Monorail car roof air conditioner well pre-assembly installing and welding tool

By designing a weld assembly for pre-assembly of the roof air conditioner well of monorail vehicles, using fast compression and adjustable positioning devices, the problems of low welding accuracy and efficiency are solved, and the efficient and precise welding process is achieved, ensuring the product Quality and consistency.

CN222176402UActive Publication Date: 2024-12-17ANHUI RAIERWEI TRANSPORTATION EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323361213.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-11
Publication Date
2024-12-17
Estimated Expiration
2033-12-11

AI Technical Summary

Technical Problem

The prior art is difficult to effectively control the welding dimensional accuracy of the pre-assembly of the roof air conditioner well of monorail vehicles and the deformation of the product after welding, and the welding efficiency is low and the labor intensity is high, which affects product quality and consistency.

Method used

A welding assembly including a base, a connection part, a fast compression device and an adjustable positioning device is designed. The tooling direction is adjusted through the positioning machine, and the rapid compression device and an adjustable positioning device are used to achieve precise welding and fixing, reducing labor Operation, improve production efficiency and product consistency.

Benefits of technology

The precision control of welding forming is achieved, the cumulative tolerance of clamping is reduced, the production efficiency is improved, the operating labor intensity is reduced, the product quality and consistency is ensured, and the maintenance and installation process is simplified.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222176402U_ABST
    Figure CN222176402U_ABST
Patent Text Reader

Abstract

The utility model discloses an assembling and welding tool for a monorail car roof air-conditioning well pre-assembly. The assembling and welding tool for the monorail car roof air-conditioning well pre-assembly comprises a base, a connecting part, a rapid pressing device and an adjustable positioning device, wherein the connecting part, the rapid pressing device and the adjustable positioning device are arranged on the base. The connecting parts are arranged at the two ends of the base and used for being connected with a positioner to change the rotating angle of the tool. The rapid pressing device is used for pressing and fixing the monorail vehicle roof air conditioner well pre-assembly and can be rapidly inserted and pulled out. And the adjustable positioning device is arranged on the transverse and / or longitudinal working surface of the base. According to the utility model, the size control of the monorail car roof air-conditioning well pre-assembly technical requirements can be ensured, and the later monorail car roof assembly quality is finally ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of rail vehicles, and in particular relates to a pre-assembly welding tool for an air-conditioning well on the roof of a monorail vehicle. Background Art

[0002] Monorail car roof air conditioning well pre-assembly (its product structure is as follows Figure 6 As the main load-bearing area of ​​the entire roof, it has high structural strength requirements and is the basis for the later assembly of air-conditioning equipment. The accuracy of its welding dimensions determines the assembly dimensions of subsequent air-conditioning equipment and the machining quality of corresponding machining items, which in turn affects the final product quality of the entire monorail car roof.

[0003] Normally, the production of conventional riveted and welded parts for rail vehicles is carried out by positioning and welding on a welding platform. However, this method is not suitable for the welding of pre-assemblies of roof air-conditioning wells, which have very high requirements. It is not easy to control the welding size, weld quality and product deformation after welding.

[0004] In addition, commonly used tooling only constrains and controls the conventional shape tolerance of the product, while the tooling for the pre-assembly of the air-conditioning well on the roof of the monorail vehicle needs to consider issues such as controlling the welding dimensions, the straightness and position tolerance of the product after welding, and the consistency of batch product production in the tooling design.

[0005] In addition, it is also necessary to consider the low welding efficiency and high labor intensity of the assembly welding of the roof air conditioning well pre-assembly.

[0006] Therefore, it is necessary to design a welding tool for the pre-assembly of the roof air conditioning well to solve the above problems. Summary of the invention

[0007] In view of the shortcomings and deficiencies in the prior art, the purpose of the utility model is to provide a monorail vehicle roof air-conditioning well pre-assembly welding tooling, which can ensure the dimensional control of the technical requirements of the monorail vehicle roof air-conditioning well pre-assembly, and ultimately ensure the later assembly quality of the monorail vehicle roof.

[0008] The technical solution of the utility model is as follows:

[0009] The pre-assembly welding tool for the air-conditioning well on the roof of a monorail vehicle comprises a base and a connecting part, a quick clamping device and an adjustable positioning device arranged on the base; the connecting part is arranged at both ends of the base, and is used to connect a positioner to change the rotation angle of the tool; the quick clamping device is used to clamp and fix the pre-assembly of the air-conditioning well on the roof of the monorail vehicle, and can be quickly plugged in and out; the adjustable positioning device is arranged on the transverse and / or longitudinal working surface of the base.

[0010] Furthermore, the base includes a rectangular tube, a steel plate and a cantilever clamp mounting seat. The rectangular tubes are spliced ​​together to form a rectangular frame. The steel plate is arranged on the working surface of the rectangular frame. The cantilever clamp mounting seat is arranged on the inner side surface of the rectangular frame. The cantilever clamp mounting seat is provided with holes.

[0011] Furthermore, a plurality of rectangular tubes are additionally arranged in the rectangular frame for reinforcing support.

[0012] Furthermore, after welding, the rectangular frame is processed as a whole to ensure the overall flatness of the working surface.

[0013] Furthermore, the quick pressing device includes a plug-in end, a connecting end and a pressing end; the plug-in end and the pressing end are parallel to each other and vertically connected together through the connecting end, and the bottom of the plug-in end is inserted into the hole of the cantilever clamp mounting seat; the pressing end moves up and down and quickly presses the monorail vehicle roof air-conditioning well pre-assembly through a thread.

[0014] Furthermore, the clamping end is provided with a thread to match and connect with the corresponding end of the connecting end.

[0015] Furthermore, the plug end can rotate 360° around the hole of the cantilever presser mounting base.

[0016] Furthermore, the connection part includes a positioner interface and a base interface, the positioner interface and the base interface are arranged back to back, the base interface is welded to the base frame, and the positioner interface is arranged outwardly and docked and fixed with the self-contained installation interface of the positioner.

[0017] Furthermore, the connection part is made of welded steel. The beneficial effects of the utility model are:

[0018] (1) By utilizing the utility model of the monorail vehicle roof air conditioning well pre-assembly welding fixture, the roof air conditioning well pre-assembly welding fixture itself and the positioner are combined to complete the one-time welding of the roof air conditioning well pre-assembly, thereby reducing the cumulative tolerance of multiple clamping. In addition, after the welding, the fixture is processed and formed by a CNC machine tool in one time, and the straightness position tolerance is 0.05mm. The precision of the fixture can be used to control the position tolerance of the roof air conditioning well pre-assembly.

[0019] (2) By changing the tooling and product direction through the positioner, multiple manual turning can be avoided, thus improving production efficiency.

[0020] The use of mechanical equipment to assist in displacement makes it safe and reliable, reduces the labor intensity of operators and improves safety.

[0021] (3) The use of an adjustable quick clamping device can prevent reverse deformation after welding, improve product consistency and control product quality, and reduce the workload of product adjustment.

[0022] The quick clamping device is a vulnerable and consumable part and is installed by plug-in. The subsequent replacement and maintenance are convenient, reducing tooling maintenance costs.

[0023] (4) The utility model is used to utilize the pre-assembly welding fixture of the monorail vehicle roof air conditioning well, and an adjustable longitudinal and transverse positioning device is adopted to quickly meet the size adjustment, reduce manual measurement, and ensure product consistency.

[0024] (5) The utility model monorail vehicle roof air conditioning well pre-assembly welding tooling has a reasonable design and a compact structure; no additional working platform is required, and installation, disassembly and use are flexible and convenient, and the service life is long. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is an overall schematic diagram of the pre-assembly welding tooling for the air conditioning well on the roof of a monorail vehicle of the utility model;

[0026] Figure 2 is a schematic diagram of the base;

[0027] Figure 3 is a schematic diagram of the connection part;

[0028] Figure 4 This is a schematic diagram of the front welding of the pre-assembly of the air conditioning well on the roof of a monorail vehicle;

[0029] Figure 5 This is a schematic diagram of the reverse welding of the pre-assembly of the air conditioning well on the roof of a monorail vehicle;

[0030] Figure 6 This is a schematic diagram of the pre-assembly product of the air conditioning well on the roof of a monorail vehicle;

[0031] Among them: 1. Base; 2. Connecting part; 3. Quick clamping device; 4. Adjustable positioning device;

[0032] 11. Rectangular tube; 12. Steel plate; 13. Cantilever clamp mounting seat;

[0033] 21. Positioner interface; 22. Base interface;

[0034] A-monorail vehicle roof air conditioning well pre-assembly product; B-monorail vehicle roof air conditioning well pre-assembly tooling. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0036] like Figure 1As shown, the monorail vehicle roof air conditioning well pre-assembly welding tool B of this embodiment includes a base 1, a connecting part 2, a quick clamping device 3 and an adjustable positioning device 4, and the connecting part 2, the quick clamping device 3 and the adjustable positioning device 4 are arranged on the base 1.

[0037] Among them, the base 1 includes a rectangular tube 11, a steel plate 12 and a cantilever clamp mounting seat 13; the rectangular tubes 11 are spliced ​​with each other (such as welding) to form a rectangular frame, and multiple rectangular tubes 11 are arranged in the rectangular frame for reinforcement and support; after welding, the overall flatness of the installation working surface is ensured by an overall processing method.

[0038] A plurality of steel plates 12 are arranged on the working surface of the rectangular frame, on which the monorail vehicle roof air conditioning well pre-assembly product A is placed, and the steel plates 12 are used to support the quick pressing device 3 to press and fix the monorail vehicle roof air conditioning well pre-assembly product A.

[0039] A plurality of cantilever clamp mounting seats 13 are arranged on the inner side surface of the rectangular frame. The cantilever clamp mounting seats 13 are provided with holes for inserting the quick clamping device 3 , so as to facilitate quick installation and removal of the quick clamping device 3 .

[0040] Among them, the connecting part 2 is arranged at both ends of the base 1, and the connecting part 2 includes a positioner interface 21 and a base interface 22. The positioner interface 21 and the base interface 22 are arranged back to back, and the base interface 22 is arranged toward the base (inwardly), and the base interface 22 is welded to the base frame 1; the positioner interface 21 is arranged outwardly, which is consistent with the built-in installation interface of the positioner, and can be connected to the positioner.

[0041] Preferably, the connection portion 2 is formed by welding steel.

[0042] Among them, the rapid pressing device 3 is used for the rapid pressing and fixing of the pre-assembly product A of the air-conditioning well on the roof of the monorail vehicle.

[0043] The quick clamping device 3 includes a plug-in end, a connecting end and a clamping end. The plug-in end and the clamping end are parallel to each other and vertically connected together through the connecting end. The bottom of the plug-in end is inserted into the hole of the above-mentioned cantilever clamper mounting seat 13; the clamping end can move up and down and quickly clamp the monorail vehicle roof air-conditioning well pre-assembly product A through a thread, and clamp it firmly (the clamping end is provided with a thread to match the corresponding end of the connecting end).

[0044] The quick clamping device 3 can be quickly plugged in and out. Specifically, the plug-in end of the quick clamping device 3 can be quickly plugged in and out of the hole of the cantilever clamping device mounting seat 13 .

[0045] The quick clamping device 3 can rotate 360° around the plug-in position. Specifically, the plug-in end of the quick clamping device 3 can rotate 360° in the horizontal direction around the hole of the cantilever clamper mounting seat 13 .

[0046] Among them, the adjustable positioning device 4 is arranged on each positioning point of the pre-assembly tooling B of the air-conditioning well on the roof of the monorail vehicle, so as to reduce manual measurement and ensure product consistency.

[0047] The adjustable positioning device 4 is located on the steel pipe 11 in the transverse and / or longitudinal direction of the base 1 to accurately position the longitudinal and transverse devices of the product in advance.

[0048] The process of welding using the monorail vehicle roof air conditioning well pre-assembly welding tool B of this embodiment is as follows:

[0049] (1) Adjust the monorail car roof air conditioning well pre-assembly welding tool B to a horizontal state, according to Figure 4 After loading the monorail vehicle roof air conditioning well pre-assembly product A into the monorail vehicle roof air conditioning well pre-assembly welding tool B, quickly press it. Then you can start welding.

[0050] Weld the front weld according to the welding process requirements.

[0051] (2) Figure 5 As shown, the tooling is rotated 180 degrees using a positioner, and the reverse weld is welded according to the welding process requirements.

[0052] (3) After welding is completed, the monorail vehicle roof air conditioning well pre-assembly product A is removed from the monorail vehicle roof air conditioning well pre-assembly welding tool B.

[0053] The above description is only a preferred embodiment of the present invention and does not constitute a limitation on the protection scope of the present invention. Any modification, equivalent replacement and improvement made within the spirit and principle of the present invention shall be included in the protection scope of the claims of the present invention.

Claims

1. Monorail car roof air conditioning well pre-assembly welding tool, characterized in that: The monorail vehicle roof air-conditioning well pre-assembly welding tooling includes a base and a connecting part, a quick clamping device and an adjustable positioning device arranged on the base; the connecting part is arranged at both ends of the base, and is used to connect a positioner to change the rotation angle of the tooling; the quick clamping device is used to clamp and fix the monorail vehicle roof air-conditioning well pre-assembly, and can be quickly plugged in and out; the adjustable positioning device is arranged on the transverse and / or longitudinal working surfaces of the base.

2. The monorail vehicle roof air conditioning well pre-assembly welding tool as claimed in claim 1, characterized in that: The base includes a rectangular tube, a steel plate and a cantilever clamp mounting seat. The rectangular tubes are spliced ​​together to form a rectangular frame. The steel plate is arranged on the working surface of the rectangular frame. The cantilever clamp mounting seat is arranged on the inner side surface of the rectangular frame. The cantilever clamp mounting seat is provided with holes.

3. The monorail vehicle roof air conditioning well pre-assembly welding tool as claimed in claim 2, characterized in that: A plurality of rectangular tubes are additionally arranged in the rectangular frame for reinforcing support.

4. The monorail vehicle roof air conditioning well pre-assembly welding tool as claimed in claim 2, characterized in that: After the rectangular frame is welded, an integral processing method is adopted to ensure the overall flatness of the working surface.

5. The monorail vehicle roof air conditioning well pre-assembly welding tool as claimed in claim 2, characterized in that: The quick clamping device includes a plug-in end, a connecting end and a clamping end; the plug-in end and the clamping end are parallel to each other and vertically connected together through the connecting end, and the bottom of the plug-in end is inserted into the hole of the cantilever clamper mounting seat; the clamping end moves up and down and quickly clamps the monorail vehicle roof air-conditioning well pre-assembly through a thread.

6. The monorail vehicle roof air conditioning well pre-assembly welding tool as claimed in claim 5, characterized in that: The clamping end is provided with a thread for matching and connecting with the corresponding end of the connecting end.

7. The monorail vehicle roof air conditioning well pre-assembly welding tool as claimed in claim 5, characterized in that: The plug end can rotate 360 ​​degrees around the hole of the cantilever presser mounting seat.

8. The monorail vehicle roof air conditioning well pre-assembly welding tool as described in any one of claims 1 to 7, characterized in that: The connection part includes a positioner interface and a base interface, the positioner interface and the base interface are arranged back to back, the base interface is welded to the base frame, and the positioner interface is arranged outwardly and docked and fixed with the self-provided installation interface of the positioner.

9. The monorail vehicle roof air conditioning well pre-assembly welding tool as claimed in claim 8, characterized in that: The connecting part is formed by welding steel.