Waste tire reinforced buried pipeline structure

By using the reinforcing structure of used tires in buried pipes, the deformation and damage caused by external impact loads is solved, the load-bearing capacity is improved, and the cost and environmental pollution is reduced, and the structural integrity and seismic resistance are achieved.

CN222142418UActive Publication Date: 2024-12-10NO 1 CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420812495.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2024-12-10
Estimated Expiration
2034-04-18

AI Technical Summary

Technical Problem

Buried pipes are prone to severe deformation or damage under external impact loads, resulting in property losses.

Method used

The reinforcing structure of waste tires is adopted, including the first reinforcing structure layer formed by mixing tire fragments and filling materials, and the second reinforcing structure layer consists of multiple waste tire edge layers and connecting parts to form a mesh structure to increase soil body lateral constraints to enhance structural integrity.

Benefits of technology

It effectively improves the load-bearing capacity of soil covered by buried pipelines, reduces the impact force of external impact loads, avoids deformation and damage, and reduces costs and environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222142418U_ABST
    Figure CN222142418U_ABST
Patent Text Reader

Abstract

The utility model provides a junked tire reinforced buried pipeline structure, which comprises a buried pipeline embedded in a buried pipeline groove; the first reinforced structure layer is arranged on the peripheral wall of the buried pipeline in a winding mode and located in the buried pipeline groove; the at least one second reinforced structure layer extends in the axial direction of the buried pipeline, and the at least one second reinforced structure layer is located above the first reinforced structure layer and located in the buried pipeline groove; and the soil body is backfilled in the buried pipeline groove. The second reinforced structure layer is arranged, the second reinforced structure layer is used for forming a strong lateral restraining effect on the overlying soil body of the buried pipeline, and meanwhile the structural integrity of the overlying soil body is enhanced. When the earth body on the buried pipeline is subjected to external impact load, the second reinforced structure layer can play a role of'net bag 'at the moment, so that the bearing capacity of the earth body on the buried pipeline is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sludge treatment equipment, in particular to a waste tire reinforced buried pipeline structure. Background Art

[0002] Buried pipelines are widely used in drainage and oil and gas transportation systems of urban roads in my country. They are an important part of urban construction. Whether the oil and gas transportation and drainage functions of buried pipelines can operate normally is closely related to the lives of urban residents. In fact, during urban construction, frequent overloading of road traffic loads and violent impact of mechanical loads during construction will cause serious deformation or even damage of buried pipelines, resulting in property losses.

[0003] That is to say, in the prior art, there is a problem that the buried pipeline is seriously deformed or even damaged due to external impact load. Utility Model Content

[0004] The utility model provides a waste tire reinforced buried pipeline structure to solve the above technical problems, which solves the problem of serious deformation or even damage of the buried pipeline caused by external impact loads.

[0005] The utility model provides a waste tire reinforced buried pipeline structure, comprising: a buried pipeline, which is buried in a buried pipeline groove; and

[0006] A first reinforcement structure layer is disposed around the outer peripheral wall of the buried pipeline and is located in the groove of the buried pipeline; and

[0007] At least one second reinforced structure layer is disposed extending along the axial direction of the buried pipeline, and at least one second reinforced structure layer is located above the first reinforced structure layer and in the groove of the buried pipeline; and

[0008] Soil is backfilled in the buried pipeline trench.

[0009] In one embodiment, the first reinforced structure layer includes tire fragments and filling materials, and the first reinforced structure layer is formed by mixing and pressing the tire fragments and the filling materials.

[0010] In one embodiment, the volume V1 of the tire fragments is equal to the volume V2 of the filling material, wherein V1 / V2 is equal to 0.4.

[0011] In one embodiment, the thickness of the first reinforced structure layer is D1, and the value range of the thickness D1 is: 10 cm≤thickness D1≤15 cm.

[0012] In one embodiment, the second reinforced structure layer comprises:

[0013] A plurality of waste tire sidewall layers, which are arranged along a first direction and a second direction respectively; and

[0014] The connecting piece is arranged between two adjacent waste tire sidewall layers among a plurality of waste tire sidewall layers and is used for connecting the two adjacent waste tire sidewall layers.

[0015] In one embodiment, a plurality of waste tire sidewall layers are arranged in a matrix.

[0016] In one embodiment, the connecting member is made of iron wire or steel wire, one end of the connecting member is tied to one of two adjacent waste tire sidewall layers, and the other end of the connecting member is tied to the other waste tire sidewall layer.

[0017] In one embodiment, the connecting member is a bolt, and threaded holes are provided on two adjacent waste tire sidewall layers. One end of the bolt is threadedly connected to the threaded hole of one of the two adjacent waste tire sidewall layers, and the other end of the bolt is threadedly connected to the threaded hole of the other waste tire sidewall layer.

[0018] In one embodiment, the width of the second reinforcement structure layer is greater than twice the diameter of the buried pipeline.

[0019] In one embodiment, the waste tire reinforced buried pipe structure includes multiple layers of second reinforced structure layers spaced apart along a third direction, and the first vertical spacing D2 between two adjacent second reinforced structure layers is in the range of 30 cm ≤ first vertical spacing D2 ≤ 50 cm, and / or the second vertical spacing D3 closest to the buried pipe in the multiple layers of second reinforced structure layers is in the range of 30 cm ≤ second vertical spacing D3 ≤ 50 cm.

[0020] Compared with the prior art, the utility model has the following beneficial effects: a second reinforced structural layer is provided, and the second reinforced structural layer is used to form a strong lateral restraint effect on the soil body overlying the buried pipeline, and at the same time, the structural integrity of the overlying soil body is enhanced. When the soil body overlying the buried pipeline is subjected to external impact loads, the second reinforced structural layer can play a "net bag" effect at this time, thereby improving the bearing capacity of the soil body overlying the buried pipeline, reducing the impact force of the external impact load, and thus avoiding the problem of serious deformation or even damage of the buried pipeline caused by the external impact load. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a main cross-sectional view of the waste tire reinforced buried pipeline structure in the embodiment of the utility model;

[0022] Figure 2 This is a schematic diagram of the three-dimensional structure of waste tires in an embodiment of the utility model;

[0023] Figure 3for Figure 1 Schematic diagram of the structural composition of the second reinforced structure layer;

[0024] Figure 4 for Figure 1 Schematic diagram of the structural composition of the first reinforced structural layer;

[0025] Figure 5 for Figure 1 Schematic diagram of buried pipeline.

[0026] In the figure: 10, buried pipeline; 20, first reinforced structure layer; 30, second reinforced structure layer; 31, waste tire sidewall layer; 32, connecting piece; 40, soil; 100, waste tire. DETAILED DESCRIPTION

[0027] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0028] like Figures 1 to 5 As shown, the utility model provides a waste tire reinforced buried pipeline structure.

[0029] The above-mentioned waste tire reinforced buried pipeline structure specifically includes a buried pipeline 10, a first reinforced structure layer 20, three second reinforced structure layers 30 and soil 40. The buried pipeline 10 is buried in the buried pipeline trench; the second reinforced structure layer 30 is extended along the axial direction of the buried pipeline 10, the second reinforced structure layer 30 is located above the first reinforced structure layer 20 and is located in the buried pipeline trench; the soil 40 is backfilled in the buried pipeline trench.

[0030] In the above configuration, three layers of the second reinforced structure layer 30 are provided, and the three layers of the second reinforced structure layer 30 are used to form a strong lateral constraint on the soil overlying the buried pipeline, and at the same time, the structural integrity of the overlying soil is enhanced. When the soil overlying the buried pipeline is subjected to external impact loads, the three layers of the second reinforced structure layer 30 can exert a "net bag" effect at this time, thereby improving the bearing capacity of the soil overlying the buried pipeline, reducing the impact force of the external impact load, and thus avoiding the problem of serious deformation or even damage of the buried pipeline caused by the external impact load.

[0031] Specifically, in one embodiment, the first reinforced structure layer 20 includes tire fragments and filling materials. The first reinforced structure layer 20 is formed by mixing and pressing the tire fragments and the filling materials.

[0032] Specifically, in one embodiment, the filling material is soil, and the tire fragments are made of waste tires 100, that is, the waste tires 100 are cut to make tire fragments.

[0033] Specifically, in one embodiment, the volume V1 of the tire fragments and the volume V2 of the filling material, wherein V1 / V2 is equal to 0.4. Setting the ratio of V1 / V2 to 0.4 can improve the structural strength of the first reinforced structure layer 20 and make it have a stronger bearing capacity.

[0034] Specifically, in one embodiment, the thickness of the first reinforced structure layer 20 is D1, and the value range of the thickness D1 is: 10 cm≤thickness D1≤15 cm.

[0035] Specifically, in one embodiment, the second reinforced structure layer 30 includes a plurality of waste tire sidewall layers 31 and a connecting member 32. The plurality of waste tire sidewall layers 31 are arranged along a first direction and a second direction respectively; the connecting member 32 is arranged between two adjacent waste tire sidewall layers 31 among the plurality of waste tire sidewall layers 31, and is used to connect the two adjacent waste tire sidewall layers 31.

[0036] Specifically, in one embodiment, a plurality of waste tire sidewall layers 31 are arranged in a matrix.

[0037] Specifically, in one embodiment, the second reinforcement structure layer 30 includes 16 waste tire sidewall layers 31 , which are distributed in a square matrix.

[0038] Specifically, in one embodiment, the connecting member 32 is made of iron wire or steel wire, one end of the connecting member 32 is tied to one of two adjacent waste tire sidewall layers 31 , and the other end of the connecting member 32 is tied to the other waste tire sidewall layer 31 .

[0039] Of course, in an alternative embodiment not shown in the drawings of the present application, the connecting member 32 is a bolt, and threaded holes are provided on two adjacent waste tire sidewall layers 31. One end of the bolt is threadedly connected to the threaded hole of one of the two adjacent waste tire sidewall layers 31, and the other end of the bolt is threadedly connected to the threaded hole of the other waste tire sidewall layer 31.

[0040] Specifically, in one embodiment, the width of the second reinforcement structure layer 30 is greater than twice the diameter of the buried pipeline 10 .

[0041] Specifically, in one embodiment, the waste tire reinforced buried pipeline structure includes three layers of second reinforced structure layers 30 spaced apart along the third direction, and the value range of the first vertical spacing D2 between two adjacent second reinforced structure layers 30 is: 30cm≤first vertical spacing D2≤50cm, and the value range of the second vertical spacing D3 closest to the buried pipeline 10 among the multiple layers of second reinforced structure layers 30 is: 30cm≤second vertical spacing D3≤50cm.

[0042] Combine the following Figures 1 to 5, a more complete embodiment of the present application is described below:

[0043] The present application provides a waste tire reinforced buried pipeline structure, comprising a buried pipeline, a second reinforced structure layer horizontally laid inside the soil body above the buried pipeline, and a first reinforced structure layer filled in the side of the buried pipeline; the second reinforced structure layer is a mesh structure formed by a plurality of tire edges connected to each other; the first reinforced structure layer is a composite filler formed by tire fragments and a filling material; the filling material is soil; and the buried pipeline is a PVC corrugated pipe.

[0044] The tire sidewalls are made by cutting multiple waste tires, which are connected to each other by wires to form a mesh-like plane structure.

[0045] The tire fragments are formed by cutting a plurality of tire treads (3), each tire fragment has a size of approximately (length×width) 5×7 cm, and in the process of being uniformly mixed with soil to form a composite filler, the volume ratio of the tire fragments to the soil is approximately 2:5.

[0046] The interlayer spacing between the second reinforced structure layers and the distance between the second reinforced structure layer and the buried pipeline c should be between 30 and 50 cm.

[0047] The laying width of the second reinforced structure layer should be greater than twice the diameter of the buried pipeline, and the filling thickness of the first reinforced structure layer should be between 10 and 15 cm.

[0048] In this application, the waste tire reinforcement technology is used to protect the buried pipeline, which not only enhances the engineering application performance of the buried pipeline, but also improves the utilization rate of the tire, and reduces the environmental pollution caused by the waste tire. Compared with the traditional geosynthetics reinforcement technology such as geogrids and geotextiles, the cost is significantly reduced. The working principle is to utilize the high-strength tensile performance of waste tires and the interaction between the tire bead of the waste tire and the soil body to form a stronger lateral constraint effect on the soil body overlying the buried pipeline, and at the same time enhance the structural integrity of the overlying soil body. When the soil body overlying the buried pipeline is subjected to external load, the tire bead reinforcement layer (the second reinforcement structure layer) of the mesh waste tire connected by the connector can play a "net bag" effect at this time, thereby improving the bearing capacity of the soil body overlying the buried pipeline and reducing the deformation. In addition, relative to plain soil, the waste tire fragment reinforced soil has higher strength, rigidity and integrity, so it can form a certain protective effect on the buried pipeline, reducing the impact of external load on the buried pipeline.

[0049] Compared with the conventional buried pipeline structure, the utility model has the following advantages:

[0050] First, the buried pipeline reinforced with waste tires overcomes the defect that the overlying soil may deform too much and cause the buried pipeline to be damaged.

[0051] Second, during the urban road construction process, the reinforced soil layer (the first reinforced structure layer) of waste tire fragments around the buried pipeline can prevent large mechanical engineering vehicles such as forklifts and excavators from having a violent impact on the buried pipeline.

[0052] Third, the meshed waste tire sidewall reinforcement layer (the second reinforcement structure layer) is buried in the soil overlying the buried pipeline. When subjected to ground load, the high-strength tensile strength of the waste tire sidewall stimulates the lateral restraint force of the reinforcement layer on the filler, thereby improving the bearing capacity of the buried pipeline.

[0053] Fourth, the structure of the reinforced buried waste tire pipeline is simple and easy to construct. It can make full use of tire waste and on-site soil and reduce environmental pollution and land occupation.

[0054] Fifth, this application improves the seismic performance of buried pipelines in urban roads to a certain extent, and is economical and environmentally friendly.

[0055] The specific steps for laying waste tire reinforced buried pipelines are as follows:

[0056] The buried pipeline trench is excavated according to the project requirements, and then according to the pre-buried position of the buried pipeline in the trench, a layer of composite filling material made of waste tire fragments is laid near the middle of the bottom of the trench and compacted to a thickness of about 20 cm as the bottom cushion layer of the buried pipeline.

[0057] Use a crane to place the buried pipe on top of the composite filling material of waste tire fragments at the bottom of the trench, and then backfill the soil on both sides of the bottom of the trench, and the compaction thickness is level with the composite filling material of waste tire fragments at the bottom.

[0058] In the areas on both sides of the buried pipeline, the composite filling material of waste tire fragments is backfilled close to the buried pipeline and compacted to a thickness of about 20 cm. After compaction, the horizontal width of the composite filling material of waste tire fragments is maintained at about 10 to 15 cm.

[0059] The soil is backfilled in the area beside the compacted composite filling material of waste tire fragments, and compacted until it is level with the composite filling material of waste tire fragments.

[0060] The above process is repeated in sequence until the composite filling material of waste tire fragments on the top of the buried pipeline is compacted.

[0061] The above construction process enables the composite filling material of waste tire fragments to successfully surround the buried pipeline as the first reinforced structure layer, followed by backfilling of soil and compaction of the soil in layers. The thickness of each layer of soil after compaction is about 20 cm, and a mesh waste tire sidewall reinforcement layer (the second reinforced structure layer) is laid according to the spacing design requirements of each layer of reinforcement material, and the width is not less than 2 times the diameter of the buried pipeline.

[0062] Repeat the above process until the design requirements of the waste tire reinforced buried pipeline are met. The final reinforced buried pipeline structure

[0063] In the present invention, the terms "first", "second", and "third" are used for descriptive purposes only and should not be understood as indicating or implying relative importance; the term "plurality" refers to two or more, unless otherwise clearly defined. The terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; "connected" can be a direct connection or an indirect connection through an intermediate medium. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0064] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by terms such as "up", "down", "left", "right", "front" and "back" are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or unit referred to must have a specific direction, be constructed and operated in a specific orientation, and therefore, cannot be understood as a limitation on the present invention.

[0065] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "specific embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0066] The above are only preferred implementations of the utility model. The protection scope of the utility model is not limited to the above embodiments. All technical solutions under the idea of ​​the utility model belong to the protection scope of the utility model. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the utility model should also be regarded as the protection scope of the utility model.

Claims

1. A waste tire reinforced buried pipeline structure, characterized in that: include: Buried pipelines, which are buried in buried pipeline trenches; as well as A first reinforcement structure layer is disposed around the outer peripheral wall of the buried pipeline and is located in the groove of the buried pipeline; and At least one second reinforced structure layer, which is extended along the axial direction of the buried pipeline, and the at least one second reinforced structure layer is located above the first reinforced structure layer and in the groove of the buried pipeline; and Soil is backfilled in the buried pipeline trench.

2. The waste tire reinforced buried pipeline structure according to claim 1 is characterized in that: The first reinforcement structure layer includes tire fragments and filling materials, and the first reinforcement structure layer is formed by mixing and pressing the tire fragments and the filling materials.

3. The waste tire reinforced buried pipeline structure according to claim 2 is characterized in that: The volume V1 of the tire fragments and the volume V2 of the filling material, wherein V1 / V2 is equal to 0.

4.

4. The waste tire reinforced buried pipeline structure according to claim 1 is characterized in that: The thickness of the first reinforced structure layer is D1, and the value range of the thickness D1 is: 10 cm≤thickness D1≤15 cm.

5. The waste tire reinforced buried pipeline structure according to claim 1 is characterized in that: The second reinforced structure layer comprises: A plurality of waste tire sidewall layers, which are arranged along a first direction and a second direction respectively; and The connecting piece is arranged between two adjacent waste tire sidewall layers among a plurality of waste tire sidewall layers, and is used for connecting the two adjacent waste tire sidewall layers.

6. The waste tire reinforced buried pipeline structure according to claim 5 is characterized in that: The plurality of waste tire sidewall layers are arranged in a matrix.

7. The waste tire reinforced buried pipeline structure according to claim 5 is characterized in that: The connecting piece is made of iron wire or steel wire, one end of the connecting piece is tied to one of the two adjacent waste tire sidewall layers, and the other end of the connecting piece is tied to the other waste tire sidewall layer.

8. The waste tire reinforced buried pipeline structure according to claim 5 is characterized in that: The connecting piece is a bolt, and threaded holes are provided on two adjacent waste tire sidewall layers. One end of the bolt is threadedly connected to the threaded hole of one of the two adjacent waste tire sidewall layers, and the other end of the bolt is threadedly connected to the threaded hole of the other waste tire sidewall layer.

9. The waste tire reinforced buried pipeline structure according to claim 1 is characterized in that: The width of the second reinforced structure layer is greater than twice the diameter of the buried pipeline.

10. The waste tire reinforced buried pipeline structure according to claim 1 is characterized in that: The scrap tire reinforced buried pipe structure includes multiple layers of the second reinforced structure layers spaced apart along a third direction, a first vertical spacing D2 between two adjacent second reinforced structure layers having a value range of: 30 cm ≤ first vertical spacing D2 ≤ 50 cm, and / or a second vertical spacing D3 closest to the buried pipe among the multiple layers of the second reinforced structure layers having a value range of: 30 cm ≤ second vertical spacing D3 ≤ 50 cm.

Citation Information

Cited By

  • Waste tire reinforced buried pipeline structure and construction method thereof

    CN118462915A