Steel stacking device for construction site
By introducing adjustable partition rods and limiting components into the steel bar stacking device, the classification chaos caused by the fixed spacing of the steel bar stacking area in the prior art is solved, and the stability and convenient classification and acquisition of steel bars are achieved.
Patent Information
- Application Number
- CN202420572951.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-03-22
AI Technical Summary
Due to the fixed space of each placement area, the existing steel bar stacking devices have caused more steel bars to be dispersed to other areas, resulting in confusion in classification and difficult to easily obtain.
A steel stacking device including a chassis, partition rods, displacement grooves, and limiting components is designed. Through the coordination of the displacement grooves and limiting components, the spacing of the partition rods is allowed to be adjusted, and its stability is ensured through the articulation and torsion spring mechanism. and controllability.
The stable displacement and spacing adjustment of the partition rod is achieved, which avoids self-displacement and chaos, and improves the classification and convenience of steel bars.
Smart Images

Figure CN222270240U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of steel material stacking, in particular to a steel material stacking device for a construction site. Background Art
[0002] Steel stacking refers to the situation on the construction site where a large amount of steel bars are needed. In order to facilitate their classification and retrieval, a stacking device will be placed on the construction site to sort and place the steel bars.
[0003] However, in the existing steel bar stacking device, the spacing between each stacking area is fixed and cannot be changed. When steel bars of different specifications are stacked, some types of steel bars are used in larger quantities, making it impossible to fully put them into one classification area. Some of them will be divided into other spacing areas, resulting in confusion in the classification of the steel bars and inconvenience in taking and using them. Utility Model Content
[0004] The utility model aims to provide a steel material stacking device for a construction site, so as to solve the problem that the steel bars which are used more are scattered to other areas due to the fixed space of each placement area of the steel bar stacking rack, resulting in chaotic classification and difficulty in taking.
[0005] The embodiments of the present invention are implemented by the following technical solutions:
[0006] The utility model provides a steel material stacking device for a construction site, comprising a base frame, a partition rod is arranged on the top of the base frame, a displacement groove is arranged on the top of the base frame, the partition rod is arranged in the displacement groove, engaging grooves are arranged on both sides of the middle of the displacement groove, and limiting components are arranged on both sides of the bottom of the partition rod, the limiting components swing along the axis, and the limiting components cooperate with the engaging groove through swinging.
[0007] Preferably, the displacement groove further includes a separation opening, a limiting groove and an embedding groove, the separation opening is arranged at both ends of the displacement groove, the limiting groove is arranged on both sides of the bottom of the displacement groove, and the embedding groove is arranged on one side of the limiting groove.
[0008] Preferably, the separation opening is an opening at both ends of the displacement groove that communicates with the outside.
[0009] Preferably, the limiting groove is a strip-shaped groove on both sides of the bottom of the displacement groove, and the engaging groove is a triangular groove that is inclined once at the limiting groove.
[0010] Preferably, the dividing rod also includes a limiting block, a shrinkage groove, an interlocking block and a stop block, the limiting block is arranged at the bottom of the dividing rod, the shrinkage groove is arranged on both sides of the limiting block, the interlocking block is connected in the shrinkage groove, and the stop block is arranged at one end of the interlocking block.
[0011] Preferably, the limiting block is a block whose bottom portion of the dividing rod cooperates with the limiting groove.
[0012] Preferably, the engaging block is a square block matched with the engaging groove, the engaging block is connected to the shrinking groove by a hinge arrangement, and torsion springs are arranged at both ends of the hinge axis of the engaging block.
[0013] Preferably, the stop block is a protrusion at one end of the engaging block close to the hinge, and the stop block protrusion fits on one end of the shrinkage groove.
[0014] The technical solution of the embodiment of the utility model has at least the following advantages and beneficial effects:
[0015] 1. Through the displacement groove and the limit assembly provided in the device, the partition rod can be stably displaced to adjust the spacing. At the same time, after the movement, the position is limited by the limit assembly to prevent it from easily displacing itself, and it can also be separated. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 For this utility model Figure 1 A schematic diagram of the enlarged structure at A in the middle;
[0019] Figure 3 It is a partial side cross-sectional structural schematic diagram of the utility model;
[0020] Figure 4 It is a schematic diagram of the top cross-sectional structure of the limiting groove and the limiting block of the utility model;
[0021] Icons: base frame 1, displacement groove 101, separation opening 1011, limiting groove 1012, fitting groove 1013, partition rod 2, limiting block 201, contraction groove 2011, fitting block 2012, and stop block 2013. DETAILED DESCRIPTION
[0022] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0023] Combine the following Figures 1 to 4 The utility model is described in detail.
[0024] A steel stacking device for a construction site includes a base frame 1, a partition rod 2 is arranged on the top of the base frame 1, a displacement groove 101 is arranged on the top of the base frame 1, the partition rod 2 is arranged in the displacement groove 101, and both sides of the middle of the displacement groove 101 are provided with engaging grooves 1013, and both sides of the bottom of the partition rod 2 are provided with limit components, the limit components swing along the axis, and the limit components cooperate with the engaging groove 1013 through swinging.
[0025] First, the required steel bars are placed on the base frame 1 on the construction site, and different types are distinguished by dividing rods 2 to facilitate differentiation and taking.
[0026] Furthermore, the displacement groove 101 also includes a separation opening 1011, a limiting groove 1012 and an interlocking groove 1013. The separation opening 1011 is arranged at both ends of the displacement groove 101, the limiting groove 1012 is arranged on both sides of the bottom of the displacement groove 101, and the interlocking groove 1013 is arranged on one side of the limiting groove 1012.
[0027] If the demand for one type of steel bar is too large, the separation bar 2 can be pushed by applying force to move the separation bar 2 along the displacement groove 101, thereby adjusting the spacing between the separation bars 2 so that the number of steel bars inserted can be adjusted.
[0028] Furthermore, the separation opening 1011 is an opening that connects the two ends of the displacement groove 101 to the outside, the limiting groove 1012 is a long strip-shaped groove on both sides of the bottom of the displacement groove 101, and the engaging groove 1013 is a triangular groove that is inclined once the limiting groove 1012 is set, and the dividing rod 2 also includes a limiting block 201, a shrinkage groove 2011, an engaging block 2012 and a stop block 2013. The limiting block 201 is set at the bottom of the dividing rod 2, the shrinkage groove 2011 is set on both sides of the limiting block 201, the engaging block 2012 is connected to the shrinkage groove 2011, and the stop block 2013 is set at one end of the engaging block 2012. The limiting block 201 is a square block that cooperates with the limiting groove 1012 at the bottom of the dividing rod 2.
[0029] At the same time, the connection between the partition rod 2 and the displacement groove 101 is achieved through the cooperation between the limiting block 201 at the bottom and the limiting groove 1012, so that the partition rod 2 will only move parallel to the displacement groove 101 without separation and tilting, making the spacing adjustment by displacement more stable.
[0030] Furthermore, the interlocking block 2012 is a block that cooperates with the interlocking groove 1013. The interlocking block 2012 is connected to the shrinkage groove 2011 through a hinged setting. Torsion springs are provided at both ends of the hinge axis of the interlocking block 2012. The stop block 2013 is a protrusion at one end of the interlocking block 2012 close to the hinge, and the protrusion of the stop block 2013 is attached to one end of the shrinkage groove 2011.
[0031] When the partition rod 2 moves along the displacement groove 101, the interlocking blocks 2012 connected by the shrinkage groove 2011 on both sides of the bottom limiting block 201 will be separated from the interlocking groove 1013 in the limiting groove 1012, and the interlocking blocks 2012 will fit against the side surface of the limiting groove 1012. Through the force applied during displacement, the interlocking block 2012 will be deflected along the hinge axis at one end, so that it will shrink into the shrinkage groove 2011, so that the limiting block 201 can be smoothly displaced in the limiting groove 1012. After moving to the appropriate position, the interlocking block 2012 stops pushing back a certain amount. The torsion springs at both ends of the hinge axis at one end will reset the interlocking block 2012, so that the interlocking block 2012 will be reset and re-embedded into the interlocking groove 1013 for connection. At the same time, the interlocking block 2012 will be re-engaged in the interlocking groove 1013 for connection due to the resistance of the block 201 3, so that the engaging block 2012 cannot be deflected to the other side, so that after the engaging block 2012 is engaged in the engaging groove 1013, it cannot push the dividing rod 2 back. At the same time, due to the resistance of the torsion spring of the engaging block 2012, the dividing rod 2 will not easily move by itself, so that the adjustment of the spacing can be better controlled. If it is necessary to reset the dividing rod 2, it can be completely separated from the separation opening 1011 by continuously pushing it, so that the dividing rod 2 will be removed, and then it can be re-engaged into the displacement groove 101 from the separation opening 1011 on the other side for displacement adjustment. In this way, the number of dividing rods 2 on the base frame 1 can also be adjusted to adapt to the situation where too many types of steel bars are not needed, and there will not be too many dividing rods 2 affecting the taking.
[0032] The following is a specific implementation process of the utility model. First, the steel bars to be used are placed on the base frame 1 on the construction site, and different types are distinguished by the partition rod 2 to facilitate the distinguished taking. If the demand for one type of steel bar is too large, the partition rod 2 can be pushed by applying force to the partition rod 2 to move the partition rod 2 along the displacement groove 101, so as to adjust the spacing between the partition rods 2, so that the number of steel bars placed can be adjusted. At the same time, the connection between the partition rod 2 and the displacement groove 101 is connected by the limiting block 201 at the bottom and the limiting groove 1012, so that the partition rod 2 only needs to be moved. The camming blocks 2012 connected by the contraction grooves 2011 on both sides of the bottom limiting block 201 will separate from the contraction grooves 1013 in the limiting grooves 1012, and the camming blocks 2012 will fit against one side surface of the limiting grooves 1012. The force applied during the displacement will cause the camming blocks 2012 to deflect along the hinge axis at one end and shrink into the contraction grooves 2011, so that the limiting blocks 201 can be smoothly moved in the limiting grooves 101. 2, and after moving to the appropriate position, the chimeric block 2012 stops pushing back a certain amount. Due to the reset of the torsion springs at both ends of the hinge shaft at one end, the chimeric block 2012 will reset and re-engage in the chimeric groove 1013 for connection. At the same time, due to the abutment of the abutment block 2013, the chimeric block 2012 cannot deflect to the other side, so that after the chimeric block 2012 is engaged in the chimeric groove 1013, it cannot push the partition rod 2 back. At the same time, due to the resistance of the torsion spring of the chimeric block 2012, the partition rod 2 will not easily move by itself. At the same time, the chimeric block The triangular fit between 2012 and the fitting groove 1013 also makes the two more stable when they are fitted together, so that the adjustment of the spacing can be better controlled. If the partition rod 2 needs to be reset, it can be completely separated from the separation opening 1011 by continuously pushing it, so that the partition rod 2 will be removed, and then re-fitted into the displacement groove 101 from the separation opening 1011 on the other side for displacement adjustment. In this way, the number of partition rods 2 on the base frame 1 can also be adjusted to adapt to the situation where too many types of steel bars are not needed, and there will not be too many partition rods 2 affecting the taking.
[0033] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A steel material stacking device for a construction site, comprising a base frame (1), a partition rod (2) being arranged on the top of the base frame (1), characterized in that: The top of the base frame (1) is provided with a displacement groove (101), the partition rod (2) is arranged in the displacement groove (101), both sides of the middle of the displacement groove (101) are provided with engaging grooves (1013), and both sides of the bottom of the partition rod (2) are provided with limiting components, the limiting components swing along the axis, and the limiting components cooperate with the engaging grooves (1013) through swinging.
2. A steel material stacking device for construction sites according to claim 1, characterized in that: The displacement groove (101) further comprises a separation opening (1011), a limiting groove (1012) and an embedding groove (1013); the separation opening (1011) is arranged at both ends of the displacement groove (101), the limiting groove (1012) is arranged at both sides of the bottom of the displacement groove (101), and the embedding groove (1013) is arranged on one side of the limiting groove (1012).
3. A steel material stacking device for construction sites according to claim 2, characterized in that: The separation opening (1011) is an opening at both ends of the displacement groove (101) that is connected to the outside.
4. A steel material stacking device for construction sites according to claim 2, characterized in that: The limiting groove (1012) is a long strip-shaped groove on both sides of the bottom of the displacement groove (101), and the fitting groove (1013) is a triangular groove arranged in an inclined manner at one end of the limiting groove (1012).
5. The steel material stacking device for construction site according to claim 1, characterized in that: The partition rod (2) further comprises a limiting block (201), a shrinkage groove (2011), a fitting block (2012) and a stop block (2013); the limiting block (201) is arranged at the bottom of the partition rod (2); the shrinkage groove (2011) is arranged on both sides of the limiting block (201); the fitting block (2012) is connected to the shrinkage groove (2011); and the stop block (2013) is arranged at one end of the fitting block (2012).
6. A steel material stacking device for construction sites according to claim 5, characterized in that: The limiting block (201) is a square block that matches the bottom of the dividing rod (2) and the limiting groove (1012).
7. The steel material stacking device for construction site according to claim 5, characterized in that: The interlocking block (2012) is a square block that matches the interlocking groove (1013). The interlocking block (2012) is connected to the contraction groove (2011) through a hinged arrangement. Torsion springs are arranged at both ends of the hinge axis of the interlocking block (2012).
8. The steel material stacking device for construction site according to claim 5, characterized in that: The stop block (2013) is a protrusion at one end of the engaging block (2012) close to the hinge, and the protrusion of the stop block (2013) fits in one end of the shrinkage groove (2011).