Mine filling gangue concrete blowing and blending device
Through the interlaced arrangement of high-pressure air blowing technology and the staggered arrangement of porous ball heads and duckbill spray heads, the problem of uneven mixing of gangue concrete during mine filling is solved, the homogeneity and fluidity in the material storage device are achieved, and labor is reduced Cleaning up demand has improved production efficiency.
Patent Information
- Application Number
- CN202421008935.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-05-10
AI Technical Summary
During the mine filling process, the gangue concrete in the storage device caused water secretion and precipitation due to uneven mixing, resulting in pumping blockage, which requires manual cleaning, which consumes a lot of manual labor and affects production. The existing device space is limited and the mixing effect is poor.
Design a mine gangue concrete spray mixing device, using high-pressure air blowing technology, disturbing the porous ball head and duckbill spray head in the material storage device, and setting the blowing sequence and time in combination with the PLC controller to ensure the material Homogeneity and a wider disturbance effect is achieved through interlaced nozzles and holes.
It effectively prevents material precipitation and pumping blockage, improves the stirring effect in the material storage device, reduces manual cleaning needs, improves production efficiency, and is suitable for material storage devices with limited space.
Smart Images

Figure CN222121590U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of mine filling, and in particular relates to a mine gangue concrete spraying and mixing device. Background Art
[0002] During the mine filling process, the mixed gangue concrete needs to be stored in the storage device at the front end of the filling pump and pumped to the mine filling working face by the filling pump. During the filling process, it may be necessary to switch the underground control valve or the raw material bin feeding system, or the equipment may have problems and need to be repaired before continuing filling. The material in the storage device cannot be effectively stirred, and the ash gradually seeps water and aggregate settles, resulting in subsequent inability to continue pumping or pumping blocking the filling pipeline. Manual cleaning of the storage device and the filling pipeline is required, which not only consumes a lot of manpower and affects production operations, but also produces a large amount of waste that is difficult to handle.
[0003] The existing filling pump storage device uses an S-valve double cylinder to transport in turn. The S-valve switches to the corresponding cylinder left and right in the pumping process, resulting in limited space in the storage device. The storage device is only stirred by the mixing impellers on both sides of the storage device. The impeller has a small coverage area and a slow rotation speed, and cannot effectively disturb the concrete in the storage device. Utility Model Content
[0004] The utility model aims to provide a mine gangue concrete spraying and mixing device, which has small space requirements and strong disturbance capability and can effectively solve the problems existing in the background technology.
[0005] In order to achieve the above-mentioned purpose, the technical scheme adopted by the utility model is as follows: a mine gangue concrete spraying and mixing device, including a filling pump storage hopper, an S valve, two feed ports are arranged on the front side wall of the filling pump storage hopper, and a discharge port is arranged on the rear side wall. The S valve is arranged in the filling pump storage hopper, one end of which is connected to the discharge port, and the other end is switched to connect the two feed ports through the S valve swing arm, and also includes an operation box, a pressure vessel, an electromagnetic control valve, and a high-pressure air pipe.
[0006] A plurality of holes are provided at the lower ends of the left and right side walls of the filling pump storage hopper, a threaded joint is fixedly connected to the outside of the hole, a threaded connector is fixedly connected to the inside of the hole, a nozzle is connected to the threaded connector, the pressure vessel is connected to a high-pressure air pipe, two high-pressure air branch pipes are connected to the ends of the high-pressure air pipe, which are respectively arranged on the left and right sides of the filling pump storage hopper, branch pipes are provided on the high-pressure air branch pipes corresponding to the holes on the left and right side walls of the filling pump storage hopper, the ends of the branch pipes are connected to the threaded joints on the holes, an electromagnetic control valve is provided on the branch pipe, and the electromagnetic control valve is connected to the operation box circuit for controlling the blowing of high-pressure gas.
[0007] Furthermore, the nozzle is a porous ball-head nozzle or a duckbill nozzle.
[0008] Furthermore, a check valve is provided on the branch pipe, and the check valve is located between the threaded joint and the electromagnetic control valve, and is used to prevent slurry from entering the high-pressure gas branch pipe.
[0009] Furthermore, the holes arranged at the lower end of the side wall of the filling pump storage hopper are arranged in an upward and downward manner, and the holes in the upper and lower rows are staggered. The nozzles of the downward holes are duckbill nozzles, and the nozzles of the upward holes are porous ball-head nozzles.
[0010] Furthermore, the holes on the left and right walls of the filling pump storage hopper are arranged alternately.
[0011] Furthermore, the porous ball-head type sprinkler installed in the upward hole is located in front of the duckbill type sprinkler installed in the downward hole.
[0012] Furthermore, a PLC controller is provided in the operation box, and the PLC controller is connected to the electromagnetic control valve circuit to realize centralized control. A control program is provided in the PLC controller to set the start sequence, start interval time and spray time of each electromagnetic control valve.
[0013] The device of the utility model releases high-energy impact force through high-pressure blowing, so that the aggregates settled at the bottom of the storage device are forced to move, the concrete is disturbed, and the concrete is kept in a homogeneous state for a long time. During the blowing process, the air content in the concrete is also increased by a small amount to ensure the fluidity of the concrete. The device is suitable for various storage devices with complex internal structures that cannot be added with stirring devices. At the same time, the device of the utility model reasonably arranges the blowing output mode, and can effectively solve the problem that the single-hole blowing of concrete materials is easy to form an air path while ensuring the disturbance effect. Different storage devices and materials of different concentrations can be adapted by adjusting the program settings, the number of air pipes and the rated pressure of the pressure vessel. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic structural diagram of Example 1 of the utility model.
[0015] Figure 2 This is a schematic diagram of the nozzle arrangement of Example 2 of the utility model.
[0016] Figure 3 This is a side view of the nozzle arrangement of Example 2 of the utility model.
[0017] In the figure: 1. Operation box; 2. Pressure vessel; 3. Control line; 4. Solenoid control valve; 5. Check valve; 6. Filling pump storage hopper; 7. Branch pipe; 8. Discharge port; 9. S valve; 10. Feed port; 11. Multi-hole ball-head nozzle; 12. High-pressure air pipe; 31. Duckbill nozzle. DETAILED DESCRIPTION
[0018] In order to make the technical means, creative features and achieved effects of the present invention easier to understand, the present invention is further described in conjunction with the accompanying drawings.
[0019] In the description of the following embodiments, it should be understood that the terms "upper", "lower", "left", "right", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, and a specific direction structure and operation, and therefore, cannot be understood as a limitation on the present application. In the description of the present application, unless otherwise specified, "multiple" means two or more.
[0020] Example 1
[0021] like Figure 1 As shown, a mine gangue concrete spraying and mixing device includes a filling pump storage hopper 6 and an S valve 9. Two feed ports 10 are arranged on the front side wall of the filling pump storage hopper 6, and a discharge port 8 is arranged on the rear side wall. The S valve 9 is arranged in the filling pump storage hopper 6, one end of which is connected to the discharge port 8, and the other end is connected to the two feed ports 8 through the S valve swing arm. The specific setting method of the S valve can refer to the existing technical standards. Due to the existence of the S valve, the space of many filling pump storage hoppers 6 is very cramped, and it is difficult to add a stirring device, or only a small stirring device can be added, and the stirring effect is limited, which easily leads to the problems in the background technology.
[0022] The technical solution of the present application also includes an operation box 1, a pressure vessel 2, an electromagnetic control valve 4, and a high-pressure gas pipe 12.
[0023] A plurality of holes are provided at the lower ends of the left and right side walls of the filling pump storage hopper 6, a threaded joint is fixedly connected to the outside of the hole, a threaded connector is fixedly connected to the inside of the hole, a porous ball head nozzle 11 is connected to the threaded connector, and the purpose of adopting the threaded connection is to facilitate installation and maintenance, the pressure vessel 2 is connected to a high-pressure air pipe 12, and two high-pressure air branch pipes are connected to the ends of the high-pressure air pipe 12, which are respectively arranged on the left and right sides of the filling pump storage hopper, and branch pipes 7 are provided on the high-pressure air branch pipes corresponding to the holes on the left and right side walls of the filling pump storage hopper, and the ends of the branch pipes 7 are connected to the threaded joints on the holes, and an electromagnetic control valve 4 is provided on the branch pipe, which is connected to the operating box 1 through a control line 3 for controlling the blowing of high-pressure gas, and a check valve 5 is provided on the branch pipe 7, and the check valve 5 is located between the threaded joint and the electromagnetic control valve, and is used to prevent slurry from entering the high-pressure air branch pipe.
[0024] A PLC controller is arranged in the operation box, and the PLC controller is connected with the electromagnetic control valve circuit to realize centralized control. A control program is arranged in the PLC controller to set the start sequence, start interval time and spray time of each electromagnetic control valve.
[0025] When in use, the slurry is put into the filling pump storage hopper 6, and the pressure container 2 is charged. When the pressure is raised to the rated pressure, according to the setting of the control program in the PLC controller of the operation box, the required number of electromagnetic control valves 4 are opened, and the high-pressure gas reaches the porous ball head 11 at the front end from each branch pipe in turn through the high-pressure gas branch pipe 7, forming a large number of dispersed bubbles, and sprayed out in all directions along the pores of the porous ball head 11 up, down, left and right under the action of high pressure. The strong airflow impacts the bottom of the material, driving the solid phase, liquid phase, and gas phase components in the surrounding material to move irregularly, destroying the van der Waals force formed by the hydration reaction of the material, remixing into a homogeneous material, prolonging the homogeneous state of the material, and preventing the material from stratification and segregation. The gas in the pressure container used in the utility model can be provided by an air compressor or other gas supply device. During the operation, the pressure container continuously replenishes the pressure to complete the operation cycle. After the pumping is completed, continue to spray, and spray the material retained at the front end of the check valve to prevent condensation and blockage of the pores.
[0026] Example 2
[0027] This embodiment is further optimized based on the embodiment 1. Figure 2 , 3 As shown, the multiple holes at the lower end of the side wall of the filling pump storage hopper are arranged in two rows, upper and lower, and the holes in the upper and lower rows are arranged in a staggered manner. Specifically, the holes in the upper row correspond to the interval arrangement of the holes in the lower row. The nozzles of the downward holes adopt duckbill nozzles 31, and the nozzles of the upward holes adopt porous ball-head nozzles 11. The duckbill nozzle sprays close to the bottom, and the porous ball-head nozzle disturbs the main body of the slurry, so that the stirring effect is better. In addition, the porous ball-head nozzle installed in the upward hole is located in front of the duckbill nozzle installed in the downward hole, so as not to affect the action of the S valve, and the disturbance effect is better.
[0028] At the same time, the holes on the left and right walls of the filling pump storage hopper are arranged alternately. Specifically, the holes on the left wall are arranged between two holes in the same row of the right wall, so that the nozzles in the filling pump storage hopper 6 are more evenly distributed, which is more conducive to the disturbance of the slurry.
[0029] Embodiment 2 mainly optimizes the design of the spraying method, so that the high-pressure gas spraying effect is better and the problems in the background technology can be more effectively avoided.
[0030] The above is a detailed description of an embodiment of the utility model, but the content is only some preferred embodiments of the utility model and cannot be considered to limit the scope of implementation of the utility model. All equivalent changes and improvements made within the scope of application of the utility model should still fall within the scope of the patent coverage of the utility model.
Claims
1. A device for spraying and mixing gangue concrete for filling in a mine, comprising a filling pump storage hopper and an S valve, wherein two feed ports are arranged on the front side wall of the filling pump storage hopper, and one discharge port is arranged on the rear side wall, the S valve is arranged in the filling pump storage hopper, one end of the S valve is connected to the discharge port, and the other end is switched to connect the two feed ports through the S valve swing arm, characterized in that: It also includes an operating box, a pressure vessel, an electromagnetic control valve, and a high-pressure gas pipe. A plurality of holes are provided at the lower ends of the left and right side walls of the filling pump storage hopper, a threaded joint is fixedly connected to the outside of the hole, a threaded connector is fixedly connected to the inside of the hole, a nozzle is connected to the threaded connector, the pressure vessel is connected to a high-pressure air pipe, two high-pressure air branch pipes are connected to the ends of the high-pressure air pipe, which are respectively arranged on the left and right sides of the filling pump storage hopper, branch pipes are provided on the high-pressure air branch pipes corresponding to the holes on the left and right side walls of the filling pump storage hopper, the ends of the branch pipes are connected to the threaded joints on the holes, an electromagnetic control valve is provided on the branch pipe, and the electromagnetic control valve is connected to the operation box circuit for controlling the blowing of high-pressure gas.
2. The mine filling gangue concrete spraying and mixing device according to claim 1, characterized in that: The nozzle is a porous ball-head nozzle or a duckbill nozzle.
3. The mine filling gangue concrete spraying and mixing device according to claim 1, characterized in that: A check valve is provided on the branch pipe, and the check valve is located between the threaded joint and the electromagnetic control valve, and is used to prevent slurry from entering the high-pressure gas branch pipe.
4. The mine filling gangue concrete spraying and mixing device according to claim 1, characterized in that: The holes arranged at the lower end of the side wall of the filling pump storage hopper are arranged in an upward and downward direction, and the holes in the upper and lower rows are arranged in a staggered manner. The nozzles of the downward holes adopt duckbill nozzles, and the nozzles of the upward holes adopt multi-hole ball-head nozzles.
5. The mine filling gangue concrete spraying and mixing device according to claim 1, characterized in that: The holes on the left side wall and the right side wall of the filling pump storage hopper are arranged alternately.
6. The mine filling gangue concrete spraying and mixing device according to claim 4 is characterized in that: The porous ball-head type sprinkler installed in the upward hole is located in front of the duckbill type sprinkler installed in the downward hole.
7. The mine filling gangue concrete spraying and mixing device according to claim 1 is characterized in that: The operation box is provided with a PLC controller, which is connected to the electromagnetic control valve circuit to realize centralized control. The PLC controller is provided with a control program for setting the start sequence, start interval time and spray time of each electromagnetic control valve.