Screening device for garbage treatment
By designing a screening device with a lever and a servo motor, the problem that the garbage disposal device in the prior art cannot be separated from non-metallic and metal waste without shutting down is solved, efficient garbage screening and separation is achieved, and working efficiency is improved.
Patent Information
- Application Number
- CN202420917180.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2034-04-29
AI Technical Summary
The existing screening device for garbage disposal cannot achieve the separation of non-metallic waste and metal waste without shutting down, resulting in low working efficiency and poor separation effect. The non-metallic waste suppresses metal waste and makes the electromagnet unable to adsorb.
A screening device including a non-metal conveyor mechanism and a metal conveyor mechanism is designed. The conveyor belt and lever structure are driven by a rotating electric machine. The lever turns over the construction waste so that the pressed metal waste can be adsorbed by an electromagnet and passes through a servo. The motor realizes automatic replacement and magnetic control of the electromagnet to ensure continuous screening and separation.
It realizes efficient screening and separation of construction waste, avoids downtime operations, improves work efficiency, and ensures effective separation of non-metallic waste and metal waste.
Smart Images

Figure CN222287577U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of garbage disposal, in particular to a screening device for garbage disposal. Background Art
[0002] Construction waste contains non-metallic waste and metal waste. In order to separate the metal waste in construction waste, the construction waste will be crushed by a crushing device, and then the non-metallic waste and metal waste will be separated by a screening device.
[0003] However, the existing screening devices for garbage disposal cannot separate non-metallic garbage from metal garbage without stopping, resulting in slow work efficiency. In addition, non-metallic garbage and metal garbage are piled on the conveyor belt, which will cause the non-metallic garbage to press the metal garbage, resulting in the metal garbage cannot be adsorbed by the electromagnet, resulting in poor separation effect between non-metallic garbage and metal garbage.
[0004] In view of the above problems, it is urgent to carry out innovative design based on the original screening device for garbage disposal. Utility Model Content
[0005] The purpose of the utility model is to provide a screening device for garbage disposal to solve the problems raised by the above-mentioned background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a screening device for garbage disposal, comprising a box body, wherein a non-metallic conveying mechanism and a metal conveying mechanism are respectively installed inside the box body;
[0007] The non-metal conveying mechanism comprises a first rotating shaft, the first rotating shaft is rotatably mounted inside the box body through a bearing, a first baffle is rotatably mounted on the outer side of the first rotating shaft through a bearing, the bottom of the first baffle is fixedly connected to the bottom inside the box body, a second rotating shaft is rotatably mounted on the outside of the box body between the first baffles through a bearing, a transmission structure is formed between the first rotating shaft and the second rotating shaft through a first conveyor belt, an end of the first rotating shaft passes through the side wall of the box body and is fixedly connected to the output end of the rotating motor, and the outer wall of the rotating motor is fixed to the outer wall of the box body through a mounting plate;
[0008] The metal conveying mechanism comprises a second baffle, the second baffle is rotatably mounted on the outer side of the first rotating shaft through a bearing, a third rotating shaft is rotatably mounted on the outer side of the box body between the second baffles through a bearing, and a transmission structure is formed between the first rotating shaft and the third rotating shaft through a second conveyor belt;
[0009] A magnetic mechanism is arranged inside the box above the first conveyor belt;
[0010] A material shifting mechanism is arranged between the first baffles and above the first conveyor belt.
[0011] Preferably, the material shifting mechanism includes a fourth rotating shaft, which is rotatably installed between the first baffles and above the first conveyor belt through a bearing, a shifting rod is fixed to the outer wall of the fourth rotating shaft, the end of the fourth rotating shaft passes through the first baffle and a first gear is fixed to the inside, a second gear is meshed with the bottom of the first gear, the inner wall of the second gear is fixedly connected to the outer wall of the first rotating shaft, and a transmission structure is formed between the fourth rotating shafts through a pulley mechanism.
[0012] Preferably, the fourth rotating shafts are distributed at equal intervals above the first conveyor belt, and the shifting rods are distributed at equal angles with respect to the central axis of the fourth rotating shafts.
[0013] Preferably, the diameter of the second gear is five times the diameter of the first gear.
[0014] Preferably, the magnetic mechanism includes a fifth rotating shaft, the fifth rotating shaft is rotatably installed inside the box through a bearing, a first movable plate is provided on the outer side of the fifth rotating shaft, a first electromagnet is fixed to the bottom of the first movable plate, the first electromagnet is located above the first conveyor belt, a second movable plate is provided on the outer side of the fifth rotating shaft, a second electromagnet is fixed to the bottom of the second movable plate, ends of the first movable plate and the second movable plate are both penetrated by a limiting rod, the end of the limiting rod is fixedly connected to the inner wall of the box, the end of the fifth rotating shaft penetrates the side wall of the box and is fixedly connected to the output end of the servo motor, and the outer wall of the servo motor is fixed to the outer wall of the box through a mounting plate.
[0015] Preferably, the fifth rotating shaft is threadedly connected to the first movable plate and the second movable plate, and the limiting rod is slidably connected to the first movable plate and the second movable plate.
[0016] Preferably, a discharge pipe is fixedly passed through the top of the box body, a storage bin is fixedly disposed on the top of the discharge pipe, and the bottom of the discharge pipe is located above the first conveyor belt.
[0017] Preferably, a collection box is disposed below the second rotating shaft and the third rotating shaft respectively.
[0018] Compared with the prior art, the utility model has the following beneficial effects: the screening device for garbage disposal can drive a first conveyor belt and two second conveyor belts to rotate forwardly at the same time by starting the rotating motor, so that the construction garbage falling on the first conveyor belt and the second conveyor belt can fall into the inside of the collection box, and when the rotating motor is started, it can drive a plurality of fourth rotating shafts and levers to rotate, and the rotating levers can fully turn over the crushed construction garbage, so that the metal garbage pressed by the non-metallic garbage can also be adsorbed by the first electromagnet, so that the construction garbage can be fully screened;
[0019] When the bottom of the first electromagnet absorbs too much metal garbage, the servo motor is started, so that the first electromagnet and the second electromagnet move backwards at the same time, until the second electromagnet moves above the first conveyor belt, and the first electromagnet moves above the second conveyor belt behind, the energized second electromagnet absorbs the metal garbage on the first conveyor belt, so that the second electromagnet replaces the first electromagnet to absorb the metal garbage on the first conveyor belt, the first electromagnet is powered off, the first electromagnet loses its magnetism, and the metal garbage absorbed by the bottom of the first electromagnet falls to the top of the second conveyor belt behind, and then the metal garbage moves to the right along with the second conveyor belt and falls into another collection box. Internal concentrated collection, when the bottom of the second electromagnet absorbs too much metal waste, the servo motor is started in reverse, so that the second electromagnet and the first electromagnet move forward at the same time, until the first electromagnet is located above the first conveyor belt, and the second electromagnet is located above the second conveyor belt in front, and then the energized first electromagnet absorbs the metal waste on the top of the first conveyor belt again, the second electromagnet is powered off, and the metal waste absorbed by the bottom of the second electromagnet falls to the top of the second conveyor belt in front, and falls to the inside of the third collection box with the second conveyor belt. In summary, construction waste can be continuously screened, avoiding downtime and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the front cross-sectional structure of the utility model;
[0021] Figure 2 It is a schematic diagram of the side cross-sectional structure of the utility model;
[0022] Figure 3 This is a schematic diagram of the cross-sectional structure of the utility model from top view;
[0023] Figure 4 For this utility model Figure 3 The enlarged structural diagram at A in the middle;
[0024] Figure 5 This is a schematic diagram of the front view installation structure of the first gear and the second gear of the utility model;
[0025] Figure 6 This is a schematic diagram of the installation structure of the first movable plate of the utility model from a top view;
[0026] Figure 7 It is a side structural schematic diagram of the first baffle and the discharge pipe of the utility model.
[0027] In the figure: 1. box body; 2. first rotating shaft; 3. first baffle; 4. second rotating shaft; 5. first conveyor belt; 6. second baffle; 7. third rotating shaft; 8. second conveyor belt; 9. rotating motor; 10. fourth rotating shaft; 11. shift lever; 12. first gear; 13. second gear; 14. fifth rotating shaft; 15. first movable plate; 16. first electromagnet; 17. second movable plate; 18. second electromagnet; 19. limit rod; 20. servo motor; 21. discharge pipe; 22. storage bin; 23. collection box; 24. pulley mechanism. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0029] See also Figure 1-7 , the utility model provides a technical solution: a screening device for garbage disposal, comprising a box body 1, inside which a non-metal conveying mechanism and a metal conveying mechanism are respectively installed;
[0030] The non-metal conveying mechanism includes a first rotating shaft 2, the first rotating shaft 2 is rotatably mounted inside the box body 1 through a bearing, a first baffle 3 is rotatably mounted on the outside of the first rotating shaft 2 through a bearing, the bottom of the first baffle 3 is fixedly connected to the bottom of the box body 1, a second rotating shaft 4 is rotatably mounted on the outside of the box body 1 between the first baffles 3, a transmission structure is formed between the first rotating shaft 2 and the second rotating shaft 4 through a first conveyor belt 5, an end of the first rotating shaft 2 passes through the side wall of the box body 1 and is fixedly connected to the output end of the rotating motor 9, and the outer wall of the rotating motor 9 is fixed to the outer wall of the box body 1 through a mounting plate;
[0031] The metal conveying mechanism includes a second baffle 6, the second baffle 6 is rotatably mounted on the outer side of the first rotating shaft 2 through a bearing, a third rotating shaft 7 is rotatably mounted on the outer side of the box body 1 between the second baffles 6, and a second conveyor belt 8 is formed between the first rotating shaft 2 and the third rotating shaft 7 to form a transmission structure;
[0032] A magnetic mechanism is provided inside the box 1 above the first conveyor belt 5;
[0033] A material shifting mechanism is provided between the first baffles 3 and above the first conveyor belt 5 .
[0034] The material shifting mechanism includes a fourth rotating shaft 10, which is rotatably installed between the first baffle plates 3 and above the first conveyor belt 5 through a bearing, a shifting rod 11 is fixed to the outer wall of the fourth rotating shaft 10, the end of the fourth rotating shaft 10 passes through the first baffle plate 3 and is fixed with a first gear 12, a second gear 13 is meshed with the bottom of the first gear 12, and the inner wall of the second gear 13 is fixedly connected to the outer wall of the first rotating shaft 2, and a transmission structure is formed between the fourth rotating shafts 10 through a pulley mechanism 24.
[0035] The fourth rotating shafts 10 are evenly spaced above the first conveyor belt 5 , and the levers 11 are evenly distributed with respect to the central axis of the fourth rotating shafts 10 , thereby increasing the area for the fourth rotating shafts 10 and the levers 11 to turn over the construction waste.
[0036] The diameter of the second gear 13 is five times the diameter of the first gear 12, which ensures that the rotation speed of the first gear 12 is greater than the rotation speed of the second gear 13, so that the first conveyor belt 5 transports construction waste at a slower speed, and the fourth rotating shaft 10 and the lever 11 rotate at a faster speed, so that the lever 11 can fully turn over the construction waste on the first conveyor belt 5.
[0037] The magnetic mechanism includes a fifth rotating shaft 14, and the fifth rotating shaft 14 is rotatably installed inside the box body 1 through a bearing, a first movable plate 15 is arranged on the outer side of the fifth rotating shaft 14, a first electromagnet 16 is fixed at the bottom of the first movable plate 15, and the first electromagnet 16 is located above the first conveyor belt 5, a second movable plate 17 is arranged on the outer side of the fifth rotating shaft 14, a second electromagnet 18 is fixed at the bottom of the second movable plate 17, ends of the first movable plate 15 and the second movable plate 17 both penetrate a limiting rod 19, an end of the limiting rod 19 is fixedly connected to the inner wall of the box body 1, an end of the fifth rotating shaft 14 penetrates the side wall of the box body 1 and is fixedly connected to the output end of the servo motor 20, and the outer wall of the servo motor 20 is fixed to the outer wall of the box body 1 through a mounting plate.
[0038] The fifth rotating shaft 14 is threadedly connected to the first movable plate 15 and the second movable plate 17, and the limiting rod 19 is slidably connected to the first movable plate 15 and the second movable plate 17, ensuring that when the fifth rotating shaft 14 rotates forward or reversely, the first movable plate 15 and the second movable plate 17 can move simultaneously, thereby allowing the first electromagnet 16 and the second electromagnet 18 to move simultaneously.
[0039] A discharge pipe 21 is fixed through the top of the box body 1, a storage bin 22 is fixed on the top of the discharge pipe 21, and the bottom of the discharge pipe 21 is located above the first conveyor belt 5. Through the discharge pipe 21, the crushed construction waste inside the storage bin 22 can be spread flat on the first conveyor belt 5.
[0040] Collecting boxes 23 are respectively arranged below the second rotating shaft 4 and the third rotating shaft 7 , so as to ensure that the construction waste on the first conveyor belt 5 and the second conveyor belt 8 can be collected in the two collecting boxes 23 .
[0041] In order to observe the situation inside the box 1 , a transparent observation window is installed on the box 1 .
[0042] Working principle: When the screening device for garbage disposal is used, the rotating motor 9 is first started, and then the rotating motor 9 drives the first rotating shaft 2 to rotate forward, and then the first rotating shaft 2 drives the first conveyor belt 5, the second rotating shaft 4, the second conveyor belt 8 and the third rotating shaft 7 to rotate forward at the same time. When the first rotating shaft 2 rotates forward, the first rotating shaft 2 drives the first gear 12 and the fourth rotating shaft 10 to rotate reversely through the second gear 13, and the fourth rotating shaft 10 drives several fourth rotating shafts 10 to rotate simultaneously through several pulley mechanisms 24, so that several fourth rotating shafts 10 drive several levers 11 thereon to rotate simultaneously;
[0043] Then, the crushed construction waste is poured into the storage bin 22, and then the crushed construction waste falls to the top of the first conveyor belt 5 through the discharge pipe 21. The crushed construction waste moves to the right along with the first conveyor belt 5, and at the same time, the first electromagnet 16 is started to generate magnetism, and the first electromagnet 16 absorbs metal waste in the construction waste. The rotating lever 11 fully turns the crushed construction waste, so that the metal waste pressed by the non-metallic waste can also be absorbed by the first electromagnet 16, so that the construction waste can be fully screened, and then the non-metallic waste moves to the right through the first conveyor belt 5 and finally falls into the collection box 23 for centralized collection;
[0044] When the bottom of the first electromagnet 16 absorbs too much metal garbage, the servo motor 20 is started. At this time, the servo motor 20 drives the fifth rotating shaft 14 to rotate. Since the fifth rotating shaft 14 is threadedly connected with the first movable plate 15 and the second movable plate 17, and the limit rod 19 is slidably connected with the first movable plate 15 and the second movable plate 17, the first movable plate 15, the first electromagnet 16, the second movable plate 17 and the second electromagnet 18 move backward at the same time until the second electromagnet 18 moves to the top of the first conveyor belt 5, and the first electromagnet 16 moves to the top of the second conveyor belt 8 at the back, and the energized second electromagnet 18 absorbs the metal garbage on the first conveyor belt 5, so that the second electromagnet 18 replaces the first electromagnet 16 to absorb the metal garbage on the first conveyor belt 5;
[0045] The first electromagnet 16 is powered off, the first electromagnet 16 loses its magnetism, and the metal waste adsorbed by the bottom of the first electromagnet 16 falls to the top of the second conveyor belt 8 at the back, and then the metal waste moves to the right along with the second conveyor belt 8 and falls into another collecting box 23 for centralized collection;
[0046] When too much metal waste is adsorbed by the bottom of the second electromagnet 18, the servo motor 20 is started in reverse, so that the second electromagnet 18 and the first electromagnet 16 move forward at the same time until the first electromagnet 16 is located above the first conveyor belt 5 and the second electromagnet 18 is located above the second conveyor belt 8 in front, and then the energized first electromagnet 16 adsorbs the metal waste on the top of the first conveyor belt 5 again, and the second electromagnet 18 is powered off, and the metal waste adsorbed by the bottom of the second electromagnet 18 falls to the top of the second conveyor belt 8 in front, and is collected inside the third collection box 23 as the second conveyor belt 8 falls. In summary, construction waste can be continuously screened, thus avoiding downtime and improving work efficiency.
[0047] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A screening device for garbage disposal, comprising a housing (1), characterized in that: A non-metallic conveying mechanism and a metal conveying mechanism are respectively installed inside the box (1); The non-metal conveying mechanism comprises a first rotating shaft (2), the first rotating shaft (2) is rotatably mounted inside the box (1) via a bearing, a first baffle (3) is rotatably mounted on the outside of the first rotating shaft (2) via a bearing, the bottom of the first baffle (3) is fixedly connected to the bottom of the box (1), a second rotating shaft (4) is rotatably mounted on the outside of the box (1) between the first baffles (3), a transmission structure is formed between the first rotating shaft (2) and the second rotating shaft (4) via a first conveyor belt (5), an end of the first rotating shaft (2) passes through the side wall of the box (1) and is fixedly connected to the output end of the rotating motor (9), and the outer wall of the rotating motor (9) is fixed to the outer wall of the box (1) via a mounting plate; The metal conveying mechanism comprises a second baffle (6), the second baffle (6) is rotatably mounted on the outer side of the first rotating shaft (2) via a bearing, a third rotating shaft (7) is rotatably mounted on the outer side of the box body (1) between the second baffles (6), and a second conveyor belt (8) is formed between the first rotating shaft (2) and the third rotating shaft (7) to form a transmission structure; A magnetic mechanism is provided inside the box (1) above the first conveyor belt (5); A material shifting mechanism is provided between the first baffles (3) and above the first conveyor belt (5).
2. A screening device for garbage disposal according to claim 1, characterized in that: The material shifting mechanism comprises a fourth rotating shaft (10), the fourth rotating shaft (10) being rotatably mounted between the first baffles (3) and located above the first conveyor belt (5) via a bearing, a shifting rod (11) being fixed to the outer wall of the fourth rotating shaft (10), an end of the fourth rotating shaft (10) passing through the interior of the first baffle (3) and being fixed with a first gear (12), a second gear (13) being meshed at the bottom of the first gear (12), an inner wall of the second gear (13) being fixedly connected to the outer wall of the first rotating shaft (2), and a transmission structure being formed between the fourth rotating shafts (10) via a pulley mechanism (24).
3. A screening device for garbage disposal according to claim 2, characterized in that: The fourth rotating shafts (10) are distributed at equal intervals above the first conveyor belt (5), and the shifting rods (11) are distributed at equal angles with respect to the central axis of the fourth rotating shafts (10).
4. A screening device for garbage disposal according to claim 2, characterized in that: The diameter of the second gear (13) is five times the diameter of the first gear (12).
5. A screening device for garbage disposal according to claim 1, characterized in that: The magnetic mechanism comprises a fifth rotating shaft (14), the fifth rotating shaft (14) is rotatably mounted inside the box (1) via a bearing, a first movable plate (15) is arranged on the outside of the fifth rotating shaft (14), a first electromagnet (16) is fixed at the bottom of the first movable plate (15), the first electromagnet (16) is located above the first conveyor belt (5), a second movable plate (17) is arranged on the outside of the fifth rotating shaft (14), a second electromagnet (18) is fixed at the bottom of the second movable plate (17), the ends of the first movable plate (15) and the second movable plate (17) both pass through a limiting rod (19), the end of the limiting rod (19) is fixedly connected to the inner wall of the box (1), the end of the fifth rotating shaft (14) passes through the side wall of the box (1) and is fixedly connected to the output end of the servo motor (20), and the outer wall of the servo motor (20) is fixed to the outer wall of the box (1) via a mounting plate.
6. A screening device for garbage disposal according to claim 5, characterized in that: The fifth rotating shaft (14) is threadedly connected to the first movable plate (15) and the second movable plate (17), and the limiting rod (19) is slidably connected to the first movable plate (15) and the second movable plate (17).
7. A screening device for garbage disposal according to claim 1, characterized in that: A discharge pipe (21) is fixedly passed through the top of the box body (1), a storage bin (22) is fixedly disposed on the top of the discharge pipe (21), and the bottom of the discharge pipe (21) is located above the first conveyor belt (5).
8. A screening device for garbage disposal according to claim 1, characterized in that: A collection box (23) is provided below the second rotating shaft (4) and the third rotating shaft (7), respectively.