Electric lifting device for sludge pump of sewage treatment station

By using ring pipe and nozzle erosion technology in the electric lifting device of the sludge pump in the sewage treatment station, the pollution problem caused by sludge drop during lifting of the sludge pump is solved, and a more stable and efficient sludge pump cleaning and maintenance process is achieved. .

CN222293361UActive Publication Date: 2025-01-03SICHUAN ZHENGXIANG ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421154907.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-24
Publication Date
2025-01-03
Estimated Expiration
2034-05-24

AI Technical Summary

Technical Problem

Sludge pumps are prone to falling off during lifting, causing pollution, increasing the workload of cleaning and maintenance.

Method used

An electric lifting device for sludge pump in sewage treatment station is designed. By surrounding the fixed ring pipe at the bottom of the suspending plate, tap water is introduced into the ring pipe, and the outer surface of the sludge pump is sprayed from the nozzle during lifting process. , reduce sludge covering and falling.

Benefits of technology

It effectively reduces the sludge drop after lifting the sludge pump, avoids ground pollution, reduces the workload of cleaning and maintenance, and improves the lifting stability of the sludge pump.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222293361U_ABST
    Figure CN222293361U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of sludge pump lifting equipment, and discloses a sewage treatment station sludge pump electric lifting device which comprises a cross beam and two supporting columns, the two supporting columns are vertically supported on the two sides of the bottom of the cross beam, a supporting plate is fixedly welded to the bottoms of the supporting columns, and a winch is installed in the middle of the bottom of the cross beam. A lifting plate is fixedly connected to the bottom of a main sling connected below the winch, an annular ring pipe is fixed to the bottom surface of the lifting plate, a plurality of nozzles communicated with the interior of the ring pipe are arranged on the bottom surface of the ring pipe, and four connecting rings are evenly fixed to the bottom surface of the lifting plate on the inner ring of the ring pipe. According to the technical scheme, the annular pipe is fixed to the outer circle of the bottom of the lifting plate in a surrounding mode, tap water can be introduced into the annular pipe, the tap water enters the annular pipe and is sprayed out of the spray head in the process of lifting the sludge pump, the outer surface of the sludge pump is scoured, sludge is left in a sedimentation tank, the sludge on the outer surface of the lifted sludge pump is little, and the sludge pump is prevented from being damaged. Pollution caused by falling on the ground is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sludge pump lifting equipment, in particular to an electric lifting device for a sludge pump in a sewage treatment station. Background Art

[0002] Sewage treatment refers to the process of purifying sewage so that it meets the water quality requirements for discharge into a certain water body or reuse. Sewage treatment is widely used in various fields such as construction, agriculture, transportation, energy, petrochemicals, environmental protection, urban landscape, medical care, and catering. It is also increasingly entering the daily lives of ordinary people. The sedimentation tank in the sewage treatment plant needs to be regularly pumped out with a sludge pump, and the sludge pump also needs to be regularly lifted for cleaning and maintenance.

[0003] Since the sludge pump sinks to the bottom of the pool, there is a lot of sludge attached to it. When it is lifted by lifting equipment, the sludge is easy to fall to the ground and cause pollution, requiring additional personnel to clean the ground, which increases the extra workload of cleaning the sludge pump. Therefore, we propose an electric lifting device for the sludge pump of a sewage treatment plant. Utility Model Content

[0004] The utility model aims to provide an electric lifting device for a sludge pump in a sewage treatment station. An annular pipe is fixed around the outer ring of the bottom of a hanging plate, and tap water can be introduced into the annular pipe. During the lifting process of the sludge pump, the tap water enters and is sprayed out from a nozzle to flush the outer surface of the sludge pump and leave the sludge in a sedimentation tank. After the sludge pump is lifted, there is less sludge on the outer surface, and it is not easy to fall to the ground and cause pollution, thereby solving the problems raised in the background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an electric lifting device for a sludge pump in a sewage treatment plant, comprising a crossbeam and a pillar, wherein the pillar is provided with two vertical supports on both sides of the bottom of the crossbeam, and a support plate is welded and fixed to the bottom of the pillar; a winch is installed in the middle position of the bottom of the crossbeam, and a hanging plate is fixed to the bottom of the main sling connected to the winch, and an annular ring tube is fixed to the bottom surface of the hanging plate, and a plurality of nozzles connected to the inside of the ring tube are provided on the bottom surface of the ring tube, and four connecting rings are evenly fixed to the bottom surface of the hanger plate of the inner circle of the ring tube.

[0006] By adopting the above technical solution, the water inlet pipe is connected to the tap water pipe, the hanging plate is driven to be lowered to the top of the sludge pump and connected thereto for lifting, so that the tap water enters the ring pipe and is sprayed out from the nozzle to flush the outer surface of the sludge pump, thereby reducing the sludge adhesion and preventing the sludge from falling to the ground and causing pollution after lifting.

[0007] Optionally, self-locking rollers are installed at the four corners of the bottom of the support plate, and a plurality of self-locking rollers are provided.

[0008] By adopting the above technical solution, the support plate, beam and other structures can be driven to move position through the self-locking roller.

[0009] Optionally, a water inlet pipe is vertically connected to the side of the surface of the hanging plate, and the water inlet pipe runs through the bottom of the hanging plate and is connected to the ring pipe.

[0010] By adopting the above technical solution, tap water is connected to the water inlet pipe, thereby supplying water to the ring pipe.

[0011] Optionally, a plurality of auxiliary slings are connected to the lower side of the main sling, and the auxiliary slings are connected to the four corners of the surface of the hanging plate.

[0012] By adopting the above technical solution, the auxiliary slings are connected between the main slings and the four corners of the hanging board, which can increase the lifting stability of the hanging board.

[0013] Optionally, a main through hole is opened in the middle of the surface of the hanger plate, and the main sling passes through the hanger plate through the main through hole and is provided with a knot pressed against the bottom surface of the hanger plate.

[0014] Optionally, auxiliary through holes are provided at the four corners of the surface of the hanger plate, and the auxiliary sling passes through the hanger plate through the auxiliary through holes and is provided with a knot pressed against the bottom surface of the hanger plate.

[0015] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0016] 1. The technical solution of the present application is to fix a ring tube around the outer circle of the bottom of the hanging plate, into which tap water can be introduced, and in the process of lifting the sludge pump, the tap water enters and is sprayed out from the nozzle to flush the outer surface of the sludge pump and leave the sludge in the sedimentation tank. After lifting, there is less sludge on the outer surface of the sludge pump, which is not easy to fall to the ground and cause pollution, thereby avoiding increasing the workload.

[0017] 2. The technical solution of the present application can increase the stability of the hanging board when lifting it by setting up a secondary sling connected to the side of the main sling and connected to the upper outer ring of the hanging board. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:

[0019] Figure 1 This is a schematic diagram of the overall structure of the electric lifting device for the sludge pump of a sewage treatment station of the utility model;

[0020] Figure 2 The utility model is a schematic diagram of the bottom structure of the hanging plate of the electric lifting device of the sludge pump of the sewage treatment station.

[0021] In the figure: 1, cross beam; 2, pillar; 21, support plate; 211, self-locking roller; 3, winch; 31, main lifting rope; 311, auxiliary lifting rope; 4, hanging plate; 41, ring pipe; 411, water inlet pipe; 412, nozzle; 42, main perforation; 43, auxiliary perforation; 44, connecting ring. DETAILED DESCRIPTION

[0022] See also Figure 1-2 The utility model provides a technical solution: an electric lifting device for a sludge pump in a sewage treatment station, comprising a cross beam 1 and a pillar 2, wherein the pillar 2 is provided with two vertical supports on both sides of the bottom of the cross beam 1, and the pillars 2 have the same length to realize the lateral support of the cross beam 1, and a support plate 21 is welded and fixed to the bottom of the pillar 2, and the pillar 2 is perpendicular to the upper surface of the support plate 21, and self-locking rollers 211 are installed at the four corners of the bottom of the support plate 21, and the support plate 21, the pillar 2 and the cross beam 1 can be driven to move by the rolling of the self-locking roller 211, and when lifting and lowering operations are required, the brake structure of the self-locking roller 211 is locked.

[0023] A winch 3 is installed in the middle position of the bottom of the crossbeam 1, and a main sling 31 is connected to the drum of the winch 3. A hanger plate 4 is connected and fixed to the bottom of the main sling 31. A main through hole 42 is opened in the middle position of the surface of the hanger plate 4. The main sling 31 passes through the hanger plate 4 through the main through hole 42 and is provided with a knot that is pressed against the bottom surface of the hanger plate 4 to achieve a firm connection to the hanger plate 4. A plurality of auxiliary slings 311 are connected to the lower side of the main sling 31. The auxiliary slings 311 are connected to the four corners of the surface of the hanger plate 4. Auxiliary through holes 43 are opened at the four corners of the surface of the hanger plate 4. The auxiliary slings 311 pass through the hanger plate 4 through the auxiliary through holes 43 and are provided with a knot that is pressed against the bottom surface of the hanger plate 4 to achieve a stabilizing effect on the connection of the hanger plate 4.

[0024] Four connecting rings 44 are evenly fixed on the bottom surface of the hanging plate 4. The connecting rings 44 can be connected to lifting connectors such as steel cables, and then connected to the sludge pump to lift the sludge pump. A ring-shaped ring pipe 41 is fixed on the bottom surface of the hanging plate 4. A plurality of nozzles 412 connected to the inside of the ring pipe 41 are arranged on the bottom surface of the ring pipe 41. A water inlet pipe 411 is vertically connected to the side of the surface of the hanging plate 4. The water inlet pipe 411 passes through the bottom of the hanging plate 4 and is connected to the ring pipe 41. During the lifting process, the water inlet pipe 411 is connected to a hose and connected to tap water, and water is supplied to the ring pipe 41 and sprayed from the nozzle 412 to flush the surface of the sludge pump and remove the sludge.

[0025] When in use, the support 2 and the crossbeam 1 are moved by the rolling of the self-locking roller 211 at the bottom of the support plate 21. After reaching the upper position of the sedimentation tank, the self-locking roller 211 is locked, the water inlet pipe 411 is connected to the tap water pipeline, the winch 3 is connected to the control and powered, and then the winch 3 can be controlled to drive the hanging plate 4 to lower the height to the top of the sludge pump, and the sludge pump is connected to the bottom of the hanging plate 4 by using the connecting ring 44 at the bottom of the hanging plate 4 in conjunction with the steel rope, and then the winch 3 drives the main sling 31 to rise to a higher height to drive the hanging plate 4 and The sludge pump is raised to a certain height, during which the valve of the tap water is opened and enters the annular pipe 41, and the water is sprayed from the nozzle 412 to continuously flush the sludge pump, and the sludge on its surface is flushed away and left in the sedimentation tank. After it is lifted, the valve of the tap water is closed, and the self-locking roller 211 is unlocked and rolled to drive the device to move to the ground on the side of the sedimentation tank, and then the self-locking roller 211 is locked again to make the winch 3 drive the hanging plate 4 to lower the height and put down the sludge pump, and then it can be dragged away for cleaning and maintenance.

Claims

1. An electric lifting device for a sludge pump in a sewage treatment plant, comprising a crossbeam (1) and a support (2), characterized in that: The pillars (2) are provided with two and vertically supported on both sides of the bottom of the crossbeam (1), and a support plate (21) is welded and fixed to the bottom of the pillars (2); A winch (3) is installed at the middle position of the bottom of the crossbeam (1); a main sling (31) connected below the winch (3) is connected and fixed to a hanging plate (4) at the bottom; an annular ring tube (41) is fixed to the bottom surface of the hanging plate (4); a plurality of nozzles (412) connected to the inside of the ring tube (41) are arranged on the bottom surface of the hanging plate (4); and four connecting rings (44) are evenly fixed to the bottom surface of the hanging plate (4) inside the ring tube (41).

2. The electric lifting device for a sludge pump of a sewage treatment station according to claim 1 is characterized in that: Self-locking rollers (211) are installed at the four corners of the bottom of the support plate (21), and a plurality of self-locking rollers (211) are provided.

3. The electric lifting device for a sludge pump of a sewage treatment station according to claim 1 is characterized in that: A water inlet pipe (411) is vertically connected to the side edge of the surface of the hanging plate (4), and the water inlet pipe (411) penetrates to the bottom of the hanging plate (4) and is in communication with the ring pipe (41).

4. The electric lifting device for a sludge pump of a sewage treatment station according to claim 1 is characterized in that: A plurality of auxiliary slings (311) are connected to the lower side of the main sling (31), and the auxiliary slings (311) are connected to the four corners of the surface of the hanging plate (4).

5. The electric lifting device for a sludge pump of a sewage treatment station according to claim 1 is characterized by: A main through hole (42) is provided in the middle of the surface of the hanging plate (4), and the main sling (31) passes through the hanging plate (4) through the main through hole (42) and is provided with a rope knot pressed against the bottom surface of the hanging plate (4).

6. The electric lifting device for a sludge pump of a sewage treatment station according to claim 4, characterized in that: Auxiliary through holes (43) are provided at four corners of the surface of the hanging plate (4), and the auxiliary sling (311) passes through the auxiliary through holes (43) and penetrates the hanging plate (4) and is provided with a rope knot pressed against the bottom surface of the hanging plate (4).