Bushing machining tool of shock absorber

By designing shock absorber bushing processing tooling including machining pipes, positioning grooves and pushing cylinders, the problems of low bushing processing pass rate and inconvenient stamping waste processing in the prior art are solved, and a higher production pass rate and workpiece are achieved. stability.

CN222242196UActive Publication Date: 2024-12-27胡辰彪
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420635610.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2024-12-27
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

During the processing of existing shock absorber bushings, due to the complex position requirements of the communication holes at both ends, the production pass rate is low and the stamping waste is inconvenient to handle, which affects the stability of the processing tooling.

Method used

A machining tool including an upper pressure assembly and a lower pressure assembly is designed to ensure the vertical position consistency of the bushing communication hole through the first and second processing pipes, positioning grooves, semicircular grooves and pushing cylinders, and through pushing The rod and cylinder discharge stamping waste.

Benefits of technology

The production pass rate of the bushing and the stability of the processing tooling are improved, the vertical opening consistency of the communication holes at both ends of the bushing are ensured, and stamping waste is effectively processed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222242196U_ABST
    Figure CN222242196U_ABST
Patent Text Reader

Abstract

The bushing machining tool comprises an upper pressing assembly and a lower pressing assembly, a first machining pipe and a second machining pipe are arranged between the upper pressing assembly and the lower pressing assembly, a first machining hole which is communicated up and down is formed in the side wall of the first machining pipe, and a second machining hole which is communicated up and down is formed in the side wall of the second machining pipe. The side wall of the second machining pipe is provided with a second machining hole which is communicated up and down, the outer end of the second machining pipe is provided with a positioning groove, the positioning groove is horizontally formed, and the positioning groove is perpendicular to the second machining hole. The method has the effect of improving the yield of produced bushings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of processing equipment, and in particular to a bushing processing tool for a shock absorber. Background Art

[0002] Shock absorbers are used to suppress the vibration caused by the rebound of the spring after absorbing shock and the impact from the road surface; they are widely used in automobiles to accelerate the attenuation of frame and body vibrations to improve the driving smoothness of the car; when passing over uneven roads, although the shock-absorbing spring can filter out the vibration of the road, the spring itself will still have reciprocating motion, and the shock absorber is used to suppress this spring jump.

[0003] The shock absorber has a bushing inside. Due to structural requirements, connecting holes are respectively opened at both ends of the bushing. The central axes of the connecting holes on both sides are vertically arranged. When processing the bushing, the connecting holes at both ends of the bushing are punched out by a stamping die. Usually, the two ends of the bushing need to be stamped twice. Both stamping processes are performed by the operating techniques of the staff. Due to the position requirements of the connecting holes at both ends of the bushing, the qualified rate of the produced bushings is low. Utility Model Content

[0004] The utility model aims to provide a bushing processing tool for a shock absorber in view of the defects and shortcomings of the prior art.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] It includes an upper pressure component and a lower pressure component, wherein a first processing tube and a second processing tube are arranged between the upper pressure component and the lower pressure component, the side wall of the first processing tube is provided with a first processing hole connected up and down, the side wall of the second processing tube is provided with a second processing hole connected up and down, and the outer end of the second processing tube is provided with a positioning groove, the positioning groove is horizontally opened, and the positioning groove and the second processing hole are vertically arranged.

[0007] Preferably, two first semicircular grooves for the first processing tube and the second processing tube to be embedded are formed on the lower side of the upper pressure component, and two second semicircular grooves for the first processing tube and the second processing tube to be embedded are formed on the upper side of the lower pressure component, and the two first semicircular grooves correspond one to one with the two second semicircular grooves.

[0008] Preferably, one end of the second processing tube protrudes from the outside of the stamping die, and the positioning groove is located on the protruding end of the second processing tube.

[0009] Preferably, a mounting seat is provided on one side of the pressing assembly, and the first processing tube and the second processing tube are both provided on the side wall of the mounting seat.

[0010] Preferably, two compression springs are evenly arranged at the lower end of the mounting seat.

[0011] Preferably, the side wall of the mounting seat is provided with two through holes, and the two through holes respectively correspond to the first processing tube and the second processing tube, and the mounting seat is provided with a pushing cylinder on the side away from the pressing assembly, and the output end of the pushing cylinder is provided with a first push rod and a second push rod, and one end of the first push rod and the second push rod respectively pass through the two through holes and are inserted into the first processing tube and the second processing tube.

[0012] Preferably, one end of the first processed tube is circumferentially chamfered.

[0013] In summary, the present application includes at least one of the following beneficial technical effects:

[0014] 1. When the bushing needs to be processed, first put the bushing on the first processing tube, then the press machine drives the upper pressing assembly, then the upper pressing assembly and the lower pressing assembly punch the side wall of one end of the bushing, insert the latch into the connecting hole just punched out, and then put the other end of the bushing on the second processing tube, let the latch be embedded in the positioning groove until the latch abuts against the bottom of the positioning groove, and push the upper pressing assembly on the press machine, so that the upper pressing assembly and the lower pressing assembly punch the side wall of the other end of the bushing. Since the positioning groove and the second processing hole are vertically arranged, the connecting holes at both ends of the bushing are vertically opened, which improves the qualified rate of the bushing production;

[0015] 2. When the bushing is inserted into the first processing tube, under the restriction of the mounting seat, the consistency of the opening position of the connecting hole at one end of the bushing is ensured;

[0016] 3. When there are a lot of stamping waste in the first processing tube and the second processing tube, start the push cylinder to push the first push rod and the second push rod, so that the first push rod and the second push rod respectively discharge the stamping waste in the first processing tube and the second processing tube, thereby improving the stability of the processing tooling. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of the press and stamping die of the utility model;

[0018] Figure 2 It is a structural schematic diagram of the punching die of the utility model;

[0019] Figure 3 It is a structural schematic diagram of the punching die of the utility model from another perspective.

[0020] In the figure: 1. upper mounting plate; 2. lower mounting plate; 3. upper pressing assembly; 4. lower pressing assembly; 5. upper forming plate; 6. upper fixing plate; 7. first semicircular groove; 8. lower forming plate; 9. lower fixing plate; 10. second semicircular groove; 11. mounting seat; 12. first processing tube; 13. second processing tube; 14. first processing hole; 15. second processing hole; 16. positioning groove; 17. chamfer; 18. guide rod; 19. compression spring; 20. pushing cylinder; 21. first push rod; 22. second push rod; 23. perforation; 24. press; 25. stamping die. DETAILED DESCRIPTION

[0021] The utility model is further described below in conjunction with the accompanying drawings.

[0022] The embodiment of the present application discloses a bushing processing tool for a shock absorber.

[0023] Reference Figure 1 and Figure 2 , including a stamping die 25, the stamping die 25 includes an upper mounting plate 1, a lower mounting plate 2, an upper pressing assembly 3 and a lower pressing assembly 4, the upper mounting plate 1 and the lower mounting plate 2 are respectively fixed to the upper template and the lower template of the press 24 by bolts, the upper pressing assembly 3 is installed on the lower end surface of the upper mounting plate 1, and the lower pressing assembly 4 is installed on the upper end surface of the lower mounting plate 2.

[0024] The upper pressure assembly 3 includes an upper forming plate 5 and an upper fixing plate 6, with an upper spring between the upper forming plate 5 and the upper fixing plate 6, and the upper fixing plate 6 is fixed to the upper mounting plate 1 by bolts. The lower end surface of the upper forming plate 5 is provided with two first semicircular grooves 7, and the two first semicircular grooves 7 are arranged horizontally and parallel to each other. The lower end surface of the upper fixing plate 6 is provided with two upper forming strips, and the lower ends of the two upper forming strips pass through the upper forming plate 5 and are respectively inserted into the two first semicircular grooves 7.

[0025] The pressing assembly 4 includes a lower forming plate 8 and a lower fixing plate 9, with a lower spring between the lower forming plate 8 and the lower fixing plate 9, and the lower fixing plate 9 is fixed to the lower mounting plate 2 by bolts. The upper end surface of the lower forming plate 8 is provided with two second semicircular grooves 10, and the two second semicircular grooves 10 are arranged horizontally and parallel to each other. The upper end surface of the lower fixing plate 9 is provided with two lower forming strips, and the upper ends of the two lower forming strips pass through the lower forming plate 8 and are respectively inserted into the two second semicircular grooves 10.

[0026] Reference Figure 2 and Figure 3A mounting seat 11 is horizontally placed at the upper end of the lower mounting plate 2, and the mounting seat 11 is located on one side of the pressing assembly 4. A first processing tube 12 and a second processing tube 13 are welded and fixed to one side of the mounting seat 11 close to the pressing assembly 4. The first processing tube 12 and the second processing tube 13 are horizontally arranged, and the first processing tube 12 and the second processing tube 13 are respectively located in the two second semicircular grooves 10. The two first semicircular grooves 7 correspond to the two second semicircular grooves 10. A first processing hole 14 connected up and down is opened on the side wall of the first processing tube 12, and a second processing hole 15 connected up and down is opened on the side wall of the second processing tube 13. A positioning groove 16 is opened at one end of the second processing tube 13 away from the mounting seat 11. The positioning groove 16 is opened horizontally, and the positioning groove 16 and the second processing hole 15 are perpendicular to each other.

[0027] The bushing is put on the first processing tube 12, and then the press 24 drives the upper pressure component 3, and then the upper pressure component 3 and the lower pressure component 4 punch the side wall of one end of the bushing, and the pin is inserted into the connecting hole just punched out, and then the other end of the bushing is put on the second processing tube 13, and the pin is embedded in the positioning groove 16 until the pin abuts against the bottom of the positioning groove 16, and the press 24 pushes the upper pressure component 3, so that the upper pressure component 3 and the lower pressure component 4 punch the side wall of the other end of the bushing. Since the positioning groove 16 and the second processing hole 15 are vertically arranged, the connecting holes at both ends of the bushing are opened vertically.

[0028] One end of the first processing tube 12 away from the mounting seat 11 is flush with the side wall of the lower forming plate 8, and a chamfer 17 is provided on the outer end of the first processing tube 12 in the circumferential direction. One end of the second processing tube 13 away from the mounting seat 11 protrudes from the side wall of the lower forming plate 8, and the positioning groove 16 is located in the protruding end of the second processing tube 13. Since the positioning groove 16 is located on the outside of the processing tooling, the pin is inserted into the connecting hole of the bushing, and then conveniently inserted into the bottom of the positioning groove 16, and under the action of the chamfer 17, one end of the bushing is conveniently inserted into the first processing tube 12.

[0029] Two guide rods 18 are inserted and fixed on the upper end surface of the lower mounting plate 2. The upper ends of the guide rods 18 pass through the mounting seat 11 and the upper mounting plate 1 in sequence. Two compression springs 19 are vertically placed between the mounting seat 11 and the lower mounting plate 2. The two compression springs 19 are respectively sleeved on the circumference of the two guide rods 18. One end of the compression spring 19 abuts against the upper end surface of the lower mounting plate 2, and the other end abuts against the lower end surface of the mounting seat 11. When the press 24 brings the upper pressing assembly 3 and the lower pressing assembly 4 closer to each other, the first processing tube 12 and the second processing tube 13 will move according to the movement of the mounting seat 11. After that, after the upper pressing plate of the press 24 is lifted, the mounting seat 11 drives the first processing tube 12 and the second processing tube 13 to be lifted under the rebound of the two compression springs 19.

[0030] A push cylinder 20 is horizontally placed on one side of the mounting seat 11 away from the pressing assembly 4. The push cylinder 20 is fixed on the press 24 through a bracket. A first push rod 21 and a second push rod 22 are horizontally fixed to the front end of the output end of the push cylinder 20. Two through holes 23 are provided on the side wall of the mounting seat 11. The two through holes 23 correspond to the first processing tube 12 and the second processing tube 13 respectively. One end of the first push rod 21 and the second push rod 22 respectively passes through the two through holes 23 and is inserted into the first processing tube 12 and the second processing tube 13. When there is a lot of stamping waste in the first processing tube 12 and the second processing tube 13 during long-term work, the push cylinder 20 is started to push the first push rod 21 and the second push rod 22, so that the first push rod 21 and the second push rod 22 discharge the stamping waste in the first processing tube 12 and the second processing tube 13 respectively.

[0031] The above description is only a preferred embodiment of the present utility model, so all equivalent changes or modifications made according to the structure, features and principles described in the scope of the present utility model patent application are included in the scope of the present utility model patent application.

Claims

1. A bushing processing tool for a shock absorber, comprising an upper pressing component (3) and a lower pressing component (4), characterized in that: A first processing tube (12) and a second processing tube (13) are arranged between the upper pressing component (3) and the lower pressing component (4); a first processing hole (14) communicating with each other up and down is provided on the side wall of the first processing tube (12); a second processing hole (15) communicating with each other up and down is provided on the side wall of the second processing tube (13); a positioning groove (16) is provided on the outer end of the second processing tube (13); the positioning groove (16) is provided horizontally, and the positioning groove (16) and the second processing hole (15) are arranged vertically.

2. The bushing processing tool for a shock absorber according to claim 1, characterized in that: The lower side of the upper pressing component (3) is provided with two first semicircular grooves (7) for the first processing tube (12) and the second processing tube (13) to be embedded, and the upper side of the lower pressing component (4) is provided with two second semicircular grooves (10) for the first processing tube (12) and the second processing tube (13) to be embedded, and the two first semicircular grooves (7) and the two second semicircular grooves (10) are in one-to-one correspondence.

3. The bushing processing tool for a shock absorber according to claim 1, characterized in that: One end of the second processing tube (13) protrudes from the outside of the stamping die (25), and the positioning groove (16) is located on the protruding end of the second processing tube (13).

4. The bushing processing tool for a shock absorber according to claim 1, characterized in that: A mounting seat (11) is provided on one side of the pressing assembly (4), and the first processing tube (12) and the second processing tube (13) are both arranged on the side wall of the mounting seat (11).

5. The bushing processing tool for a shock absorber according to claim 4, characterized in that: Two compression springs (19) are evenly arranged at the lower end of the mounting seat (11).

6. The bushing processing tool for a shock absorber according to claim 4, characterized in that: The side wall of the mounting seat (11) is provided with two through holes (23), and the two through holes (23) correspond to the first processing tube (12) and the second processing tube (13) respectively. The mounting seat (11) is provided with a pushing cylinder (20) on a side away from the pressing component (4), and the output end of the pushing cylinder (20) is provided with a first push rod (21) and a second push rod (22), and one end of the first push rod (21) and the second push rod (22) respectively passes through the two through holes (23) and is inserted into the first processing tube (12) and the second processing tube (13).

7. The bushing processing tool for shock absorber according to claim 1, characterized in that One end of the first processed tube (12) is provided with a chamfer (17) in the circumferential direction.