Prefabricated T-beam wet joint formwork dismantling device
By designing a prefabricated T-beam wet seam formwork removal device, and using the combination of drawing screws and reinforcement devices, the problem of difficult removal of wet seam formwork is solved, the construction progress and quality is guaranteed, and the advantages of material saving and environmental protection are provided.
Patent Information
- Application Number
- CN202420763707.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-12
- Publication Date
- 2024-12-13
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing wet joint formwork is not easy to be demolished after the pouring is completed, resulting in violent demolition by workers, affecting the quality and progress of construction.
A prefabricated T-beam wet seam formwork removal device is designed, including bottom formwork, draw screw, mountain card, hexagon nut and rebar back corrugated. The removal process of formwork is simplified by the combination of pulling device and reinforcement device. .
It effectively solves the problem of difficult formwork removal, is easy to operate, reduces material consumption and environmental pollution, and ensures construction progress and quality.
Smart Images

Figure CN222160958U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of highway construction, in particular to a device for removing a prefabricated T-beam wet joint template. Background Art
[0002] According to the current bridge construction specifications and design drawings, after the erection of the prefabricated T-beam is completed, the steel bars between the beams must be connected in time, and then the concrete wet joints must be poured as required. According to conventional construction technology, wet joints are mostly reinforced with a formwork reinforcement system of hanging formwork and tension screws. This formwork reinforcement system has good reinforcement effect, convenient construction, and low cost. However, it is not easy to remove the bottom formwork after the wet joint is poured. It is very easy for workers to use violent removal due to the difficulty in removing the formwork. Such operations will affect the construction quality and progress of the wet joints, and will also cause excessive consumption of materials and human resources.
[0003] Therefore, it is urgent to facilitate workers to remove the bottom formwork in the formwork reinforcement system more effectively and completely to ensure the construction progress and quality. Utility Model Content
[0004] The utility model aims to provide a prefabricated T-beam wet joint template removal device to solve the technical problem that the bottom template is difficult to remove after the existing wet joint casting is completed.
[0005] To achieve the above purpose, the specific technical solution of a prefabricated T-beam wet joint template removal device of the utility model is as follows:
[0006] A prefabricated T-beam wet joint template removal device comprises a bottom template and a tension rod, one end of the tension rod passes through the bottom template, both ends of the tension rod are provided with mountain-shaped clips, hexagonal nuts of tension devices and threaded steel back ribs, the hexagonal nuts of tension devices are arranged on the side of the mountain-shaped clip facing the two ends of the tension rod, the threaded steel back rib is arranged on the side facing the middle of the tension rod, the middle sleeve of the tension rod is provided with a PVC protective sleeve, and a reinforcing device hexagonal nut is arranged between the PVC protective sleeve and the bottom template.
[0007] Furthermore, the length of the drawing rod is 500 mm and the diameter is 12 mm.
[0008] Furthermore, the hexagonal nut of the pulling device and the hexagonal nut of the reinforcement device are matched with the pulling wire rod, and both are M12.
[0009] Furthermore, the length of the PVC protective sleeve is 250 mm and the diameter is 25 mm.
[0010] Furthermore, the diameter of the threaded steel back rib is 28 mm.
[0011] Furthermore, the thickness of the bottom template is 15 mm.
[0012] Furthermore, it also includes a prefabricated T-beam wet joint arranged on the prefabricated T-beam flange plate, one end of the pair of drawing rods passes through the prefabricated T-beam wet joint, the threaded steel back rib on the bottom mold side of the prefabricated T-beam wet joint is arranged between the mountain-shaped card and the bottom mold plate, and a square wood back rib is arranged between the threaded steel back rib on the bridge deck side and the prefabricated T-beam flange plate.
[0013] The utility model provides a prefabricated T-beam wet joint template removal device with the following advantages:
[0014] The prefabricated T-beam wet joint template removal device pushes out the wet joint bottom template through the hexagonal nut fastened in advance at the bottom of the screw rod. After the bottom template is cleaned and coated with a release agent, it can be used for the wet joint construction of the next section. It effectively solves the problem of workers destroying the template by violent removal when it is difficult to remove the wet joint bottom template. At the same time, since the device is easy to operate and disassemble, and the tool manufacturing is not difficult, conventional materials are used, consumables are less, and the construction process is pollution-free, it has the dual advantages of saving materials and environmental protection. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The overall schematic diagram of the device provided by the utility model;
[0016] Figure 2 A front view of the bottom mold reinforcement and removal device provided by the utility model;
[0017] Figure 3 The utility model is provided for a side view of the bottom mold reinforcement and removal device.
[0018] In the figure: 1. Tension rod; 2. PVC protective sleeve; 3. Mountain-shaped card; 4. Hexagonal nut of tension device; 5. Hexagonal nut of reinforcement device; 6. Threaded steel back rib; 7. Bottom formwork; 8. Prefabricated T-beam flange plate; 9. Prefabricated T-beam wet joint; 10. Square wood back rib. DETAILED DESCRIPTION
[0019] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0020] See also Figures 1 to 3The utility model provides a prefabricated T-beam wet joint 9 template removal device, which is used in concrete wet joint pouring occasions. It is mainly composed of a pulling device and a reinforcement device. The pulling device is composed of a pulling rod 1, a PVC protective sleeve, two mountain clamps, and two hexagonal nuts. The reinforcement device is composed of a hexagonal nut and four threaded steel back ribs 6. One end of the pulling rod 1 passes through the bottom template 7. Both ends of the pulling rod 1 are provided with mountain clamps 3, pulling device hexagonal nuts 4 and threaded steel back ribs 6. The pulling device hexagonal nuts 4 are arranged on one side of the mountain clamp 3 facing the two ends of the pulling rod 1, and the threaded steel back ribs 6 are arranged on the side facing the middle of the pulling rod 1. The middle sleeve of the pulling rod 1 is provided with a PVC protective sleeve 2, and the reinforcement device hexagonal nuts 5 are arranged between the PVC protective sleeve 2 and the bottom template 7. It also includes a prefabricated T-beam wet joint 9 arranged on the prefabricated T-beam flange plate 8, one end of the drawing rod 1 passes through the prefabricated T-beam wet joint 9, the threaded steel back rib 6 on the bottom mold side of the prefabricated T-beam wet joint 9 is arranged between the mountain-shaped card 3 and the bottom mold plate 7, and a square wood back rib 10 is arranged between the threaded steel back rib 6 on the bridge deck side and the prefabricated T-beam flange plate 8.
[0021] Preferably, the length of the wire rod 1 is 500 mm and the diameter is 12 mm. Setting the length to 500 mm has the advantage of being moderate in length, which can ensure that it passes through the formwork and the concrete wet joint and provides sufficient support. The wire rod with a diameter of 12 mm has good tensile strength and can withstand the tension during construction.
[0022] Preferably, the hexagonal nut 4 of the pulling device and the hexagonal nut 5 of the reinforcing device are matched with the pulling rod 1, and both are M12. The nuts of M12 specification are matched with the pulling rod 1 to ensure the tightness and reliability of the connection.
[0023] Preferably, the length of the PVC protective sleeve 2 is 250 mm and the diameter is 25 mm. The length of 250 mm can provide protection for the wire rod 1 without interfering with the reinforcement of the formwork, prevent the wire rod from directly contacting the wet joint concrete, and reduce corrosion and wear. The sleeve with a diameter of 25 mm is suitable for a 12 mm wire rod to pass through, which can protect the wire rod without excessively affecting the overall strength of the structure.
[0024] Preferably, the diameter of the threaded steel back rib 6 is 28 mm, and the length is adjusted accordingly. The length of the threaded steel back rib 6 is adjustable to adapt to wet joints and templates of different widths, providing flexibility. The threaded steel with a diameter of 28 mm has good bending resistance, can effectively support the template and prevent deformation.
[0025] Preferably, the thickness of the bottom formwork 7 is 15 mm, and the size is adjusted accordingly. Increasing the thickness of the formwork can improve its overall stability and load-bearing capacity, which is very important for bearing the weight of concrete wet joints and other loads that may be encountered during construction. Thicker formwork usually means higher turnover times, which is particularly beneficial for long-term projects or situations where the formwork needs to be reused many times. The bottom formwork 7 is relatively easy to demould and has good corrosion resistance, so that the formwork can remain in good condition even in harsh construction environments, reducing maintenance costs.
[0026] Preferably, the specification of the square wood back rib 10 is 50*100mm, and the length is adjusted accordingly.
[0027] First, weld the two threaded steel bars to the mountain-shaped clamp 3 on the bottom mold side as a whole, then insert the tensioning rod 1 into the PVC protective sleeve 2, and screw the end of the screw rod on the bottom mold side into the M12 reinforcement device hexagonal nut 5, 15mm bottom mold plate 7, the mountain-shaped clamp 3 with threaded steel back rib 6, and the M12 tensioning device hexagonal nut 4 in sequence; screw the end of the screw rod on the bridge deck side into the mountain-shaped clamp 3 with threaded steel back rib 6 and the M12 tensioning device hexagonal nut 4 in sequence.
[0028] See also Figures 1 to 3 This dismantling device has both reinforcement and dismantling functions. After the wet joint formwork is reinforced and poured to reach the dismantling strength, the wet joint bottom formwork can be pushed out by the hexagonal nut fastened in advance at the bottom of the screw. After the bottom formwork is cleaned and coated with a release agent, it can be used for the next section of wet joint construction. This effectively solves the problem of workers resorting to violent dismantling and damaging the formwork when it is difficult to dismantle the wet joint bottom formwork.
[0029] The utility model provides a prefabricated T-beam wet joint template removal device with the following advantages:
[0030] The prefabricated T-beam wet joint template removal device pushes out the wet joint bottom template through the hexagonal nut fastened in advance at the bottom of the screw rod. After the bottom template is cleaned and coated with a release agent, it can be used for the wet joint construction of the next section. It effectively solves the problem of workers destroying the template by violent removal when it is difficult to remove the wet joint bottom template. At the same time, since the device is easy to operate and disassemble, and the tool manufacturing is not difficult, conventional materials are used, consumables are less, and the construction process is pollution-free, it has the dual advantages of saving materials and environmental protection.
[0031] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A prefabricated T-beam wet joint formwork removal device, characterized in that: It comprises a bottom template (7) and a wire drawing rod (1), one end of the wire drawing rod (1) passes through the bottom template (7), and both ends of the wire drawing rod (1) are provided with a mountain clamp (3), a hexagonal nut of a pulling device (4) and a threaded steel back rib (6), the hexagonal nut of the pulling device (4) is arranged on one side of the mountain clamp (3) facing the two ends of the wire drawing rod (1), and the threaded steel back rib (6) is arranged on the side facing the middle of the wire drawing rod (1), the middle sleeve of the wire drawing rod (1) is provided with a PVC protective sleeve (2), and a reinforcing device hexagonal nut (5) is arranged between the PVC protective sleeve (2) and the bottom template (7).
2. The prefabricated T-beam wet joint formwork removal device according to claim 1 is characterized in that: The length of the drawing rod (1) is 500 mm and the diameter is 12 mm.
3. The prefabricated T-beam wet joint formwork removal device according to claim 2, characterized in that: The hexagonal nut (4) of the pulling device and the hexagonal nut (5) of the reinforcing device are matched with the pulling wire rod (1), and both are M12.
4. The prefabricated T-beam wet joint formwork removal device according to claim 1, characterized in that: The PVC protective sleeve (2) has a length of 250 mm and a diameter of 25 mm.
5. The prefabricated T-beam wet joint formwork removal device according to claim 1, characterized in that: The diameter of the threaded steel back rib (6) is 28 mm.
6. The prefabricated T-beam wet joint formwork removal device according to claim 1, characterized in that: The thickness of the bottom template (7) is 15 mm.
7. The prefabricated T-beam wet joint formwork removal device according to claim 1, characterized in that: It also includes a prefabricated T-beam wet joint (9) arranged on the prefabricated T-beam flange plate (8), one end of the pair of drawing rods (1) passes through the prefabricated T-beam wet joint (9), the threaded steel back rib (6) on the bottom mold side of the prefabricated T-beam wet joint (9) is arranged between the mountain-shaped card (3) and the bottom mold plate (7), and a square wood back rib (10) is arranged between the threaded steel back rib (6) on the bridge deck side and the prefabricated T-beam flange plate (8).