Prefabricated cement board installation auxiliary device

By designing prefabricated cement board installation auxiliary devices, the height adjustment and level installation of cement boards are achieved using hydraulic structures and leveling instruments, the problem of steel pads cannot be adjusted in the prior art is solved, and construction efficiency is improved and costs are reduced.

CN222162040UActive Publication Date: 2024-12-13CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420607083.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-12-13
Estimated Expiration
2034-03-27

AI Technical Summary

Technical Problem

In assembled monolithic buildings, the steel pads cannot be adjusted during the installation process of prefabricated cement boards, which leads to low construction efficiency and increased costs. The steel pads as permanent structures cannot be taken out, which affects the installation accuracy.

Method used

A prefabricated cement board installation auxiliary device is designed, including a base, hydraulic structure and height adjustment structure. The height adjustment of the cement board is achieved through the hydraulic cylinder and the fuel tank, and a level is used to ensure the installation is flat.

Benefits of technology

It improves construction efficiency, ensures that the cement slabs are consistent with the foundation level, reduces the use cost of steel pads, and realizes stable installation and adjustment of cement slabs, reducing production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222162040U_ABST
    Figure CN222162040U_ABST
Patent Text Reader

Abstract

The utility model discloses an auxiliary device for mounting a prefabricated cement board. Comprising a base; a cavity is formed in the base, and a height adjusting structure is arranged on the periphery of the base; a hydraulic structure is arranged in the cavity of the base; the hydraulic structure comprises a hydraulic cylinder and an oil tank; the hydraulic cylinder is located on one side of the cavity of the base, and the upper end of a telescopic rod of the hydraulic cylinder extends out of the top face of the base and is used for being supported below a preset cement board. The oil tank is positioned on the other side of the cavity of the base; an operation box is arranged at the top of the base and above the oil tank; and the telescopic rod is driven to move up and down through the operation rod above the operation box, so that the height of the prefabricated cement board is adjusted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of equipment for construction engineering, and particularly relates to an auxiliary device for installing a prefabricated cement board. Background Art

[0002] With the elimination of backward production capacity and the transformation and upgrading of the construction industry, prefabricated buildings have gradually become the mainstream structural form of the construction industry. The columns and shear walls of the structure are designed to be prefabricated. The PC components are made in the factory and installed and poured on site. The upper and lower sections of the components are connected by sleeves and post-grouting. Post-grouting refers to grouting as a subsequent process in foundation treatment. Among them, when installing the upper and lower sections, the design requires a gap to be left. After the installation and positioning, the gap between the upper and lower sections is sealed with mortar.

[0003] When using the conventional installation method, steel pads are placed at the corresponding positions before the upper component is installed. After the steel pads are leveled with a level, the upper component is hoisted for installation, mortar sealing, and sleeve grouting. The steel pads cannot be removed from the gap. As part of the permanent structure, and after the steel pads are installed in the upper section, they cannot be adjusted. If there is a deviation in elevation, the upper component needs to be hoisted and the steel pads reinstalled. The construction efficiency is low, and the steel pads require continuous investment as permanent structures, which increases the construction cost. Utility Model Content

[0004] The utility model provides a prefabricated cement board installation auxiliary device, aiming at solving the problem of height adjustment of the prefabricated cement board.

[0005] In order to achieve the above-mentioned purpose, the utility model provides a prefabricated cement board installation auxiliary device; it includes a base; a cavity is arranged in the base, and a height adjustment structure is arranged around the base; a hydraulic structure is arranged in the cavity of the base; the hydraulic structure includes a hydraulic cylinder and an oil tank; the hydraulic cylinder is located on one side of the base cavity, and the upper end of the telescopic rod of the hydraulic cylinder extends out of the top surface of the base to support the bottom of the pre-set cement board; the oil tank is located on the other side of the base cavity; an operating box is arranged on the top of the base and above the oil tank; a support rod is arranged on one side of the top of the operating box; the top of the support rod is hingedly connected with an installation cylinder; a piston structure is arranged in the operating box; the piston structure includes a piston cylinder and a piston rod; the piston cylinder is arranged in the middle of the operating box, and a first hydraulic pipe is arranged between the piston cylinder and the oil tank; a first one-way valve is arranged on the first hydraulic pipe; the piston rod It is inserted in the piston cylinder, and a piston is installed at the lower end of the piston rod; the upper end of the piston rod passes through the operating box and is supported at the bottom of the mounting cylinder; the piston rod and the mounting cylinder are rotatably connected; an operating rod is arranged in the mounting cylinder, one end of the operating rod is inserted in the mounting cylinder, and the other end of the operating rod extends out of the mounting cylinder; the operating rod is swung up and down to drive the piston rod to move up and down; a second hydraulic pipe is connected between the hydraulic cylinder, the oil tank and the piston cylinder respectively; the second hydraulic pipe includes a main pipe section and two branch pipe sections; the upper ends of the two branch pipe sections are respectively connected to the hydraulic cylinder and the oil tank, and the lower ends of the two branch pipe sections are respectively connected to the upper end of the main pipe section; the lower end of the main pipe section is connected to the hydraulic cylinder; a second one-way valve is installed on the branch pipe section connected to the piston cylinder, and a control switch is arranged on the branch pipe section connected to the oil tank, and the control switch is installed on the side wall of the base and protrudes from the outer surface of the side wall of the base.

[0006] Furthermore, the adjustment structure includes a screw barrel and a screw rod fixedly arranged around the base; the screw rod and the screw barrel are threadedly connected; a rotating head is arranged at the upper end of the screw rod, and a supporting foot is arranged at the lower end of the screw rod; the screw rod is rotatably connected through a bearing arranged in the supporting foot.

[0007] Furthermore, a level is also provided on the base.

[0008] Furthermore, the operating rod is a telescopic rod, and the operating rod is connected to the mounting tube via a fixing pin.

[0009] Furthermore, the bottom of the piston tube and the bottom of the hydraulic cylinder are both provided with support blocks; the top of the telescopic rod is provided with a top platform.

[0010] Compared with the prior art, the beneficial effects of the utility model are as follows: four height adjustment structures and a level are installed on the side of the base, and the installation auxiliary device is leveled by the cooperation of the two, thereby ensuring that the prefabricated cement board can be kept level with the foundation, thereby ensuring the safety of the installation; the prefabricated cement board is installed and fixed by using hydraulic means, which can save more effort and be more stable and safe during use; at the same time, the device can be reused to reduce production costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a front structural schematic diagram of the utility model.

[0012] Figure 2 It is a schematic diagram of the structure inside the base of the utility model.

[0013] Figure 3 It is a schematic diagram of the top structure of the utility model.

[0014] Description of the drawings: 1. Base; 2. Hydraulic cylinder; 2.1. Telescopic rod; 4. Oil tank; 5. Operating box; 6. Piston cylinder; 7. Piston rod; 7.1. Piston; 8. Support rod; 9. Mounting cylinder; 10. Operating rod; 11. First hydraulic pipe; 12. Second hydraulic pipe; 12.1. Main pipe section; 12.2. Branch pipe section; 13. First non-return valve; 14. Second non-return valve; 15. Control switch; 16. Screw barrel; 17. Screw rod; 18. Rotating head; 19. Support foot; 20. Level; 21. Fixing pin; 22. Support block; 23. Top platform. DETAILED DESCRIPTION

[0015] The following will be combined with the drawings of the specification to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0016] In the description of this patent, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing this patent and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on this patent.

[0017] Combined with Figure 1-3The utility model is a prefabricated cement board installation auxiliary device; it includes a base 1; a cavity is arranged in the base 1, and an adjustable height adjustment structure is arranged around the base 1; a hydraulic structure is arranged in the cavity of the base 1; the hydraulic structure includes a hydraulic cylinder 2 and an oil tank 4; the hydraulic cylinder 2 is located on one side of the cavity of the base 1, and the upper end of the telescopic rod 2.1 of the hydraulic cylinder 2 extends out of the top surface of the base 1 to support the bottom of the prefabricated cement board; the oil tank 4 is located on the other side of the cavity of the base 1; an operation box 5 is arranged on the top of the base 1 and above the oil tank 4; a support rod 8 is arranged on one side of the top of the operation box 5; the top of the support rod 8 is hingedly connected with a mounting cylinder 9; a piston structure is arranged in the operation box 5; the piston structure includes a piston cylinder 6 and a piston rod 7; the piston cylinder 6 is arranged inside the operation box 5, and a first hydraulic pipe 11 is arranged between the piston cylinder 6 and the oil tank 4; a first one-way valve 13 is arranged on the first hydraulic pipe 11; the piston rod 7 is inserted In the piston cylinder 6, a piston 7.1 is installed at the lower end of the piston rod 7; the upper end of the piston rod 7 passes through the operating box 5 and is supported under the mounting cylinder 9; the piston rod 7 is rotatably connected to the mounting cylinder 9; an operating rod 10 is arranged in the mounting cylinder 9, one end of the operating rod 10 is inserted in the mounting cylinder 9, and the other end of the operating rod 10 extends out of the mounting cylinder 9, and the piston rod 7 is driven to move up and down by swinging the operating rod 10 up and down; the hydraulic cylinder 2, the oil tank 4 and the piston cylinder 6 are separated A second hydraulic pipe 12 is separately connected to the piston cylinder 6; the second hydraulic pipe 12 includes a main pipe section 12.1 and two branch pipe sections 12.2; the upper ends of the two branch pipe sections 12.2 are respectively connected to the hydraulic cylinder 2 and the oil tank 4, and the lower ends of the two branch pipe sections 12.2 are respectively connected to the upper end of the main pipe section 12.1; the lower end of the main pipe section 12.1 is connected to the hydraulic cylinder 2; a second one-way valve 14 is installed on the branch pipe section connected to the piston cylinder 6, and a control switch 15 is provided on the branch pipe section connected to the oil tank 4.

[0018] The adjustment structure includes a screw barrel 16 and a screw rod 17 fixedly arranged around the base 1; the screw rod 17 is threadedly connected to the screw barrel 16; a rotating head 18 is arranged at the upper end of the screw rod 17, and a supporting foot 19 is arranged at the lower end of the screw rod 17; the screw rod 17 is rotatably connected through a bearing arranged in the supporting foot 19. The base 1 is driven to move up and down by rotating the rotating head 18. A level 20 is also arranged on the base 1. The level of the base 1 is detected by the level 20, and the level of the base 1 is adjusted by the adjustment structure.

[0019] The operating rod 10 is a telescopic rod 2.1, and the operating rod 10 is connected to the mounting tube 9 via a fixing pin 21.

[0020] The bottom of the piston tube 6 and the bottom of the hydraulic cylinder 2 are both provided with support blocks 22; to prevent the piston and the piston in the hydraulic cylinder from extending into the bottom of the structure where they are located, a top platform 23 is provided on the top of the telescopic rod 2.1.

[0021] The control switch 15 is installed on the side wall of the base 1 and protrudes from the outer surface of the side wall of the base 1 for easy operation.

[0022] Working principle: Before using the prefabricated cement board installation auxiliary device, fix four auxiliary devices of the same model at the four corners of the prefabricated board preinstallation position, and then observe the level meter to determine whether the installation auxiliary device is level with the ground. If it is not level, adjust the auxiliary device to the level by adjusting the structure, and then lift the cement prefabricated board by the crane and slowly lower it. Use the installation auxiliary device to support the cement prefabricated board, and then adjust the height of the cement prefabricated board by turning the operating rod 10 up and down to ensure that the predetermined distance between the cement prefabricated board and the foundation is maintained; when it is necessary to raise the top platform When the height of the top platform 23 is reached, the operating rod 10 is turned downward to drive the piston 7.1 to move downward, and the liquid in the piston cylinder 6 is pressed into the hydraulic cylinder 2 through the second hydraulic pipe 12. At this time, the control switch is closed to ensure that the liquid in the piston cylinder 6 flows into the hydraulic cylinder, raising the height of the top platform 23 on the telescopic rod 2.1; when the height of the top platform 23 needs to be lowered, the first one-way valve 13 is opened, and the operating rod 10 is turned upward to drive the piston 7.1 to move upward, and the liquid in the oil tank 4 is discharged into the piston cylinder 6; the control switch 15 is turned on to allow the liquid in the hydraulic cylinder 2 to flow into the oil tank 4, thereby lowering the height of the top platform 23. Ensure that the cement prefabricated board is vertical to the foundation. After the cement prefabricated board is positioned, fill the gap between the cement prefabricated board and the foundation with cement to fix the connection, and then turn on the control switch to lower the telescopic rod 2.1 and take out the installation auxiliary device.

[0023] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any figure mark in the claims should not be regarded as limiting the claims involved.

Claims

1. A prefabricated cement board installation auxiliary device; characterized in that: The invention comprises a base (1); a cavity is arranged in the base (1); and height-adjustable adjustment structures are arranged around the base (1); a hydraulic structure is arranged in the cavity of the base (1); the hydraulic structure comprises a hydraulic cylinder (2) and an oil tank (4); the hydraulic cylinder (2) is located on one side of the cavity of the base (1); the upper end of the telescopic rod (2.1) of the hydraulic cylinder (2) extends out of the top surface of the base (1) to be supported under the pre-placed cement board; the oil tank (4) is located on the other side of the cavity of the base (1); and a hydraulic cylinder (2) is arranged on the top of the base (1) and above the oil tank (4). An operating box (5); a support rod (8) is provided on one side of the top of the operating box (5); a mounting cylinder (9) is hingedly connected to the top of the support rod (8); a piston structure is provided in the operating box (5); the piston structure comprises a piston cylinder (6) and a piston rod (7); the piston cylinder (6) is provided inside the operating box (5), and a first hydraulic pipe (11) is provided between the piston cylinder (6) and the oil tank (4); a first non-return valve (13) is provided on the first hydraulic pipe (11); the piston rod (7) is inserted into the piston cylinder (6), and the piston rod ( A piston (7.1) is installed at the lower end of the hydraulic cylinder (2), the upper end of the piston rod (7) passes through the operating box (5) and is supported below the mounting cylinder (9); the piston rod (7) and the mounting cylinder (9) are rotatably connected; an operating rod (10) is arranged in the mounting cylinder (9), one end of the operating rod (10) is inserted in the mounting cylinder (9), and the other end of the operating rod (10) extends out of the mounting cylinder (9), and the piston rod (7) is driven to move up and down by swinging the operating rod (10) up and down; the hydraulic cylinder (2), the oil tank (4) and the piston cylinder (6) are respectively connected A second hydraulic pipe (12) is provided; the second hydraulic pipe (12) comprises a main pipe section (12.1) and two branch pipe sections (12.2); the upper ends of the two branch pipe sections (12.2) are respectively connected to the hydraulic cylinder (2) and the oil tank (4), and the lower ends of the two branch pipe sections (12.2) are respectively connected to the upper end of the main pipe section (12.1); the lower end of the main pipe section (12.1) is connected to the hydraulic cylinder (2); a second one-way valve (14) is installed on the branch pipe section connected to the piston cylinder (6), and a control switch (15) is provided on the branch pipe section connected to the oil tank (4).

2. The prefabricated cement board installation auxiliary device according to claim 1, characterized in that: The adjustment structure comprises a screw barrel (16) and a screw rod (17) fixedly arranged around the base (1); the screw rod (17) is threadedly connected to the screw barrel (16); a rotating head (18) is arranged at the upper end of the screw rod (17), and a supporting foot (19) is arranged at the lower end of the screw rod (17); the screw rod (17) is rotatably connected via a bearing arranged in the supporting foot (19).

3. The prefabricated cement board installation auxiliary device according to claim 1, characterized in that: The base (1) is also provided with a level (20).

4. The prefabricated cement board installation auxiliary device according to claim 1, characterized in that: The operating rod (10) is a telescopic rod (2.1), and the operating rod (10) is connected to the mounting tube (9) via a fixing pin (21).

5. The prefabricated cement board installation auxiliary device according to claim 1, characterized in that: The bottom of the piston cylinder (6) and the bottom of the hydraulic cylinder (2) are both provided with support blocks (22); and the top of the telescopic rod (2.1) is provided with a top platform (23).

6. The prefabricated cement board installation auxiliary device according to claim 1, characterized in that: The control switch (15) is mounted on the side wall of the base (1) and is arranged to protrude from the outer surface of the side wall of the base (1).