Water level early warning device for water conservancy project construction survey
By designing a balance adjustment mechanism in the water level monitoring and early warning device, the adjustment and balance of the support rod length is solved, and the existing devices are not subjected to uneven force and insufficient stability are ensured that the radar level gauge is always above the river surface and is suitable for different installations Location.
Patent Information
- Application Number
- CN202420097649.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-16
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2034-01-16
AI Technical Summary
The existing water level monitoring and early warning devices are unevenly subjected to stress, not stable enough, and the length of the support rod is fixed, so they cannot be suitable for different installation positions, resulting in the radar water level gauge not always being maintained above the river surface.
A water level early warning device including a fixed rod and a balance adjustment mechanism is designed. The balance adjustment mechanism consists of a support rod, a rack, a fixed block, a control box, a locking assembly, a slide groove, a slide block, a slot, a slot, a threaded tube. , limiting groove, first threaded hole, locking bolt, and large threaded hole are composed of. Through the cooperation of these components, the adjustment and balance of the length of the support rod is achieved to ensure the stability and adaptability of the device.
By adjusting the length of the support rod, ensuring that the radar level gauge is always above the river surface, enhancing the stability and adaptability of the device, suitable for different installation positions, and avoiding the problem of loose bolts at the bottom of the fixing rod.
Smart Images

Figure CN222297375U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of water level early warning devices, in particular to a water level early warning device used for construction survey of water conservancy projects. Background Art
[0002] Water conservancy projects are projects built to control and allocate natural surface water and groundwater in order to achieve the purpose of eliminating harm and promoting benefits. Only by building water conservancy projects can we control water flows, prevent floods and waterlogging disasters, and regulate and allocate water to meet the people's needs for water resources for life and production.
[0003] In water conservancy projects, water level monitoring devices are used to monitor the water level inside the river to prevent natural disasters caused by rising water levels. Therefore, water level monitoring and early warning devices are used. Existing early warning devices monitor the water level through a radar water level gauge above the water surface. The radar water level gauge is generally installed at one end of a support rod, and the other end of the support rod is fixed on a fixed rod. This causes a large tensile force on one side of the fixed rod, and the fixing bolts at the bottom of the fixed rod are prone to loosening. In addition, the existing support rod is fixed in length and can only be installed in a fixed position. In order to make the early warning device more stable and applicable to different installation positions, the radar water level gauge is always ensured to be above the river surface. A water level early warning device for construction survey of water conservancy projects is now provided. Utility Model Content
[0004] The utility model aims to provide a water level early warning device for water conservancy project construction survey in order to solve the problem that the existing water level monitoring and early warning device is unevenly stressed and unstable.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a water level warning device for water conservancy project construction survey, comprising a fixed rod, a through hole is opened on the outer wall of the fixed rod, and a balance adjustment mechanism is arranged on the fixed rod, and the balance adjustment mechanism is used to balance the horizontality of the support rod and adjust the length of the support rod;
[0006] The balance adjustment mechanism includes a support rod, a rack, a fixed block, a control box, a locking assembly, a slide groove, a slider, a slot, a tooth groove, a threaded tube, a limit groove, a first threaded hole, a locking bolt, and a large threaded hole;
[0007] The fixing block is slidably connected to the outer wall of the fixing rod, the large threaded hole is opened at the lower part of one end of the fixing block, and the large threaded hole penetrates to the other end of the fixing block, the threaded pipe is threadedly connected to the large threaded hole, and the threaded pipe penetrates the through hole on the outer wall of the fixing rod;
[0008] The slide groove and the slider are provided with two, the two slide grooves are symmetrically opened on both sides of one end of the top of the fixed block, the two sliders are slidably connected to the two slide grooves respectively, one end of the control box is fixedly connected to one end of the two sliders, the card slot is opened at the center of the bottom end of the control box, and the tooth grooves are opened on the inner walls of both sides of the card slot;
[0009] There are two first threaded holes, which are opened at the top of both sides of the fixing block and one end close to the control box, the locking assembly is arranged on the top of the fixing block, and the locking bolt is threadedly connected to the locking assembly and the first threaded hole;
[0010] The limiting grooves and the racks are provided with two, the two limiting grooves are symmetrically opened on the inner wall of the threaded tube, the support rod is slidably connected to the inner wall of the threaded tube, and the support rod is engaged in the slots, the two racks are symmetrically fixedly connected to the outer wall of the support rod, and the racks are slidably connected to the limiting grooves and meshed with the tooth grooves.
[0011] As a further solution of the utility model: the locking assembly includes an n-shaped fixing frame, a clamping block, and a second threaded hole;
[0012] The n-type fixing frame is clamped on the top of the fixing block, and two of the clamping blocks and the second threaded holes are provided. The two clamping blocks are fixedly connected to the bottom of the n-type fixing frame, and the two clamping blocks are respectively clamped in the two slide grooves. The two second threaded holes are respectively opened on both sides of the n-type fixing frame, and the locking bolts are threadedly connected to the second threaded holes.
[0013] As a further solution of the utility model: a camera and a solar panel are fixed to the outer wall of the fixing rod by bolts, a radar water level meter is installed at one end of the support rod away from the fixing rod, and a battery power supply assembly is arranged inside the control box.
[0014] As a further solution of the utility model: the height of the sliding block is smaller than the height of the sliding groove, and when the threaded tube is fully tightened, the two limiting grooves are in a horizontal state.
[0015] As a further solution of the utility model: the diameter of the through hole on the outer wall of the fixing rod is consistent with the outer diameter of the threaded tube, and the inner diameter of the threaded tube is consistent with the diameter of the support rod.
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] By arranging a support rod, a rack, a fixed block, a control box, a locking assembly, a slide groove, a slider, a slot, a tooth groove, a threaded tube, a limit groove, a first threaded hole, a locking bolt, and a large threaded hole, the extension length of the support rod can be determined according to the horizontal distance between the installation position and the river surface. The control box can be slid upward to separate the tooth groove from the rack, and the support rod can slide back and forth to adjust the extension length of the support rod. At the same time, the slot of the control box is engaged with the other end of the support rod to balance the pulling force of the extended end of the support rod on the fixed rod, making the entire device more stable and more adaptable. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the structure of the utility model;
[0019] Figure 2 This is a schematic diagram of the bottom structure of the control box of the utility model;
[0020] Figure 3 This is an exploded view of the control box and the threaded pipe of the utility model;
[0021] Figure 4 This is a schematic diagram of the locking assembly structure of the utility model;
[0022] Figure 5 This is a schematic diagram of the fixing rod structure of the utility model.
[0023] In the figure: 1. fixing rod; 2. supporting rod; 3. rack; 4. fixing block; 5. control box; 6. locking assembly; 7. slide groove; 8. slider; 9. clamping groove; 10. tooth groove; 11. threaded tube; 12. limiting groove; 13. first threaded hole; 14. locking bolt; 15. large threaded hole; 16. radar water level gauge; 601. n-type fixing bracket; 602. clamping block; 603. second threaded hole. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] See also Figures 1 to 5In an embodiment of the utility model, a water level warning device for water conservancy project construction survey includes a fixing rod 1, a through hole is opened on the outer wall of the fixing rod 1, and a balance adjustment mechanism is provided on the fixing rod 1, and the balance adjustment mechanism is used to balance the horizontality of the support rod 2 and adjust the length of the support rod 2; the balance adjustment mechanism includes a support rod 2, a rack 3, a fixing block 4, a control box 5, a locking assembly 6, a slide groove 7, a slider 8, a card groove 9, a tooth groove 10, a threaded tube 11, a limit groove 12, a first threaded hole 13, a locking bolt 14, and a large threaded hole 15; the fixing block 4 is slidably connected to the outer wall of the fixing rod 1, and the large threaded hole 15 is opened on the fixing block 4, and the large threaded hole 15 penetrates to the other end of the fixed block 4, the threaded tube 11 is threadedly connected to the large threaded hole 15, and the threaded tube 11 penetrates the through hole on the outer wall of the fixed rod 1; there are two slide grooves 7 and sliders 8, the two slide grooves 7 are symmetrically opened on both sides of one end of the top of the fixed block 4, the two sliders 8 are slidably connected to the two slide grooves 7, one end of the control box 5 is fixedly connected to one end of the two sliders 8, the slot 9 is opened at the center of the bottom end of the control box 5, and the tooth groove 10 is opened on the inner walls of both sides of the slot 9; there are two first threaded holes 13, the two first threaded holes 13 are opened on the top of both sides of the fixed block 4 near the control box 5 The locking assembly 6 is arranged at the top of the fixing block 4, and the locking bolt 14 is threadedly connected to the locking assembly 6 and the first threaded hole 13; there are two limit grooves 12 and racks 3, and the two limit grooves 12 are symmetrically opened on the inner wall of the threaded tube 11, the support rod 2 is slidably connected to the inner wall of the threaded tube 11, and the support rod 2 is engaged with the slot 9, and the two racks 3 are symmetrically fixedly connected to the outer wall of the support rod 2, and the rack 3 is slidably connected to the limit groove 12 and meshed with the tooth groove 10; the locking assembly 6 includes an n-type fixing frame 601, a block 602, and a second threaded hole 603; the n-type fixing frame 601 is engaged with the top of the fixing block 4, the block 602, the first There are two second threaded holes 603, two clamping blocks 602 are fixedly connected to the bottom of the n-type fixing frame 601, and the two clamping blocks 602 are respectively engaged with the two slide grooves 7, and the two second threaded holes 603 are respectively opened on both sides of the n-type fixing frame 601, and the locking bolts 14 are threadedly connected to the second threaded holes 603; the outer wall of the fixing rod 1 is fixed with a camera and a solar panel by bolts, and a radar water level gauge 16 is installed at the end of the support rod 2 away from the fixing rod 1, and a battery power supply assembly is arranged inside the control box 5; the diameter of the through hole on the outer wall of the fixing rod 1 is consistent with the outer diameter of the threaded tube 11, and the inner diameter of the threaded tube 11 is consistent with the diameter of the support rod 2.
[0026] In this embodiment: when assembling the early warning device, first sleeve the fixing block 4 on the fixing rod 1, slide the fixing block 4, align the large threaded hole 15 with the through hole on the outer wall of the fixing rod 1, screw the threaded tube 11 into the large threaded hole 15, and the threaded tube 11 will penetrate the through hole on the outer wall of the fixing rod 1. When the threaded tube 11 is fully tightened, the two limit grooves 12 are in a horizontal state, and the fixing block 4 is fixed at this time. Then, insert the support rod 2 into the threaded tube 11, so that the support rod 2 penetrates the threaded tube 11, the fixing block 4, and the fixing rod 1, and then pick up the control box 5, align the slider 8 on the back of the control box 5 with the slide groove 7 on the fixing block 4 and slide it in, until the control box 5 can no longer slide down, the slot 9 will be engaged with the support rod 2, and the tooth groove 10 will mesh with the rack 3 on the outer wall of the support rod 2, thereby fixing the support rod 2;
[0027] Then place the locking assembly 6 on the top of the fixed block 4, so that the two blocks 602 are engaged with the two slide grooves 7, the second threaded hole 603 is aligned with the first threaded hole 13, and then screw the locking bolt 14 into the second threaded hole 603 and align it with the first threaded hole 13, so as to fix the locking assembly 6, so that the control box 5 will not separate from the fixed block 4 along the slide groove 7, and then install the camera, solar panel, radar water level meter 16, power supply assembly, circuit, etc. in place to realize the installation of the early warning device.
[0028] Please refer to Figures 2-3 , the height of the slider 8 is smaller than the height of the slide groove 7, and when the threaded tube 11 is fully tightened, the two limit grooves 12 are in a horizontal state.
[0029] In this embodiment: when it is necessary to adjust the extension length of the support rod 2, the control box 5 is pulled upwards. Since the height of the slider 8 is less than the height of the slide groove 7, the slider 8 will slide in the slide groove 7. At this time, the slot 9 will be separated from the support rod 2, and the tooth groove 10 will be separated from the rack 3, thereby releasing the fixation of the support rod 2. The extension length of the support rod 2 can be adjusted according to the horizontal distance between the installation position and the river surface, so that the radar water level meter 16 is always located above the river surface. After the length is determined, the control box 5 is moved downwards so that the slot 9 is re-engaged with the support rod 2, and the tooth groove 10 is engaged with the rack 3. At this time, one end of the support rod 2 bears the gravity of the control box 5, thereby balancing the pulling force of the extended end of the support rod 2 on the fixed rod 1.
[0030] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A water level warning device for water conservancy project construction survey, comprising a fixing rod (1), wherein a through hole is provided on the outer wall of the fixing rod (1), characterized in that: The fixing rod (1) is provided with a balancing adjustment mechanism, and the balancing adjustment mechanism is used to balance the horizontality of the support rod (2) and adjust the length of the support rod (2); The balance adjustment mechanism comprises a support rod (2), a rack (3), a fixing block (4), a control box (5), a locking assembly (6), a slide groove (7), a slider (8), a clamping groove (9), a tooth groove (10), a threaded tube (11), a limiting groove (12), a first threaded hole (13), a locking bolt (14), and a large threaded hole (15); The fixing block (4) is slidably connected to the outer wall of the fixing rod (1); the large threaded hole (15) is opened at the lower part of one end of the fixing block (4), and the large threaded hole (15) penetrates to the other end of the fixing block (4); the threaded tube (11) is threadedly connected to the large threaded hole (15), and the threaded tube (11) penetrates the through hole on the outer wall of the fixing rod (1); The slide groove (7) and the slider (8) are provided with two, the two slide grooves (7) are symmetrically opened on both sides of one end of the top of the fixed block (4), the two sliders (8) are slidably connected to the two slide grooves (7), one end of the control box (5) is fixedly connected to one end of the two sliders (8), the slot (9) is opened at the center of the bottom end of the control box (5), and the tooth groove (10) is opened on the inner walls of both sides of the slot (9); Two first threaded holes (13) are provided, and the two first threaded holes (13) are opened at the top of both sides of the fixing block (4) and one end close to the control box (5); the locking assembly (6) is provided at the top of the fixing block (4), and the locking bolt (14) is threadedly connected to the locking assembly (6) and the first threaded hole (13); The limiting groove (12) and the rack (3) are provided with two, the two limiting grooves (12) are symmetrically opened on the inner wall of the threaded tube (11), the support rod (2) is slidably connected to the inner wall of the threaded tube (11), and the support rod (2) is engaged in the clamping groove (9), the two racks (3) are symmetrically fixedly connected to the outer wall of the support rod (2), and the rack (3) is slidably connected to the limiting groove (12) and engaged with the tooth groove (10).
2. A water level early warning device for water conservancy project construction survey according to claim 1, characterized in that: The locking assembly (6) comprises an N-shaped fixing frame (601), a clamping block (602), and a second threaded hole (603); The N-type fixing frame (601) is engaged with the top of the fixing block (4), and two of the blocks (602) and the second threaded holes (603) are provided. The two blocks (602) are fixedly connected to the bottom of the N-type fixing frame (601), and the two blocks (602) are respectively engaged with the two slide grooves (7), and the two second threaded holes (603) are respectively opened on both sides of the N-type fixing frame (601), and the locking bolts (14) are threadedly connected to the second threaded holes (603).
3. A water level early warning device for water conservancy project construction survey according to claim 1, characterized in that: The outer wall of the fixing rod (1) is fixed with a camera and a solar panel by means of bolts, a radar water level meter (16) is installed at one end of the support rod (2) away from the fixing rod (1), and a battery power supply assembly is arranged inside the control box (5).
4. A water level early warning device for water conservancy project construction survey according to claim 1, characterized in that: The height of the sliding block (8) is smaller than the height of the sliding groove (7), and when the threaded tube (11) is completely tightened, the two limiting grooves (12) are in a horizontal state.
5. The water level early warning device for water conservancy project construction survey according to claim 1 is characterized in that: The diameter of the through hole on the outer wall of the fixing rod (1) is consistent with the outer diameter of the threaded tube (11), and the inner diameter of the threaded tube (11) is consistent with the diameter of the supporting rod (2).