beam for an assembled building according to claim 1, characterized in that: The fixing sleeve (9), the connecting sleeve (10) and the fixing screw (11) are all located inside the connecting plate (8).