Anti-explosion barrier gate mounting device
By using embedded parts, bases, bidirectional threaded screws and water collectors in the gate installation device, the rust and corrosion problems caused by low installation efficiency of the gate on asphalt pavement and rainwater accumulation are solved, and simple and convenient installation is achieved and rainwater removal effect.
Patent Information
- Application Number
- CN202420714242.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2034-04-09
AI Technical Summary
When the gate is installed on asphalt pavement or stone base, the expansion screw method in the prior art is cumbersome, resulting in low installation efficiency and easy to cause rust and corrosion due to rainwater accumulation on rainy days.
An explosion-proof gate installation device is designed, including embedded parts, bases, installation boxes, two-way threaded screws, mobile racks, fixing bolts and water collecting tanks. The embedded parts are embedded in the concrete, and the base is on the concrete floor. The two-way threaded screw rod and handwheel are used to achieve simple installation and disassembly of the main body of the gate, and the rainwater is removed through the water collection tank and drain outlet to prevent rust and corrosion.
It realizes rapid and convenient installation and disassembly of the gate, improves installation efficiency, and effectively removes rainwater on rainy days, avoiding rust and corrosion in the fixing bolts and installation box.
Smart Images

Figure CN222227142U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of road gates, in particular to an explosion-proof road gate installation device. Background Art
[0002] The barrier gate, also known as a vehicle blocker, is a channel entrance and exit management device specially used to restrict the travel of motor vehicles on the road. It is now widely used in highway toll stations and parking lot systems to manage vehicle passages and to manage the entry and exit of vehicles. The electric barrier gate can raise and lower the lever through wireless remote control alone, or it can be automatically managed through the parking lot management system (i.e. IC card swiping management system). Vehicles are released by picking up the card when entering the parking lot, and are automatically released after the parking fee is collected when leaving the parking lot.
[0003] When installing the barrier, first place the main engine of the barrier on the installation surface, then mark the installation holes of the main engine on the installation surface, then drill holes at the marks on the installation surface with an impact drill, and then fix the main engine with expansion bolts. Finally, install the gate rod of the barrier on the main engine of the barrier. The installation surface of the barrier is mostly on an asphalt pavement or a stone base. The installation method using expansion screws is cumbersome and has low installation efficiency. Therefore, an explosion-proof barrier installation device is urgently needed. Utility Model Content
[0004] The purpose of the utility model is to provide an explosion-proof barrier installation device to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the utility model provides the following technical solutions: an explosion-proof barrier installation device, comprising an embedded part, the top of the embedded part is fixedly connected to a base, the top of the base is provided with a barrier body, and the bottom of the barrier body is fixed with an installation box;
[0006] A movable groove is provided on the inner top wall of the installation box, and a bidirectional threaded screw is arranged in the movable groove. The surfaces of the bidirectional threaded screw with positive and negative threads are respectively threadedly connected to movable frames, and the ends of the movable frames away from each other are respectively fixedly connected to movable plates, and the ends of the movable plates away from each other are respectively fixedly connected to fixing bolts.
[0007] Preferably, a hand wheel is provided on the left side of the installation box, and the right side of the hand wheel movably penetrates the installation box and is fixedly connected with the bidirectional threaded screw.
[0008] When installing the barrier gate body, the embedded parts are pre-buried in the ground concrete, and the base is located on the concrete ground. The barrier gate body and the installation box at the bottom are inserted into the installation groove at the top of the base, so that the movable holes on both sides of the installation box correspond to the slots on the left and right inner walls of the installation groove respectively.
[0009] Preferably, movable holes are respectively provided at both ends of the installation box, and three movable holes are respectively provided.
[0010] Preferably, three fixing bolts are provided, and the three fixing bolts are respectively matched with the movable holes.
[0011] Then turn the hand wheel to rotate the bidirectional threaded screw, so that the movable frame moves outward at the same time, and the movable plate drives the fixing bolt to move outward at the same time, so that the fixing bolt moves outward at the same time, and the fixing bolt passes through the movable holes and is inserted into the slot, thereby completing the installation of the gate body.
[0012] Preferably, a mounting groove is provided on the top of the base, and slots are provided on the left and right inner walls of the mounting groove, respectively, and the slots are respectively matched with the movable holes.
[0013] Preferably, a water collecting trough is provided on the inner bottom wall of the installation groove, and drainage outlets are provided at both ends of the base.
[0014] Through the water collection trough, when it rains, rainwater will enter the installation trough along the gap between the installation box and the base. The water collection trough is used to collect rainwater, and the rainwater entering the water collection trough is discharged from the drain outlet.
[0015] Preferably, a plurality of drain outlets are provided, and the plurality of drain outlets are respectively connected to the water collecting tank.
[0016] Compared with the prior art, the beneficial effects achieved by the utility model are:
[0017] First, according to the utility model, when installing the barrier gate body, the embedded parts are pre-buried in the ground concrete, and the base is located on the concrete ground. The barrier gate body and the installation box at the bottom are inserted into the installation groove at the top of the base, so that the movable holes on both sides of the installation box correspond to the slots on the left and right inner walls of the installation groove respectively. Then, the hand wheel is rotated to rotate the bidirectional threaded screw, so that the movable frame moves outward at the same time, the movable plate drives the fixing bolts to move outward at the same time, and the fixing bolts move outward at the same time. The fixing bolts are respectively inserted into the slots through the movable holes, thereby completing the installation of the barrier gate body. The installation and disassembly are simple and convenient, and the installation efficiency is high.
[0018] Second, the utility model has a water collecting trough. When it rains, rainwater will enter the installation trough along the gap between the installation box and the base. The water collecting trough is used to collect rainwater. The rainwater enters the water collecting trough and is discharged from the drain ports respectively. Multiple drain ports drain water faster, avoiding rainwater accumulation in the installation trough, causing rainwater to enter the installation box through the movable hole, and preventing the fixing bolt and the inside of the installation box from being soaked by rainwater and rusting and corroding. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0020] Figure 2This is a schematic diagram of the front cutaway structure of the installation box and the base when the utility model is installed;
[0021] Figure 3 This is a schematic diagram of the three-dimensional structure of the installation box of the utility model cut from the front;
[0022] Figure 4 It is a schematic diagram of the three-dimensional structure of the front cutaway view of the base of the utility model.
[0023] Among them: 1. embedded parts; 2. base; 3. gate body; 4. installation box; 41. bidirectional threaded screw; 42. movable frame; 43. movable plate; 44. fixing bolt; 45. hand wheel; 21. water collection tank; 22. drain outlet. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] The utility model provides the following technical solutions:
[0026] Embodiment 1
[0027] See also Figure 1 , Figure 2 , Figure 3 , an explosion-proof barrier installation device, comprising an embedded part 1, a base 2 is fixedly connected to the top of the embedded part 1, a barrier body 3 is arranged on the top of the base 2, and an installation box 4 is fixed to the bottom of the barrier body 3;
[0028] A movable groove is provided on the inner top wall of the installation box 4, in which a bidirectional threaded screw 41 is arranged, and the surfaces of the bidirectional threaded screw 41 with positive and negative threads are respectively threadedly connected to a movable frame 42, and the ends of the movable frames 42 away from each other are respectively fixedly connected to movable plates 43, and the ends of the movable plates 43 away from each other are respectively fixedly connected to fixing bolts 44.
[0029] A hand wheel 45 is provided on the left side of the installation box 4 , and the right side of the hand wheel 45 movably penetrates the installation box 4 and is fixedly connected to the bidirectional threaded screw 41 .
[0030] Both ends of the installation box 4 are respectively provided with movable holes, and three movable holes are respectively provided.
[0031] Three fixing bolts 44 are provided, and the three fixing bolts 44 are respectively matched with the movable holes.
[0032] A mounting groove is formed on the top of the base 2, and slots are formed on the left and right inner walls of the mounting groove, respectively, and the slots are respectively matched with the movable holes.
[0033] Through the above technical scheme, when the barrier gate body 3 is installed, the embedded part 1 is pre-buried in the ground concrete, and the base 2 is located on the concrete ground. The barrier gate body 3 and the installation box 4 at the bottom are inserted into the installation groove at the top of the base 2, so that the movable holes on both sides of the installation box 4 correspond to the slots on the left and right inner walls of the installation groove respectively, and then the hand wheel 45 is rotated to rotate the bidirectional threaded screw 41, so that the movable frame 42 moves outward at the same time, and the movable plate 43 drives the fixing bolt 44 to move outward at the same time, so that the fixing bolt 44 moves outward at the same time, and the fixing bolt 44 passes through the movable holes and is inserted into the slot, thereby completing the installation of the barrier gate body 3. The installation and disassembly are simple and convenient, and the installation efficiency is high.
[0034] Embodiment 2
[0035] See also Figure 4 On the basis of the first embodiment, it is further obtained that: a water collecting tank 21 is opened on the inner bottom wall of the installation groove, and drainage ports 22 are opened at both ends of the base 2.
[0036] A plurality of drain ports 22 are provided, and the plurality of drain ports 22 are respectively connected to the water collecting tank 21 .
[0037] Through the above technical solution, through the opened water collection trough 21, when it rains, rainwater will enter the installation groove along the gap between the installation box 4 and the base 2. The water collection trough 21 is used to collect rainwater. The rainwater enters the water collection trough 21 and is discharged from the drain ports 22 respectively. Multiple drain ports 22 drain water faster, avoiding rainwater accumulation in the installation groove, causing rainwater to enter the installation box 4 through the movable hole, and avoiding the fixing bolt 44 and the inside of the installation box 4 from being soaked by rainwater and rusting and corroding.
[0038] In actual operation, when the device is in use, the embedded part 1 is pre-buried in the ground concrete, and the base 2 is located on the concrete ground. The gate body 3 and the installation box 4 at the bottom are inserted into the installation slot at the top of the base 2, so that the movable holes on both sides of the installation box 4 correspond to the slots on the left and right inner walls of the installation slot respectively. Then, the hand wheel 45 is rotated to rotate the bidirectional threaded screw 41, so that the movable frame 42 moves outward at the same time, and the movable plate 43 drives the fixing bolt 44 to move outward at the same time, so that the fixing bolt 44 moves outward at the same time, and the fixing bolt 44 passes through the movable hole and is inserted into the slot, thereby completing the installation of the gate body 3. The installation and disassembly are simple and convenient, and the installation efficiency is high.
[0039] Through the opened water collection trough 21, when it rains, rainwater will enter the installation groove along the gap between the installation box 4 and the base 2. The water collection trough 21 is used to collect rainwater. The rainwater enters the water collection trough 21 and is discharged from the drain ports 22 respectively. Multiple drain ports 22 drain water faster, avoiding rainwater accumulation in the installation groove, causing rainwater to enter the installation box 4 through the movable hole, and avoiding the fixing bolt 44 and the inside of the installation box 4 from being soaked by rainwater and rusting and corroding.
[0040] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit thereof, and the scope of the invention is defined by the appended claims and their equivalents.
Claims
1. An explosion-proof barrier installation device, comprising an embedded part (1), characterized in that: The top of the embedded part (1) is fixedly connected to a base (2), a gate body (3) is arranged on the top of the base (2), and an installation box (4) is fixed to the bottom of the gate body (3); A movable groove is provided on the inner top wall of the installation box (4), a bidirectional threaded screw rod (41) is arranged in the movable groove, and the surfaces of the bidirectional threaded screw rod (41) with positive and negative threads are respectively threadedly connected to a movable frame (42), and the ends of the movable frames (42) that are away from each other are respectively fixedly connected to movable plates (43), and the ends of the movable plates (43) that are away from each other are respectively fixedly connected to fixing bolts (44).
2. The explosion-proof barrier installation device according to claim 1, characterized in that: A hand wheel (45) is arranged on the left side of the installation box (4), and the right side of the hand wheel (45) movably penetrates the installation box (4) and is fixedly connected to the bidirectional threaded screw rod (41).
3. The explosion-proof barrier installation device according to claim 1, characterized in that: Both ends of the installation box (4) are respectively provided with movable holes, and three movable holes are respectively provided.
4. The explosion-proof barrier installation device according to claim 3, characterized in that: Three fixing bolts (44) are respectively provided, and the three fixing bolts (44) are respectively matched with the movable holes.
5. The explosion-proof barrier installation device according to claim 4, characterized in that: The top of the base (2) is provided with a mounting groove, and the left and right inner walls of the mounting groove are respectively provided with slots, and the slots are respectively matched with the movable holes.
6. The explosion-proof barrier installation device according to claim 5, characterized in that: A water collecting groove (21) is provided on the inner bottom wall of the installation groove, and drainage openings (22) are respectively provided at both ends of the base (2).
7. The explosion-proof barrier installation device according to claim 6, characterized in that: A plurality of the drainage ports (22) are provided, and the plurality of drainage ports (22) are respectively connected to the water collecting tank (21).
