Concrete pouring device for building engineering construction
By using a concrete pouring device with rotatable bulk tray and telescopic rod in construction, multiple pouring channels are provided, which solves the problem of easy separation of pile-based concrete pouring, achieving uniform pouring of concrete and improving project quality.
Patent Information
- Application Number
- CN202420792894.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-12-10
- Estimated Expiration
- 2034-04-17
AI Technical Summary
In construction projects, under the limitations of existing equipment, pouring pile foundation concrete can easily lead to concrete separation and affect project quality.
A concrete pouring device for construction construction was designed, using rotatable bulk trays and telescopic rods to provide multiple pouring channels, and the concrete is evenly conveyed and poured through rotatable bulk trays and spiral feed rods.
It effectively reduces the possibility of separation during pile foundation concrete pouring, improves the quality of the project, and ensures continuous and uniform pouring of concrete.
Smart Images

Figure CN222140733U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of construction engineering equipment, and in particular relates to a concrete pouring device for construction engineering. Background Art
[0002] In the process of building construction, it is necessary to transport the mixed concrete to different locations for pouring through different equipment. In the process of concrete pouring, in order to prevent the concrete from segregating, the concrete pouring needs to be carried out continuously and evenly. Among them, when pouring pile foundations, due to the limitations of existing equipment, most pile foundations use a single pouring channel to pour concrete into the pile foundation, causing the concrete in the pile foundation to accumulate first and then collapse and flow in other directions. This pouring method is very likely to cause the concrete in the pile foundation to segregate, thus bringing hidden dangers to the quality of the project. Utility Model Content
[0003] The technical problem to be solved by the utility model is: to overcome the shortcomings of the prior art and provide a concrete pouring device for construction engineering construction, which adopts a rotatable bulk material plate to provide multiple pouring channels for pile foundation pouring, so that the concrete pouring of the pile foundation can be carried out evenly, reducing the possibility of segregation in the concrete pouring of the pile foundation, thereby improving the quality of the project.
[0004] The concrete pouring device for construction engineering construction includes a carrier, a telescopic rod, and a pouring structure. The outer wall of the carrier is provided with a discharge end connected to the interior of the carrier; one end of the telescopic rod is movably connected to the carrier and is located on one side of the discharge end; the pouring structure is rotatably connected to one side of the carrier, and some components are movably connected to the telescopic rod; wherein a rotatable pouring component and a driving component for driving the pouring component to rotate are provided at one end of the pouring structure away from the carrier.
[0005] Preferably, the casting assembly includes a connecting part, a bulk material tray, and a casting pipe, wherein a through groove is provided inside the connecting part; a cavity is provided inside the bulk material tray, which is arranged at one end of the connecting part, and the cavity is connected to the through groove; the casting pipe is arranged at one end of the bulk material tray away from the connecting part, and at least one casting pipe is provided.
[0006] Preferably, a rack surrounding the outer side wall of the bulk material tray is provided.
[0007] Preferably, the driving assembly includes a connecting piece and a driving box, wherein a reinforcing rib is provided inside the connecting piece; the driving box is arranged at one end of the connecting piece, and part of the assembly is engaged with the bulk material tray.
[0008] Preferably, a first motor is embedded in the driving box, and a power output end of the first motor protrudes through a side wall of the driving box to the outside of the driving box.
[0009] Preferably, a bevel gear is installed on the power output end of the first motor, and is meshed with a rack provided on the outer side wall of the bulk material tray through the bevel gear.
[0010] Preferably, the casting structure also includes a feeding pipe, a spiral feeding rod, a second motor, and an articulated seat. The interior of the feeding pipe defines a feeding space, one end of which is connected to the connecting part; the spiral feeding rod is arranged in the feeding space; the second motor is arranged at one end of the feeding pipe, and its power output end passes through the outer wall of the feeding pipe and is connected to the spiral feeding rod; the articulated seat is symmetrically arranged on the outer wall of the feeding pipe.
[0011] Preferably, the carrier also includes a discharge hopper, a storage groove, and a hinged ear. The storage hopper is arranged in the carrier and is connected to the discharge end; the storage groove is located on one side of the discharge end and is used to install and store the telescopic rod; the hinged ear is arranged on the side wall of the carrier, located on the side of the discharge end away from the storage groove, and is adapted to be connected with the hinged seat.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. Provide multi-channel concrete pouring for the pouring of pile foundation, so that the pouring of pile foundation can be carried out evenly, reducing the possibility of segregation of concrete during the pouring process and effectively improving the quality of the project. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is the front view of the utility model;
[0015] Figure 2 This is the front view of the casting structure of the utility model;
[0016] Figure 3 It is a cross-sectional schematic diagram of the casting structure of the utility model;
[0017] Figure 4 It is a cross-sectional schematic diagram of the casting assembly and the driving assembly of the utility model;
[0018] Figure 5 This is a schematic diagram of the carrier structure of the utility model.
[0019] In the figure, 100, carrier; 110, discharge end; 120, storage hopper; 130, storage slot; 131, telescopic rod installation position; 140, hinged ear; 141, lower slot; 150, operation panel; 151, fuel generator; 152, wheel; 200, telescopic rod; 300, casting structure; 310, material receiving box; 320, feeding pipe; 321, hinged seat; 330, spiral feeding rod; 331, second motor; 340, drive assembly; 341, connecting piece; 342, reinforcing rib; 343, drive box; 344, first motor; 345, bevel gear; 350, casting assembly; 351, connecting part; 352, bearing; 353, bulk material tray; 354, rack; 355, casting pipe; 356, dividing cone; 360, sleeve; 361, chute installation slot. DETAILED DESCRIPTION
[0020] The utility model is further described below in conjunction with the accompanying drawings:
[0021] The directional nouns involved in the detailed description paragraphs are only for the convenience of those skilled in the art to understand the technical solutions described in this application according to the visual orientation shown in the accompanying drawings. Unless otherwise clearly specified and limited, the terms "setting", "installation", "connection", etc. should be understood in a broad sense. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.
[0022] The utility model is further described below in conjunction with the accompanying drawings:
[0023] The directional nouns involved in the detailed description paragraphs are only for the convenience of those skilled in the art to understand the technical solutions described in this application according to the visual orientation shown in the accompanying drawings. Unless otherwise clearly specified and limited, the terms "setting", "installation", "connection", etc. should be understood in a broad sense. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.
[0024] like Figures 1 to 5 As shown, the concrete pouring device for construction engineering construction includes a carrier 100, a telescopic rod 200, and a pouring structure 300. The outer wall of the carrier 100 is provided with a discharge end 110 connected to the inside of the carrier 100; one end of the telescopic rod 200 is movably connected to the carrier 100 and is located on one side of the discharge end 110; the pouring structure 300 is rotatably connected to one side of the carrier 100, and some components thereof are movably connected to the telescopic rod 200; wherein, a rotatable pouring component 350 and a driving component 340 for driving the pouring component 350 to rotate are provided at one end of the pouring structure 300 away from the carrier 100.
[0025] Optionally, the telescopic rod 200 is a retractable structure. In this way, the casting structure 300 can adjust the angle between the feeding structure and the carrier 100 by retracting the telescopic rod 200, so that the device can be applied to different working environments; at the same time, after the device completes the work, the casting structure 300 can be folded up by retracting the telescopic rod 200, which reduces the space occupied by the device and facilitates transportation.
[0026] like Figures 2 to 4 As shown, the casting assembly 350 includes a connecting portion 351, a bulk material tray 353, and a casting pipe 355. The connecting portion 351 is provided with a through groove inside; the bulk material tray 353 is provided with a cavity inside, which is arranged at one end of the connecting portion 351, and the cavity is connected to the through groove; the casting pipe 355 is arranged at one end of the bulk material tray 353 away from the connecting portion 351, and at least one is provided.
[0027] Optionally, a bearing 352 is provided at the connection between the connection portion 351 and the feed pipe 320.
[0028] Optionally, a dividing cone 356 is provided inside the bulk material tray 353. In this way, the concrete entering the dividing tray through the connection portion 351 can be distributed to different positions in different dividing trays through the dividing cone 356, and discharged from the dividing tray by the pouring pipes 355 arranged at different positions at the bottom of the dividing tray, so that each pouring pipe 355 can discharge the same amount of concrete, ensuring uniformity during concrete pouring.
[0029] Optionally, a sleeve 360 is installed on the outer wall of the pouring pipe 355, and a chute installation groove 361 surrounding the outer wall of the sleeve 360 is provided. In this way, through the sleeve 360 provided with the chute installation groove, chute pipes of different lengths can be added on the basis of the pouring pipe 355, so as to reduce the drop of concrete during pouring, reduce the occurrence of concrete segregation during the pouring process, and effectively improve the quality of concrete pouring.
[0030] Optionally, a rack 354 is provided on the outer side wall of the bulk material tray 353 and surrounds the bulk material tray 353 .
[0031] like Figure 3 and Figure 4 As shown, the driving assembly 340 includes a connecting member 341 and a driving box 343. A reinforcing rib 342 is provided inside the connecting member 341. The driving box 343 is arranged at one end of the connecting member 341, and part of the assembly is engaged with the bulk material tray 353. In this way, the driving box 343 is hoisted below the casting structure 300 through the connecting member 341, and the connection strength of the driving box 343 can be further enhanced through the built-in reinforcing rib 342, thereby ensuring the stability of the driving box 343 when engaging and moving with the material distribution tray.
[0032] Optionally, a first motor 344 is embedded in the driving box 343 , and a power output end of the first motor 344 passes through a side wall of the driving box 343 and protrudes to the outside of the driving box 343 .
[0033] Optionally, a bevel gear 345 is installed on the power output end of the first motor 344 , and is meshed with a rack 354 provided on the outer side wall of the bulk material tray 353 through the bevel gear 345 .
[0034] like Figures 2 to 4 As shown, the casting structure 300 also includes a feeding pipe 320, a spiral feeding rod 330, a second motor 331, and an articulated seat 321. The feeding pipe 320 defines a feeding space inside, one end of which is connected to the connecting portion 351; the spiral feeding rod 330 is arranged in the feeding space; the second motor 331 is arranged at one end of the feeding pipe 320, and its power output end passes through the outer wall of the feeding pipe 320 and is connected to the spiral feeding rod 330; the articulated seat 321 is symmetrically arranged on the outer wall of the feeding pipe 320. In this way, the spiral feeding rod 330 can rotate under the drive of the second motor 331, and the concrete is continuously transported from one end of the feeding pipe 320 to the other end, ensuring the continuity of concrete transportation.
[0035] Optionally, one end of the feed pipe 320 is provided with a material receiving box 310, and an opening is provided above the material receiving box 310. In this way, concrete can enter the feed pipe 320 through the opening on the material receiving box 310, and be transported to the other end of the feed pipe 320 through the spiral feed rod 330.
[0036] like Figure 5 As shown, the carrier 100 also includes a discharge hopper, a storage groove 130, and a hinged ear 140. The storage hopper 120 is arranged in the carrier 100 and is connected to the discharge end 110; the storage groove 130 is located on one side of the discharge end 110, and is used to install and store the telescopic rod 200; the hinged ear 140 is arranged on the side wall of the carrier 100, and is located on the side of the discharge end 110 away from the storage groove 130, and is adapted to be connected with the hinge seat 321.
[0037] Optionally, a symmetrically arranged telescopic rod installation position 131 is provided in the storage slot 130 for installing the telescopic rod 200 .
[0038] Optionally, the bottom of the carrier is provided with a lower slot 141. In this way, after the casting structure 300 is unfolded, the second motor 331 can be accommodated, so that the casting structure 300 can obtain a larger pitch angle.
[0039] Optionally, an operation panel 150 is provided on the side wall of the carrier 100 for controlling the operation of the casting structure 300 .
[0040] Optionally, a fuel generator 151 is provided inside the carrier 100 to provide the pouring structure 300 with electricity required for operation.
[0041] Optionally, wheels 152 are provided at the bottom of the carrier 100. In this way, the casting structure 300 can be conveniently transported to different working positions by the wheels 152, thereby improving the working efficiency of concrete casting.
[0042] It can be understood that when using the present pouring device, the carrier 100 is moved to an appropriate working position, and the fuel generator 151 is started to provide the device with the power required for operation. The material distribution plate is lowered through the operation panel 150 so that the material distribution plate is located directly above the pouring position. Concrete is poured into the storage hopper 120, and the equipment is started at this time. The concrete in the storage hopper 120 is discharged from the discharge end 110 under the action of gravity and falls into the receiving box 310. The spiral feeding rod 330 is continuously rotated to transport the concrete in the receiving box 310 to the position of the connecting portion 351 connected to the feeding pipe 320, and then enters the rotating material distribution plate from the connecting portion 351, and is discharged from the pouring pipes 355 at different positions, so that the concrete is evenly poured in the pile foundation, effectively avoiding the accumulation and segregation caused by the unilateral pouring of concrete, and improving the quality of the pile foundation concrete pouring.
[0043] Finally, although this specification is described according to implementation methods, not every implementation method contains only one independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.
Claims
1. A concrete pouring device for construction engineering, characterized in that: include: A carrier (100), wherein an outer wall thereof is provided with a discharge end (110) which is in communication with the interior of the carrier (100); A telescopic rod (200), one end of which is movably connected to the carrier (100) and is located on one side of the discharge end (110); A casting structure (300) is rotatably connected to one side of the carrier (100), wherein some components are movably connected to the telescopic rod (200); Wherein, a rotatable casting component (350) and a driving component (340) for driving the casting component (350) to rotate are provided at one end of the casting structure (300) away from the carrier (100).
2. A concrete pouring device for construction engineering according to claim 1, characterized in that: The pouring assembly (350) includes: A connecting portion (351) having a through groove therein; A bulk material tray (353) having a cavity therein, disposed at one end of the connecting portion (351), and the cavity being in communication with the through slot; The pouring pipe (355) is arranged at one end of the bulk material tray (353) away from the connecting portion (351), and is provided with at least one pouring pipe.
3. A concrete pouring device for construction engineering according to claim 2, characterized in that: A rack (354) is provided on the outer side wall of the bulk material tray (353) and surrounds the tray.
4. A concrete pouring device for construction engineering according to claim 1, characterized in that: The drive assembly (340) includes: A connecting piece (341) having reinforcing ribs (342) therein; The drive box (343) is arranged at one end of the connecting member (341), and a part of the components is engaged with the bulk material tray (353).
5. A concrete pouring device for construction engineering according to claim 4, characterized in that: The driving box (343) is embedded with a first motor (344), and a power output end of the first motor (344) passes through a side wall of the driving box (343) and protrudes to the outside of the driving box (343).
6. A concrete pouring device for construction engineering according to claim 5, characterized in that: A bevel gear (345) is installed on the power output end of the first motor (344), and is meshed with a rack (354) provided on the outer wall of the bulk material tray (353) through the bevel gear (345).
7. A concrete pouring device for construction engineering according to claim 1, characterized in that: The casting structure (300) further comprises: A feeding pipe (320) defines a feeding space therein, one end of which is in communication with the connecting portion (351); A spiral feeding rod (330) is arranged in the feeding space; A second motor (331) is disposed at one end of the feeding tube (320), and a power output end thereof passes through the outer wall of the feeding tube (320) and is connected to the spiral feeding rod (330); The hinge seat (321) is symmetrically arranged on the outer side wall of the feeding pipe (320).
8. A concrete pouring device for construction engineering according to any one of claims 1 to 7, characterized in that: The carrier (100) further comprises: A storage hopper (120) is disposed in the carrier (100) and is connected to the discharge end (110); A storage groove (130), located on one side of the discharge end (110), and used for installing and storing the telescopic rod (200); The hinge ear (140) is arranged on the side wall of the carrier (100), is located on a side of the discharge end (110) away from the storage groove (130), and is adaptably connected to the hinge seat (321).
Citation Information
Cited By
Pouring device for building construction
CN223689322U
