Connecting device for quickly installing steel structure grid

By using plug-in structure and drive components in the grid connection device, the problem of time-consuming and labor-intensive rotation of threads in the prior art is solved, and a fast and labor-saving connection method is achieved, and the installation efficiency and stability are improved.

CN222275755UActive Publication Date: 2024-12-31SUZHOU SUWANG CONSTR ENG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420980079.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-08
Publication Date
2024-12-31
Estimated Expiration
2034-05-08

AI Technical Summary

Technical Problem

The existing mesh lever connection method requires manual rotation of threads, which is time-consuming and labor-intensive and affects installation efficiency.

Method used

The ball and the tie rod are connected by a plug-in structure, including the first plug-in assembly and the second plug-in assembly, and the plug-in rod, the force rod, the drive nut and the sliding rod are used to achieve quick connection by plug-in and rotating the drive nut. Combining springs and balls reduces friction and looseness.

Benefits of technology

It realizes a fast and labor-saving connection between the tie rod and the ball, improves installation efficiency, enhances stability and reliability, and reduces the possibility of wear and looseness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222275755U_ABST
    Figure CN222275755U_ABST
Patent Text Reader

Abstract

The utility model discloses a connecting device for quickly installing a steel structure net rack, which comprises a ball body and a pull rod, the ball body is fixedly connected with the pull rod through an inserting structure, and the inserting structure comprises a first inserting component and a second inserting component; the first inserting assembly comprises a first inserting opening formed in the side wall of the ball body, and a first inserting rod matched with the first inserting opening in an inserting mode is arranged at the end of the pull rod; the second inserting assembly comprises a through groove formed in the side wall of the end of the pull rod, the through groove is movably connected with a stress rod, a thread corresponding to the through groove is arranged on the outer side of the end of the pull rod, and a driving nut in threaded fit with the thread is arranged on the outer side of the end of the pull rod. According to the connecting device for rapidly installing the steel structure net rack, the arranged inserting structure is composed of the first inserting assembly and the second inserting assembly, rapid connection of the pull rod and the ball body is facilitated, trouble and labor are saved, and efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of grid connection structures, in particular to a fast-installed steel structure grid connection device. Background Art

[0002] The grid structure is a spatial structure composed of multiple rods connected by nodes in a certain grid form. It has the advantages of small spatial force, light weight, high rigidity and good seismic performance. It can be used as the roof of buildings such as gymnasiums, theaters, exhibition halls, waiting halls, stadium stand awnings, hangars, and two-way large column spacing workshops.

[0003] Existing truss tie rods are usually connected to multiple tie rods by rotating threads on a connecting ball. During assembly and disassembly, workers are required to manually rotate the tie rods into or out of the connecting ball. Since the tie rods are a little heavy, this method is time-consuming and labor-intensive, affects efficiency, and is inconvenient to install.

[0004] Therefore, it is necessary to propose a quick installation steel structure grid connection device to solve the above problems. Utility Model Content

[0005] The main purpose of the utility model is to provide a quick installation steel structure grid connection device, which can effectively solve the problems in the background technology.

[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0007] A quick-install steel structure grid connection device comprises a sphere and a pull rod, wherein the sphere and the pull rod are connected and fixed via a plug-in structure, wherein the plug-in structure comprises a first plug-in component and a second plug-in component;

[0008] The first plug-in assembly includes a first socket provided on the side wall of the sphere, and the end of the pull rod is provided with a first plug rod plugged with the first socket;

[0009] The second plug-in assembly includes a through groove arranged on the side wall of the pull rod end, the through groove is movably connected with a force rod, the outer side of the pull rod end is provided with a thread corresponding to the through groove, the outer side of the pull rod end is provided with a driving nut mating with the thread, the inner side of the first plug rod is provided with a mounting groove connected to the through groove, the mounting groove is movably connected with a sliding rod, the side wall of the sliding rod is provided with a driving block, the side wall of the first plug rod is provided with a receiving groove corresponding to the driving block, the receiving groove is movably connected with a second plug rod mating with the inclined surface of the driving block, and the inner wall of the first socket is provided with a second socket adapted to the second plug rod.

[0010] Preferably, a steel column is embedded in the side wall of the sphere, and the first socket is arranged on the steel column;

[0011] The first plug rod is in the shape of a regular polygonal column, and the first socket is adapted to the first plug rod.

[0012] Preferably, both ends of the force-bearing rod protrude from the side wall of the pull rod;

[0013] The driving nut is used to push the force bearing rod to move.

[0014] Preferably, one end of the sliding rod extends to the inner side of the through slot and is fixedly connected to the side wall of the force-bearing rod, so that when the driving nut is rotated, the sliding rod can be driven to move through the force-bearing rod.

[0015] Preferably, the sliding rod is in the shape of a regular polygonal column adapted to the first insertion rod, and the driving blocks are evenly distributed on the circumferential side wall of the sliding rod;

[0016] The second plugging rods correspond to the driving blocks one by one, the second sockets correspond to the second plugging rods one by one, and the second plugging rods are plug-fitted with the second sockets.

[0017] Preferably, a spring is provided between one end of the sliding rod and the inner wall of the mounting groove.

[0018] Preferably, a ball is movably provided on the side of the end of the force-bearing rod facing the driving nut.

[0019] Preferably, a limiting block is provided on the inner wall of the accommodating groove, a limiting recess is provided on the side wall of the second insertion rod, and one end of the limiting block extends to the inner side of the limiting recess and slidably cooperates with the limiting recess.

[0020] Compared with the prior art, the utility model provides a quick installation steel structure grid connection device, which has the following beneficial effects:

[0021] The quick-installation steel structure grid connection device consists of a first plug-in component and a second plug-in component through a plug-in structure, which facilitates the quick connection of the pull rod and the sphere, saves time and effort and improves efficiency. The setting of the spring can ensure the stability of the sliding rod and reduce the possibility of loosening of the drive nut and the thread. The ball can reduce the friction between the load-bearing rod and the drive nut and reduce wear. The setting of the limit recess and the limit block can limit and guide the second plug rod to avoid disengagement, while increasing stability. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a structural schematic diagram of the utility model;

[0023] Figure 2 It is a schematic diagram of the structure of the utility model when the pull rod and the sphere are separated;

[0024] Figure 3 It is a schematic diagram of the cross-sectional structure of the connection between the pull rod and the first plug rod of the utility model;

[0025] Figure 4 It is a three-dimensional structural schematic diagram of the sliding rod of the utility model;

[0026] Figure 5 This utility model Figure 3 Enlarged view of point A in the middle.

[0027] In the figure: 1. sphere; 2. pull rod; 3. steel column; 4. first socket; 5. second socket; 6. first plug rod; 7. second plug rod; 8. thread; 9. drive nut; 10. force rod; 11. through groove; 12. ball; 13. mounting groove; 14. spring; 15. drive block; 16. sliding rod; 17. receiving groove; 18. limit notch; 19. limit block. DETAILED DESCRIPTION

[0028] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0029] like Figure 1-5 As shown, a quick-install steel structure grid connection device includes a sphere 1 and a tie rod 2. The sphere 1 and the tie rod 2 are connected and fixed by a plug-in structure. The plug-in structure includes a first plug-in component and a second plug-in component.

[0030] The first plug assembly includes a first socket 4 arranged on the side wall of the sphere 1. Specifically, a steel column 3 is embedded in the side wall of the sphere 1, and the first socket 4 is arranged on the steel column 3. The end of the pull rod 2 is provided with a first plug rod 6 plugged with the first socket 4. The first plug rod 6 is a regular polygonal column, and the first socket 4 is adapted to the first plug rod 6.

[0031] The second plug-in assembly includes a through slot 11 arranged on the side wall of the end of the pull rod 2, and the through slot 11 is movably connected with a force-bearing rod 10, both ends of the force-bearing rod 10 protrude from the side wall of the pull rod 2, and the outer side of the end of the pull rod 2 is provided with a thread 8 corresponding to the through slot 11, and the outer side of the end of the pull rod 2 is provided with a driving nut 9 threadably matched with the thread 8, and the driving nut 9 is used to push the force-bearing rod 10 to move, and the inner side of the first plug rod 6 is provided with a mounting slot 13 connected with the through slot 11, and the mounting slot 13 is movably connected with a sliding rod 16, and one end of the sliding rod 16 extends to the inner side of the through slot 11 and is fixedly connected to the side wall of the force-bearing rod 10, so that when the driving nut 9 is rotated The force-bearing rod 10 can drive the sliding rod 16 to move, and a driving block 15 is provided on the side wall of the sliding rod 16. The sliding rod 16 is a regular polygonal prism matched with the first plug rod 6, and the driving blocks 15 are evenly distributed on the circumferential side wall of the sliding rod 16. The side wall of the first plug rod 6 is provided with a receiving groove 17 corresponding to the driving block 15, and the receiving groove 17 is movably connected with the second plug rod 7 matched with the inclined surface of the driving block 15. The inner wall of the first socket 4 is provided with a second socket 5 matched with the second plug rod 7, the second plug rod 7 corresponds one-to-one with the driving block 15, the second socket 5 corresponds one-to-one with the second plug rod 7, and the second plug rod 7 is plugged and matched with the second socket 5.

[0032] Furthermore, in order to increase the stability between the thread 8 and the drive nut 9 , a spring 14 is provided between one end of the sliding rod 16 and the inner wall of the mounting groove 13 .

[0033] In order to reduce friction, a ball 12 is movably provided on the end of the force-bearing rod 10 facing the driving nut 9 .

[0034] In addition, in order to limit and guide the second insertion rod 7, a limiting block 19 is set on the inner wall of the accommodating groove 17, and a limiting recess 18 is set on the side wall of the second insertion rod 7. One end of the limiting block 19 extends to the inner side of the limiting recess 18 and slidably cooperates with the limiting recess 18.

[0035] It should be noted that the utility model is a quick-install steel structure grid connection device. When in use, the first plug rod 6 at the end of the pull rod 2 is plugged into the first socket 4. At this time, the second plug rod 7 corresponds to and fits the second socket 5 one by one. Then, the driving nut 9 is screwed through the workpiece, and the driving nut 9 pushes the force-bearing rod 10 to move. The force-bearing rod 10 drives the sliding rod 16 to move, and the spring 14 is compressed, and then the sliding rod 16 drives the driving block 15 to move. The driving block 15 cooperates with the inclined surface of the second plug rod 7, so that the second plug rod 7 moves outward into the second socket 5, thereby completing the plug-in fixation. Compared with the threaded connection, it is more reliable and safe, and the operation is labor-saving and convenient. There is no need to rotate the entire pull rod 2, which improves efficiency. In addition, the reverse force generated by the spring 14 can increase the stability of the sliding rod 16. The reverse force acts on the driving nut 9 through the force-bearing rod 10, thereby increasing the stability between the driving nut 9 and the thread 8 and reducing the possibility of loosening.

[0036] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A quick-install steel structure grid connection device, comprising a sphere (1) and a tie rod (2), characterized in that: The sphere (1) and the pull rod (2) are connected and fixed via a plug-in structure, wherein the plug-in structure comprises a first plug-in component and a second plug-in component; The first plug-in assembly comprises a first socket (4) arranged on the side wall of the sphere (1), and the end of the pull rod (2) is provided with a first plug rod (6) plugged into and matched with the first socket (4); The second plug-in assembly includes a through groove (11) arranged on the side wall of the end of the pull rod (2), the through groove (11) is movably connected to a force-bearing rod (10), the outer side of the end of the pull rod (2) is provided with a thread (8) corresponding to the through groove (11), the outer side of the end of the pull rod (2) is provided with a driving nut (9) threadedly matched with the thread (8), the inner side of the first plug rod (6) is provided with a mounting groove (13) connected to the through groove (11), the mounting groove (13) is movably connected to a sliding rod (16), the side wall of the sliding rod (16) is provided with a driving block (15), the side wall of the first plug rod (6) is provided with a receiving groove (17) corresponding to the driving block (15), the receiving groove (17) is movably connected to a second plug rod (7) matched with the inclined surface of the driving block (15), and the inner wall of the first socket (4) is provided with a second socket (5) adapted to the second plug rod (7).

2. A quick installation steel structure grid connection device according to claim 1, characterized in that: A steel column (3) is embedded in the side wall of the sphere (1), and the first socket (4) is arranged on the steel column (3); The first insertion rod (6) is in the shape of a regular polygonal prism, and the first socket (4) is adapted to fit the first insertion rod (6).

3. A quick installation steel structure grid connection device according to claim 1, characterized in that: Both ends of the force-bearing rod (10) protrude from the side wall of the pull rod (2); The driving nut (9) is used to push the force bearing rod (10) to move.

4. A quick installation steel structure grid connection device according to claim 3, characterized in that: One end of the sliding rod (16) extends to the inner side of the through slot (11) and is fixedly connected to the side wall of the force-bearing rod (10), so that when the driving nut (9) is rotated, the sliding rod (16) can be driven to move through the force-bearing rod (10).

5. A quick installation steel structure grid connection device according to claim 4, characterized in that: The sliding rod (16) is in the shape of a regular polygonal column adapted to the first insertion rod (6), and the driving blocks (15) are evenly distributed on the circumferential side wall of the sliding rod (16); The second plug rod (7) corresponds to the driving block (15) one by one, the second socket (5) corresponds to the second plug rod (7) one by one, and the second plug rod (7) and the second socket (5) are plug-fitted.

6. A quick installation steel structure grid connection device according to claim 5, characterized in that: A spring (14) is arranged between one end of the sliding rod (16) and the inner wall of the mounting groove (13).

7. A quick installation steel structure grid connection device according to claim 5, characterized in that: A ball (12) is movably provided on the side of the end of the force bearing rod (10) facing the driving nut (9).

8. A quick-install steel structure grid connection device according to claim 7, characterized in that: A limiting block (19) is disposed on the inner wall of the receiving groove (17), and a limiting recess (18) is disposed on the side wall of the second insertion rod (7); one end of the limiting block (19) extends to the inner side of the limiting recess (18) and is slidably engaged with the limiting recess (18).

Citation Information

Cited By

  • Connecting device for quickly installing steel structure grid

    CN223838266U