Project cost surveying instrument
By using a combination of mounting plates, mapping structures and drive components in the construction project cost site mapper, combined with cooling and insulation components and refrigerators, the problem of excessive temperature caused by strong light is solved, ensuring measurement accuracy and simplifying maintenance, and improving The practicality of the mapper.
Patent Information
- Application Number
- CN202323640110.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2033-12-29
AI Technical Summary
The existing construction project cost site mapper is subjected to strong light in open areas and without obstructions, which affects the accuracy of the measurement data and reduces its usefulness.
A project cost mapping instrument was designed, using a combination of mounting plate, mapping instrument body, mapping structure and driving components, including cooling and thermal insulation components and refrigerators, powered by solar panels, and mapping is realized through arc blocks and hydraulic rods. The instrument is stable and fixed and rotated to ensure measurement accuracy is maintained under high temperature environments.
It effectively avoids temperature increases caused by strong light, ensures the accuracy of measurement data, and simplifies the disassembly and assembly and maintenance of the measuring instrument, improving its practicality.
Smart Images

Figure CN222124342U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of work cost, in particular to a surveying and mapping instrument for engineering cost. Background Art
[0002] The process of forecasting, planning, controlling, calculating, analyzing and evaluating engineering costs by comprehensively applying knowledge and skills in management, economics and engineering technology is called engineering cost management. In the process of engineering cost management, data must be measured by surveying instruments. Surveying instruments combine optics, mechanics and electronics to capture workpieces into computers for processing and magnify them 18 to 230 times, and display them on the screen. You can directly take photos for archiving or do surface observation, measurement and drawing.
[0003] According to the Chinese patent with the authorized publication number CN215981659U, a construction engineering cost on-site surveying instrument is disclosed. A support seat is provided at the bottom of the surveying instrument body, and the surveying instrument body is rotatably connected to the support seat. By adjusting the position of the support legs up and down, the on-site surveying instrument can be switched between a folded state and an unfolded state. In the actual use of the above scheme, when the surveying instrument is applied to engineering cost surveying, open areas and unobstructed objects often appear in the surveying area during use. Strong light will cause the working temperature of the surveying instrument to be too high, which may cause its measurement data to be inaccurate, and thus may fail to achieve the expected measurement effect, reducing the practicality of the existing construction engineering cost on-site surveying instrument. Utility Model Content
[0004] In view of the shortcomings of the prior art, the present application provides a surveying instrument for construction cost, which has the advantages of effectively preventing strong light from causing the temperature of the surveying instrument to be too high, thereby affecting the surveying accuracy, and solves the problem of low practicality of existing on-site surveying instruments for construction project cost.
[0005] In order to achieve the above-mentioned purpose of effectively avoiding the situation that strong light causes the temperature of the surveying instrument to be too high, thereby affecting the surveying accuracy, the present application provides the following technical solutions: a surveying instrument for engineering cost, comprising a mounting plate, a surveying instrument body, four support columns fixed to the bottom of the mounting plate, a surveying structure mounted on the top of the mounting plate for surveying, and a driving assembly mounted on the bottom of the mounting plate for driving the surveying instrument body to rotate;
[0006] The surveying and mapping structure includes a mounting assembly installed inside the mounting plate for mounting a surveying and mapping instrument body, a cooling and heat insulation assembly installed on the top of the mounting assembly for preventing the surveying and mapping instrument body from being heated up during operation, and a fixing assembly installed inside the cooling and heat insulation assembly for fixing the surveying and mapping instrument body;
[0007] The mounting assembly includes a rotating plate rotatably connected to the inside of the mounting plate, and two arc blocks respectively fixed to the left and right sides of the rotating plate; the two arc blocks are used to make the rotating plate rotate more stably;
[0008] The cooling and heat-insulating assembly includes a protection frame fixed to the top of the rotating plate, a cover plate hinged to the top of the protection frame by hinges, a heat-insulating layer fixed to the inside of the protection frame and the bottom of the cover plate, a solar panel fixed to the top of the cover plate, a solar battery fixed to the top of the rotating plate, a refrigerator fixed to the rear side wall of the protection frame, and an observation window fixed to the front of the protection frame; the observation window is used to ensure that the surveying instrument body can measure the target location
[0009] By adopting the above technical solution, it is effectively avoided that the temperature of the surveying instrument body is too high due to strong light, thereby affecting the surveying accuracy.
[0010] Furthermore, the fixing assembly includes two hydraulic rods respectively fixed to the left and right inner walls of the protective frame, two fixing plates respectively fixed to the opposite sides of the two hydraulic rods, and a slider fixed to the bottom of the fixing plates; the slider is used to make the sliding of the fixing plates more stable.
[0011] By adopting the above technical solution, it is convenient for staff to maintain the surveying and mapping instrument body.
[0012] Furthermore, the driving assembly includes two connecting columns fixed to the bottom of the mounting plate, a horizontal plate fixed between the bottom ends of the two connecting columns, and a motor fixed to the top of the horizontal plate; the motor is used to drive the rotating plate to rotate.
[0013] By adopting the above technical solution, it is ensured that the surveying instrument body can perform all-round measurement of the target location.
[0014] Furthermore, a mounting groove is provided at the bottom of the mounting plate, and the output shaft of the motor is fixed to the bottom of the rotating plate.
[0015] By adopting the above technical solution, it is ensured that the rotating plate can be driven to rotate by the motor.
[0016] Furthermore, a rotation groove is provided on the top of the mounting plate, an annular groove is provided inside the mounting plate, the annular groove is communicated with the rotation groove, and the arc block is slidably connected inside the annular groove.
[0017] By adopting the above technical solution, it is ensured that the rotating plate can rotate stably and effectively in the rotating groove.
[0018] Furthermore, two slide grooves are provided on the top of the rotating plate, and the sliding block is slidably connected inside the slide grooves.
[0019] By adopting the above technical solution, it is ensured that the fixing plate can be adjusted to be more stable through the slider.
[0020] Furthermore, rubber pads are fixed on opposite sides of the two fixing plates, and the length of the observation window is greater than the length of the surveying instrument body.
[0021] By adopting the above technical solution, it is ensured that the fixing plate fixes the surveying and mapping instrument body more stably and that the fixing plate fixes the surveying and mapping instrument body more stably.
[0022] Furthermore, the right side of the cover plate is snap-connected to the right side of the protection frame via a buckle, and the diameter of the rotating plate is equal to the diameter of the rotating groove.
[0023] By adopting the above technical solution, it is ensured that the surveying instrument body can be effectively protected.
[0024] Compared with the prior art, this invention provides a new type of surveying and mapping instrument for engineering cost, which has the following beneficial effects:
[0025] The engineering cost surveying and mapping instrument, through the coordinated use of the mounting plate, the surveying and mapping instrument body, the surveying and mapping structure and the driving assembly, can effectively prevent strong light from causing the temperature of the surveying and mapping instrument to rise during operation when there is an open area and no obstructions in the surveying and mapping area during the use of the surveying and mapping instrument, thereby effectively preventing the surveying and mapping instrument from causing inaccurate measurement data due to excessive temperature, ensuring that the surveying and mapping instrument can achieve the expected measurement effect, and at the same time, the surveying and mapping instrument can be quickly and conveniently disassembled and assembled, which is convenient for staff to maintain the surveying and mapping instrument, thereby improving the practicality of the engineering cost surveying and mapping instrument. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of the structure of this application;
[0027] Figure 2 A top view of the structure of the present application;
[0028] Figure 3 It is a three-dimensional schematic diagram of the structure of the utility model;
[0029] Figure 4 It is a partial enlarged schematic diagram of part A in the structure of the utility model.
[0030] In the figure: 1. mounting plate; 2. support column; 3. surveying instrument body; 200. surveying structure; 2011. rotating plate; 2012. rotating groove; 2013. arc block; 2014. annular groove; 2021. protective frame; 2022. cover plate; 2023. insulation layer; 2024. solar panel; 2025. solar battery; 2026. refrigerator; 2027. observation window; 2031. hydraulic rod; 2032. fixing plate; 2033. slider; 2034. slide groove; 300. driving assembly; 301. connecting column; 302. horizontal plate; 303. motor; 304. mounting groove. DETAILED DESCRIPTION
[0031] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.
[0032] See also Figure 1-4 The utility model provides a technical solution: a surveying instrument for engineering cost, comprising a mounting plate 1, a surveying instrument body 3, four support columns 2 fixed to the bottom of the mounting plate 1, a surveying structure 200 mounted on the top of the mounting plate 1 for surveying, a driving assembly 300 mounted on the bottom of the mounting plate 1 for driving the surveying instrument body 3 to rotate, and the support columns 2 make the mounting plate 1 more stable;
[0033] By using the mounting plate 1, the surveying instrument body 3, the surveying structure 200 and the driving assembly 300 in coordination, when an open area or no obstructions appear in the surveying area during the use of the surveying instrument, it can effectively prevent strong light from causing the temperature of the surveying instrument to rise during operation, thereby effectively preventing the surveying instrument from causing inaccurate measurement data due to excessive temperature, ensuring that the surveying instrument can achieve the expected measurement effect. At the same time, the surveying instrument can be quickly and conveniently disassembled and assembled, which is convenient for the staff to maintain the surveying instrument, thereby improving the practicality of the surveying instrument used for engineering cost.
[0034] In this embodiment, the surveying and mapping structure 200 is a structure for surveying and mapping a target location.
[0035] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the surveying and mapping structure 200 includes a mounting assembly installed inside the mounting plate 1 for mounting the surveying and mapping instrument body 3, a cooling and heat-insulating assembly installed on the top of the mounting assembly for preventing the surveying and mapping instrument body 3 from reaching a high temperature during operation, and a fixing assembly installed inside the cooling and heat-insulating assembly for fixing the surveying and mapping instrument body 3.
[0036] In this embodiment, the installation assembly is a structure that facilitates the installation of the surveying and mapping instrument body 3 .
[0037] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the mounting assembly includes a rotating plate 2011 rotatably connected to the inside of the mounting plate 1, and two arc blocks 2013 respectively fixed to the left and right sides of the rotating plate 2011, and the two arc blocks 2013 are used to make the rotating plate 2011 rotate more stably.
[0038] It should be noted that a rotating groove 2012 is provided on the top of the mounting plate 1, and an annular groove 2014 is provided inside the mounting plate 1. The annular groove 2014 is connected to the rotating groove 2012, and the arc block 2013 is slidably connected inside the annular groove 2014. The diameter of the rotating plate 2011 is equal to the diameter of the rotating groove 2012, ensuring that the rotating plate 2011 can rotate stably and effectively in the rotating groove 2012.
[0039] In this embodiment, the cooling and heat-insulating assembly is a structure to prevent the temperature of the surveying and mapping instrument body 3 from being too high when it is working.
[0040] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the cooling and heat-insulating assembly includes a protective frame 2021 fixed to the top of the rotating plate 2011, a cover plate 2022 hinged to the top of the protective frame 2021 by hinges, an insulating layer 2023 fixed to the inside of the protective frame 2021 and the bottom of the cover plate 2022, a solar panel 2024 fixed to the top of the cover plate 2022, a solar battery 2025 fixed to the top of the rotating plate 2011, a refrigerator 2026 fixed to the inner rear side wall of the protective frame 2021, and an observation window 2027 fixed to the front of the protective frame 2021. The observation window 2027 is used to ensure that the surveying instrument body 3 can measure the target location.
[0041] It should be noted that the right side of the cover plate 2022 is snap-connected to the right side of the protective frame 2021 via a buckle, thereby ensuring that the surveying and mapping instrument body 3 can be effectively protected.
[0042] In addition, the back side of the cooler 2026 penetrates through the protective frame 2021 and extends to the back side of the protective frame 2021 , ensuring that the heat generated by the cooler 2026 is discharged outside the protective frame 2021 .
[0043] In addition, the solar battery 2025 is electrically connected to the solar panel 2024 to ensure that the solar panel 2024 can effectively convert solar energy into electrical energy and store it in the solar battery 2025. The insulation layer 2023 is made of insulation asbestos cloth to ensure that the insulation layer 2023 can effectively block the heat in the light.
[0044] In this embodiment, the fixing assembly is a structure for fixing the surveying and mapping instrument body 3 .
[0045] like Figure 1 , Figure 2 and Figure 4 As shown, the fixing assembly includes two hydraulic rods 2031 respectively fixed to the inner left wall and the inner right wall of the protective frame 2021, two fixing plates 2032 respectively fixed to the opposite sides of the two hydraulic rods 2031, and a slider 2033 fixed to the bottom of the fixing plate 2032. The slider 2033 is used to make the sliding of the fixing plate 2032 more stable.
[0046] It should be noted that two slide grooves 2034 are provided on the top of the rotating plate 2011 , and the sliders 2033 are slidably connected inside the slide grooves 2034 , ensuring that the fixed plate 2032 can be adjusted to be more stable through the sliders 2033 .
[0047] In addition, rubber pads are fixed on opposite sides of the two fixing plates 2032 to ensure that the fixing plates 2032 are more stably fixed to the surveying instrument body 3. The length of the observation window 2027 is greater than the length of the surveying instrument body 3, ensuring that the fixing plates 2032 are more stably fixed to the surveying instrument body 3.
[0048] In this embodiment, the driving assembly 300 is a structure for adjusting the angle of the surveying and mapping instrument body 3 .
[0049] like Figure 1 As shown, the driving assembly 300 includes two connecting columns 301 fixed to the bottom of the mounting plate 1, a horizontal plate 302 fixed between the bottom ends of the two connecting columns 301, and a motor 303 fixed to the top of the horizontal plate 302; the motor 303 is used to drive the rotating plate 2011 to rotate.
[0050] It should be noted that a mounting groove 304 is provided at the bottom of the mounting plate 1 , the output shaft of the motor 303 is fixed to the bottom of the rotating plate 2011 , and the top of the mounting groove 304 is connected to the rotating groove 2012 , ensuring that the rotating plate 2011 can be driven to rotate by the motor 303 .
[0051] In addition, the solar battery 2025 is electrically connected to the refrigerator 2026 and the motor 303 , respectively, and the refrigerator 2026 and the motor 303 are powered by the solar battery 2025 .
[0052] The working principle of the above embodiment is:
[0053] When in use, the cover plate 2022 is first opened, and the surveying instrument body 3 to be used is placed on the rotating plate 2011, and then the fixing plate 2032 is driven by the hydraulic rod 2031 to move left and right, so that the surveying instrument body 3 is fixed by the two fixing plates 2032. When the surveying instrument body 3 is used in an open area or without any shielding, the protective frame 2021 can effectively prevent strong sunlight from directly irradiating the surveying instrument body 3. At the same time, the heat in the sunlight can be effectively blocked by the heat insulation layer 2033. At the same time, turning on the refrigerator 2026 can effectively ensure that the protective frame 2021 is The temperature is low, which prevents the inaccurate measurement result caused by the overheating of the surveying instrument body 3. At the same time, the motor 303 can also drive the rotating plate 2011 to rotate, thereby driving the surveying instrument body 3 to rotate, and the surveying instrument body 3 can be used to completely measure the situation of the target location. When the surveying instrument body 3 needs to be maintained, the hydraulic rod 2031 drives the fixed plate 2032 to move left and right, thereby releasing the fixation of the fixed plate 2032 to the surveying instrument body 3, so that the surveying instrument body 3 can be effectively taken out from the protective frame 2021, which is convenient for the staff to maintain the surveying instrument body 3.
[0054] Compared with the prior art, the surveying and mapping instrument for construction cost, through the coordinated use of the mounting plate 1, the surveying and mapping instrument body 3, the surveying and mapping structure 200 and the driving assembly 300, can effectively prevent strong light from causing the temperature of the surveying and mapping instrument to rise during operation when there is an open area and no obstructions in the surveying and mapping area during the use of the surveying and mapping instrument, thereby effectively preventing the surveying and mapping instrument from causing inaccurate measurement data due to excessive temperature, ensuring that the surveying and mapping instrument can achieve the expected measurement effect, and at the same time, the surveying and mapping instrument can be quickly and conveniently disassembled and assembled, making it convenient for staff to maintain the surveying and mapping instrument, thereby improving the practicality of the surveying and mapping instrument for construction cost and solving the problem of low practicality of existing on-site surveying and mapping instruments for construction engineering cost.
[0055] The electrical components appearing in the article are all electrically connected to the main controller and the power supply. The main controller can be a conventional known device for control such as a computer, and the existing public power connection technology is not described in detail in the article.
Claims
1. A surveying instrument for engineering cost, Features: It comprises a mounting plate (1), a surveying and mapping instrument body (3), four support columns (2) fixed to the bottom of the mounting plate (1), a surveying and mapping structure (200) mounted on the top of the mounting plate (1) for surveying and mapping, and a driving assembly (300) mounted on the bottom of the mounting plate (1) for driving the surveying and mapping instrument body (3) to rotate; The surveying and mapping structure (200) comprises a mounting assembly installed inside the mounting plate (1) for mounting a surveying and mapping instrument body (3), a cooling and heat insulation assembly installed on the top of the mounting assembly for preventing the surveying and mapping instrument body (3) from having a high temperature when in operation, and a fixing assembly installed inside the cooling and heat insulation assembly for fixing the surveying and mapping instrument body (3); The mounting assembly comprises a rotating plate (2011) rotatably connected to the inside of the mounting plate (1), and two arc-shaped blocks (2013) respectively fixed to the left and right sides of the rotating plate (2011); the two arc-shaped blocks (2013) are used to make the rotating plate (2011) rotate more stably; The cooling and heat-insulating assembly comprises a protective frame (2021) fixed to the top of the rotating plate (2011), a cover plate (2022) hingedly connected to the top of the protective frame (2021) by a hinge, a heat-insulating layer (2023) fixed to the inside of the protective frame (2021) and the bottom of the cover plate (2022), a solar panel (2024) fixed to the top of the cover plate (2022), a solar battery (2025) fixed to the top of the rotating plate (2011), a refrigerator (2026) fixed to the inner rear side wall of the protective frame (2021), and an observation window (2027) fixed to the front of the protective frame (2021); the observation window (2027) is used to ensure that the surveying instrument body (3) can measure the target location.
2. A surveying and mapping instrument for engineering cost according to claim 1, Features: The fixing assembly comprises two hydraulic rods (2031) respectively fixed to the left inner wall and the right inner wall of the protective frame (2021), two fixing plates (2032) respectively fixed to the opposite sides of the two hydraulic rods (2031), and a sliding block (2033) fixed to the bottom of the fixing plate (2032); the sliding block (2033) is used to make the sliding of the fixing plate (2032) more stable.
3. A surveying and mapping instrument for engineering cost according to claim 1, Features: The driving assembly (300) comprises two connecting columns (301) fixed to the bottom of the mounting plate (1), a transverse plate (302) fixed between the bottom ends of the two connecting columns (301), and a motor (303) fixed to the top of the transverse plate (302); the motor (303) is used to drive the rotating plate (2011) to rotate.
4. A surveying and mapping instrument for construction cost according to claim 3, Features: A mounting groove (304) is provided at the bottom of the mounting plate (1), and the output shaft of the motor (303) is fixed to the bottom of the rotating plate (2011).
5. The engineering cost surveying and mapping instrument according to claim 1, Features: A rotation groove (2012) is provided at the top of the mounting plate (1), an annular groove (2014) is provided inside the mounting plate (1), the annular groove (2014) is connected to the rotation groove (2012), and the arc block (2013) is slidably connected inside the annular groove (2014).
6. A surveying and mapping instrument for engineering cost according to claim 2, Features: Two slide grooves (2034) are provided on the top of the rotating plate (2011), and the sliding block (2033) is slidably connected inside the slide grooves (2034).
7. The engineering cost surveying and mapping instrument according to claim 2, Features: Rubber pads are fixed to opposite sides of the two fixing plates (2032), and the length of the observation window (2027) is greater than the length of the surveying instrument body (3).
8. The engineering cost surveying and mapping instrument according to claim 5, Features: The right side of the cover plate (2022) is snap-connected to the right side of the protective frame (2021) via a snap buckle, and the diameter of the rotating plate (2011) is equal to the diameter of the rotating groove (2012).
Citation Information
Patent Citations
Field surveying and mapping instrument for construction engineering cost
CN215981659U