Building model building device based on BIM
By introducing a synchronous construction design of transparent display boards and electromagnets into the building model construction device, the problem of users being unable to observe the internal layout is solved, and a more efficient construction experience and aesthetic improvement is achieved.
Patent Information
- Application Number
- CN202422662432.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-01
- Publication Date
- 2024-12-10
- Estimated Expiration
- 2034-11-01
AI Technical Summary
After the existing building model construction device is built, users cannot observe the internal furniture layout, which increases the workload and cost, and leads to a sense of separation between the models and reduces the need for aesthetics.
A BIM-based building model construction device was designed, including building tables, layered components and line laying mechanisms. The synchronous construction and combination of multi-story buildings is achieved through transparent display boards and electromagnets, providing a richer viewing experience, and Avoid vibration and errors through arc-shaped elastic plates and plug-ins.
Users can intuitively see the internal spatial layout of the building model and the overall effect of multi-layer construction, reducing workload and cost, and improving the accuracy and aesthetics of the construction.
Smart Images

Figure CN222145691U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building models, and specifically relates to a building model building device based on BIM. Background Art
[0002] Architectural and environmental art models are between plane drawings and actual three-dimensional space. They organically link the two together and are a three-dimensional model. Architectural models help to consider design creation, can intuitively reflect design intent, and make up for the limitations of drawings in expression.
[0003] When it is necessary to build a BIM-based building model, a BIM-based building model building device is needed to build the building model. However, after the existing building model building device is built, users can usually only view the entire model, but cannot observe the specific furniture layout inside. The specific furniture layout inside needs to be built separately, which not only increases the workload and cost, but also increases the sense of separation between models when users switch between multiple separate models, which easily reduces the user's aesthetic demand for the building. Utility Model Content
[0004] The purpose of the utility model is to solve the shortcomings of the prior art and to propose a building model building device based on BIM.
[0005] To achieve the above purpose, the utility model provides a BIM-based building model construction device, comprising a construction platform, a base plate is fixedly installed on the top of the construction platform, support columns are fixedly connected to the four corners of the top of the construction platform, and a top plate is fixedly connected to the top of the support column;
[0006] A layered building assembly is arranged above the building platform, and the layered building assembly is used for layered building of the building model.
[0007] In the above technical solution, further, the layered building assembly includes a second slider slidably connected to the support column, a first display board is fixedly connected between the second sliders, mounting plates are fixedly connected on both sides of the outer wall of the first display board, a wire-releasing mechanism is fixedly installed on both sides of the top of the top plate, and the wire-releasing mechanism is connected to the mounting plate by a pull rope.
[0008] In the above technical solution, further, a first slider is slidably connected to the outer wall of the support column, a second display plate is fixedly connected between the first sliders, an electromagnet is fixedly installed on the outer wall of the second slider, a second buffer sleeve is fixedly connected to the top of the first slider, a magnetic matching plate is fixedly connected to one side of the outer wall of the second buffer sleeve, and the magnetic matching plate and the electromagnet are magnetically matched, and a first buffer sleeve is sleeved and fixedly connected on the bottom of the outer wall of the support column.
[0009] In the above technical solution, further, evenly distributed empty grooves are opened on the top of the outer walls of the first buffer sleeve and the second buffer sleeve, and evenly distributed plug-ins are fixedly connected to the bottom of the outer walls of the first slider and the second slider, and the plug-ins are adapted to the empty grooves.
[0010] In the above technical solution, further, an arc-shaped spring plate is fixedly connected to the inside of the empty groove, an insertion rod is inserted and slidably connected to the inside of the arc-shaped spring plate, a contact plate is fixedly connected to the top of the arc-shaped spring plate, and the contact plate is slidably connected and inserted into the inside of the empty groove, a thickened section is fixedly connected to the inner wall of the arc-shaped spring plate, and the insertion rod is fixedly connected to the top of the outer wall of the thickened section.
[0011] In the above technical solution, further, support blocks are fixedly connected to both sides of the inner wall of the arc-shaped spring plate, and a pressure plate is fixedly connected to the outer wall of the insertion rod.
[0012] Compared with the prior art, the utility model has the following beneficial effects:
[0013] The second-floor building can be directly built on the first display board. The first display board is made of transparent material, which is convenient for builders to locate during construction to avoid excessive errors between the buildings on both sides. Users can also intuitively see the appearance of the building models on both sides being merged together. When building the first floor, the pay-off mechanism is powered on and drives the first display board to rise through the pull rope, freeing up space for users to build the first floor. At the same time, through this design, users can also intuitively see the spatial layout inside the first floor. After the electromagnet is powered on, it generates magnetism, and then adsorbs and fixes the magnetic matching board. At this time, the pay-off mechanism can drive the second display board and the first display board to rise synchronously. This design allows the laying and combination of multi-layer buildings to be carried out synchronously to provide a richer viewing experience.
[0014] When the insert block is not inserted into the empty slot, the contact plate is located outside. During the process of inserting the insert block into the empty slot, the contact plate is driven to be retracted into the empty slot, and at the same time, the insertion rod under the contact plate slides inside the arc-shaped spring plate, and at the same time, the thickened section is deformed. The thickened section will pull the arc-shaped spring plate to deform and bend toward the central axis, thereby generating resistance to the first display plate and the second display plate moving downward, preventing them from vibrating when contacting the second buffer sleeve and the first buffer sleeve, thereby affecting the building model. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of a BIM-based building model construction device structure proposed by the utility model;
[0016] Figure 2 A schematic diagram of the matching structure of a slider and a second buffer sleeve of a building model building device based on BIM proposed by the utility model;
[0017] Figure 3 This is a schematic diagram of the internal structure of a hollow slot of a BIM-based building model building device proposed in the utility model.
[0018] In the figure: 1. building platform; 2. base plate; 3. support column; 4. top plate; 5. pay-off mechanism; 6. mounting plate; 7. first display plate; 8. second display plate; 9. first slider; 10. first buffer sleeve; 11. second buffer sleeve; 12. magnetic matching plate; 13. electromagnet; 14. plug-in block; 15. empty slot; 16. contact plate; 17. plug-in rod; 18. arc spring plate; 19. thickening section; 20. support block; 21. pressure plate; 22. second slider. DETAILED DESCRIPTION
[0019] In order to more clearly understand the above-mentioned objects, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0020] like Figure 1-Figure 3 A BIM-based building model construction device is shown, comprising a construction platform 1, a base plate 2 is fixedly installed on the top of the construction platform 1, support columns 3 are fixedly connected to the four corners of the top of the construction platform 1, and a top plate 4 is fixedly connected to the top of the support columns 3. The building model can be built on the top of the base plate 2;
[0021] A layered building component is arranged above the building platform 1, and the layered building component is used for building building models in layers. The layered building component includes a second slider 22 slidably connected to the support column 3, and a first display board 7 is fixedly connected between the second sliders 22. The outer wall of the first display board 7 is fixedly connected to a mounting plate 6 on both sides, and a wire-releasing mechanism 5 is fixedly installed on both sides of the top of the top plate 4, and the wire-releasing mechanism 5 is connected to the mounting plate 6 by a pull rope. The second layer of the building can be directly built on the first display board 7. The first display board 7 is made of transparent material, which is convenient for the builder to position during construction to avoid excessive errors between the buildings on both sides. The user can also intuitively see the appearance of the building models on both sides being merged together. When building the first layer, the wire-releasing mechanism 5 is energized and drives the first display board 7 to rise through the pull rope, freeing up space for the user to build the first layer. At the same time, through this design, the user can also intuitively see the spatial layout inside the first layer.
[0022] A first slider 9 is also slidably connected to the outer wall of the support column 3, a second display board 8 is fixedly connected between the first sliders 9, an electromagnet 13 is fixedly installed on the outer wall of the second slider 22, a second buffer sleeve 11 is fixedly connected to the top of the first slider 9, a magnetic matching plate 12 is fixedly connected to one side of the outer wall of the second buffer sleeve 11, and the magnetic matching plate 12 and the electromagnet 13 are magnetically matched, a first buffer sleeve 10 is sleeved and fixedly connected to the bottom of the outer wall of the support column 3, the electromagnet 13 generates magnetism when energized, and then adsorbs and fixes the magnetic matching plate 12, at this time the pay-off mechanism 5 can drive the second display board 8 and the first display board 7 to rise synchronously, this design allows the laying and combination of multi-story buildings to be carried out synchronously to provide a richer viewing experience.
[0023] The top of the outer wall of the first buffer sleeve 10 and the second buffer sleeve 11 is provided with evenly distributed slots 15, and the bottom of the outer wall of the first slider 9 and the second slider 22 is fixedly connected with evenly distributed plug blocks 14, and the plug blocks 14 are adapted to the slots 15. When idle, the plug blocks 14 are inserted into the slots 15 to increase the guidance between the first display board 7 and the support column 3, and avoid lateral tilt due to uneven force.
[0024] The inside of the empty slot 15 is fixedly connected with an arc spring plate 18, and an insertion rod 17 is inserted and slidably connected inside the arc spring plate 18. The top of the arc spring plate 18 is fixedly connected with a contact plate 16, and the contact plate 16 is slidably connected and inserted into the inside of the empty slot 15. The inner wall of the arc spring plate 18 is fixedly connected with a thickened section 19, and the insertion rod 17 is fixedly connected to the top of the outer wall of the thickened section 19. When the plug block 14 is not inserted into the empty slot 15, the contact plate 16 is located outside. During the movement of the first display plate 7 and the second display plate 8, the contact plate 16 is driven to be retracted into the empty groove 15, and the insertion rod 17 below the contact plate 16 slides inside the arc spring plate 18, and the thickened section 19 is deformed. The thickened section 19 will pull the arc spring plate 18 to deform and bend toward the central axis, thereby generating resistance to the first display plate 7 and the second display plate 8 moving downward, thereby preventing them from vibrating when contacting the second buffer sleeve 11 and the first buffer sleeve 10, thereby affecting the building model.
[0025] Support blocks 20 are fixedly connected to both sides of the inner wall of the arc-shaped spring plate 18, and a pressure plate 21 is fixedly connected to the outer wall of the insertion rod 17. When the insertion rod 17 moves downward, the pressure plate 21 is driven to move downward synchronously. During the process, the pressure plate 21 applies pressure to the empty slot 15, and the two are deformed together under the action of pressure. This design further enhances the buffering force generated during the downward pressing of the insertion rod 17.
[0026] Working principle:
[0027] The second-floor building can be directly built on the first display board 7. The first display board 7 is made of transparent material, which is convenient for builders to position during construction to avoid excessive errors between the buildings on both sides. Users can also intuitively see the appearance of the building models on both sides being merged together. When building the first floor, the pay-off mechanism 5 is powered on and drives the first display board 7 to rise through the pull rope, freeing up space for users to build the first floor. At the same time, through this design, users can also intuitively see the spatial layout inside the first floor. After the electromagnet 13 is powered on, it generates magnetism, and then adsorbs and fixes the magnetic matching plate 12. At this time, the pay-off mechanism 5 can drive the second display board 8 and the first display board 7 to rise synchronously. This design allows the laying and combination of multi-layer buildings to be carried out synchronously to provide a richer viewing experience.
[0028] When the insert block 14 is not inserted into the empty slot 15, the contact plate 16 is located outside. During the process of inserting the insert block 14 into the empty slot 15, the contact plate 16 is driven to be retracted into the empty slot 15, and at the same time, the insertion rod 17 below the contact plate 16 slides inside the arc-shaped spring plate 18, and at the same time, the thickened section 19 is deformed. The thickened section 19 will pull the arc-shaped spring plate 18 to deform and bend toward the central axis, thereby generating resistance to the first display plate 7 and the second display plate 8 moving downward, thereby preventing them from vibrating when contacting the second buffer sleeve 11 and the first buffer sleeve 10, thereby affecting the building model.
[0029] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions only describe the principles of the utility model. The utility model may be subject to various changes and improvements without departing from the spirit and scope of the utility model, and these changes and improvements fall within the scope of the utility model to be protected.
Claims
1. A BIM-based building model construction device, comprising a construction platform (1), characterized in that: A base plate (2) is fixedly mounted on the top of the building platform (1), support columns (3) are fixedly connected to the four corners of the top of the building platform (1), and a top plate (4) is fixedly connected to the top of the support columns (3); A layered building assembly is provided above the building platform (1), and the layered building assembly is used for building a building model in layers.
2. The BIM-based building model construction device according to claim 1, characterized in that: The layered building assembly comprises a second slider (22) slidably connected to the support column (3), a first display board (7) is fixedly connected between the second sliders (22), both sides of the outer wall of the first display board (7) are fixedly connected to the mounting plate (6), and both sides of the top of the top plate (4) are fixedly installed with a wire-releasing mechanism (5), and the wire-releasing mechanism (5) and the mounting plate (6) are connected by a drawstring.
3. The BIM-based building model construction device according to claim 2, characterized in that: A first slider (9) is also slidably connected to the outer wall of the support column (3), a second display board (8) is fixedly connected between the first sliders (9), an electromagnet (13) is fixedly installed on the outer wall of the second slider (22), a second buffer sleeve (11) is fixedly connected to the top of the first slider (9), a magnetic matching plate (12) is fixedly connected to one side of the outer wall of the second buffer sleeve (11), and the magnetic matching plate (12) and the electromagnet (13) are magnetically matched, and a first buffer sleeve (10) is sleeved and fixedly connected to the bottom of the outer wall of the support column (3).
4. The BIM-based building model construction device according to claim 3, characterized in that: Evenly distributed slots (15) are provided on the top of the outer walls of the first buffer sleeve (10) and the second buffer sleeve (11), and evenly distributed inserts (14) are fixedly connected to the bottom of the outer walls of the first slider (9) and the second slider (22), and the inserts (14) are adapted to fit the slots (15).
5. The BIM-based building model construction device according to claim 4, characterized in that: The interior of the empty slot (15) is fixedly connected to an arc-shaped spring plate (18), an insertion rod (17) is inserted into and slidably connected to the interior of the arc-shaped spring plate (18), a contact plate (16) is fixedly connected to the top of the arc-shaped spring plate (18), and the contact plate (16) is slidably connected and inserted into the interior of the empty slot (15), an inner wall of the arc-shaped spring plate (18) is fixedly connected to a thickened section (19), and the insertion rod (17) is fixedly connected to the top of the outer wall of the thickened section (19).
6. The BIM-based building model construction device according to claim 5, characterized in that: Support blocks (20) are fixedly connected to both sides of the inner wall of the arc-shaped spring plate (18), and a pressure plate (21) is fixedly connected to the outer wall of the insertion rod (17).
