Roadway tunneling ventilation assembly
By designing the tunnel boring ventilation components, using the support plate and guide impeller to cooperate with the turbine fan, the problem of installation difficulties of traditional ventilation measures is solved, efficient ventilation and dust cleaning of the excavation area is achieved, and the safety and efficiency of the excavation environment are ensured.
Patent Information
- Application Number
- CN202421018367.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-11
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2034-05-11
AI Technical Summary
When digging new tunnels, traditional ventilation measures are difficult to install, which affects the excavation work and cannot effectively ensure the visibility and safety of the excavation area.
A tunnel boring ventilation assembly is designed, including a boring assembly and a driver. The ventilation assembly is equipped with a ventilation assembly at the bottom of the boring assembly. The ventilation assembly is matched with the telescope and the driver through the support plate and guide impeller to ensure effective ventilation in the ventilation area and through the turbine fan and air chamber. Improve ventilation efficiency.
It effectively improves the ventilation effect of the excavation area, reduces the accumulation of dust and harmful gases, ensures the safety and comfort of the working environment, and improves the efficiency and smoothness of the excavation operation.
Smart Images

Figure CN222184766U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel excavation, in particular to a tunnel excavation ventilation component. Background Art
[0002] "Underground tunneling" refers to the excavation of tunnels or tunnels in underground mines. These excavations are usually necessary for the extraction of mineral resources or for underground engineering construction. Tunnel excavation needs to consider geological conditions, safety measures, engineering equipment and other factors, and is a complex and important engineering activity.
[0003] When excavating, there is more than one tunnel. When excavating a new tunnel branch, since it is a newly opened area, the ventilation measures in the original tunnel cannot be extended to the newly excavated area, resulting in the visibility and safety of the excavation cannot be guaranteed. It is necessary to design ventilation measures during excavation. When excavating a new tunnel, traditional ventilation measures are difficult to install and will affect the excavation work. Based on this, they need to be improved. Utility Model Content
[0004] In view of the deficiencies of the prior art, the utility model provides a tunnel excavation ventilation component, which solves the problem that when excavating a new tunnel in the prior art, traditional ventilation measures are difficult to install and will affect the excavation work.
[0005] The tunnel excavation ventilation assembly of the utility model comprises an excavation assembly used for tunnel excavation and a driver arranged under the excavation assembly;
[0006] A conveying assembly is provided at one end of the excavation assembly for conveying excavated rocks;
[0007] A ventilation assembly is provided at the bottom of the excavation assembly for ventilating the excavation area;
[0008] The ventilation assembly includes a supporting plate, the supporting plate is combined with a driver through a telescopic member, and an arc strip is provided at the bottom of the supporting plate, and the arc strip cooperates with the telescopic member to force the front end of the supporting plate to fit the ground;
[0009] The inner side of the support plate is provided with two symmetrically arranged inner cavities, and the top of the inner cavity is provided with a guide impeller for guiding the excavated gravel into the conveying assembly;
[0010] A ventilation area is arranged on the top of the guide impeller.
[0011] As a further improvement of the utility model, an air cavity is provided inside the inner cavity, one end of the air cavity extends to one side of the support plate and is installed with a sealing plug, one end of the sealing plug is installed with a pipe, and the pipe extends to the rear end of the conveying component.
[0012] As a further improvement of the present invention, the outer side of the pipe is clamped between the drivers by means of a buckle, and a turbine fan is provided at one end of the pipe for suctioning the ventilation area to improve ventilation efficiency.
[0013] As a further improvement of the present invention, a ventilation impeller is further provided at one end of the turbine fan for cooperating with the turbine fan to improve the suction power.
[0014] As a further improvement of the utility model, a shunt pipe is arranged on one side of the sealing plug, the shunt pipe is arranged in a "V" shape, and one end of the shunt pipe is connected to the pipeline through a connecting piece.
[0015] As a further improvement of the utility model, the support plate is provided with a conveying area between the two guide impellers, and protective plates are provided on both sides of the conveying area. The conveying area is adapted to the conveying assembly and is used to convey the excavated gravel.
[0016] As a further improvement of the utility model, an upward baffle is provided on one side of the support plate close to the protective plate, and a fixed distance is maintained between the baffle and the guide impeller to prevent gravel from splashing.
[0017] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0018] The utility model can excavate the tunnel in combination with the excavation component by means of the supporting plate and the guide impeller component, and can absorb the dust and harmful gas generated when the excavation component is working by means of the ventilation area and the pipeline component, thereby improving the efficiency of ventilation and reducing the influence of dust and the like on the visibility of the excavation area;
[0019] The conveying assembly and the conveying area can cooperate with the guide impeller to guide the generated gravel out during the excavation process. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0021] Figure 1 This is a schematic diagram of the combined structure of the excavation component, the conveying component, the drive component and the ventilation component of the utility model;
[0022] Figure 2 This is a schematic diagram of the top view of the combined structure of the excavation component, the conveying component, the driver, and the ventilation component of the utility model;
[0023] Figure 3 It is a schematic diagram of the side view structure of the combined excavation component, conveying component, driver and ventilation component of the utility model;
[0024] Figure 4 This is a schematic diagram of the front view structure of the tunneling component, conveying component, driver and ventilation component combination of the utility model;
[0025] Figure 5 It is a bottom view structural diagram of the combination of the tunneling assembly, the conveying assembly, the driver and the ventilation assembly of the utility model;
[0026] Figure 6 This is a schematic diagram of the top view of the ventilation assembly of the utility model;
[0027] Figure 7 This is a schematic diagram of the three-dimensional structure of the ventilation component of the utility model;
[0028] Figure 8 This is a schematic diagram of the structure of the ventilation assembly of the utility model when viewed from above;
[0029] Fig. 9 For this utility model Figure 6 Schematic diagram of the AA section structure.
[0030] In the figure: 1. Excavation assembly; 2. Conveying assembly; 3. Drive assembly; 4. Ventilation assembly;
[0031] 41. Support plate; 42. Guide impeller; 43. Ventilation area; 44. Ventilation impeller; 45. Buckle; 46. Pipe; 47. Diverter pipe; 48. Sealing plug; 49. Turbine fan; 410. Baffle bar; 411. Conveying area; 412. Protective plate; 413. Inner cavity; 414. Arc strip; 415. Wind cavity. DETAILED DESCRIPTION
[0032] The following will disclose multiple embodiments of the utility model with diagrams. For the purpose of clear description, many physical details will be described together in the following description. However, it should be understood that these physical details should not be used to limit the utility model. In other words, in some embodiments of the utility model, these physical details are not necessary. In addition, for the purpose of simplifying the diagram, some conventional structures and components will be depicted in a simple schematic manner in the diagram.
[0033] In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present utility model.
[0034] See also Figure 1 , Figure 2 , Figure 3 , Figure 5 "Underground tunnel excavation" refers to the excavation of tunnels or tunnels in underground mines. During excavation, there is more than one tunnel. When excavating a new tunnel branch, since it is newly opened, the ventilation measures in the original tunnel cannot be extended to the newly excavated area, resulting in the visibility and safety of the excavation not being guaranteed. It is necessary to design ventilation measures during excavation. When excavating a new tunnel, traditional ventilation measures are difficult to install and will affect the excavation work. Based on this, the present application provides a tunnel excavation ventilation component 4, including a tunnel excavation component 1 for tunnel excavation and a driver 3 arranged under the tunnel excavation component 1;
[0035] A conveying assembly 2 is provided at one end of the excavation assembly 1 for conveying excavated soil and rocks;
[0036] A ventilation assembly 4 is provided at the bottom of the excavation assembly 1 for ventilating the excavation area;
[0037] The ventilation assembly 4 includes a support plate 41, which is combined with the driver 3 through a telescopic member, and an arc strip 414 is provided at the bottom of the support plate 41, and the arc strip 414 cooperates with the telescopic member to force the front end of the support plate 41 to fit the ground;
[0038] The inner side of the support plate 41 is provided with two symmetrically arranged inner cavities 413, and the top of the inner cavity 413 is provided with a guide impeller 42 for guiding the excavated gravel into the conveying assembly 2;
[0039] A ventilation area 43 is provided on the top of the guide vane 42 .
[0040] The support plate 41 is combined with the driver 3 through a telescopic member to ensure that the ventilation assembly 4 can adapt to different excavation environments. An arc strip 414 is provided at the bottom of the support plate 41, and the front end of the support plate 41 is fitted with the ground in cooperation with the telescopic member. The ventilation assembly 4 is provided at the bottom of the excavation assembly 1 to ventilate the excavation area and ensure the safety of the operating environment.
[0041] A ventilation area 43 is provided on the top of the guide impeller 42 to enhance the ventilation effect and keep the air in the excavation area fresh.
[0042] By designing the supporting plate 41 and the guide impeller 42 in a reasonable manner, the excavation area is ventilated and cleaned, and the safety and comfort of the working environment are improved. At the same time, the setting of the conveying component 2 also improves the efficiency and smooth progress of the excavation operation, and the ventilation component 4 ventilates the excavation area, reduces the accumulation of harmful gases, and ensures the safety of the environment.
[0043] Furthermore, a dust reduction measure, such as a liquid atomizer (generally water), may be provided at the front end of the tunneling assembly 1 to achieve a stable dust reduction environment, prevent dust from escaping, and ensure the tunneling working environment;
[0044] Moreover, the setting of the conveying component 2 realizes the timely conveying of excavated soil and rocks, and improves the efficiency of the excavation operation. Through the design of the guide impeller 42, the excavated gravel is introduced into the conveying component 2, which keeps the excavation site clean and reduces the pollution to the working environment. The support plate 41 is combined with the driver 3 through the telescopic part, and can adapt to different excavation environments, and has certain flexibility and adaptability.
[0045] See also Figure 1 , Figure 2 , Figure 3 , Figure 5 , Figure 6 , Figure 7 , Figure 8 and Fig. 9 An air cavity 415 is arranged on the inner side of the inner cavity 413, one end of the air cavity 415 extends to one side of the supporting plate 41 and is installed with a sealing plug 48, one end of the sealing plug 48 is installed with a pipe 46, and the pipe 46 extends to the rear end of the conveying component 2.
[0046] The outer side of the pipe 46 is clamped between the drivers 3 via a buckle 45 , and a turbine fan 49 is provided at one end of the pipe 46 for suctioning the ventilation area 43 to improve ventilation efficiency.
[0047] The pipe 46 is extended to the rear end of the conveying assembly 2. This design enables the air chamber 415 to effectively connect the ventilation assembly 4 and the conveying assembly 2, thereby achieving ventilation of the excavation area and the export of crushed stones.
[0048] A turbine fan 49 is provided at one end of the pipe 46 for sucking the ventilation area 43. Such a design can improve the ventilation efficiency, quickly suck away the air containing dust and harmful gases, and keep the excavation site clean and safe.
[0049] The ventilation effect is further improved by providing the wind chamber 415 and the turbine fan 49. This design enables the dust and harmful gases generated during the excavation process to be exhausted in time, effectively improving the working environment and improving the safety and comfort of the workers.
[0050] The ventilation area 43 is sucked by the turbine fan 49, which effectively improves the ventilation efficiency, maintains the cleanliness and air circulation of the excavation site, and promptly removes harmful gases and dust generated during the excavation process, reducing harm to the health of workers and improving work safety. The setting of the wind chamber 415 and the turbine fan 49 makes the connection between the ventilation component 4 and the conveying component 2 more perfect, thereby improving the working efficiency and coordination of the entire tunnel excavation system.
[0051] See also Figure 1 , Figure 2 , Figure 3 , Figure 5 , Figure 6 , Figure 7 , Figure 8 as well as Fig. 9 A ventilation impeller 44 is also provided at one end of the turbine fan 49 to cooperate with the turbine fan 49 to improve the suction power.
[0052] A shunt pipe 47 is provided on one side of the sealing plug 48. The shunt pipe 47 is provided in a "V" shape, and one end of the shunt pipe 47 is connected to the pipeline 46 through a connecting piece.
[0053] The design of the ventilation impeller 44 enables the fan to absorb air from the excavation area more efficiently when working, thereby enhancing the ventilation effect and improving the efficiency of air exchange. The function of the diverter pipe 47 is to evenly distribute the wind force generated by the ventilation impeller 44 to various parts of the sealing plug 48, ensuring that the ventilation effect can fully cover the entire excavation area and further improve the ventilation effect. Through the design of the turbine fan 49 and the sealing plug 48, the working performance and stability of the ventilation component 4 are enhanced, making the ventilation system more reliable.
[0054] See also Figure 7 , Figure 8 , Fig. 9 The support plate 41 is located between the two guide impellers 42 and has a conveying area 411 . Protective plates 412 are provided on both sides of the conveying area 411 . The conveying area 411 is adapted to the conveying assembly 2 and is used to convey the excavated gravel.
[0055] An upward baffle 410 is provided on one side of the support plate 41 close to the protective plate 412 , and a fixed distance is maintained between the baffle 410 and the guide impeller 42 to prevent gravel from splashing.
[0056] Protection plates 412 are provided on both sides of the conveying area 411 to protect the surrounding environment from the impact of splashing gravel. The conveying area 411 is adapted to the conveying assembly 2 and is used to convey the excavated gravel to ensure the smooth progress of the excavation process. The protection plates 412 are provided on both sides of the conveying area 411 to protect the surrounding environment and the safety of workers and prevent the splashing of gravel from causing damage to surrounding personnel and equipment.
[0057] The above description is only an embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of the claims of the present invention.
Claims
1. A tunnel excavation ventilation assembly, comprising an excavation assembly (1) for tunnel excavation and a driver (3) arranged under the excavation assembly (1); Features: A conveying assembly (2) is provided at one end of the excavation assembly (1) for conveying excavated rocks; A ventilation assembly (4) is provided at the bottom of the excavation assembly (1) for ventilating the excavation area; The ventilation assembly (4) comprises a supporting plate (41), the supporting plate (41) is combined with the driver (3) via a telescopic member, and a curved strip (414) is provided at the bottom of the supporting plate (41), and the curved strip (414) cooperates with the telescopic member to force the front end of the supporting plate (41) to fit the ground; Two symmetrically arranged inner cavities (413) are arranged on the inner side of the support plate (41), and a guide impeller (42) is installed on the top of the inner cavity (413) for guiding the excavated gravel into the conveying assembly (2); A ventilation area (43) is provided on the top of the guide impeller (42).
2. A tunnel excavation ventilation assembly according to claim 1, characterized in that: An air cavity (415) is provided inside the inner cavity (413), one end of the air cavity (415) extends to one side of the supporting plate (41) and is installed with a sealing plug (48), one end of the sealing plug (48) is installed with a pipe (46), and the pipe (46) extends to the rear end of the conveying assembly (2).
3. A tunnel excavation ventilation assembly according to claim 2, characterized in that: The outer side of the pipe (46) is clamped between the drivers (3) via a buckle (45), and a turbine fan (49) is provided at one end of the pipe (46) for sucking air from the ventilation area (43) to improve ventilation efficiency.
4. A tunnel excavation ventilation assembly according to claim 3, characterized in that: One end of the turbine fan (49) is also provided with a ventilation impeller (44) for cooperating with the turbine fan (49) to improve suction power.
5. A tunnel excavation ventilation assembly according to claim 2, characterized in that: A shunt pipe (47) is provided on one side of the sealing plug (48). The shunt pipe (47) is arranged in a "V" shape, and one end of the shunt pipe (47) is connected to the pipeline (46) through a connecting piece.
6. A tunnel excavation ventilation assembly according to claim 1, characterized in that: The support plate (41) is located between the two guide impellers (42) and is provided with a conveying area (411). Protective plates (412) are provided on both sides of the conveying area (411). The conveying area (411) is adapted to the conveying assembly (2) and is used to convey excavated gravel.
7. A tunnel excavation ventilation assembly according to claim 1, characterized in that: An upward blocking bar (410) is provided on one side of the support plate (41) close to the protective plate (412), and a fixed distance is maintained between the blocking bar (410) and the guide impeller (42) to prevent gravel from splashing.