Sewer construction device for green building construction

The sewer construction device addresses the issue of uneven soil covering and instability by incorporating a leveling and stabilizing mechanism, ensuring a flat and stable sewer pipe installation.

CN222206531UActive Publication Date: 2024-12-20INNER MONGOLIA BAOTOU XINGYE GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422356038.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-12-20
Estimated Expiration
2034-09-26

AI Technical Summary

Technical Problem

Existing sewer construction devices for green buildings fail to ensure a flat and stable soil covering after backfilling, which can lead to instability and reduced service life of the sewer system.

Method used

A sewer construction device equipped with a leveling device and stabilizing device, featuring a leveling bulldozer plate and stabilizing mechanism, to ensure a flat soil surface and enhance the stability of the sewer pipe installation.

Benefits of technology

The device ensures a flat soil covering and improves the stability of the sewer pipe installation, enhancing the overall stability and service life of the sewer system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222206531U_ABST
    Figure CN222206531U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of construction devices, and discloses a sewer construction device for green building construction, which comprises a fixed support, four connecting wheels are mounted on the outer side of the fixed support in a matched manner, and a metal support is fixed at the top of the fixed support; the device is provided with a leveling device, an electric push rod is started, an output shaft of the electric push rod drives a metal fixing frame to move, the angle of the metal fixing frame is adjusted, the metal fixing frame drives an assembling support and an installation connecting sleeve to adjust the angle, and the lower bottom face of a leveling bulldozing plate can be attached to the soil covering surface; the covering part of the covering soil is flat, and the ground is flat after the sewer construction pipeline is laid; the device is provided with the stabilizing device, the upper top face of the supporting frame is attached to the bottom of the connecting pipeline, supporting of the bottom of the connecting pipeline is enhanced through the supporting frame, the assembling structure stability of the connecting pipeline is improved, and meanwhile the using stability of the device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction devices, in particular to a sewer construction device for green building construction. Background Art

[0002] Green buildings, also known as green buildings or sustainable buildings, minimize the impact of the entire building on the environment and save resources during its life cycle through creative structural and usage designs. In order to increase the life of the sewer and meet the construction requirements of green buildings, during the construction of the sewer, first lay the pre-buried sewer pipe in the center of the excavated trench. During laying, try to keep the pipe level to ensure the stability of the installation. After the sewer pipe is laid, cover the surface of the sewer with fine soil and backfill the trench. The fine soil covering method ensures that the sewer pipe will not be damaged by hard objects in the covering soil, thereby increasing the service life of the sewer.

[0003] A Chinese patent discloses a sewer construction device for green building construction (authorization announcement number CN 220590216U). The patented technology includes a filter cartridge, one end of which is fixedly connected to a crushing cartridge, and the end of the filter cartridge inner cavity away from the crushing cartridge is fixedly connected to a cross mounting frame, and the middle of the cross mounting frame is rotatably connected to a rotating shaft, and one end of the rotating shaft passes through the crushing cartridge and is fixedly connected to a first driven wheel and a second driven wheel, a filter assembly is provided on one side of the surface of the rotating shaft, and an auger blade is fixedly connected to the other side of the surface of the rotating shaft, a driving motor is fixedly installed at the bottom of the crushing cartridge, and a crushing shaft is rotatably connected to the top of the inner cavity of the crushing cartridge, and a plurality of crushing blades are equidistantly fixedly connected to the surface of the crushing shaft. The utility model is a sewer construction device for green building construction, which drives the rotation of the driving wheel through the rotation of the driving motor, drives the rotation of the crushing shaft through the rotation of the driving wheel, and drives the rotation of the crushing shaft through the rotation of the crushing shaft, thereby crushing the covering soil.

[0004] However, the above construction device is mainly used to crush the covering soil during use. After the covering soil is backfilled into the trench, the backfilled area may not be flat enough. Therefore, those skilled in the art provide a sewer construction device for green building construction to solve the problems raised in the above background technology. Utility Model Content

[0005] The purpose of the utility model is to provide a sewer construction device for green building construction to solve the problems raised in the above-mentioned background technology.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A sewer construction device for green building construction, comprising a fixed bracket, four connecting wheels are cooperatively installed on the outer side of the fixed bracket, a metal bracket is fixed on the top of the fixed bracket, a handle bracket is fixed on one side of the metal bracket, a water spray container is fixed on the top of the fixed bracket, a carbon steel bracket is installed on the top of the fixed bracket, a water tank is arranged inside the water spray container, a water pump is installed inside the water spray container, the water pump and the water tank are connected by a pipeline, a connecting pipeline is connected to the outer side of the water pump, one end of the connecting pipeline is connected to a nozzle, a stabilizing device is installed on the top of the carbon steel bracket, and a leveling device is arranged on the bottom of the carbon steel bracket;

[0008] The leveling device includes a supporting metal rod, one side of the supporting metal rod is rotatably connected to an electric push rod via a rotating shaft, one end of the electric push rod is rotatably connected to a metal fixing frame via a rotating shaft, a carbon steel plate is fixed to the top of the metal fixing frame, the outer side of the metal fixing frame is rotatably connected to a movable bracket via a rotating shaft, one end of the movable bracket is fixed with an installation connecting sleeve, a leveling bulldozer plate is fixed to the side of the installation connecting sleeve away from the movable bracket, and an assembly bracket is fixed to the outer side of the installation connecting sleeve.

[0009] As a further solution of the utility model: the stabilizing device includes an installation shell, a fixing pad is fixed to the inner bottom wall of the installation shell, the top of the fixing pad is connected to a reset spring, the top of the reset spring is connected to a lifting pad, the top of the lifting pad is fixed to a support frame, one end of the lifting pad is fixed with a limiting slider, the bottom of the lifting pad is fixed with a carbon steel pad, and the outer side of the carbon steel pad is fixed with a roller mounting sleeve.

[0010] As a further solution of the utility model: the interior of the roller mounting sleeve is rotatably connected with a guide roller via a rotating shaft, and the mounting shell and the carbon steel bracket are fixedly connected.

[0011] As a further solution of the utility model: a through hole is opened inside the installation shell, and the size of the through hole is adapted to the size of the support frame.

[0012] As a further solution of the utility model: the assembly bracket and the metal fixing frame are rotatably connected via a rotating shaft, and the carbon steel plate and the supporting metal rod are rotatably connected via a rotating shaft.

[0013] As a further solution of the utility model: the supporting metal rod and the carbon steel bracket are fixedly connected, and the connecting pipe and the carbon steel bracket are fixedly connected.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] 1. This device is equipped with a leveling device. During the construction of green building sewers, after the sewer pipes are laid, the surface of the sewer is covered with fine soil and the trench is backfilled. At this time, the soil covering may not be flat enough. Start the electric push rod, let the output shaft of the electric push rod drive the metal fixing frame to move, adjust the angle of the metal fixing frame, and let the metal fixing frame drive the assembly bracket and the installation connection sleeve to adjust the angle, so that the bottom surface of the leveling bulldozer can fit with the surface of the soil, and then push the handle bracket to move the leveling bulldozer to make the covering part of the soil flat, so as to ensure that the ground is flat after the sewer construction pipeline is laid;

[0016] 2. The device is provided with a stabilizing device to make the upper surface of the support frame fit with the bottom of the connecting pipe. The limit slider plays a limiting role to avoid excessive squeezing of the bottom of the connecting pipe by the support frame. The support of the bottom of the connecting pipe is strengthened by the support frame, the stability of the connecting pipe assembly structure is improved, and the stability of the use of the device is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 A three-dimensional diagram of a sewer construction device for green building construction;

[0018] Figure 2 It is a structural schematic diagram of a leveling device in a sewer construction device for green building construction;

[0019] Figure 3 The present invention is a structural schematic diagram of a stabilizing device in a sewer construction device used in green building construction.

[0020] In the figure: 1. Fixed bracket; 2. Connecting wheel; 3. Metal bracket; 4. Handle bracket; 5. Water spray container; 6. Carbon steel bracket; 7. Connecting pipe; 8. Stabilizing device; 81. Mounting shell; 82. Fixed pad; 83. Reset spring; 84. Lifting pad; 85. Support frame; 86. Limiting slider; 87. Carbon steel plate; 88. Roller mounting sleeve; 89. Guide roller; 9. Leveling device; 91. Support metal rod; 92. Electric push rod; 93. Metal fixed frame; 94. Carbon steel plate; 95. Movable bracket; 96. Mounting connecting sleeve; 97. Leveling bulldozer plate; 98. Assembly bracket; 10. Sprinkler. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figure 1-3 In the embodiment of the utility model, a sewer construction device for green building construction includes a fixed bracket 1, four connecting wheels 2 are installed on the outer side of the fixed bracket 1, a metal bracket 3 is fixed on the top of the fixed bracket 1, a handle bracket 4 is fixed on one side of the metal bracket 3, a water spray container 5 is fixed on the top of the fixed bracket 1, a carbon steel bracket 6 is installed on the top of the fixed bracket 1, a water tank is arranged inside the water spray container 5, a water pump is installed inside the water spray container 5, the water pump and the water tank are connected by a pipeline, a connecting pipe 7 is connected to the outer side of the water pump, one end of the connecting pipe 7 is connected to a nozzle 10, a stabilizing device 8 is installed on the top of the carbon steel bracket 6, and a leveling device 9 is arranged on the bottom of the carbon steel bracket 6;

[0023] The leveling device 9 includes a supporting metal rod 91, one side of the supporting metal rod 91 is rotatably connected to an electric push rod 92 via a rotating shaft, the supporting metal rod 91 and the carbon steel bracket 6 are fixedly connected, the connecting pipe 7 and the carbon steel bracket 6 are fixedly connected, one end of the electric push rod 92 is rotatably connected to a metal fixing frame 93 via a rotating shaft, a carbon steel plate 94 is fixed to the top of the metal fixing frame 93, the outer side of the metal fixing frame 93 is rotatably connected to a movable bracket 95 via a rotating shaft, one end of the movable bracket 95 is fixed with an installation connecting sleeve 96, a leveling bulldozer plate 97 is fixed to the side of the installation connecting sleeve 96 away from the movable bracket 95, an assembly bracket 98 is fixed to the outer side of the installation connecting sleeve 96, the assembly bracket 98 and the metal fixing frame 93 are rotatably connected via a rotating shaft, and the carbon steel plate 94 and the supporting metal rod 91 are rotatably connected via a rotating shaft.

[0024] As an embodiment of the utility model, the stabilizing device 8 includes an installation shell 81, a fixing pad 82 is fixed to the inner bottom wall of the installation shell 81, a reset spring 83 is connected to the top of the fixing pad 82, a lifting pad 84 is connected to the top of the reset spring 83, a support frame 85 is fixed to the top of the lifting pad 84, a through hole is opened inside the installation shell 81, and the size of the through hole is adapted to the size of the support frame 85, a limiting slider 86 is fixed to one end of the lifting pad 84, a carbon steel pad 87 is fixed to the bottom of the lifting pad 84, a roller mounting sleeve 88 is fixed to the outer side of the carbon steel pad 87, and a guide roller 89 is rotatably connected to the inside of the roller mounting sleeve 88 through a rotating shaft, and the installation shell 81 and the carbon steel bracket 6 are fixedly connected.

[0025] The working principle of the utility model is as follows: the device is provided with a leveling device 9. During the construction of the green building sewer, after the sewer pipe is laid, the surface of the sewer is covered with fine soil and the trench is backfilled. At this time, the soil covering may be not flat enough. The user can push the handle bracket 4 to drive the fixed bracket 1 to move, and then start the water pump in the water spray container 5. The water in the water tank of the water spray container 5 is pumped out by the water pump, and then transported to the nozzle 10 through the connecting pipe 7 to realize spraying, and then the electric push rod 92 is started, so that the output shaft of the electric push rod 92 drives the metal fixing frame 93 to move, so that the angle of the metal fixing frame 93 is adjusted, and the metal fixing frame 93 drives the assembly bracket 98 and the installation connection sleeve 96 to adjust the angle, so that the bottom surface of the bulldozer plate 97 can be leveled. The handle bracket 4 is pushed to make the leveling bulldozer plate 97 move, so that the covered part of the soil is leveled, ensuring that the ground is level after the sewer construction pipeline is laid; the device is provided with a stabilizing device 8. After the connecting pipe 7 and the carbon steel bracket 6 are fixedly connected, the mounting shell 81 and the carbon steel bracket 6 are fixedly connected, and the reset spring 83 in the mounting shell 81 provides elastic force in the vertical direction, so that the lifting pad 84 drives the support frame 85 to move, so that the upper top surface of the support frame 85 is in contact with the bottom of the connecting pipe 7. At this time, the limiting slider 86 plays a limiting role, avoiding excessive squeezing of the bottom of the connecting pipe 7 by the support frame 85, and strengthening the support of the bottom of the connecting pipe 7 by the support frame 85, thereby improving the stability of the assembly structure of the connecting pipe 7 and improving the stability of the use of the device.

[0026] The above are only preferred specific implementation methods of the utility model, but the protection scope of the utility model is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the utility model, who makes equivalent replacements or changes based on the technical scheme and utility model concept of the utility model, should be covered by the protection scope of the utility model.

Claims

1. A sewer construction device for green building construction, comprising a fixed bracket (1), characterized in that: Four connecting wheels (2) are mounted on the outer side of the fixed bracket (1); a metal bracket (3) is fixed on the top of the fixed bracket (1); a handle bracket (4) is fixed on one side of the metal bracket (3); a water spray container (5) is fixed on the top of the fixed bracket (1); a carbon steel bracket (6) is mounted on the top of the fixed bracket (1); a water tank is arranged inside the water spray container (5); a water pump is mounted inside the water spray container (5); the water pump and the water tank are connected via a pipe; a connecting pipe (7) is connected to the outer side of the water pump; a nozzle (10) is connected to one end of the connecting pipe (7); a stabilizing device (8) is mounted on the top of the carbon steel bracket (6); and a leveling device (9) is mounted on the bottom of the carbon steel bracket (6); The leveling device (9) comprises a supporting metal rod (91), one side of the supporting metal rod (91) is rotatably connected to an electric push rod (92) via a rotating shaft, one end of the electric push rod (92) is rotatably connected to a metal fixing frame (93) via a rotating shaft, a carbon steel plate (94) is fixed to the top of the metal fixing frame (93), the outer side of the metal fixing frame (93) is rotatably connected to a movable bracket (95) via a rotating shaft, one end of the movable bracket (95) is fixed with a mounting connection sleeve (96), a side of the mounting connection sleeve (96) away from the movable bracket (95) is fixed with a leveling bulldozer plate (97), and an outer side of the mounting connection sleeve (96) is fixed with an assembly bracket (98).

2. A sewer construction device for green building construction according to claim 1, characterized in that: The stabilizing device (8) comprises a mounting shell (81), a fixing pad (82) is fixed to the inner bottom wall of the mounting shell (81), a reset spring (83) is connected to the top of the fixing pad (82), a lifting pad (84) is connected to the top of the reset spring (83), a support frame (85) is fixed to the top of the lifting pad (84), a limiting slider (86) is fixed to one end of the lifting pad (84), a carbon steel pad (87) is fixed to the bottom of the lifting pad (84), and a roller mounting sleeve (88) is fixed to the outer side of the carbon steel pad (87).

3. A sewer construction device for green building construction according to claim 2, characterized in that: The roller mounting sleeve (88) is rotatably connected to a guide roller (89) via a rotating shaft, and the mounting housing (81) and the carbon steel bracket (6) are fixedly connected.

4. A sewer construction device for green building construction according to claim 2, characterized in that: A through hole is provided inside the installation shell (81), and the size of the through hole matches the size of the support frame (85).

5. A sewer construction device for green building construction according to claim 1, characterized in that: The assembly bracket (98) and the metal fixing frame (93) are rotatably connected via a rotating shaft, and the carbon steel plate (94) and the supporting metal rod (91) are rotatably connected via a rotating shaft.

6. A sewer construction device for green building construction according to claim 1, characterized in that: The supporting metal rod (91) and the carbon steel bracket (6) are fixedly connected, and the connecting pipe (7) and the carbon steel bracket (6) are fixedly connected.