Bearing structure, photovoltaic support and photovoltaic power station
By forming a bus chamber and setting up a bus hole in the main beam of the photovoltaic bracket, combined with the design of the water collecting tank, the water leakage problem caused by the multi-layer sink structure is solved, a more stable and reliable drainage effect is achieved, and the assembly process is simplified.
Patent Information
- Application Number
- CN202323461275.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2033-12-18
AI Technical Summary
The existing photovoltaic bracket adopts a multi-layer sink structure, resulting in excessive confluence of water flow, which is prone to water leakage, affects the stability and reliability of flow diversion, and the assembly process is cumbersome, reducing convenience.
The main beam inner cavity is used to form a bus chamber, and a bus hole is provided on the surface. The first and second water collection tanks are connected to the bus hole through the flow hole to form a closed bus passage to avoid water splashing, simplify the water tank structure, and improve assembly. Convenience.
It effectively avoids water overflow, improves the drainage stability and reliability of the photovoltaic bracket, simplifies the assembly process, and enhances the practicality of the load-bearing structure.
Smart Images

Figure CN222301669U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of photovoltaic equipment, in particular to a bearing structure, a photovoltaic bracket and a photovoltaic power station. Background Art
[0002] In the related art, photovoltaic brackets usually need to be equipped with corresponding gutter structures in the gaps between adjacent photovoltaic modules, so that rainwater or clean water falling on the photovoltaic modules can flow from the edges of the photovoltaic modules into the gutter structures for diversion, collection and discharge, thereby preventing water droplets from falling under the photovoltaic modules and causing the environment of the photovoltaic power station to become damp and moldy, thereby ensuring the stable operation of the photovoltaic power station.
[0003] However, most existing photovoltaic brackets adopt a multi-layer water tank structure design, using the upper water tank to collect water falling from the longitudinal gap and the transverse gap of the photovoltaic module respectively, and then the water collected by the upper water tank is collected in the lower water tank for centralized discharge.
[0004] However, when the upper water tank is used to converge to the lower water tank, the water volume is too large, so that part of the water flow splashes out of the lower water tank, causing leakage at the bottom of the photovoltaic bracket, affecting the diversion stability and reliability of the photovoltaic bracket. In addition, the overall assembly process of the multi-layer water tank structure is relatively cumbersome, which reduces the convenience of assembling the photovoltaic bracket. Utility Model Content
[0005] The main purpose of the utility model is to provide a bearing structure, a photovoltaic bracket and a photovoltaic power station, aiming to utilize the inner cavity of the main beam for flow convergence and diversion, avoid water leakage of the photovoltaic bracket during the diversion process, and improve the structural stability and reliability of the bearing structure.
[0006] To achieve the above-mentioned purpose, the bearing structure proposed in the utility model includes a main beam and a water tank frame, the main beam is used to connect the support frame, a confluence cavity is formed in the main beam, and the surface of the main beam is provided with a confluence hole connected to the confluence cavity; the water tank frame is connected to the main beam, and the surface of the water tank frame facing away from the main beam forms a first water collecting trough and a second water collecting trough, the extension direction of the first water collecting trough is set at an angle to the extension direction of the second water collecting trough, the first water collecting trough is connected to the second water collecting trough, and the bottom wall of the first water collecting trough is provided with a flow hole, and the flow hole is connected to the confluence hole correspondingly.
[0007] Optionally, the bottom wall of the first water collecting trough is provided with a guide edge around the flow hole, and the guide edge is bent toward the main beam and inserted into the confluence hole.
[0008] Optionally, the water trough frame includes at least two first trough body beams and a second trough body beam, at least two of the first trough body beams are arranged at intervals along the extension direction of the main beam and connected to the main beam, and the first water collecting trough is formed on the surface of the first trough body beam facing away from the main beam; the second trough body beam is arranged between two adjacent first trough body beams, and the second water collecting trough is formed on the surface of the second trough body beam, and the two ends of the second trough body beam are respectively overlapped on the slot edges of the two first water collecting troughs.
[0009] Optionally, both ends of the second trough beam are respectively provided with guide inclined plates, and the guide inclined plates are arranged in the first water collecting trough and bent toward the bottom wall of the first water collecting trough.
[0010] Optionally, the main beam is provided with a fixing clamp, which is connected to the surface of the main beam and clamps and fixes the first trough beam.
[0011] Optionally, the bearing structure also includes a secondary beam, which is connected to the main beam and arranged between two adjacent first trough beams. The extension direction of the secondary beam is set at an angle to the extension direction of the main beam, and the second trough beam is connected to the secondary beam.
[0012] Optionally, the bearing structure further includes a mounting member, which is connected to the first trough beam and the secondary beam and is used to mount and fix the photovoltaic assembly.
[0013] Optionally, the bearing structure further comprises a drainage beam, which is connected to the main beam and arranged near one end of the main beam. A drainage groove is arranged on the surface of the drainage beam, and a drainage hole connected to the confluence cavity is arranged on the end surface of the main beam, and the drainage hole is arranged above the notch of the drainage groove.
[0014] Optionally, the drainage trough has a first inner side wall and a second inner side wall opposite to each other, the drainage hole is located between the first inner side wall and the second inner side wall, and the second inner side wall is arranged close to the surface of the main beam facing away from the water tank frame. The drainage beam is defined to have a height direction, and the width of the first inner side wall along the height direction is greater than the width of the second inner side wall along the height direction.
[0015] The utility model also proposes a photovoltaic bracket, which includes a supporting frame and a bearing structure. The bearing structure is the bearing structure described above. The supporting frame is connected to and fixed to the bearing structure, and the bearing structure is used to bear and fix photovoltaic components.
[0016] The utility model also provides a photovoltaic power station, which includes a photovoltaic component and a photovoltaic bracket. The photovoltaic bracket is the photovoltaic bracket mentioned above, and the photovoltaic component is installed on the photovoltaic bracket.
[0017] By utilizing the hollow structure of the main beam to form a confluence cavity, the bearing structure can form a closed confluence channel, and then after the trough structure utilizes the first water collecting trough and the second water collecting trough to collect the accumulated water on the photovoltaic module, the flow holes on the bottom wall of the first water collecting trough can be used to converge the water into the confluence cavity of the main beam for centralized discharge, thereby effectively avoiding water splashing when the bearing structure converges the water flow, and preventing water from overflowing to the bottom of the photovoltaic bracket when the photovoltaic bracket is draining, so that the photovoltaic bracket can achieve a more stable and reliable drainage effect, further improving the practicality and reliability of the bearing structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0019] Figure 1 This is a structural schematic diagram of an embodiment of the utility model after the photovoltaic bracket and the photovoltaic module are assembled;
[0020] Figure 2 for Figure 1 A partial enlarged view of the middle A;
[0021] Figure 3 It is a partial structural schematic diagram of an embodiment of the load-bearing structure of the utility model;
[0022] Figure 4 for Figure 3 A partial enlarged view of point B in the middle;
[0023] Figure 5 for Figure 3 A partial enlarged view of point C in the middle;
[0024] Figure 6 for Figure 3 The cross-sectional view of the load-bearing structure at the main beam;
[0025] Figure 7 for Figure 6 A partial enlarged view of point D in the middle;
[0026] Figure 8 for Figure 6 A partial enlarged view of point E in the middle;
[0027] Fig. 9 for Figure 3 A schematic diagram of a partial structure of an embodiment of a first trough beam of a bearing structure;
[0028] Fig.10 for Figure 3 A schematic diagram of the partial structure of an embodiment of a main beam of a load-bearing structure.
[0029] Description of Figure Numbers:
[0030]
[0031]
[0032] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0034] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back...) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0035] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0036] In addition, in the present utility model, descriptions such as "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text is to include three parallel solutions. Taking "A and / or B as an example", it includes solution A, or solution B, or solutions that satisfy both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present utility model.
[0037] Most existing photovoltaic brackets adopt a multi-layer water tank structure design, using the upper water tank to collect the water falling from the longitudinal gap and the transverse gap of the photovoltaic module, and then the water collected by the upper water tank is collected in the lower water tank for centralized discharge. However, when the upper water tank converges to the lower water tank with a multi-layer water tank structure, it is easy for part of the water flow to splash out of the lower water tank due to excessive convergence water volume, causing leakage at the bottom of the photovoltaic bracket, affecting the diversion stability and reliability of the photovoltaic bracket. In addition, the overall assembly process of the multi-layer water tank structure is relatively cumbersome, which reduces the convenience of assembling the photovoltaic bracket. In view of the above problems, the utility model proposes a bearing structure 100.
[0038] Reference Figures 1 to 10 In an embodiment of the utility model, the bearing structure 100 includes a main beam 10 and a water tank frame 30. The main beam 10 is used to connect the support frame 200. A confluence cavity 11 is formed in the main beam 10. The surface of the main beam 10 is provided with a confluence hole 13 connected to the confluence cavity 11; the water tank frame 30 is connected to the main beam 10, and a first water collecting trough 311 and a second water collecting trough 331 are formed on the surface of the water tank frame 30 facing away from the main beam 10. The extension direction of the first water collecting trough 311 is set at an angle to the extension direction of the second water collecting trough 331. The first water collecting trough 311 is connected to the second water collecting trough 331. The bottom wall of the first water collecting trough 311 is provided with a flow hole 313, and the flow hole 313 is connected to the confluence hole 13 accordingly.
[0039] It is understandable that in a photovoltaic power station, photovoltaic modules 2000 are mostly installed in an array on a photovoltaic support 1000, and there is usually a certain gap between two photovoltaic modules 2000 adjacent to each other longitudinally and between two photovoltaic modules 2000 adjacent to each other laterally, so that the photovoltaic modules 2000 can be separated from each other to reduce interference. Photovoltaic power stations can usually be set up in environments with large open areas such as building roofs or mountain plains, so that the photovoltaic power station can better receive and convert light energy and improve the light energy utilization rate of the photovoltaic power station. At this time, when the photovoltaic power station encounters thunderstorms or uses a cleaning device to spray water on the photovoltaic components 2000 for cleaning, the water falling on the photovoltaic components 2000 can flow out from the gap between two adjacent photovoltaic components 2000 along the edges of the photovoltaic components 2000, and the photovoltaic bracket 1000 can be provided with water troughs corresponding to the gap between two longitudinally adjacent photovoltaic components 2000 and the gap between two laterally adjacent photovoltaic components 2000 below the photovoltaic components 2000, so that water flowing through the gap between the photovoltaic components 2000 can flow into the water trough, preventing water from dripping from the gap between the photovoltaic components 2000 into the installation position of the photovoltaic bracket 1000, so that the environment at the bottom of the photovoltaic bracket 1000 can be kept dry, and the dark environment at the bottom of the photovoltaic bracket 1000 is prevented from being damp and breeding mold due to water accumulation, which is conducive to better utilization of the space occupied by the photovoltaic power station to place other photovoltaic equipment or sundries. Since multiple photovoltaic modules 2000 are arranged in an array on the photovoltaic support 1000, corresponding water troughs need to be set in the gap between each two adjacent photovoltaic modules 2000. At this time, the water collected by multiple water troughs on the photovoltaic support 1000 can be converged to one place for centralized discharge to ensure the stable operation of the photovoltaic power station.
[0040] In the present application, the photovoltaic support 1000 can use the support frame 200 to support the bearing structure 100, so that the bearing structure 100 can stably support the photovoltaic assembly 2000. The support frame 200 can be a support column or a triangular support, etc. By using a rectangular steel material to set the main beam 10 connected to the support frame 200 in the bearing structure 100, the hollow structure of the rectangular steel material can be used to form a confluence cavity 11 with a certain degree of airtightness inside the main beam 10. By setting a confluence hole 13 connected to the confluence cavity 11 on the surface of the main beam 10 facing away from the support frame 200, when the water tank frame 30 is connected and installed on the main beam 10, the flow hole 313 of the bottom wall of the first water collecting tank 311 is set corresponding to the position of the confluence hole 13, so that the flow hole 313 and the confluence hole 13 can overlap and connect, so as to realize the connection between the first water collecting tank 311 and the confluence cavity 11. A second water collecting trough 331 is also formed on the water trough frame 30. By making the extension direction of the first water collecting trough 311 and the extension direction of the second water collecting trough 331 form an angle, and connecting the first water collecting trough 311 with the second water collecting trough 331, the water trough frame 30 can form a criss-crossing water trough drainage system using the first water collecting trough 311 and the second water collecting trough 331, and by connecting the first water collecting trough 311 with the confluence cavity 11 through the flow hole 313 and the confluence hole 13, the main beam 10 can form a confluence drainage structure of the water trough structure, reducing the confluence water trough setting of the water trough structure, effectively simplifying the overall structure of the water trough frame 30, and facilitating better assembly of the photovoltaic bracket 1000. Furthermore, when the photovoltaic module 2000 is installed on the bearing structure 100, the photovoltaic module 2000 can be set above the water tank frame 30, and the two adjacent sides of the frame of the photovoltaic module 2000 are placed corresponding to the first water collecting tank 311 and the second water collecting tank 331, so that the first water collecting tank 311 and the second water collecting tank 331 can be respectively located at the horizontal gap and the longitudinal gap between multiple photovoltaic modules 2000. When rain or clean water falls on the photovoltaic module 2000, the water can flow into the first water collecting tank 311 and the second water collecting tank 331 along the edge of the frame of the photovoltaic module 2000, and the water in the second water collecting tank 331 flows into the first water collecting tank 311, so that the water flows in the first water collecting tank 311 through the flow hole 313 and the confluence hole 13 into the confluence cavity 11 of the main beam 10 for centralized discharge, thereby realizing the drainage function of the photovoltaic bracket 1000.
[0041] By utilizing the hollow structure of the main beam 10 to form a confluence cavity 11, the bearing structure 100 can form a closed confluence channel, and then after the trough structure utilizes the first water collecting trough 311 and the second water collecting trough 331 to collect the accumulated water on the photovoltaic module 2000, the flow holes 313 on the bottom wall of the first water collecting trough 311 can be utilized to converge the water flow into the confluence cavity 11 of the main beam 10 for centralized discharge, thereby effectively avoiding water splashing when the bearing structure 100 converges the water flow, and preventing the water flow from overflowing to the bottom of the photovoltaic bracket 1000 when the photovoltaic bracket 1000 is drained, so that the photovoltaic bracket 1000 can achieve a more stable and reliable drainage effect, further improving the practicality and reliability of the bearing structure 100.
[0042] Among them, the bearing structure 100 can use a fastening structure with a longer length to connect the main beam 10 and the photovoltaic module 2000; or the structural strength of the water tank frame 30 can be increased, so that the fastening structure is set on the water tank frame 30 to connect and fix the photovoltaic module 2000, so as to realize the stable bearing installation of the photovoltaic module 2000 by the bearing structure 100. The water tank structure can make the first water collecting tank 311 extend horizontally and the second water collecting tank 331 extend horizontally and longitudinally, and then when the photovoltaic bracket 1000 uses the tilting setting of the bearing structure 100 to adjust the installation angle of the photovoltaic module 2000, the second water collecting tank 331 can be tilted with the bearing structure 100, so that the water flow in the second water collecting tank 331 can flow better into the first water collecting tank 311 under the action of gravity, which is conducive to better guaranteeing the confluence and discharge of water flow. Similarly, the main beam 10 can also be extended along the horizontal longitudinal direction, so that the water flowing through the first water collecting trough 311 and converging into the confluence cavity 11 of the main beam 10 can better flow to the side of the supporting frame body close to the installation plane of the photovoltaic bracket 1000 under the action of gravity, which is beneficial to improve the drainage efficiency of the photovoltaic bracket 1000, reduce the water blockage on the supporting structure 100, and further improve the structural stability and reliability of the photovoltaic bracket 1000.
[0043] Reference Figure 6 , Figure 7 and Fig. 9 In one embodiment of the utility model, the bottom wall of the first water collecting trough 311 is provided with a guide edge 315 around the flow hole 313, and the guide edge 315 is bent toward the main beam 10 and inserted into the confluence hole 13.
[0044] In this embodiment, the water tank frame 30 can use stamping technology to form a guide edge 315 at the position of the bottom wall of the first water collecting tank 311 corresponding to the flow hole 313, or a circular ring can be welded at the edge of the flow hole 313 to form a guide edge 315, so that the first water collecting tank 311 can be formed into a funnel structure by using the guide edge 315 on the side facing the main beam 10, so that when the water tank frame 30 is installed on the main beam 10, the guide edge 315 can be set in the flow confluence cavity 11 through the confluence hole 13, and then When the water in the first water collecting trough 311 flows through the flow hole 313, it can flow more smoothly into the confluence cavity 11 under the diversion effect of the diversion edge 315. At the same time, the diversion edge 315 can block the gap between the water trough frame 30 and the main beam 10, effectively preventing the water from flowing into the gap between the water trough frame 30 and the main beam 10 during the process of entering the confluence cavity 11 through the flow hole 313 and overflowing to the bottom of the photovoltaic support 1000 with a certain probability, further improving the drainage stability and reliability of the photovoltaic support 1000. Among them, the diversion edge 315 and the bottom wall of the first water collecting trough 311 can be set in an arc bend, so that the diversion edge 315 can form a diversion surface with a certain curvature to achieve a better diversion effect.
[0045] Reference Figures 3 to 5 In one embodiment of the utility model, the water tank frame 30 includes at least two first trough body beams 31 and a second trough body beam 33. At least two first trough body beams 31 are arranged at intervals along the extension direction of the main beam 10 and are connected to the main beam 10. A first water collecting trough 311 is formed on the surface of the first trough body beam 31 facing away from the main beam 10; the second trough body beam 33 is arranged between two adjacent first trough body beams 31, and a second water collecting trough 331 is formed on the surface of the second trough body beam 33. The two ends of the second trough body beam 33 are respectively overlapped on the notch edges of the two first water collecting troughs 311.
[0046] In this embodiment, the water tank frame 30 can be formed by combining and splicing at least two first tank beams 31 and second tank beams 33. The first tank beam 31 and second tank beam 33 can be formed by processing and producing the structure of channel steel, so that the surface of the first tank beam 31 can be recessed to form the first water collecting tank 311, and the surface of the second tank beam 33 can be recessed to form the second water collecting tank 331. The first tank beam 31 and second tank beam 33 made of channel steel can better simplify the overall structure of the water tank frame 30, and further improve the assembly convenience and practicality of the bearing structure 100. Among them, the water tank structure can use at least two first tank beams 31 to be arranged in sequence along the extension direction of the main beam 10. The bearing structure 100 can use multiple first tank beams 31 to more quickly collect water flow to the confluence cavity 11 of the main beam 10 for discharge. At the same time, the bearing structure 100 can form multiple arranged first water collecting tanks 311 corresponding to multiple rows of photovoltaic modules 2000, ensuring the overall drainage stability and reliability of the photovoltaic support 1000. The second trough beam 33 can be arranged between two adjacent first trough beams 31, wherein the number of second trough beams 33 can be set correspondingly according to the number of photovoltaic modules 2000 arranged along the extension direction of the first trough beams 31, by making the two ends of the second trough beam 33 located at the notch of the first water collecting trough 311 of the two adjacent first trough beams 31, and making the end of the second trough beam 33 overlap the notch edge of the first water collecting trough 311, and by providing a water outlet connected to the second water collecting trough 331 on the end face of the second trough beam 33, the water flow in the second water collecting trough 331 can flow from the end of the second trough beam 33 into the first water collecting trough 311, which is conducive to better realizing the drainage distribution on the bearing structure 100, and further improving the stability and reliability of the bearing structure 100.
[0047] Reference Figure 4 and Figure 5 In one embodiment of the present invention, two ends of the second trough beam 33 are respectively provided with guide inclined plates 333 , the guide inclined plates 333 are arranged in the first water collecting trough 311 , and are bent toward the bottom wall of the first water collecting trough 311 .
[0048] In this embodiment, the second trough beam 33 can be bent at the bottom edge of the end to form a guide inclined plate 333, and the guide inclined plate 333 is inclined toward the slot of the first water collecting trough 311. Therefore, under the guiding effect of the guide inclined plate 333, the water flow in the second water collecting trough 331 can be smoothly and obliquely flowed into the first water collecting trough 311, reducing the splashing of water when it flows from the second water collecting trough 331 into the first water collecting trough 311, better reducing the overflow of water in the bearing structure 100, and further improving the drainage stability and reliability of the bearing structure 100.
[0049] Reference Figure 4 , Figure 6 and Figure 7 In one embodiment of the utility model, the main beam 10 is provided with a fixing clamp 15 , which is connected to the surface of the main beam 10 and clamps and fixes the first trough beam 31 .
[0050] In this embodiment, the bearing structure 100 can be provided with a fixing clamp 15 installed on the main beam 10. The fixing clamp 15 can be provided in a U shape, so that the fixing clamp 15 can be buckled and installed on the main beam 10, and enclosed with the surface of the main beam 10 to form a clamping space. At this time, by setting the size of the fixing clamp 15 to correspond to the outer diameter size of the first trough beam 31, the fixing clamp 15 can clamp the first trough beam 31 and connect and fix it on the surface of the main beam 10, so that the first trough beam 31 can be firmly clamped in the clamping space, and the installation and fixation between the main beam 10 and the first trough beam 31 can be achieved. By clamping and fixing the first trough beam 31 with the fixing clamp 15, the shaking of the first trough beam 31 on the main beam 10 can be better limited, which is conducive to better preventing the water in the first water collecting tank 311 from being shaken and overflowing with a certain probability, and further improving the structural stability and reliability of the bearing structure 100. Among them, the fixing clamp 15 can be provided with a protruding structure at a position facing the first water collecting trough 311, so that the fixing clamp 15 can use the protruding structure to pass through the slot of the first water collecting trough 311 and be set in the first water collecting trough 311, and abut against the inner wall of the first water collecting trough 311, so that the fixing clamp 15 can abut against the inner wall and outer wall of the first trough body beam 31, so that the fixing clamp 15 can better clamp and fix the first trough body beam 31, and further improve the connection stability and reliability between the main beam 10 and the first trough body beam 31.
[0051] Reference Figure 3 and Figure 4 In one embodiment of the utility model, the bearing structure 100 also includes a secondary beam 50, which is connected to the main beam 10 and is arranged between two adjacent first trough beams 31. The extension direction of the secondary beam 50 is set at an angle to the extension direction of the main beam 10, and the second trough beam 33 is connected to the secondary beam 50.
[0052] In this embodiment, the bearing structure 100 can be provided with a secondary beam 50 between any two adjacent first trough beams 31, and the extension direction of the secondary beam 50 can be consistent with the extension direction of the first trough beam 31, and the surface of the secondary beam 50 facing away from the main beam 10 is located in the same plane as the surface where the notch of the first trough beam 31 is located, so that the secondary beam 50 can connect and support the second trough beam 33 overlapped between the two adjacent first trough beams 31, so that the second trough beam 33 can better carry a larger amount of water. In addition, when the bearing structure 100 is provided with multiple main beams 10 to support and fix the water tank frame 30, the secondary beam 50 can be used to connect the multiple main beams 10, and the secondary beam 50 and the main beam 10 can be combined to form a frame structure with a certain structural strength, so that the bearing structure 100 can more stably and reliably support and fix the photovoltaic module 2000, further improving the overall structural stability and reliability of the bearing structure 100.
[0053] Reference Figures 1 to 4 In one embodiment of the present invention, the bearing structure 100 further includes a mounting member 70 , which is connected to the first trough beam 31 and the secondary beam 50 and is used to mount and fix the photovoltaic assembly 2000 .
[0054] In this embodiment, the bearing structure 100 can be connected to the mounting member 70 on the side of the first tank beam 31 facing away from the main beam 10 and the side of the secondary beam 50 facing away from the main beam 10. The mounting member 70 can be used to connect and fix the photovoltaic assembly 2000 placed on the tank frame 30. The mounting member 70 can be fastened to the bottom edge of the frame of the photovoltaic assembly 2000 by bolts, so that the photovoltaic assembly 2000 is installed and fixed on the bearing structure 100. In addition, the mounting member 70 can also use a pressing block to press the surface of the frame of the photovoltaic assembly 2000 facing away from the bearing structure 100, so that the mounting member 70 can more firmly connect the photovoltaic assembly 2000 and the bearing structure 100, further improving the load of the photovoltaic assembly 2000. Among them, when the mounting member 70 is assembled on the first tank beam 31, it can be erected at the notch of the first water collecting tank 311, and the mounting member 70 clamps and fixes the outer wall and inner wall of the first tank beam 31 to achieve a stable connection and assembly of the mounting member 70 on the first tank beam 31. When the mounting member 70 is connected to the secondary beam 50, the second trough beam 33 can also be clamped and fixed, so that the mounting member 70 can not only fasten the photovoltaic module 2000, but also connect and fix the second trough beam 33 and the secondary beam 50, which is conducive to better simplifying the component arrangement of the bearing structure 100 and further improving the assembly convenience of the bearing structure 100. At this time, the mounting member 70 connected to the first trough beam 31 and the mounting member 70 connected to the secondary beam 50 can be connected and fixed to the adjacent two sides of the photovoltaic module 2000 respectively, so that the photovoltaic support 1000 can be connected and fixed around the photovoltaic module 2000 on the bearing structure 100 by using the mounting member 70, so as to realize the stable assembly of the photovoltaic module 2000 on the photovoltaic support 1000, and further improve the connection stability and reliability between the bearing structure 100 and the photovoltaic module 2000.
[0055] Reference Figure 2 , Figure 3 , Figure 6 and Figure 8 In one embodiment of the utility model, the bearing structure 100 further includes a drainage beam 90, which is connected to the main beam 10 and is disposed near one end of the main beam 10. A drainage groove 91 is disposed on the surface of the drainage beam 90, and a drainage hole 17 connected to the confluence cavity 11 is disposed on the end surface of the main beam 10, and the drainage hole 17 is disposed above the notch of the drainage groove 91.
[0056] In this embodiment, when the bearing structure 100 is provided with multiple main beams 10 to bear and support the water tank frame 30, each main beam 10 can form a confluence cavity 11 to converge and discharge the water of the water tank frame 30. At this time, a drainage beam 90 can be set at one end of the multiple main beams 10, so that the extension direction of the drainage beam 90 is set at an angle to the extension direction of the main beam 10, and then by setting a drainage hole 17 connected to the confluence cavity 11 on the end face of the main beam 10 facing the drainage beam 90, and forming a drainage groove 91 on the surface of the drainage beam 90, the water gathered in the confluence cavity 11 of the main beam 10 can be discharged into the drainage groove 91 through the drainage hole 17, so that the bearing structure 100 can use the drainage groove 91 located on the peripheral side to further gather the water in each main beam 10, so as to better realize the integrated discharge of water from the bearing structure 100, and further improve the drainage stability and reliability of the photovoltaic bracket 1000. Among them, the drainage beam 90 can be connected and fixed to the end of the main beam 10 through a bracket, and the notch of the drainage groove 91 is set close to the drainage hole 17 of the main beam 10, reducing the distance between the drainage beam 90 and the main beam 10, so that the water flow can be more stably concentrated and converged into the drainage groove 91, which is conducive to better avoiding water overflow. When the bearing structure 100 is tilted according to the installation angle of the photovoltaic module 2000, the drainage beam 90 can be set on the side of the bearing structure 100 facing the installation plane of the photovoltaic bracket 1000, so that the water in the confluence cavity 11 of the main beam 10 can flow to the drainage groove 91 more stably under the action of gravity, further improving the drainage stability and reliability of the bearing structure 100.
[0057] Reference Figure 8 In one embodiment of the present invention, the drainage trough 91 has a first inner wall 911 and a second inner wall 913 opposite to each other, the drainage hole 17 is located between the first inner wall 911 and the second inner wall 913, and the second inner wall 913 is arranged close to the surface of the main beam 10 facing away from the water tank frame 30. The drainage beam 90 is defined to have a height direction, and the width of the first inner wall 911 along the height direction is greater than the width of the second inner wall 913 along the height direction.
[0058] In this embodiment, the drainage groove 91 can utilize the first inner wall 911 with a larger width to be set toward the drainage hole 17 of the main beam 10, and the second inner wall 913 with a smaller width can be set below the bottom surface of the main beam 10 facing away from the water groove frame 30, so that the drainage hole 17 of the main beam 10 is located between the first inner wall 911 and the second inner wall 913. At this time, when the water flow in the main beam 10 flows toward the drainage groove 91 through the drainage hole 17, it can flow stably into the drainage groove 91 under the blocking effect of the first inner wall 911, effectively avoiding a certain probability of overflowing the drainage groove 91 when the water flow rate is too fast, preventing water accumulation at the bottom of the photovoltaic bracket 1000, and further improving the drainage stability and reliability of the bearing structure 100.
[0059] The utility model also proposes a photovoltaic bracket, which includes a supporting frame and a bearing structure. The specific structure of the bearing structure refers to the above-mentioned embodiment. Since the photovoltaic bracket adopts all the technical solutions of all the above-mentioned embodiments, it has at least all the beneficial effects brought by the technical solutions of the above-mentioned embodiments, which will not be described one by one here.
[0060] The utility model also proposes a photovoltaic power station, which includes photovoltaic components and photovoltaic brackets. The specific structure of the photovoltaic bracket refers to the above-mentioned embodiment. Since the photovoltaic power station adopts all the technical solutions of all the above-mentioned embodiments, it has at least all the beneficial effects brought by the technical solutions of the above-mentioned embodiments, which will not be described one by one here.
[0061] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. A bearing structure, characterized in that: include: A main beam, the main beam is used to connect the support frame, a confluence cavity is formed in the main beam, and a confluence hole connected to the confluence cavity is provided on the surface of the main beam; A water tank frame, the water tank frame is connected to the main beam, and the surface of the water tank frame facing away from the main beam forms a first water collecting tank and a second water collecting tank, the extension direction of the first water collecting tank and the extension direction of the second water collecting tank are set at an angle, the first water collecting tank is connected with the second water collecting tank, and the bottom wall of the first water collecting tank is provided with a flow hole, and the flow hole is connected with the confluence hole correspondingly.
2. The bearing structure according to claim 1, characterized in that: The bottom wall of the first water collecting trough is provided with a flow guiding edge around the flow hole, and the flow guiding edge is bent toward the main beam and inserted into the flow confluence hole.
3. The bearing structure according to claim 1, characterized in that: The water tank frame comprises: At least two first trough beams, at least two of which are arranged in an interval along the extension direction of the main beam and connected to the main beam, and the first water collecting trough is formed on the surface of the first trough beam facing away from the main beam; The second trough body beam is arranged between two adjacent first trough body beams, the second water collecting trough is formed on the surface of the second trough body beam, and the two ends of the second trough body beam are respectively overlapped on the notch edges of the two first water collecting troughs.
4. The bearing structure according to claim 3, characterized in that: Both ends of the second trough body beam are respectively provided with guide inclined plates, and the guide inclined plates are arranged in the first water collecting trough and bent toward the bottom wall of the first water collecting trough.
5. The bearing structure according to claim 3, characterized in that: The main beam is provided with a fixing clamp, which is connected to the surface of the main beam and clamps and fixes the first trough beam.
6. The bearing structure according to claim 3, characterized in that: The bearing structure also includes a secondary beam, which is connected to the main beam and arranged between two adjacent first trough beams. The extension direction of the secondary beam is arranged at an angle with the extension direction of the main beam, and the second trough beam is connected to the secondary beam.
7. The bearing structure according to claim 6, characterized in that: The bearing structure also includes a mounting component, which is connected to the first trough beam and the secondary beam and is used to install and fix the photovoltaic component.
8. The load-bearing structure according to any one of claims 1 to 7, characterized in that: The bearing structure further comprises a drainage beam, which is connected to the main beam and is arranged close to one end of the main beam; A drainage groove is provided on the surface of the drainage beam, and a drainage hole connected to the confluence cavity is provided on the end surface of the main beam. The drainage hole is arranged above the notch of the drainage groove.
9. The bearing structure according to claim 8, characterized in that: The drainage trough has a first inner side wall and a second inner side wall opposite to each other, the drainage hole is located between the first inner side wall and the second inner side wall, and the second inner side wall is arranged close to the surface of the main beam facing away from the water trough frame; It is defined that the drainage beam has a height direction, and the width of the first inner side wall along the height direction is greater than the width of the second inner side wall along the height direction.
10. A photovoltaic support, characterized in that: The photovoltaic bracket includes a supporting frame and a bearing structure, the bearing structure is the bearing structure described in any one of claims 1 to 9, the supporting frame is connected to and fixed to the bearing structure, and the bearing structure is used to bear and fix photovoltaic components.
11. A photovoltaic power station, characterized in that: The photovoltaic power station comprises a photovoltaic module and a photovoltaic bracket, the photovoltaic bracket is the photovoltaic bracket according to claim 10, and the photovoltaic module is installed on the photovoltaic bracket.