Production line for automotive instrument panel cross beam assembly
By adopting the design of a shared welding robot group in the automotive dashboard beam assembly production line, the problems of low efficiency and poor quality in the existing technology are solved, the stability and efficient production of the welding process are achieved, and the accuracy of the product is ensured. Safety performance.
Patent Information
- Application Number
- CN202420889488.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2034-04-26
AI Technical Summary
There are problems of low efficiency and poor quality in the production of existing automotive dashboard cross beam assembly, especially during the welding process, the parts are prone to deform and the welding quality is inconsistent, which affects assembly accuracy and safety performance.
A production line for automotive dashboard cross beam assembly is designed, using the left and right pipe beam production branch lines in the welding room and a shared welding robot group. By welding the stations arranged in sequence, welding is ensured that the angle of the welding robot is correct and stable. Two branch lines are used to share the welding robot group to improve production efficiency and reduce costs.
It avoids deformation and poor welding problems during parts handling, ensures geometric stability and consistency of welding quality, improves production efficiency and reduces production costs.
Smart Images

Figure CN222243273U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of instrument panel crossbeam assembly production, in particular to a vehicle instrument panel crossbeam assembly production line. Background Art
[0002] Welding is a very important process in the automotive industry. During the welding process, welding stress is inevitably generated, and the resulting deformation directly affects the dimensional accuracy of the product. What is more serious is that it poses a potential risk to safety performance, reduces the bearing capacity of the structure, shortens the product life, or directly leads to scrapping.
[0003] The instrument panel crossbeam assembly is the most important assembly component in the automotive interior assembly. Many important components are installed on it, such as the steering wheel, CD player, air conditioning panel, air conditioning outlet, auxiliary airbag, etc. The reasonable design, overall beauty and performance of the instrument panel crossbeam directly determine the customer's intuitive evaluation of the vehicle performance. The instrument panel crossbeam is an important load-bearing component of the instrument panel assembly and one of the structural components. It is universal for a series of models on this platform.
[0004] At present, the dashboard crossbeam assembly is welded manually, and the manual operation method has the following problems: 1. After the parts are welded, they are very easy to deform during transportation, and the geometric dimensions are unstable, which affects the evaluation indicators such as assembly accuracy and surface difference, resulting in poor accuracy of the entire vehicle; 2. The welding quality is inconsistent and the production efficiency is low, and the amount of supporting welding tooling invested is relatively large. Summary of the invention
[0005] The utility model provides a vehicle instrument panel crossbeam assembly production line, aiming to solve the problems of low efficiency and poor quality in the existing production method.
[0006] In order to solve the above technical problems, the technical solution of the utility model is: a vehicle instrument panel cross beam assembly production line, characterized in that: it includes a welding room, the welding room is provided with a left tube beam production branch line, a right tube beam production branch line and a welding robot group, the left tube beam production branch line and the right tube beam production branch line are symmetrically arranged, and the left tube beam production branch line and the right tube beam production branch line share the welding robot group; the structure of the left tube beam production branch line: includes the 10th sequence station, the 20th sequence station, and the 30th sequence station arranged in sequence, and the 10th sequence station is used to The left mounting main bracket assembly, the right mounting main bracket assembly, the instrument upper body main mounting bracket assembly, and the instrument panel tube beam are welded into a whole to form the 10th sequence assembly; the 20th sequence station is used to weld the instrument panel sub-mounting bracket assembly, the steering column mounting bracket, and the tube beam connecting bracket group to the 10th sequence assembly to form the 20th sequence assembly; the 30th sequence station is used to weld the central control bracket assembly and the fuse box mounting bracket assembly to the 20th sequence assembly to form the 30th sequence assembly; the structure of the right tube beam production branch line is the same as that of the left tube beam production branch line.
[0007] The above technical solution is further limited in that the welding robot group includes an R1 welding robot, an R2 welding robot, and an R3 welding robot which are distributed in sequence; the 10th workstation shares the R1 welding robot, the 20th workstation shares the R2 welding robot, and the 30th workstation shares the R3 welding robot.
[0008] The above technical solution is further limited in that the supporting equipment of the welding room includes a smoke extraction device.
[0009] The above technical solution is further limited in that the supporting equipment of the welding robot group includes a welding robot control cabinet.
[0010] Beneficial effects: 1) The dashboard crossbeam assembly designed by the utility model avoids the problem of bumping or deformation during the long-distance transportation and transfer of the sub-assembly; 2) The use of robot welding can ensure the correct and stable angle of the welding gun, and the repeatability accuracy reaches 0.08%, which is conducive to the stability and control of geometric dimensions, avoids the problems of poor appearance such as weld depression and distortion in manual welding, and ensures the consistency of product welding quality; 3) The method of using two branch lines to share a welding robot group is about 3 times the efficiency of traditional manual welding, which improves production efficiency and reduces production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the structure of the utility model.
[0012] Figure 2 It is the internal structure diagram of the utility model.
[0013] Figure 3 This is the schematic diagram of the 10th sequence operation.
[0014] Figure 4 This is the schematic diagram of the 20th operation.
[0015] Figure 5 This is the schematic diagram of the 30th operation. DETAILED DESCRIPTION
[0016] like Figure 1 and Figure 2 As shown, a vehicle instrument panel cross beam assembly production line includes a welding room 1, in which a left tube beam production branch line, a right tube beam production branch line and a welding robot group are arranged. The left tube beam production branch line and the right tube beam production branch line with the same structure are symmetrically arranged, and the left tube beam production branch line and the right tube beam production branch line share the welding robot group; the structure of the left tube beam production branch line includes the 10th sequence station 2, the 20th sequence station 3, and the 30th sequence station 4 arranged in sequence,
[0017] like Figure 3As shown, the 10th sequence station 2 is used to weld the left main mounting bracket assembly 5, the right main mounting bracket assembly 6, the instrument upper body main mounting bracket assembly 7, and the instrument panel pipe beam 8 into a whole and form the 10th sequence assembly;
[0018] like Figure 4 As shown, the 20th workstation 3 is used to weld the instrument panel auxiliary mounting bracket assembly 9, the steering column mounting bracket 10, and the pipe beam connecting bracket group 11 to the 10th assembly to form the 20th assembly;
[0019] like Figure 5 As shown, the 30th sequence station 4 is used to weld the central control bracket assembly 12 and the fuse box mounting bracket assembly 13 to the 20th sequence assembly to form the 30th sequence assembly;
[0020] like Figure 2 As shown, the welding robot group includes R1 welding robot, R2 welding robot, and R3 welding robot which are distributed in sequence; the 10th workstation shares R1 welding robot 14, the 20th workstation shares R2 welding robot 15, and the 30th workstation shares R3 welding robot 16; in the two production branches, workstations with the same operation share a set of welding robots, which improves the utilization rate of welding robots and helps reduce production costs;
[0021] like Figure 1 As shown, the supporting equipment of the welding room 1 includes a fume extractor; a fume collecting hood 17 is provided on the top of the welding room corresponding to each welding station, and the fume collected by the fume collecting hood is transported to the fume filtering equipment through a fan 18 and a pipe 19; this structure is conducive to improving production safety;
[0022] The door of the welding room 1 is electric;
[0023] like Figure 2 As shown, the supporting equipment of the welding robot group includes a welding robot control cabinet 20, which includes a robot control cabinet and a welding control cabinet; the robot control cabinet is the core component of the robot system, responsible for managing and controlling the movement, sensor input and actuator output of the robot; the main function of the welding control cabinet is to control the power output, welding speed, welding current and other parameters of the welding machine to ensure welding quality and production efficiency;
[0024] In the left tube beam production branch line and the right tube beam production branch line, each welding station is equipped with a welding fixture and a welding positioner;
[0025] The welding room, smoke extraction equipment, welding robot, robot control cabinet, welding control cabinet, welding fixture and welding positioner are conventional technologies in this field, so their structures are not described; the door of the welding room, the fan of the smoke extraction equipment, the robot control cabinet, the welding control cabinet and the welding positioner are all controlled by the PLC control cabinet 21.
Claims
1. A production line for a vehicle instrument panel cross beam assembly, characterized in that: It includes a welding room body, in which a left tube beam production branch line, a right tube beam production branch line and a welding robot group are arranged, the left tube beam production branch line and the right tube beam production branch line are symmetrically arranged, and the left tube beam production branch line and the right tube beam production branch line share the welding robot group; the structure of the left tube beam production branch line: includes the 10th sequence station, the 20th sequence station, and the 30th sequence station arranged in sequence, the 10th sequence station is used to weld the left main mounting bracket assembly, the right main mounting bracket assembly, the instrument upper body main mounting bracket assembly, and the instrument panel tube beam into a whole and form the 10th sequence assembly; the 20th sequence station is used to weld the instrument panel auxiliary mounting bracket assembly, the steering column mounting bracket, and the tube beam connecting bracket group to the 10th sequence assembly and form the 20th sequence assembly; the 30th sequence station is used to weld the central control bracket assembly and the fuse box mounting bracket assembly to the 20th sequence assembly and form the 30th sequence assembly; the structure of the right tube beam production branch line is the same as that of the left tube beam production branch line.
2. According to claim 1, a vehicle instrument panel cross beam assembly production line is characterized by: The welding robot group includes an R1 welding robot, an R2 welding robot, and an R3 welding robot which are distributed in sequence; the 10th workstation shares the R1 welding robot, the 20th workstation shares the R2 welding robot, and the 30th workstation shares the R3 welding robot.
3. A vehicle instrument panel cross beam assembly production line according to claim 1 or 2, characterized in that: The supporting equipment of the welding room includes a smoke extraction device.
4. The vehicle instrument panel cross beam assembly production line according to claim 3 is characterized by: The welding robot group supporting equipment includes a welding robot control cabinet.