Socket type large-diameter steel-plastic pipe

By setting a docking ring at one end of the steel-plastic pipe body, the problem of difficulty in controlling stability when the crane is lowered is solved, the rapid alignment and efficient laying of steel-plastic pipes are achieved, and the pipeline docking speed and efficiency are improved.

CN222297147UActive Publication Date: 2025-01-03JIANGYIN HONGJIANG FORGING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420598593.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2025-01-03
Estimated Expiration
2034-03-27

AI Technical Summary

Technical Problem

The stability of the plug-in large-diameter steel-plastic pipe is difficult to control when the crane is lowered, resulting in difficult docking and laying.

Method used

A docking ring is provided at one end of the steel-plastic pipe body, and the docking rings enable the rapid alignment and fixation of the two steel-plastic pipes to ensure stable docking when the crane is lowered.

Benefits of technology

It improves the laying efficiency of steel-plastic pipes, simplifies the docking process of multiple pipelines, and ensures the accuracy and stability of docking.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222297147U_ABST
    Figure CN222297147U_ABST
Patent Text Reader

Abstract

The utility model discloses a socket type large-diameter steel-plastic pipe which comprises a steel-plastic pipe body, a butt joint ring is arranged at one end of the steel-plastic pipe body, the butt joint ring is a first arc-shaped ring, a first sealing ring is arranged at the end, close to the first arc-shaped ring, of the steel-plastic pipe body, and a second sealing ring is arranged at the end, close to the second arc-shaped ring, of the steel-plastic pipe body. A first annular groove is formed in the end, close to the first arc-shaped ring, of the steel-plastic pipe body, the first sealing ring is embedded into the first annular groove, a first inserting block is arranged at the bottom of the end, away from the first arc-shaped ring, of the steel-plastic pipe body, a first inserting groove is formed in the bottom wall of the first arc-shaped ring, and the first inserting block is inserted into the first inserting groove. Relates to the technical field of steel-plastic pipes, a butt joint ring is arranged at one end of a steel-plastic pipe body, so that the steel-plastic pipe body to be laid directly descends and is carried on the butt joint ring, rapid alignment between the two steel-plastic pipe bodies can be achieved, laying of the steel-plastic pipe bodies is rapidly achieved, and the pipe laying efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel-plastic pipes, in particular to a socket-and-spigot type large-diameter steel-plastic pipe. Background Art

[0002] The socket-and-spigot type pipe is made up of many pipe sections. One end of the pipe section is a spigot and the other end is a socket. The diameter of the socket end is partially enlarged, and its inner diameter is larger than the outer diameter of the spigot end. The installation connection is to insert the spigot of the pipe section into the socket of another pipe section. The annular gap between the two ends is filled with interface materials. The interface materials can generally be rubber rings, expansive or asbestos cement. In special cases, lead-coated steel-plastic pipes can also be used.

[0003] At present, when multiple pipelines are being butt-jointed and laid, the large-diameter socket-type steel-plastic pipe is lifted up by a crane and then slowly lowered to align with the pipelines laid in the tunnel. When the two steel-plastic pipes are in the same straight line, the lifted steel-plastic pipe needs to be moved toward the pipeline laid in the tunnel until it is tightly pressed against the pipeline. However, due to its heavy weight, the stability of the steel-plastic pipe is difficult to control when it is lowered by a crane, making it difficult to accurately align the two steel-plastic pipes, resulting in difficulty in butt-jointing and laying. Utility Model Content

[0004] In view of the problems existing in the existing socket-and-spigot type large-diameter steel-plastic pipe, the utility model is proposed.

[0005] Therefore, the purpose of the utility model is to provide a large-diameter steel-plastic pipe with a socket type, which solves the problem of the current large-diameter steel-plastic pipe with a socket type. When multiple pipes are to be butt-jointed and laid, the steel-plastic pipe is lifted up by a crane and then slowly lowered to be aligned with the pipes laid in the tunnel. When the two steel-plastic pipes are in the same straight line, the lifted steel-plastic pipe needs to be moved toward the pipes laid in the tunnel until it is tightly joined. However, due to its heavy weight, the stability of the steel-plastic pipe is difficult to control when it is lowered by a crane, so that the two steel-plastic pipes are not easy to be accurately aligned, resulting in difficulty in butt-jointing and difficulty in laying.

[0006] In order to solve the above technical problems, according to one aspect of the present invention, the present invention provides the following technical solutions:

[0007] A socket-and-spigot type large-diameter steel-plastic pipe comprises a steel-plastic pipe body, one end of which is provided with a docking ring.

[0008] As a preferred solution of the socket-and-spigot type large-diameter steel-plastic pipe described in the utility model, the docking ring is configured as a first arc ring, and a first sealing ring is provided at one end of the steel-plastic pipe body close to the first arc ring.

[0009] As a preferred solution of the socket-and-spigot type large-diameter steel-plastic pipe described in the utility model, a first annular groove is provided at one end of the steel-plastic pipe body close to the first arc ring, and the first sealing ring is embedded in the first annular groove.

[0010] As a preferred solution of the socket-type large-diameter steel-plastic pipe described in the utility model, a first plug-in block is provided at the bottom of one end of the steel-plastic pipe body away from the first arc ring, and a first plug-in groove is provided on the bottom wall of the first arc ring. When the two steel-plastic pipe bodies are connected to each other, the first plug-in block is inserted into the first plug-in groove.

[0011] As an optimal solution for the socket-type large-diameter steel-plastic pipe described in the utility model, both ends of the steel-plastic pipe body are inclined surfaces, the docking ring is set as a second arc ring, and a second sealing ring is set at one end of the steel-plastic pipe body close to the second arc ring.

[0012] As a preferred solution of the socket-and-spigot type large-diameter steel-plastic pipe described in the utility model, wherein: a second annular groove is formed at one end of the steel-plastic pipe body close to the second arc ring, and the second sealing ring is embedded in the second annular groove.

[0013] As a preferred solution of a socket-type large-diameter steel-plastic pipe described in the utility model, a second plug-in block is provided at the bottom of one end of the steel-plastic pipe body away from the second arc ring, and a second plug-in groove is provided on the bottom wall of the second arc ring. When the two steel-plastic pipe bodies are connected, the second plug-in block is inserted into the second plug-in groove.

[0014] Compared with existing technologies:

[0015] By setting a docking ring at one end of the steel-plastic pipe body, the steel-plastic pipe body to be laid can be directly lowered and placed on the docking ring, so that the two steel-plastic pipe bodies can be quickly aligned, thereby quickly laying the steel-plastic pipe body and improving the efficiency of pipeline laying. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A schematic diagram of the structure provided for Example 1 of the utility model;

[0017] Figure 2 Provided for the utility model embodiment 1 Figure 1 A top view of

[0018] Figure 3 Provided for the utility model embodiment 1 Figure 1 Right side view;

[0019] Figure 4 A schematic diagram of the structure provided for Embodiment 2 of the present utility model;

[0020] Figure 5 Provided for Example 2 of the utility model Figure 4 A top view of

[0021] Figure 6 A schematic diagram of the structure provided for Embodiment 3 of the present utility model;

[0022] Figure 7 Provided for Example 3 of the utility model Figure 6 Right side view;

[0023] Figure 8 This is a structural schematic diagram provided for Example 4 of the utility model.

[0024] In the figure: the steel-plastic pipe body 1, the first annular groove 11, the first plug-in block 12, the second annular groove 13, the second plug-in block 14, the first arc ring 2, the first plug-in groove 21, the first sealing ring 3, the second arc ring 4, the second plug-in groove 41, and the second sealing ring 5. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solutions and advantages of the present invention more clear, the implementation methods of the present invention will be further described in detail below with reference to the accompanying drawings.

[0026] Embodiment 1:

[0027] The utility model provides a socket-type large-diameter steel-plastic pipe. Figure 1-3 It includes a steel-plastic pipe body 1, one end of which is provided with a docking ring, which is smaller than the size of the semicircular ring. Therefore, when the steel-plastic pipe body 1 is docked, it can be directly docked and laid in the up and down directions, thereby increasing the pipeline docking speed and improving the pipeline laying efficiency.

[0028] The docking ring is set as a first arc ring 2, and a first sealing ring 3 is provided at one end of the steel-plastic pipe body 1 close to the first arc ring 2. Specifically, a first annular groove 11 is opened at one end of the steel-plastic pipe body 1 close to the first arc ring 2, and the first sealing ring 3 is embedded in the first annular groove 11; therefore, when the crane lifts up the steel-plastic pipe body 1 to be laid, the steel-plastic pipe body 1 is lowered, as long as the end of the steel-plastic pipe body 1 away from the first arc ring 2 is placed on the first arc ring 2 of the steel-plastic pipe body 1 in the tunnel, the docking can be quickly completed.

[0029] During specific use, after the crane lifts up the steel-plastic pipe body 1 to be laid, it lowers the steel-plastic pipe body 1 so that the end of the steel-plastic pipe body 1 away from the first arc ring 2 is placed on the first arc ring 2 of the steel-plastic pipe body 1 in the tunnel, and the lowered steel-plastic pipe body 1 is driven to press against the steel-plastic pipe body 1 in the tunnel, thereby quickly completing the docking, thereby quickly realizing the laying of the steel-plastic pipe body and improving the efficiency of pipeline laying.

[0030] Embodiment 2:

[0031] See attached Figure 4-5 , which is different from Example 1: a first plug-in block 12 is provided at the bottom of the end of the steel-plastic pipe body 1 away from the first arc ring 2, and a first plug-in groove 21 is provided on the bottom wall of the first arc ring 2. When the two steel-plastic pipe bodies 1 are docked, the first plug-in block 12 is inserted into the first plug-in groove 21, which can effectively ensure that the steel-plastic pipe bodies 1 are tightly docked.

[0032] During specific use, after the crane lifts up the steel-plastic pipe body 1 to be laid, the steel-plastic pipe body 1 is lowered so that the end of the steel-plastic pipe body 1 away from the first arc ring 2 is placed on the first arc ring 2 of the steel-plastic pipe body 1 in the tunnel, and the first plug-in block 12 at the bottom of the lowered steel-plastic pipe body 1 is inserted into the first plug-in groove 21 on the steel-plastic pipe body 1 in the tunnel, so as to quickly complete the docking, thereby quickly realizing the laying of the steel-plastic pipe body and improving the efficiency of pipeline laying.

[0033] Embodiment 3:

[0034] See attached Figure 6-7 , which is different from Example 1: both ends of the steel-plastic pipe body 1 are inclined surfaces, the docking ring is set as a second arc ring 4, and a second sealing ring 5 is provided at the end of the steel-plastic pipe body 1 close to the second arc ring 4. Specifically, a second annular groove 13 is opened at the end of the steel-plastic pipe body 1 close to the second arc ring 4, and the second sealing ring 5 is embedded in the second annular groove 13; at this time, when the crane releases and lowers the steel-plastic pipe body 1 to be laid, the end of the released steel-plastic pipe body 1 away from the second arc ring 4 is pressed on the end of the steel-plastic pipe body 1 laid in the tunnel close to the second arc ring 4, and one end of the two second arc rings 4 is pressed together, and the second sealing ring 5 is compressed.

[0035] During actual use, the crane releases and lowers the steel-plastic pipe body 1 to be laid, and the end of the released steel-plastic pipe body 1 away from the second arc ring 4 is pressed on the end of the steel-plastic pipe body 1 laid in the tunnel close to the second arc ring 4, and one end of the two second arc rings 4 are pressed together, and the second sealing ring 5 is tightened.

[0036] Embodiment 4:

[0037] See attached Figure 8 , which is different from Example 1: a second plug-in block 14 is provided at the bottom of the end of the steel-plastic pipe body 1 away from the second arc ring 4, and a second plug-in groove 41 is opened on the bottom wall of the second arc ring 4. When the two steel-plastic pipe bodies 1 are docked, the second plug-in block 14 is inserted into the second plug-in groove 41.

[0038] During specific use, the crane releases and lowers the steel-plastic pipe body 1 to be laid, and the end of the released steel-plastic pipe body 1 away from the second arc ring 4 is pressed on the end of the steel-plastic pipe body 1 laid in the tunnel close to the second arc ring 4, and one end of the two second arc rings 4 is pressed together, and the second sealing ring 5 is tightened, and at the same time, the second plug-in block 14 on the lower steel-plastic pipe body 1 is inserted into the second plug-in groove 41 of the steel-plastic pipe body 1 in the tunnel, thereby ensuring that the two steel-plastic pipe bodies 1 will not rotate relative to each other, thereby improving the docking stability of the steel-plastic pipe body 1, thereby quickly realizing the laying of the steel-plastic pipe body and improving the efficiency of pipeline laying.

[0039] Although the present invention has been described above with reference to the embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the various features in the embodiments disclosed in the present invention may be used in combination with each other in any manner, and the fact that these combinations are not exhaustively described in this specification is only for the sake of omitting space and saving resources. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

Claims

1. A socket-and-spigot type large-diameter steel-plastic pipe, comprising a steel-plastic pipe body (1), characterized in that: One end of the steel-plastic pipe body (1) is provided with a docking ring; The docking ring is configured as a first arc-shaped ring (2), and a first sealing ring (3) is provided at one end of the steel-plastic pipe body (1) close to the first arc-shaped ring (2); A first annular groove (11) is formed on one end of the steel-plastic pipe body (1) close to the first arc-shaped ring (2), and the first sealing ring (3) is embedded in the first annular groove (11); A first plug-in block (12) is provided at the bottom of one end of the steel-plastic pipe body (1) away from the first arc-shaped ring (2), and a first plug-in groove (21) is provided on the bottom wall of the first arc-shaped ring (2). When the two steel-plastic pipe bodies (1) are butt-jointed, the first plug-in block (12) is inserted into the first plug-in groove (21).

2. A socket-and-spigot type large-diameter steel-plastic pipe according to claim 1, characterized in that: Both ends of the steel-plastic pipe body (1) are inclined surfaces, the docking ring is configured as a second arc ring (4), and a second sealing ring (5) is provided at one end of the steel-plastic pipe body (1) close to the second arc ring (4).

3. A socket-and-spigot type large-diameter steel-plastic pipe according to claim 2, characterized in that: A second annular groove (13) is formed at one end of the steel-plastic pipe body (1) close to the second arc-shaped ring (4), and the second sealing ring (5) is embedded in the second annular groove (13).

4. The socket-and-spigot type large-diameter steel-plastic pipe according to claim 3, characterized in that: A second plug-in block (14) is provided at the bottom of one end of the steel-plastic pipe body (1) away from the second arc-shaped ring (4), and a second plug-in groove (41) is provided on the bottom wall of the second arc-shaped ring (4). When the two steel-plastic pipe bodies (1) are butt-jointed, the second plug-in block (14) is inserted into the second plug-in groove (41).